Storm damage roof repair scope disputed and alternative accommodation claimed

FirmFinancial Firm (Unknown - Insurer)
Decided2016-04-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Applicants claimed storm damage to their holiday home roof, and the FSP limited repairs to a small area. AFCA found the whole roof was storm damaged and must be settled on JC's recommendations, with interest if cash settled, and refused alternative accommodation costs.

On the balance of probabilities the storm was the proximate cause of the whole roof damage, and the PDS excludes temporary accommodation for a holiday home.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 409190 Determination Page 1 of 8 Case number: 409190 31 March 2016 1 Overview 1.1 Dispute The Applicants lodged a claim with the Financial Services Provider (FSP) for storm damage to their holiday home. The FSP accepted the claim, but a dispute arose over the extent of works required to repair damage to the roof. 1.2 Issues and key findings What works are required to repair the roof? The damage to the roof is such that the roof must be replaced consistently with the report from the FSP’s roofer, JC. Are the Applicants entitled to alternative accommodation costs? The FSP is not required to pay for alternative holiday accommodation. 1.3 Determination This Determination is in favour of the Applicants. The FSP must settle the claim in respect of the roof based on JC’s recommendations in accordance with the terms and conditions of the policy. In the event the FSP elects to cash settle the claim, interest is payable in accordance with the Insurance Contracts Act from 4 August 2015 until the date payment is made. The FSP is not required to pay for any alternative holiday accommodation costs incurred or to be incurred by the Applicants. Case No: 409190 Determination Page 2 of 8 2 Reasons for determination 2.1 What works are required to repair the roof? The parties disagree on the extent of the damage caused by the storm The Applicants’ building and contents were damaged by a storm. The FSP has accepted cover in respect of damage caused by the storm. In respect of the roof, the FSP submits that only 8m 2 of tiles, 20m 2 of sarking and 10 lineal metres of ridge line bedding was damaged by the storm and requires replacing. In support of this, the FSP relies on:  a statement of works (SOW) by RC stating this was all that was required to repair the roof; and  statements from its assessor and RC that no further damage would have occurred after the make safe was complete . The Applicants submit the whole of the roof and sarking require replacement. In support of this, the Applicants rely on:  A report from their roofer (MH) which referred to over 40 broken tiles, water damage to the battens, sagging and torn sarking. The roofer recommended reroofing with new materials.  The FSP’s roofer (JC) stated that approximately 100 tiles were cracked or broken, ridge cappings were in poor condition and the gable cement worked was dislodged, cracked and partially nonexistent. JC recommended roof replacement. On balance, on the evidence available, I accept that the whole of the roof and sarking requires replacement. The latest report obtained by the FSP from JC confirms this. The issue is whether the need to replace the entire roof was caused by the storm. The storm and subsequent works caused the damage The Applicants say their property, including the roof was in good condition prior to the storm. In support of this, they refer to their recent replacement of the gutters and the assessors’ report noting the property was in good condition. Importantly, the Applicants say they have owned the property for approximately 30 years and have had no any leaking issues prior to the storm. There is no basis to dispute this. The Applicants further submit that the damage to the roof was caused not just b y the storm, but by the workmen ’s temporary repairs and the removal of the antenna, which was heavy and would have resulted in more broken tiles. According to the Applicants, this is because the tiles become more brittle with age and therefore more susceptible to cracking in the event they are walked on. JC’s report states that the cause of the leak includes age and the roof tiles being in poor condition (cracked). The Applicants say they spoke to the relevant person at JC who confirmed his reference to the “age” of the roof as a cause was because the tiles Case No: 409190 Determination Page 3 of 8 become more brittle with age and therefore more susceptible to cracking when they are walked on. This would be consistent with the damage as described by the Applicants following the storm and subsequent repairs. The roof itself was not that old, with the assessor estimating it to be 20 to 30 y ears old. It is unclear from JC’s report whether his reference to poor condition of the tiles is due to the storm, subsequent repair attempts or as they would have been prior to the storm. I note there is no reference in the report to the age of the cracking (be it recent or otherwise). JC does not refer to a storm as the cause of damage. There is no evidence that JC was briefed by the FSP about the original storm. This may be because JC was engaged to make safe the property after further leaking in January 2016, some nine months after the storm. In response to JC’s report, the FSP noted that the make safe repair was a temporary measure and, as the Applicant disagreed with the scope of works, the FSP was unable to undertake the permanent repair. While this may explain why the make safe repairs did not hold, it is not evidence that the storm was not the dominant cause of the damage to the roof. On the information before me, I am satisfied the proximate cause of the damage to the entire roof was the storm. This may have been exacerbated by the make safe works, including removal of the antenna. I have reached this conclusion on the basis that:  the roof was not leaking prior to the storm;  the storm (and most likely the subsequent works) damaged the roof;  the entire roof needs replacing;  the roof is not particularly old such that entire replacement would otherwise be necessary; and  there is no other basis that has been demonstrated to have caused the damage. The FSP must settle the claim in respect of the roof ba sed on JC’s recommendations in accordance with the terms and conditions of the policy. In the event the FSP elects to cash settle the claim, interest is payable in accordance with the Insurance Contracts Act from 4 August 2015 (the date of the FSP’s final decision letter) until the date payment is made. 2.2 Are the Applicants entitled to alternative accommodation costs? Alternative holiday accommodation costs need not be compensated The Applicants submitted a quote for alternative holiday accommodation, as repairs to the home had not been completed at the time they took their usual vacation. There is no evidence that the Applicants paid for this or any alternative holiday accommodation. The Product Disclosure Statement (PDS) specifically excludes temporary accommodation if the damaged home is not the primary place of residence at the Case No: 409190 Determination Page 4 of 8 time of the loss. As the house is a holiday home the FSP is not required to pay accommodation cost pursuant to the PDS. The Applicants state that the need for alternative holiday accommodation arose not from the claim, but from the FSP’s delay in agreeing to the replacement of the entire roof. Given the facts in this dispute, I am not satisfied that payment for alternative holiday accommodation is appropriate. While no do ubt disappointing, there is no evidence that the inability to have a holiday at their holiday house resulted in an additional cost to the Applicants. Further, I am not satisfied that the inconvenience is sufficient that a payment for non-financial loss is appropriate. In this instance, the payment of interest at the rate prescribed above is a sufficient remedy. Case No: 409190 Determination Page 5 of 8 3 Supporting information 3.1 FOS approach to this dispute I have determined this dispute based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. I have taken into account all the material submitted by the parties, both before and after the Recommendation was made. There has been a full exchange of all documents relied on to make this Determination and each party has had the opportunity to address any issues raised by the other. 3.2 Chronology Date Event 21 April 2015  Storm  Ripped out front left hand anchor point (one of four for the TV antenna) and pulled out the tiles.  The back two anchor points were the worst affected. 27 April 2015  Applicants lodged claim 30 April 2015  Applicant met with FSP’s assessor at the property.  Later that afternoon four tradesmen arrived to mak e repairs.  Tradesmen removed all four damaged anchor p oints a n d cut off the exc ess a n chor pins with a cordless grinder that went through the dam a ged tiles and then into the timber under t he tiles.  They th en replaced the damaged areas with second hand tiles supplied by the Applicant.  They carried the tiles up and down a ladder and across the roof to get to the four anchor points.  TV antenna lowered by three tradesmen.  According to the Ap plicants, the head tradesmen said “the roof was stuffed and that because of the damage to the ceili ngs, walls, etc, that they will gut this house – you will end up with a complete new r oof, sarking, ba t te ns, tiles, ceili ngs, walls – every th i ng. I t will be a new house.” 21 May 2015  Applicants met RC at the property .  According to FS P, roof was inspected again and was deemed to be secure. 18 June 2015  According to the FSP, the Applicant contacted the FSP to discuss the proposed repairs. The Applicant advised that the he expected all the roof tiles and sarking to be replaced, not just the section of the roof and sarking. Case No: 409190 Determination Page 6 of 8 Date Event 1July 2015  RC quote of $51,666 accept ed by FSP 23 July 2015  Applicants say they were informed by FSP ’s rep resentative that she would be recommending all the sarking and al the roof tiles, battens, etc be replaced. 4 August 2015  FSP denied claim 11 August 2015  FSP spoke to its assessor who con f i r med that, in line with SOW f r o m R C , not all sarking requires replacing, only damaged area. 23 October 2015  Quote for repairs provided by Applicants. 5 January 2016  Applicant provides evidence of further leaking 28 January 2016  FSP’s r oofer (JC) undert akes further make safe repairs. 3.3 Reports Report Key points 30 April 2015 Assessor report Roof yet to be assessed or made safe Condition of property: Good condition for age Undated SOW by RC Roof area:  Remove and replace approx. 8m 2 of cement tiles  Remove & replace approx. 20m 2 of sarking to effected area  Repair ridge line bedding approx. 10 lin m  Replace 1 x TV antenna and guy lines 25 June 2015 FSP’s “Expert Review report” Insured wants all tiles and ridge lines replaced or roof s prayed t o match. Clear policy limit to not complete a 100% roof match. Assessor has confirmed with builder the only sarking needing replacement h as been captured on scope at 20 m 2 . Concludes RC quote is more than adequat e to cover cost of works. 18 Augus t 2015 Assessor statement  The sarking was damaged by the impact of the TV antenna  A make safe tarp was completed within days and very soon after tiles were replaced and the roof sealed as watertight. o [Applicants note that no tarp was ever installed. House was exposed to elements for 9 days as SES never came]  There would have been no further issues with wind damaging sarking once roof was made safe back to pre - loss position  This is evident by fact insured has not lodged a complaint for further water ent ry p ost make safe completed. Case No: 409190 Determination Page 7 of 8 o [but this occurs in January 2016]  This roof is an older cement tiled type – 20 - 30 years old. Sarking would be the same age.  Deterioration to sarking is a normal part of breakdown of materials.  Assessor does not believe that the initial event has caused major sarking damage as suspected by insured.  The repair method as scoped will repair the roof back to pre - loss condition to nor mal building trades quality. 2 October 2015 Applicant’s roofer (MH)  There are over 40 broken tiles a cross the roof that are not water tight and are irreplaceable  There is some water damage in the wooden batte ns  The sarking is sagging , torn and will no longer prevent water from entering roof  Recommend reroofing house with new material  Quote: $11,200 [undat ed] RC  The make safe works made the roof completel y water t ight and there was no need to install a tarpaulin as matching tiles were use d to perform the make safe  The inspection on 21 May 2015 again deemed the roof to be secure  The un d amaged sarking w ould not have become any further damaged aft er the make safe had secured t he roof  The fact that ceiling s have not been installed would not affect the sarking to the underside of the roof tiles. 29 January 2016 FSP’s roofer (JC) Condition report  Roof tiles are in poor condition  Gutters are in fair condition  Ridge cappings are in poor condition  There are approx. 100 cracked / broken roof tiles visible  Evidence of previous workmanship / makesafe  Gable cement work dislodged, cracked & partially non existent Cause of leak  Age  Roof tiles are in poor condition  Cracked wat er courses in roof tiles  Cracked / broke n roof tiles  Hairline cracks visible in roof tiles  Ridge capping cement work is poor and is dislodged  Gable cement works partially non existent Recommendation  Ti le changes to entire roof  Re - bedding to ridge capping o v er entire roof  Re - pointing to ridge capping over entire roof  Roof replacement Case No: 409190 Determination Page 8 of 8 3.4 Relevant policy terms

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.