Determination 409308

Claim for concrete pumping boom collapse damage partly declined under mechanical breakdown and wear and tear exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2015-12-11
ProductGeneral Insurance · Other general
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's boom collapsed and the FSP denied the claim under the mechanical breakdown exclusion. AFCA found the FSP must pay repair costs for consequential damage from the rod eye fracture and interest, but not for damage from wear and tear.

The policy excludes mechanical breakdown but covers damage occurring as a consequence of it, and damage from ordinary wear and tear is excluded.

Issues

Subjects and remedies

pay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 409308 Determination Page 1 of 7 Case number: 409308 24 November 2015 1 Overview 1.1 Dispute The Applicant lodged a claim under its plant and machinery policy with the Financial Services Provider (FSP) for damage to the concrete pumping boom on the insured truck which failed while being operated in September 2014. The FSP denied the claim on the basis that the damage was caused by mechanical breakdown which was excluded from cover under the policy (given the Applicant had not taken out the optional cover available). 1.2 Issues and key findings Is the FSP liable for the damage to the concrete pumping boom? The FSP is not liable for the damage to the rod eye of the hydraulic ram for the third stage of the pumping boom, which ca used the boom to collapse. The fracture of the rod eye was caused by mechanical breakdown, which is excluded from cover under the policy. However, the policy provides cover for any damage which occurs as a consequence of mechanical breakdown. Accordingly, the FSP is liable for the additional damage to the third stage boom section (and related components) resulting from the fracture of the rod eye. However, the FSP is not liable for the remaining damage to other sections of the boom. This damage occurred over an extended period of time due to ordinary wear and tear (possibly exacerbated by welding defects). 1.3 Determination This Determination is partly in favour of the Applicant. The FSP is to reimburse the Applicant for the cost of the repairs to the third stage boom section, the third cylinder and the second and third connection linkages, less any amount specifically referrable to the repair of the fractured rod eye. The FSP should obtain an itemised invoice from the repairer (CS) to determine this amount. The FSP is required to pay interest on the settlement amount at the rate determined in accordance with section 57 of the Insurance Contracts Act 1984 (Cth) from the date on which the Applicant paid the relevant repair costs, until the date of payment of the settlement amount. Case No: 409308 Determination Page 2 of 7 Case No: 409308 Determination Page 3 of 7 2 Reasons for Determination 2.1 Is the FSP liable for the damage to the concrete pumping boom? Policy provides cover for accidental damage subject to exclusions The Applicant is required to establish that, on the balance of probabilities, it has suffered loss or damage which falls within the scope of cover under the policy. This is known as a prima facie claim. If the Applicant is able to establish a prima facie claim, the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the claim. The Applicant’s policy provides cover for “Insured Damage” to the truck and concrete pumping boom which occurs during the period of insurance. For the purposes of the policy, “Insured Damage” is defined to mean “accidental sudden and unforeseen physical loss of or damage”. The Applicant says the rod eye of the hydraulic ram for the third stage of the boom fractured and detached from the retention pin, causing the boom to collapse. The FSP’s loss adjuster (PC) confirmed that the damage to the boom was consistent with the Applicant’s description of how the loss occurred. On this basis, the Panel is satisfied the Applicant has established a prima facie claim for insured damage under the policy. Accordingly, the FSP bears the onus of establishing that, on the balance of probabilities, it is entitled to rely on a policy exclusion to deny the Applicant’s claim. The FSP says it is entitled to deny the claim because the claimed damage was caused by “mechanical breakdown”, being the sudden and unforeseen physical damage caused by the actual breaking, seizing or burning out of any part of an insured item. The policy contains an exclusion for the cost of repairing damage caused by mechanical breakdown. While it is possible to take out optional cover for mechanical breakdown (which effectively removes this exclusion), the Applicant had not done so. Damage to rod eye is excluded from cover There is conflicting information about the cause of the fracture to the rod eye which caused the boom to collapse. The FSP obtained a report from a forensic metallurgist (F) who concluded that the fracture had resulted from the inability of the component part to withstand the stresses imposed while the pumping boom was in operation. F considered the inability of the part to withstand stress may have been caused by either the inadequate design of the part itself or by the Applicant using the boom inappropriately. Case No: 409308 Determination Page 4 of 7 However, the FSP’s loss adjuster (P) considered it was highly unlikely the Applicant had used the boom inappropriately, as it would have been difficult to induce overloading stress while performing concrete pumping works. Further, the boom had specific design features intended to prevent damage in the event excessive forces were applied. Both the Applicant and the FSP’s consultants have referred to the fact that other operators had experienced similar problems with the same make and model of concrete pumping boom. There is also information which suggests that the manufacturer had produced a strengthened replacement part. However, it appears the manufacturer had commissioned its own report which indicated the fracture of the relevant part was not due to any defect in design or construction. In the Panel’s view, there is insufficient information to determine with any certainty the underlying cause of the fracture of the rod eye. Nevertheless, the Panel accepts that the fracture of the rod eye is properly described as “mechanical breakdown” for the purposes of the policy (that is, the “actual breaking” of a component part of the insured concrete pumping boom ). Accordingly, the FSP is entitled to rely on the policy exclusion for mechanical breakdown to deny liability for this aspect of the claimed damage. FSP is liable for additional damage resulting from mechanical breakdown As outlined above, the policy excludes liability for the cost of repairing damage to the pumping boom caused by the mechanical breakdown of a component part. However, the exclusion clearly states that damage which occurs as a consequence of mechanical breakdown will be covered. Accordingly, while the FSP is not liable for cost of repairing the rod eye, it is liable for the cost of repairing any other damage to the pumping boom which occurred as a result. There is conflicting information about the extent of the damage to the boom which was caused by the fracture of the rod eye, as compared to other factors. The FSP obtained a quotation from a specialist repairer (CS) for the repairs to the pumping boom following its collapse. The quotation provided by CS states that, after dismantling and inspecting the boom and consulting with the manufacturer, it was agreed that the third cylinder, the third stage boom section and the second and third connection linkages (which had all been subject to impact) needed to be replaced. The quotation also refers to the need for replacement of the second stage cylinder, a full grit blast repair of all deformations and cracks and the installation of compensation plates in accordance with the manufacturer’s requirements. The FSP disputes that any of the cracking damage to the concrete pumping boom was caused by the collapse in September 2014. The FSP says that pumping booms Case No: 409308 Determination Page 5 of 7 are known to suffer fatigue cracking over a period of time, as reflected by the requirement that they undergo a full recertification process (including the repair of fatigue cracks and deflections) every six years. The FSP relies on a second report prepared by the forensic metallurgist (F) after carrying out a detailed examination and testing of the damaged boom. In his report, F confirmed that the third stage of the boom had twisted as a result of the collapse and had been scrapped. He noted there was no evidence of any cracking to this stage which pre-existed the collapse. However, F stated that three of the four remaining stages of the boom displayed circumferential cracking at the welded reinforcement of various pivot points. F considered that the brittle nature of the cracks and their trajectory around the reinforcement point showed that the cracks were due to fatigue caused by normal wear and tear. F’s report also identified undercut and end of run cracking to each of the four remaining sections of the boom caused by welding defects. F reported that the quality of the welding was generally poor and did not comply with applicable Australian Standards. The Panel considers the available information does not supports the FSP’s position that it is not liable for any of the damage to the concrete boom. The Applicant has confirmed that two loud cracking sounds were heard just prior to the collapse which suggests that at least some of the cracking damage occurred suddenly and as a result of the fracture of the rod eye. The repairer (CS) has confirmed there was impact damage to various component parts of the boom. Given the sudden collapse of the boom and the nature of the damage to the third stage boom section (as confirmed by F), the Panel considers that, on the balance of probabilities, this damage was caused by the fracture of the rod eye. Accordingly, this damage constitutes “sudden and unforeseen” damage resulting from mechanical breakdown and therefore is subject to cover under the policy. The repairer (CS) confirmed that certain component parts connected to the third stage boom section (namely, the third cylinder and the second and third connection linkages) were also damaged during the collapse. This is consistent with the nature of the collapse and the extent of the damage to the third stage boom section. Accordingly, this additional damage is also covered under the policy as it occurred as a consequence of mechanical breakdown. FSP is not liable for remaining damage The repair quote provided by CS includes the replacement of the second stage cylinder and a full grit blast repair of all deformations and cracks in all remaining sections of the boom (together with the installation of compensation plates in accordance with the manufacturer’s requirements ). Case No: 409308 Determination Page 6 of 7 As outlined above, the FSP’s forensic metallurgist (F) concluded that the cracking to the remaining sections of the boom had been caused by ordinary wear and tear, possibly exacerbated by welding defects. It appears that such damage typically occurs in the ordinary course of use, as reflected by the fact that concrete pumping booms are required to undergo a regular re-certification process every six years. The available information suggests the Applicant’s boom was approaching its next re -certification date when the collapse occurred. On this basis, the Panel is satisfied that this damage was not caused by the sudden collapse of the boom in September 2014 but occurred over an extended period of time due to ordinary wear and tear, possibly exacerbated by welding defects . Accordingly, the FSP is not liable for this part of the damage. Case No: 409308 Determination Page 7 of 7 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, the Panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. 3.2 Terms of policy S ubject Terms Cover for Insured Damage We will cover you for Insured Damage occurring during the Policy Period anywhere within the Territorial L imit ... Insured Damage means accidental sudden and unforeseen physical loss of or damage to an Insured Item which occurs during the Policy Period . Exclusions Section One of this policy does not cover:  Insured Damage caused by or due to wear and tear ….  the cost of repairs or replacement due to: (a) Electrical, electronic or mec hanical Breakdow n , failure, break age or malfunction … If as a consequence of any of a) to d) above, Insured Damage occurs, such Insured Damage will be covered. Breakdown means sudden and unforeseen physical damage caused by the actual br e aking, seizing or burning out of any part of an Insured I tem necessitating repair or replacement before normal working can resume.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.