Storm damage roof repair scope disputed and alternative accommodation claimed
Summary
Applicants claimed storm damage to their holiday home roof, and the FSP limited repairs to a small area. AFCA found the whole roof was storm damaged and must be settled on JC's recommendations, with interest if cash settled, and refused alternative accommodation costs.
On the balance of probabilities the storm was the proximate cause of the whole roof damage, and the PDS excludes temporary accommodation for a holiday home.
Issues
- Claim denial primary · upheld
“On balance, on the evidence available, I accept that the whole of the roof and sarking requires replacement.”
- Delay secondary · not upheld
“Not satisfied that payment for alternative holiday accommodation is appropriate; the payment of interest is a sufficient remedy.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Determination
Case No: 409190 Determination Page 1 of 8
Case number: 409190 31 March 2016
1 Overview
1.1 Dispute
The Applicants lodged a claim with the Financial Services Provider (FSP) for storm
damage to their holiday home.
The FSP accepted the claim, but a dispute arose over the extent of works required to
repair damage to the roof.
1.2 Issues and key findings
What works are required to repair the roof?
The damage to the roof is such that the roof must be replaced consistently with the
report from the FSP’s roofer, JC.
Are the Applicants entitled to alternative accommodation costs?
The FSP is not required to pay for alternative holiday accommodation.
1.3 Determination
This Determination is in favour of the Applicants.
The FSP must settle the claim in respect of the roof based on JC’s recommendations
in accordance with the terms and conditions of the policy. In the event the FSP elects
to cash settle the claim, interest is payable in accordance with the Insurance
Contracts Act from 4 August 2015 until the date payment is made.
The FSP is not required to pay for any alternative holiday accommodation costs
incurred or to be incurred by the Applicants.
Case No: 409190 Determination Page 2 of 8
2 Reasons for determination
2.1 What works are required to repair the roof?
The parties disagree on the extent of the damage caused by the storm
The Applicants’ building and contents were damaged by a storm. The FSP has
accepted cover in respect of damage caused by the storm.
In respect of the roof, the FSP submits that only 8m 2 of tiles, 20m 2 of sarking and 10
lineal metres of ridge line bedding was damaged by the storm and requires replacing.
In support of this, the FSP relies on:
a statement of works (SOW) by RC stating this was all that was required to
repair the roof; and
statements from its assessor and RC that no further damage would have
occurred after the make safe was complete .
The Applicants submit the whole of the roof and sarking require replacement. In
support of this, the Applicants rely on:
A report from their roofer (MH) which referred to over 40 broken tiles, water
damage to the battens, sagging and torn sarking. The roofer recommended
reroofing with new materials.
The FSP’s roofer (JC) stated that approximately 100 tiles were cracked or
broken, ridge cappings were in poor condition and the gable cement worked
was dislodged, cracked and partially nonexistent. JC recommended roof
replacement.
On balance, on the evidence available, I accept that the whole of the roof and sarking
requires replacement. The latest report obtained by the FSP from JC confirms this.
The issue is whether the need to replace the entire roof was caused by the storm.
The storm and subsequent works caused the damage
The Applicants say their property, including the roof was in good condition prior to the
storm. In support of this, they refer to their recent replacement of the gutters and the
assessors’ report noting the property was in good condition.
Importantly, the Applicants say they have owned the property for approximately 30
years and have had no any leaking issues prior to the storm. There is no basis to
dispute this.
The Applicants further submit that the damage to the roof was caused not just b y the
storm, but by the workmen ’s temporary repairs and the removal of the antenna,
which was heavy and would have resulted in more broken tiles. According to the
Applicants, this is because the tiles become more brittle with age and therefore more
susceptible to cracking in the event they are walked on.
JC’s report states that the cause of the leak includes age and the roof tiles being in
poor condition (cracked). The Applicants say they spoke to the relevant person at JC
who confirmed his reference to the “age” of the roof as a cause was because the tiles
Case No: 409190 Determination Page 3 of 8
become more brittle with age and therefore more susceptible to cracking when they
are walked on. This would be consistent with the damage as described by the
Applicants following the storm and subsequent repairs. The roof itself was not that
old, with the assessor estimating it to be 20 to 30 y ears old. It is unclear from JC’s
report whether his reference to poor condition of the tiles is due to the storm,
subsequent repair attempts or as they would have been prior to the storm. I note
there is no reference in the report to the age of the cracking (be it recent or
otherwise).
JC does not refer to a storm as the cause of damage. There is no evidence that JC
was briefed by the FSP about the original storm. This may be because JC was
engaged to make safe the property after further leaking in January 2016, some nine
months after the storm.
In response to JC’s report, the FSP noted that the make safe repair was a temporary
measure and, as the Applicant disagreed with the scope of works, the FSP was
unable to undertake the permanent repair. While this may explain why the make safe
repairs did not hold, it is not evidence that the storm was not the dominant cause of
the damage to the roof.
On the information before me, I am satisfied the proximate cause of the damage to
the entire roof was the storm. This may have been exacerbated by the make safe
works, including removal of the antenna. I have reached this conclusion on the basis
that:
the roof was not leaking prior to the storm;
the storm (and most likely the subsequent works) damaged the roof;
the entire roof needs replacing;
the roof is not particularly old such that entire replacement would otherwise be
necessary; and
there is no other basis that has been demonstrated to have caused the
damage.
The FSP must settle the claim in respect of the roof ba sed on JC’s recommendations
in accordance with the terms and conditions of the policy. In the event the FSP elects
to cash settle the claim, interest is payable in accordance with the Insurance
Contracts Act from 4 August 2015 (the date of the FSP’s final decision letter) until the
date payment is made.
2.2 Are the Applicants entitled to alternative accommodation costs?
Alternative holiday accommodation costs need not be compensated
The Applicants submitted a quote for alternative holiday accommodation, as repairs
to the home had not been completed at the time they took their usual vacation. There
is no evidence that the Applicants paid for this or any alternative holiday
accommodation.
The Product Disclosure Statement (PDS) specifically excludes temporary
accommodation if the damaged home is not the primary place of residence at the
Case No: 409190 Determination Page 4 of 8
time of the loss. As the house is a holiday home the FSP is not required to pay
accommodation cost pursuant to the PDS.
The Applicants state that the need for alternative holiday accommodation arose not
from the claim, but from the FSP’s delay in agreeing to the replacement of the entire
roof.
Given the facts in this dispute, I am not satisfied that payment for alternative holiday
accommodation is appropriate. While no do ubt disappointing, there is no evidence
that the inability to have a holiday at their holiday house resulted in an additional cost
to the Applicants. Further, I am not satisfied that the inconvenience is sufficient that a
payment for non-financial loss is appropriate. In this instance, the payment of interest
at the rate prescribed above is a sufficient remedy.
Case No: 409190 Determination Page 5 of 8
3 Supporting information
3.1 FOS approach to this dispute
I have determined this dispute based on what is fair in all the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous
Financial Ombudsman Service (FOS) decisions. I have taken into account all the
material submitted by the parties, both before and after the Recommendation was
made.
There has been a full exchange of all documents relied on to make this
Determination and each party has had the opportunity to address any issues raised
by the other.
3.2 Chronology
Date Event
21 April 2015 Storm
Ripped out front left hand anchor point (one of four for the TV antenna)
and pulled out the tiles.
The back two anchor points were the worst affected.
27 April 2015 Applicants lodged claim
30 April 2015 Applicant met with FSP’s assessor at the property.
Later that afternoon four tradesmen arrived to mak e repairs.
Tradesmen removed all four damaged anchor p oints a n d cut off the
exc ess a n chor pins with a cordless grinder that went through the
dam a ged tiles and then into the timber under t he tiles.
They th en replaced the damaged areas with second hand tiles
supplied by the Applicant.
They carried the tiles up and down a ladder and across the roof to get
to the four anchor points.
TV antenna lowered by three tradesmen.
According to the Ap plicants, the head tradesmen said “the roof was
stuffed and that because of the damage to the ceili ngs, walls, etc, that
they will gut this house – you will end up with a complete new r oof,
sarking, ba t te ns, tiles, ceili ngs, walls – every th i ng. I t will be a new
house.”
21 May 2015 Applicants met RC at the property .
According to FS P, roof was inspected again and was deemed to be
secure.
18 June 2015 According to the FSP, the Applicant contacted the FSP to discuss the
proposed repairs. The Applicant advised that the he expected all the
roof tiles and sarking to be replaced, not just the section of the roof
and sarking.
Case No: 409190 Determination Page 6 of 8
Date Event
1July 2015 RC quote of $51,666 accept ed by FSP
23 July 2015 Applicants say they were informed by FSP ’s rep resentative that she
would be recommending all the sarking and al the roof tiles, battens,
etc be replaced.
4 August 2015 FSP denied claim
11 August 2015 FSP spoke to its assessor who con f i r med that, in line with SOW f r o m
R C , not all sarking requires replacing, only damaged area.
23 October 2015 Quote for repairs provided by Applicants.
5 January 2016 Applicant provides evidence of further leaking
28 January 2016 FSP’s r oofer (JC) undert akes further make safe repairs.
3.3 Reports
Report Key points
30 April 2015
Assessor report
Roof yet to be assessed or made safe
Condition of property: Good condition for age
Undated
SOW by RC
Roof area:
Remove and replace approx. 8m 2 of cement tiles
Remove & replace approx. 20m 2 of sarking to effected area
Repair ridge line bedding approx. 10 lin m
Replace 1 x TV antenna and guy lines
25 June 2015
FSP’s “Expert Review
report”
Insured wants all tiles and ridge lines replaced or roof s prayed t o
match. Clear policy limit to not complete a 100% roof match.
Assessor has confirmed with builder the only sarking needing
replacement h as been captured on scope at 20 m 2 .
Concludes RC quote is more than adequat e to cover cost of works.
18 Augus t 2015
Assessor statement
The sarking was damaged by the impact of the TV antenna
A make safe tarp was completed within days and very soon after
tiles were replaced and the roof sealed as watertight.
o [Applicants note that no tarp was ever installed. House
was exposed to elements for 9 days as SES never came]
There would have been no further issues with wind damaging
sarking once roof was made safe back to pre - loss position
This is evident by fact insured has not lodged a complaint for
further water ent ry p ost make safe completed.
Case No: 409190 Determination Page 7 of 8
o [but this occurs in January 2016]
This roof is an older cement tiled type – 20 - 30 years old. Sarking
would be the same age.
Deterioration to sarking is a normal part of breakdown of
materials.
Assessor does not believe that the initial event has caused major
sarking damage as suspected by insured.
The repair method as scoped will repair the roof back to pre - loss
condition to nor mal building trades quality.
2 October 2015
Applicant’s roofer (MH)
There are over 40 broken tiles a cross the roof that are not water
tight and are irreplaceable
There is some water damage in the wooden batte ns
The sarking is sagging , torn and will no longer prevent water from
entering roof
Recommend reroofing house with new material
Quote: $11,200
[undat ed]
RC
The make safe works made the roof completel y water t ight and
there was no need to install a tarpaulin as matching tiles were
use d to perform the make safe
The inspection on 21 May 2015 again deemed the roof to be
secure
The un d amaged sarking w ould not have become any further
damaged aft er the make safe had secured t he roof
The fact that ceiling s have not been installed would not affect the
sarking to the underside of the roof tiles.
29 January 2016
FSP’s roofer (JC)
Condition report
Roof tiles are in poor condition
Gutters are in fair condition
Ridge cappings are in poor condition
There are approx. 100 cracked / broken roof tiles visible
Evidence of previous workmanship / makesafe
Gable cement work dislodged, cracked & partially non existent
Cause of leak
Age
Roof tiles are in poor condition
Cracked wat er courses in roof tiles
Cracked / broke n roof tiles
Hairline cracks visible in roof tiles
Ridge capping cement work is poor and is dislodged
Gable cement works partially non existent
Recommendation
Ti le changes to entire roof
Re - bedding to ridge capping o v er entire roof
Re - pointing to ridge capping over entire roof
Roof replacement
Case No: 409190 Determination Page 8 of 8