Text of the determination
Determination
Case No: 409244 Determination Page 1 of 11
Case number: 409244 1 April 2016
1 Overview
1.1 Dispute
The applicants lodged a claim under their landlord insurance policy with the financial
service provider (FSP) after their investment property was damaged by squatters in
July 2015. The property was vacant at the time the damage occurred.
The FSP accepted the claim and made arrangements to assess the damage.
However, during the claim process, the squatters returned and caused further
damage, including by lighting a fire in the kitchen. Accordingly, the applicants lodged
a second claim for the additional damage.
The FSP assessed the damage to the property under both claims and offered to cash
settle the applicants for a total amount of $78,074, based on a scope of works and
quotation prepared by the FSP‟s contractors.
However, the applicants say the cash settlement offered is insufficient to allow them
to restore the property to its previous condition. Among other things, they say the
FSP has failed to indemnify them for additional damage to the property which
occurred due to burst pipes in September 2015.
The applicants also seek compensation for various losses suffered due to the
manner in which the FSP has handled their claim.
1.2 Issues and key findings
Is the FSP required to increase the cash settlement amount?
The cash settlement amount should be increased to reflect:
the reasonable costs of repairing the damage to the stump at the rear corner of
the property caused by the detached downpipe; and
50% of the costs of replacing the copper pipes at the front of the property.
Are the applicants entitled to compensation?
The applicants are not entitled to any additional amounts, whether under the terms of
their policy or by way of compensation or reimbursement. The FSP managed the
claim reasonably overall and is not primarily responsible for the additional damage to
the property caused by the squatters in August 2015 .
Case No: 409244 Determination Page 2 of 11
1.3 Determination
This Determination is partly in favour of the applicants.
The FSP is to increase the cash settlement amount of $78,074.10 offered by an
additional amount of $14,730, and pay this amount to the applicants in full and final
settlement of their claims.
The FSP is to pay interest on the additional amount of $6,240 (only), in accordance
with section 2.1 below. Interest is not payable on the remainder of the settlement
amount.
Case No: 409244 Determination Page 3 of 11
2 Reasons for determination
2.1 Is the FSP required to increase the cash settlement amount?
Determination is limited to current claims
The events which gave rise to the current dispute occurred from July 2015 onwards.
The applicants had previously lodged two separate claims under the policy for
damage to the property which occurred in November 2014 (the Nov 14 claims). The
applicants‟ tenant vacated the property around this time.
The Nov 14 claims were the subject of a separate FOS dispute, which was resolved
by negotiation between the parties in early 2015. The FSP cash settled the claims by
paying the applicants $3,200 (in April 2015) and $20,680 (in June 2015), based on
quotations provided by their builders.
The applicants‟ property remained vacant and repairs had not yet been completed
when squatters caused further damage to the property in July and August 2015.
During the course of this dispute, the applicants have raised concerns about various
actions taken by the FSP in the course of managing the Nov 14 claims. However, as
the Nov 14 claims were the subject of a prior negotiated settlement facilitated by
FOS, they are outside the scope of the current Determination.
FSP elected to cash settle claims
Under the terms of the policy, the FSP may settle a claim for damage to the
applicants‟ property by rep airing the damage to the property or paying the applicants
the cost (to the FSP) of doing so.
The FSP may elect to repair the property on a „new for old‟ basis or to a c ondition
similar to that which the property was in before the damage occurred.
In the present case, the FSP decided to cash settle the applicants for the additional
damage to the property caused by the squatters in July and August 2015. The FSP‟s
decision to cash settle was based partly on the fact that the repairs required as a
result of the Nov 14 claims had not yet been carried out by the applicants.
The cash settlement amount of $78,074.10 offered by the FSP was based on a
quotation prepared by the FSP‟s builder (A) in accordance with two scopes of work
prepared by the FSP‟s assessor (SO).
The assessor (SO) prepared separate scopes of works for the damage caused by
the squatters in July and August 2015 respectively, following his thorough inspection
of the property in September 2015.
At this time, SO also identified repairs which had been settled under the Nov 14
claims (but had not yet been carried out), as well as items considered to be routine
maintenance repairs.
Case No: 409244 Determination Page 4 of 11
FSP’s scope of works is generally appropriate
Having carefully reviewed the scopes of work prepared by SO, the Panel is satisfied
that these documents generally provide an accurate assessment of the claim-related
damage and a detailed breakdown of the works required to restore the property to its
pre-existing condition.
The repairs included in SO‟s scopes of work are generally consistent with the claim -
related damage to the property as identified in the reports prepared and the
photographs taken by the various contractors who inspected the property. In
particular, the Panel has been assisted by the numerous detailed photographs taken
by SO during his inspections of the property.
The applicants say the cash settlement paid by the FSP is insufficient to allow them
to restore the property to its previous condition. They have provided several
quotations totalling over $110,000 from their builder (SS) for the necessary repairs,
based on a building report prepared by their building consultant (BW).
Some of the items included in the quotations provided by SS are not subject to cover
under the policy. Such items include the replacement of plants and garden beds
(which are specifically excluded from cover under the policy) and damage to carpets
(which are not covered as the applicants did not have contents insurance).
Some of the other items included in SS‟s quotations concerned damage which had
already been cash settled as part of the Nov 14 claims (for example, some of the
damage to the garage and back door area). It is possible these items were
inadvertently included because the applicants‟ building consultant was not familiar
with the extent of the damage cash settled under the Nov 14 claims.
In the course of his assessment, the FSP‟s assessor (SO) compared his photographs
from September 2015 with images taken by the assessor who handled the Nov 14
claims, in order to ensure there was no double counting. SO worked through the list
of items prepared by BW and explained in each case why he considered particular
items should not be accepted under the current claims.
The quotations prepared by SS also included an amount for undertaking works to
secure the property to prevent further access by squatters. However, it appears that,
to the extent these works were undertaken, they were carried out by the FSP‟s
contractors at no cost to the applicants.
For the reasons outlined above, the Panel is satisfied that the scopes of work
prepared by SO for the repair of the claim-related damage are generally appropriate.
However, the Panel will now consider in more detail the following three specific areas
in which the applicants say the FSP‟s scopes of work are deficient:
the removal of asbestos from the property;
the repair of the damage caused by the disconnected downpipe at the rear of
the property; and
the repair of damage caused by the escape of water in September 2015.
Case No: 409244 Determination Page 5 of 11
Applicants have not established additional asbestos removal is required
During their assessments of the property, both the applicants‟ builder (BW) and the
FSP‟s cleaning contractor (AM) identified that some of the damaged walls at the
property contained asbestos.
Accordingly, the FSP engaged an asbestos specialist (PR) to assess the risks posed
by asbestos building materials at the property and undertake any necessary
remediation works required in order to allow the claim-related repairs to commence.
The assessment report and clearance certificate provided by PR confirms that he
identified and removed asbestos from the walls and floors in the front entrance, the
corridor, the rear entrance and the toilet. The “before and after” photographs included
with the clearance certificate evidence the works undertaken.
The applicants say that PR failed to remove asbestos from the eaves at the property,
which were damaged by the fire. They also say that PR‟s asbestos remediation
works were carried out as a temporary make safe measure only, and the FSP should
be required to arrange for the removal of any remaining asbestos at the property.
The scope of works prepared by the FSP‟s assessor (SO) following his detailed
inspection describes the eaves as being constructed out of timber. Accordingly, the
FSP says no further works are required to this area.
The quotation provided by the applicants ‟ builder (SS) for asbestos removal includes
the removal of the eaves linings at the property.
However, it is does not appear that SS carried out any testing of the eaves linings
and therefore it is unclear on what basis he concluded that the eaves contained
asbestos. The photographs of the damaged eaves provided (while not determinative)
do not indicate that the eaves contained asbestos-type materials.
The Panel notes that the scope of the asbestos assessment undertaken by PR
included the whole of the accessible interior and exterior areas of the property. PR
conducted a visual inspection of the property and tested any materials which were
suspected of containing asbestos. Based on the results of his testing, PR identified
the areas where remediation works were required (as described above).
Based on the available information, the Panel is satisfied that the asbestos removal
works carried out by PR are sufficient to satisfy the FSP‟s obligations to the
applicants under the policy.
The clearance certificate, air monitoring test results and photographs provided by PR
confirm that the relevant building materials were stripped out in each area of the
property where asbestos had been identified. In the absence of any co ntrary
information evidencing the ongoing presence of asbestos in these areas, the Panel
accepts that the asbestos remediation works were properly conducted.
The Panel notes that the FSP‟s obligations under the policy do not extend to
removing any and all asbestos-containing materials at the property. The FSP is only
obliged to attend to asbestos removal where the need for such measures has arisen
as a result of an insured event under the policy.
Accordingly, the FSP is not liable for any additional asbestos removal works.
Case No: 409244 Determination Page 6 of 11
Settlement amount should be increased to allow for stump repair
The scope of works prepared by the FSP‟s assessor (SO) in September 2015
provides for the replacement of a downpipe at the rear corner of the property, which
had become detached from the stormwater drain.
During the course of this dispute, the FSP acknowledged that the scope of works did
not allow for the repair of a timber stump at the rear of the property which had been
damaged due to water discharging from the downpipe directly onto the soil in this
area.
The damage to the stump is evident in photographs taken by the applicants‟ builder
(BW) in August 2015. The photographs confirm that the stormwater run-off
discharging from the downpipe had washed away the soils around the stump. BW
advised that the stump would need to be replaced and the subsidence issues
addressed.
In its email of 5 November 2015, the FSP offered to arrange fo r a scope of works and
quotation for the repair of this aspect of the damage. However, the FSP also
indicated it was willing to consider a quote from the applicants‟ builder (SS).
The applicants have provided a quotation from SS for $9,240 (including GST) for the
rectification of the downpipe and the remediation of the foundations at the rear corner
of the property.
In the circumstances, the Panel considers it is fair and reasonable that the settlement
amount should be increased to allow for the remediation of the foundations, based on
the quote provided by the applicants‟ builder (given the FSP accepted liability for this
damage and invited the applicants to provide a quote).
However, SS‟s quotation should be adjusted to remove the costs associated with
rectifying the downpipe (as an allowance has already been made for this aspect of
the repairs, given it was included in SO‟s scope of works).
In the circumstances, the Panel considers the FSP should be required to increase
the settlement amount by $8,490.
In determining this amount, the Panel has taken into account the passage of time.
Accordingly, the FSP is not required to pay interest on this amount.
There is limited information about the damage to the pipes
The applicants seek cover for the replacement of damaged copper water pipes at the
front of the property which they say were damaged due to the installation of
temporary fencing by the FSP‟s contractors during the claim process.
The FSP‟s claim notes reflect that the applicants notified the FSP in mi d-September
2015 that there was water pooling in the front yard of the property.
The FSP‟s builder (A) attended the property on 21 September 2015 and turned off
the water. While the FSP‟s claim notes indicate A was supposed to determine the
cause of the damage, he noted only “fire damage to water mains”.
Case No: 409244 Determination Page 7 of 11
As the applicants have noted, it is unlikely the issues with the water pipes at the front
of the property were related to the fire, which affected the rear of the property onl y.
The applicants have provided an invoice from their plumber (WM) for $12,479
(including GST) for the replacement of damaged underground hot and cold water
pipes at the property. The applicants have also provided photographs showing the
works undertaken.
In January 2016, WM clarified that the damage to the pipes occurred when the heavy
concrete stands erected to support the temporary fencing were dragged onto the
front lawn, knocking over the water meter which then twisted and broke the pipes.
However, oth er than WM‟s brief statement, there is no independent information to
support this.
The FSP disputes WM‟s findings as to the extent and cause of the damage and
queries why all of the pipework needed to be replaced. However, the FSP has been
unable to investigate further due to the pipes having been replaced by WM on 15
October 2015.
Given the limited information available, it is difficult to determine with any certainty
the cause of the damage to the copper water pipes at the front of the property.
FSP should reimburse applicants for 50% of pipe replacement costs
It is perhaps surprising that the FSP did not more fully investigate the issue with the
pipes in September 2015, given its potential liability (whether for losses arising from
the actions of its contractors or under the separate insured event of escape of liquid).
However, the FSP‟s approach may have been influenced by the fact that the full
extent of the damage which the applicants were seeking to claim did not become
apparent until later.
The applicants say they repeatedly advised the FSP of ongoing issues with pipes in
the weeks following the initial escape of water. However, there is limited information
to support this.
It is also unclear why there would have been ongoing issues with the escape of water
from the applicants‟ property, given the water was turned off by the FSP‟s builder (A)
in September 2015.
As noted above, the FSP was unable to arrange a further inspection of the damage
once the applicants replaced the pipes. The applicants did not give the FSP prior
notice of their intention to do so before the works were carried out on 15 October
2015.
The Panel considers that the applicants could reasonably have been expected to
notify the FSP of their intention to proceed with the repairs, given the quoted cost of
the works and the fact that the parties were involved in ongoing discussions at the
relevant time. The applicants‟ actions in this regard have prejudiced th e FSP.
The available information (including the reports provided by both WM and A)
suggests that the cause of the damage was claim-related. However, the Panel is not
satisfied that the costs incurred by the applicants were reasonable.
Case No: 409244 Determination Page 8 of 11
In the circumstances, the Panel considers the FSP should be required to reimburse
the applicants for $6,240, being 50% of the cost of the works completed by WM.
The FSP is required to pay interest on this amount at the rate determined in
accordance with section 57 of the Insurance Contracts Act 1984 (Cth), for the period
from 15 October 2015 until the payment date.
2.2 Are the applicants entitled to compensation?
Applicants are dissatisfied with FSP’s claim handling
Under the Terms of Reference, FOS may award compensation (capped at $3,300)
for consequential financial loss suffered by an applicant in connection with their
claim.
In addition, FOS may award compensation (capped at $3,000) for non-financial loss
where an applicant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
However, FOS adopts a conservative approach to the award of compensation for
non-financial loss. FOS expects applicants to be moderately robust and bear the
usual stress and inconvenience associated with an insurance claim.
The applicants are dissatisfied with the manner in which the FSP has handled their
claim. In particular, they say that the FSP unreasonably delayed the resolution of the
claim and failed to properly secure the property.
The applicants are not entitled to loss of rent benefits under the policy as the property
was not tenanted at the time the loss occurred. However, they seek compensation for
loss of rent on the ba sis that the FSP‟s failure to properly manage their claim has left
them unable to repair and re-tenant the property.
FSP did not unreasonably delay the claim
Having carefully reviewed the claim history, the Panel is satisfied that the time taken
to settle the applicants‟ claim was not unreasonable in the circumstances.
The FSP arranged for an assessor (SO) to attend the property and inspect the
damage within days of the applicants lodging their claim.
However, SO was unable to proceed with his inspection of the property due to the
extremely poor condition in which the property had been left following its occupation
by the squatters.
In his report dated 16 July 2015, SO confirms that the property was littered with
rubbish including syringes, blood-stained tissues and human faeces.
The FSP appointed its cleaning contractor (AM) to carry out a thorough clean of the
property so that SO could complete his assessment. However, AM was forced to
delay the cleaning operations due to security concerns triggered by the ongoing
presence of squatters.
Case No: 409244 Determination Page 9 of 11
There was a further delay caused by the need to arrange for the assessment and
removal of asbestos from the property, after AM had completed the cleaning works.
The applicants note that their builder (BW) completed an assessment of the property
during July 2015. They consider the FSP should have proceeded with its own
assessment despite the condition of the property.
However, the Panel considers the FSP acted reasonably in delaying the assessment
until after the cleaning and asbestos removal process had been completed. The FSP
has legal obligations to its employees not to place their health and safety at risk.
The FSP acted promptly to assess its liability and provide the applicants with a cash
settlement offer, following SO‟s assessment of the property in September 2015.
FSP took reasonable steps to secure the property
The applicants say the FSP did not take adequate steps to secure their property after
they lodged their initial claim for malicious damage in July 2015. They consider the
FSP‟s failure to secure the property enabled the squatters to re -enter and cause
further damage.
The FSP was aware of the need to secure the property following SO‟s initial
inspection on 16 July 2015 and appointed its builder (A) to insta ll a temporary fence
at the front of the property.
The applicants contacted the FSP on 26 July 2015 to advise that the property had
not been secured and the squatters had returned and broken down the rear door.
The following day, A attended and erected a temporary fence.
The FSP‟s claim notes suggest that it continued to have concerns about the safety of
its contractors at the property, given the risk that the squatters may return. The
applicants also had concerns and asked the local police to keep an eye on the
property.
There were ongoing discussions between the FSP and the applicants about whose
responsibility it was to arrange for additional security at the property. The FSP
ultimately agreed to engage a security guard to accompany its cleaning contractor
(AM) to the property so the clean-up and make safe could proceed.
On two occasions in early August, the applicants advised the FSP that they (and/or
the local police) had attended the property and were satisfied that it was secure.
However, it appears the squatters managed to re-enter the property and cause
further damage, including by lighting a fire in the kitchen.
The FSP has accepted liability for the additional damage to the property caused by
the squatters in August 2015 and has included the repair of this damage in the scope
of works.
Given the circumstances of the claim, the Panel considers the FSP acted reasonably
to secure the property. It was impractical for the FSP to board up the property as part
of the initial make safe, as ongoing access was required in order to allow the
assessment process to be completed.
Case No: 409244 Determination Page 10 of 11
The Panel considers that the further damage to the property in August 2015 has
occurred primarily due to the continued persistence of the squatters, rather than a
failure on the part of the FSP or its contractors.
In circumstances where both the applicants and the police had confirmed they
considered the property to be secure, the Panel is satisfied that the measures taken
by the FSP were appropriate.
Applicants are not entitled to compensation
For the reasons outlined above, the Panel considers that an award of compensation
is not justified in the circumstances.
The applicants are not entitled to reimbursement of any expenses incurred by the
applicants in obtaining reports from their contractors, as the Panel has found these
reports of limited assistance in resolving the dispute.
Case No: 409244 Determination Page 11 of 11
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the nature
of the dispute, it has been referred directly to a Panel for Determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other.
The Panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this Determination, the Panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.