Home / Financial Firm (Unknown - Insurer) / Determination 409158

Determination 409158

Storm damage claim to rented property declined; untimely claim handling and delay in structural engineer engagement

FirmFinancial Firm (Unknown - Insurer)
Decided2016-01-29
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$750
Amount claimed$50,000
SourceAFCA PDF

Summary

The landlord sought about $50,000 for storm-related damage to a rented property, which the FSP declined as wear and tear and gradual damage. AFCA found the denial justified but found the claim was not handled in a timely way and ordered $750 non-financial loss; the sale-price loss was not established.

The insured bears the onus of proving a storm loss and the insurer must prove any exclusion, and here the builder evidence showed wear and tear and gradual damage, while unusual inconvenience from delay supported non-financial loss.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 409158 Determination Page 1 of 9 Case number: 409158 29 January 2016 1 Overview 1.1 Dispute The Applicant lodged a claim for storm damage to her rented property on 21 April 2015. She seeks about $50,000 for remediation of several issues at the property including the concrete patio, the internal eave linings and the range hood. The FSP declined the claim on the basis the loss did not arise from a storm. The Applicant is also dissatisfied with the FSP‟s claims handling. 1.2 Issues and key findings Is the FSP entitled to deny the claim? The FSP is entitled to deny the claim as the material provided does not establish the claimed damage was caused by a storm on 21 April 2015. Rather, the material provided establishes the damage was caused by wear and tear, lack of maintenance and was caused gradually over time. As such causes are excluded from cover, the FSP is entitled to deny the claim. Is the Applicant entitled to other compensation? The Applicant is entitled to $750 compensation for non-financial loss as the material establishes the claim was not handled in a timely fashion. Further, the FSP‟s failure to properly manage the engagement of a structural engineer caused further delay. The material provided does not establish the Applicant lost money on the sale of her house because of the FSP‟s conduct. 1.3 Determination This Determination is substantially in favour of the FSP. The FSP is entitled to deny the claim and need take no further action in relation to the claim. Upon being notified of the Applicant‟s acceptance of the Determination, the FSP is to pay to the Applicant $750 compensation for non-financial loss. Case No: 409158 Determination Page 2 of 9 2 Reasons for Determination 2.1 Is the FSP entitled to deny the claim? Material provided does not establish damage caused by storm on 21 April 2015 The Applicant claims damage to the insured property in a storm on 21 April 2015. The Applicant‟s tenant reported the damage to her that day and the Applicant reported the claim to the FSP. When she reported the storm damage, the FSP noted the claim included: “…cracking to back patio cement slab, moulding concrete slab, back door to laundry, eaves to laundry, movement in kitchen cupboards, fallen down (sic)” The FSP accepted there was storm activity near the premises on the day but says the evidence does not support the damages claimed occurred in the storm. Rather, it says the damage predated the storm, and is as a result of maintenance issues and faulty workmanship The FSP relies on a report and photographs from a builder who inspected the property 1 July 2015. The Applicant has provided no expert report as she did not wish to incur that further expenditure. She says:  the assessment was completed in less than 10 minutes  the builder did not go into the roof to investigate  there are no photographs or investigation of the clearly boggy and damaged surrounding areas of the concrete slab  the water damage was due not to one storm but a series of storms  investigations with concrete companies confirm an empty space beneath the concrete slab is one of the most common causes of slab cracks. If the supporting soil is washed away, this leaves a void causing sinking and cracking  the concrete slab had been there for over 10 years and with the exception of a few minor cracks, the large cracks and very evident moisture buildup on the slab coincided with recent storm activity and excessive water  the property was properly maintained - gutter guards had been installed; leaf clearing was done twice a year; there was no evidence of ongoing blockage in roof gutters; trapped water was the cause of the damage; and the water damage caused mould I have carefully considered the submissions of the parties, the builder‟s report and further email to the FSP and the photographs taken by the builder. There is no evidence rainwater entered the kitchen to cause damage to the range hood. The builder noted there was no staining or water entry evident to the ceiling or walls surrounding the range hood cover. Further, the tenant was not able to tell the builder how the range hood fell. And the bottom half of the range hood was not available for the builder to inspect. Case No: 409158 Determination Page 3 of 9 The Applicant has the onus to prove on the balance of probabilities the damage to the range hood was caused by the storm on 21 April 2015. The material provided does not meet that onus. The photographs support the builder‟s contention the eaves lining over the back door were not damaged in a storm but were damaged over time. I am satisfied the mould and eaves lining breakdown in the photographs confirm the builder‟s opinion. Although the builder did not inspect inside the roof, he inspected the roof over the eaves and said he found dead vegetation there. In all the circumstances, I am satisfied the builder could formulate a view on the cause of damage without inspecting the inside of the roof. The builder says as the cracking is uniform all over the slab, and one part has not subsided more than another part, the damage was not caused by water seeping under the slab. He points also to the photographs of the ground around the slab which show no signs of erosion. Having considered the material provided and in particular the photographs, I am also satisfied the cracking was not caused in the storm but is old damage. The FSP proposed an inspection of the slab by a structural engineer. There is extensive correspondence about why the inspection did not take place. Accordingly, this Determination is made on the basis of material provided. I acknowledge the builder is not a structural engineer. However, he is a licensed builder with 31 ye ars‟ experience. I am satisfied he has the expertise to comment on the claimed damage. Further, I am satisfied the photographs he took when he inspected the claimed damage support his view of the cause of damage. Moreover, the policy does not respond to a claim where damage is caused in persistent bad weather. The policy responds to a storm event. Although the Applicant had accidental damage cover, as the loss or damage falls under an insured event in the policy, namely storm, the policy provides the loss or damage will be assessed under that insured event. Having considered the material provided I am not satisfied on the balance of probabilities the claimed damage was caused in a storm on 21 April 2015. Rather, the material provided establishes the claimed damage was caused by wear and tear and lack of maintenance and was caused gradually over time. Such causes of damage are excluded from cover. The FSP is entitled to deny the claim. 2.1 Is the Applicant entitled to other compensation? FSP’s claims handling w as not timely The Applicant also complains the claim was dealt with in a poor and un-timely manner. She says the claim was rejected with insufficient review and explanation. She also says the FSP failed to comply with its own procedures in regard to clai ms and complaints handling. Case No: 409158 Determination Page 4 of 9 Without a proper assessment and delay, she claims she could not go ahead with the works on the property which disadvantaged her when she sold the property. When the Applicant spoke to the Service on 30 September 2015, she advised the property was on the market and a conditional contract was recently signed. The FSP notes contracts were exchanged on 19 October 2015. In its Notice of Response, the FSP sets out timeframes. I note the claim was made on 21 April 2015. The FSP‟s builder did not assess the property until 1 July 2015. There is no explanation for this delay. The builder‟s report was received on 7 July 2015, more information was sought from him on 23 July 2015 and the claim denied 24 July 2015. By letter dated 27 July 2015, the claim was formally denied. The FSP‟s customer resolution specialist reviewed the claim and also provided further information and explanation in a letter dated 28 July 2015. I am satisfied by this time, the claim was reviewed sufficiently and a satisfactory explanation provided by the FSP to the Applicant about why the claim was denied. While maintaining no evidence to indicate the concrete slab was damaged by the storm event, in its Notice of Response dated 15 September 2015, the FSP recommended an engineer be arranged to reassess the concrete slab. A structural engineer was engaged on 1 October 2015. However, the material from the FSP establishes there was a 2 week delay from the engineer due to high workloads at their end. This is despite the fact the FSP was advised by the Service the Applicant was selling the property and the property would be tenanted for only another two weeks. Accordingly, by the time the structural engineer contacted the Applicant‟s tenant on 25 October 2015, she was no l onger living at the premises. Accordingly, further delay occurred. The Service‟s Terms of Reference enable the Service to compensate an Applicant for non-financial loss (capped at $3,000). Compensation for non-financial loss is limited. FOS may decide a n FSP should compensate an Applicant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the Applicant‟s expectation of enjoyment or peace of mind. Having considered the timeframes, I am not satisfied the FSP has handled this matter in a timely fashion. The claim was made on 21 April 2015. A reasonable explanation of the FSP‟s claims decision was not made until 28 July 2015. Further, the FSP failed to properly manage the engagement of the structural engineer. The Service takes a conservative approach to compensation for non-financial loss. Nonetheless in the circumstances of this matter, I am satisfied the FSP‟s claims handling was not timely and would have interfered w ith the Applicants‟ peace of mind. The Applicant has provided no material supporting the contention she lost money on the sale of her house because of the FSP‟s conduct. The material establishes the FSP was entitled to deny the claim and its claims response 28 July 2015 was adequate. Insufficient detail is provided as to when the property went on the market, Case No: 409158 Determination Page 5 of 9 why sales fell through or why the FSP‟S conduct reduced the sale price. The material provided does not establish the loss claimed. Having considered all the material, I am satisfied it is fair in all the circumstances the FSP pay to the Applicant $750 compensation for non-financial loss. Case No: 409158 Determination Page 6 of 9 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this Determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extract Storm What is covered Your building and/or contents are covered for loss or damage caused by storm . What is not covered …. • loss or damage caused by wind, rain, hail or snow which entered an ordinarily fully enclosed part of your building through an opening not created by the storm . …. Glossary Storm • A violent wind including a tornado or named cyclone; or • rain, hail or snow of unusual volume, force or duration. It is not persistent bad weather or heavy or persistent rain by itself. …. Case No: 409158 Determination Page 7 of 9 Accidental damage What is covered You are covered for loss or damage to your building and/or contents caused by an accident at your insured address . …. If the cause of the loss or damage falls under an Insured Event in the policy, the loss or damage will be assessed under that Insured Event. Your building and/or contents are not covered under this Optional Cover for loss or damage as described in the General Exclusions listed ….. …. General Exclusions Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with: 1. defects, structural or design faults, faulty workmanship or faulty design: …. 4. wear and tear and lack of maintenance, including rust, corrosion and deterioration; …. 9. the vibration, settling, shrinking or expanding of earth or any building, foundation, wall, pavement or path; …. 35. gradual loss or damage of any kind; 3.3 Other relevant material considered  Parties‟ submissions, emails and photographs  Correspondence between the parties Date Action Renewal notice 2 April 2015  Period of insurance 2/4/15 – 2/4/16  Insured Events included Storm  Building cover: Optional Cover Accidental Damage Claim report Reported 21 April 2015  FSP noted storm 21 April 2015 12.00  FSP noted: „insured advised there is cracking to back patio cement slab, moulding concrete slab, back door to laundry, eaves to laundry, movement in kitchen cupboards, fallen down (sic)” Inspection report and photographs FSP‟s Builder  S inspected and p hotographed the property 1 July 2015 with the tenant. Case No: 409158 Determination Page 8 of 9  S directed by tenant to damage as a result of the recent storm event 21/4/15: damaged range hood, eaves linings, and concrete slab  S reported on the claimed damage: Kitchen The base of the range hood had fallen off and damaged. See photo. It is unknown how the section of range hood fell off and was damaged. It is my opinion that this is not storm related. Eaves lining The eaves linings over the back door were water damaged. Given the mould build up and the eaves lining starting to break down it is my opinion that the damage to the eaves has been occurring over a long time. I inspected the roof over the eaves and found that the base of the valley iron directly over the damage d eaves was blocked with dead vegetation. It is my opinion that this is a lack of maintenance issue. Patio concrete slab I was shown the extensive cracking to the concrete patio slab. I was informed that the cracking had just occurred. My inspection revealed that the cracking appeared aged and it is my opinion the result of faulty workmanship and not storm related Email from builder to FSP 23 July 2015 Regarding the range hood:  Tenant was extremely vague; directed me to kitchen and showed me a cupboard where the bottom half of the range hood was missing. I was shown the range hood. The tenant pointed at the range hood and said, look at that ??? I asked what happened here not know ing what to look at. What‟s half a range hood got to do with the storm ?? I was told that this part of the range hood fell during the storm. I ask the tenant “do you know how it fell and she did not know. She said that there was loud thunder shaking everyt hing. The range hood was not around for me to inspect. I don‟t know where it was. Tenant was not forthcoming and quite defensive with answering questions about what happened with the range hood. I could not ask any further questions as it felt that I was i nterrogating her.  No staining or water entry evidence to the ceiling, or walls surrounding the range hood cupboard. No water entry occurred inside the house as per my report. It is my opinion based on the look of the remaining part of the range hood that i t was well over 10 years old.  Tenant told me that the range hood was good before the storm Case No: 409158 Determination Page 9 of 9 Regarding the concrete patio slab:  For a concrete slab to crack the way it has means that the ground was not compacted, lack of steel reinforcement, or wrong streng th concrete was used, or the soil substrate has settled over time. Storm and rain can‟t crack a concrete slab. The cracking is uniform all over the slab. So one part hasn‟t subsided more than another part of the slab. I don‟t believe that any water seeped under the slab. There is no evidence of this. Please see photos of the ground around the slab. There are no signs of erosion.  As for something dropping on the slab, tenant was asked if cracks were there before and said they were not there before. To (build er) there does not appear to have been any impact. The cracks appear old with dirt in between the cracks.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.