Home / Financial Firm (Unknown - Insurer) / Determination 409123

Determination 409123

Cost of repairs for subsidence caused by water leak

FirmFinancial Firm (Unknown - Insurer)
Decided2015-12-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$159,206
Non-financial loss—
Amount claimed$279,884
SourceAFCA PDF

Summary

The applicants' house was damaged by subsidence from an underground water leak, and the insurer had paid $100,713.05 towards repairs. On reassessment AFCA accepted most of the applicants' repair scope, reduced by $25,506, and ordered $159,205.80 plus statutory interest and reimbursement of expert report costs.

The insurer must pay the cost of repairing damage caused by the insured event, including re-levelling and underpinning that the expert evidence shows was necessitated by the leak, and it cannot relitigate causation rejected in the first determination.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 409123 Determination Page 1 of 15 Case number: 409123 18 December 2015 1 Overview 1.1 Dispute The Service made a Determination (“the first Determination”) in favour of the Applicants on 28 February 2015. The Service determined the FSP was required to accept the Applicants’ claim in accordance with the terms and conditions of the policy and pay the cost of expert reports and compensation. The FSP has paid the cost of expert reports and compensation. After the Determination, both parties assessed the claim and provided further expert opinion about the costs to repair the insured property as a result of the insured event. On or about 23 June 2015, the FSP paid the Applicants $100,713.05 being its assessment of the cost of repairs as a result of the insured event plus interest. Relying on its experts’ opinions and costings, the Applicants contend this does not adequately compensate them for the loss. 1.2 Issues and key findings Does the FSP’s offer fairly assess the cost to repair the da mage from the insured event? Relying on the expert material provided in the first Determination and in this Determination, the Panel is not satisfied the amount offered by the FSP in satisfaction of the first Determination was sufficient. Relying on the expert material, the Panel accepted the damage claimed by the Applicants was caused by the insured event and, save for some minor adjustments, the Panel accepted the Applicants’ claim for the cost of repairs. Are the Applicants entitled to compensation? While time has been taken to resolve the assessment of the claim, which the Panel accepts would have caused inconvenience and stress, the Panel considers the amount of compensation paid already ($1,500) remains adequate compensation. The Panel is satisfied the nature of the issues involved in the dispute the subject of this Determination, required expert opinion. The Panel relied on the Applicants’ expert reports in making this Determination. Subject to the Applicants providing proof of the cost of the further expert reports, the Panel considers it is fair in all the circumstances the FSP reimburse the Applicants the cost of the further expert reports obtained in support of the claim in this Determination. Case No: 409123 Determination Page 2 of 15 1.3 Determination This Determination is substantially in favour of the Applicants. Subject to the Applicants accepting the Determination, within 5 business days of acceptance, the FSP is to:  pay to the Applicants $159,205.80 (that is, in addition to the $100,713.05 already paid by the FSP to the Applicants)  pay statutory interest on the said sum from 18 July 2014 until date of payment  reimburse the Applicants the costs of expert reports obtained in support of their claim in this Determination (subject to invoices/receipts as proof) . Case No: 409123 Determination Page 3 of 15 2 Reasons for Determination 2.1 Does the FSP’s offer fairly assess the cost to repair the damage from the insured event? Parties’ scopes of work differ substantially Both parties consulted experts to assess the loss and damage to the insured property. The Applicants continue to consult J, the engineer who first inspected the property for them on or about 15 April 2014. J provided a scope of works after consultation with an underpinning expert and various trades. The underpinning expert M also attended the site on 14 April 2015. The scope of works prepared by J for the Applicants totals $279,884 including GST. Both J and M say the foundations subsided because of the underground water flow from the leaking pipe. M says the insured property has sustained substantial damage and the works necessary to rectify this are extensive and difficult. M advises to properly level the house, piers and headstocks need to be applied to a further area, as, when foundations subside, that subsidence puts pressure further along the foundation strip. M’s quo te describes the underpinning required and has costed it at $76,380.76 including GST. The Applicants submit the insured property must be rectified back to the condition it was in prior to the water leak and repairs cannot be undertaken properly without first re-levelling the substructure. The Applicants submit there is substantial subsidence cracking and foundation movement to the south-eastern corner of the property which the FSP characterises as pre-existing damage, despite the pre-purchase reports not identifying any noticeable cracks. In the first Determination, the FSP consulted with a number of experts but did not re- engage these experts to assess the loss consequent upon the first Determination. The FSP engaged a civil engineer/building consultant, MC. MC reviewed the FSP’s expert reports from the first Determination. He also inspected the site with the male Applicant and his builder on 16 March 2015 and again on 22 April 2015. On the second occasion, MC inspected the site with S who prepared a scope of works for the FSP after inspection of the insured property. The scope of works relied on by the FSP after the second inspection totals $95,172.20. This amount together with interest has been paid to the Applicants. The material establishes a number of reasons why the scopes of work (the Scopes) differ. The FSP calculated the difference between the construction costs allowed by J (after consultation with trades and with M) and by MC (after consultation with S) in the amount of $135,251. Case No: 409123 Determination Page 4 of 15 FSP’s expert’s r easons for his scope of works are rebuttable The FSP submits the first Determination did not hold the FSP responsible for rectification of pre-existing issues, repairing damage which had occurred due to excluded risks or replacing undamaged property. It says the major difference between the Scopes is the installation cost of underpinning 30 piers and costs associated with repair of damage caused by those works. The FSP does not accept the costs for re-levelling the lounge room tiled floor and the cracking repairs to the upstairs and downstairs walls on the western side of the house. It submits the Applicants’ scope of works restores the entire property to its original condition. When MC first inspected the property he was concerned to distinguish between the gradual aged deterioration of the building and damage caused by the burst water pipe. He said the house was in less than average condition and noted damage which he said was either poor workmanship, non-compliant building works or the damage was too remote from the water leak. MC agreed the footing at the south-east corner of the house may require underpinning but wanted to consult with another of the FSP’s experts, A. He said to adopt M’s installation costs, is an obvious improvement in the original structure of the insured property. A provided reports relied on by the FSP and referred to in the first Determination. MC prepared a scope of works not only based on his visual inspection of the property but also on the basis of a previous scope of works prepared by the FSP’s expert engineer I and dated 22 November 2013. Engineer I’s reports were also relied on by the FSP and referred to in the first Determination MC wanted to meet with the Applicants’ expert J and undertake a GPR survey to detect for voids under the footing in the vicinity of the leak but this did not occur. MC noted there was no evidence of movement or cracking in the extensive area of floor tiling to the lounge, and this influenced his view of the extent of damage caused by the leaking water pipe. MC consulted with the engineers from I and the geotechnical engineer, A, to identify and differentiate the pre-existing damage. He says engineers I and A agreed if there was any significant settlement in the concrete floor of the lounge room, it would be highly likely there would be obvious evidence of cracking in the large ceramic floor tiles and neither he, engineer I or A observed this kind of damage. MC concluded therefore, the out of level lounge room concrete slab either occurred prior to the installation of the tiles or the concrete floor slab was never level. The Panel notes this kind of reasoning was rebutted by J in the report dated 21 August 2014 provided in the first Determination. J submitted the floor level survey indicates there is a floor level difference of about 84mm across the floor slab within the estimated flow path of the water leak. J says this out of level is visually obvious. J says it is highly unlikely the floor was constructed out of level and/or it was not detected in the pre-purchase inspection (also referred to in the first Determination). Based on J’s opinion, which was accepted by the Panel in the first Determination, the Panel agrees it is unlikely the Case No: 409123 Determination Page 5 of 15 floor was constructed out of level due to the innocuous contents of both the pre- purchase inspection report and the entry condition report (both referred to in the first Determination). Another reason for MC’s opinion was he found no visible evidence of washouts, voids or erosion as referred to by M. However, the Panel has reconsidered the expert reports relied on by the FSP in the first Determination. The Panel notes the engineer I comments when he first inspected the insured property on 17 January 2013, that a visual inspection of the house confirmed the soil underneath the house on the eastern side had eroded due to the water leak. Further, MC disputes a subsidence of 170mm and says if this occurred there would be evidence of catastrophic mo vement. He says I’s engineers agree. However the Panel notes there is no corroborating material from I’s engineers submitted by the FSP for the purposes of this Determination. MC submits in those circumstances the 170mm subsidence must have been pre-existing. The Panel notes reports from the Applicants’ expert engineers, J and B, submitted and accepted by the Panel in the first Determination. Both note the level of difference and both note the area of greatest settlement is coincident with the area of the reported leak. Both conclude the movement is not the result of issues posited by the FSP’s experts but say the movement is due to the water leak and would not have occurred without the water leak. Therefore, neither J nor B agree the 170mm subsidence was pre-existing. Relevant material from the first Determination about the damage and the nature of repairs required In making its offer of settlement, the Panel considers the FSP cannot reiterate arguments about causation which were not accepted by the Panel in the first Determination. Further, while relying on MC’s opinion in this Determination, the Panel notes the FSP has not taken into account observations made by the other experts it relied on in the first Determination. In particular, aside from the observations already made in this Determination, the Panel notes the following relevant material from the first Determination:  The water leak was very significant as evidenced by the water consumption advice.  The FSP’s assessor inspected the property 10 Januar y 2013 and noted the patio structure was breaking away from the main house as the ground was subsiding and dropping about 150mm out of level over a length of about 9 metres. Photographs taken by the assessor show severe cracking in and around the patio at that time.  The FSP’s engineer, I, inspected the insured property on 17 January 2013 and confirmed the soil underneath the house on the eastern side had eroded extensively. This addresses one of MC’s concerns. Engineer I said this was due to a prolonged mains water leak. Engineer I was of the opinion there was extensive undermining of the footings throughout the eastern side of the house and it was highly likely large voids were present under the slab of the house. Although Engineer I noted pre-existing cracks, he also said fresh cracking was due to the new stress caused by the foundation movement. Case No: 409123 Determination Page 6 of 15  On 22 November 2013, Engineer I prepared a scope of works for damage to the dwelling and the veranda which allowed $7,000 for soil testing, and some provision for engineering work. He also allowed for demolition and disposal of the entire remaining veranda/patio area adjacent to the east elevation of the dwelling and for a structural engineer to inspect the house footings and ground to the south-east corner of the dwelling to advise if variation for the scope was required prior to construction of the new veranda. Engineer I also included in the scope at that time the supply and construction of a new concrete step footings/piers for the veranda but only allowed footings 900mm deep.  When engineer I re-inspected the site 18 November 2013, he noted a 68mm fall to the south-east corner of the dwelling across the 4m width of the lounge room and also noted cracking reappearing in the master bedroom above. Although he was of the opinion the damage was a result of ongoing issues, as well as the leak, he wanted further investigation, including an extensive geotechnical investigation.  A was then engaged by the FSP to determine the nature of the on-site soils. A said when the insured building was built, less substantial footings were required to indoor/outdoor areas such as the rear left hand side of the insured property. A noted the challenge to determine whether there was any old damage which had been reactivated by the recent drainage event and what might constitute new damage. (Engineer I had also noted the footing in the south-west corner of the dwelling was 450mm deep and was considered adequate at the time of construction). The Panel considers this material is relevant to propositions put by the FSP regarding poor workmanship or non-compliant building works.  But more relevantly to the question of the quantum of the claim, A said the rectification work was not going to be simple and described substantial underpinning to a depth of at least 6 metres.  Although engineer I’s view was there was noticeable pre -existing damage above the subsided area, and only a portion of the damage or cost of repairs should be related to the leak, he agreed the only viable solution is to use deep screw piering; and further, that because underpinning an isolated area may encourage further cracking, he would not recommend partial works. Expert material establishes relevelling of lounge floor and extensive underpinning is now required because of damage from the insured event While the Panel accepts the FSP is only responsible for the cost to repair the loss or damage to the building as a result of the insured event, the Panel is not persuaded the material establishes the re-levelling of the lounge room floor and the installation cost of underpinning 30 piers, and costs associated with repair of damage caused by those works, was not caused by the insured event. Both M and J are clear in their opinion. The FSP does not dispute M’s 42 years of experience in rectification work. The first Determination accepted damage to the insured property was caused by the water leak. M is very clear in his professional advice. In order to prevent further damage occurring, M says it is advisable to rectify the subsidence as soon as possible and there is no shortcut to the rectification. Whatever their opinions on causation, the FSP’s experts I and A accept this analysis. Case No: 409123 Determination Page 7 of 15 Although the Panel notes the rectification cost may be an improvement to the Applicants’ property, the Pa nel accepts the material establishes the damage caused by the insured event can only be properly rectified as described by M. Further, the FSP’s experts I and A agree with the kind of solution proposed by M. In other words, the damage caused by the insured event cannot be permanently rectified unless the building is re-levelled. The Panel does not accept that re-levelling would have been necessary but for the significant insured event that occurred. Therefore the Panel accepts all of the cost of re -levelling the building has been made necessary as a consequence of the insured event. Accordingly, although some areas of the underpinning are to the west of the property and away from the water leak, the preponderance of the expert evidence is a shortcut cannot be taken. Once the foundation subsided because of the water leak, the cost of repairs necessitated piers to a depth of 6m and partial repairs are not recommended by the experts. Fair to accept some reductions from Applicants’ scope of works MC analysed J’ s quote for repair costs and made some other observations in his report dated 13 July 2015. In the absence of rebuttal evidence from J, or the Applicants, the Panel accepts J’s quote can be reduced for some costs such as the electrical costs and the cost o f the scaffolding, rubbish and builder’s clean. The Panel considers other reductions are not properly made as they relate to or are as a result of the underpinning. Whilst the Panel accepts the Applicants are entitled to the cost of underpinning on the west side of the insured property (for the reasons stated above), the Panel is not persuaded the FSP is obliged to pay for the cost of repairs to the external western wall, external front wall, front entry and all bedrooms (other than the main bedroom which is above the south-east corner of the insured property). The Panel considers these areas are too far from the area of the leak and the flow path as described by J in his reports in the first Determination. Taking into account these considerations, and addi ng in the builder’s margin and GST, the Panel considers it is fair in the circumstances to reduce J’s quote by $25,506. The Panel notes the policy term which describes how the FSP will settle a building claim. The Panel acknowledges it is at the FSP’s opti on to decide whether to repair or pay the cost to repair. The first Determination did not stipulate the FSP was to cash settle the Applicants’ claim. Rather, the FSP was to accept the Applicants’ claim in accordance with the terms and conditions of the policy. Having elected to cash settle the Applicants’ claim, the FSP has transferred all of the risk of the repair costs to the Applicants. The Panel acknowledges the FSP is entitled to make this election under the policy. The Panel also acknowledges the FSP is only to pay the cost of repairing the insured building to the condition it was in just before the loss or damage occurred, and this Determination may mean some parts of the insured building may be repaired to a condition better than it was in just before the loss or damage occurred. However, in view of the expert opinion about the Case No: 409123 Determination Page 8 of 15 rectification works, the Panel considers that outcome is fair in all the circumstances especially as the risks involved with extensive repairs are now transferred to the Applicants. On the information provided and for the reasons stated, the Panel accepts the repair costs caused by the insured event are $254,378 including GST. The Panel notes the FSP has paid to the Applicants $95,172.20 plus interest. The Panel determines the balance payable to the Applicants is $159,205.80 plus statutory interest on the said sum accruing from 18 July 2014. 2.2 Are the Applicants entitled to receive further compensation? $1,500 already paid by FSP for compensation remains fair In the first Determi nation, the Panel considered the Applicants had suffered an unusual degree of inconvenience and established an entitlement to compensation. The Panel considered an amount of $1,500 was fair in all the circumstances. The FSP has paid the Applicants the compensation. The Panel accepts the FSP is entitled to challenge an insured’s scope of works. The FSP calculated its assessment of the Applicants’ entitlement and paid it on 23 June 2015. Whilst the Panel acknowledges the stress and further time taken to reso lve this dispute, the Panel considers the amount already paid for compensation of $1,500 remains fair in all the circumstances. 2.3 Are the Applicants entitled to receive further compensation for professional costs? Reports needed to rebut FSP's assessment and Panel relied on reports In the first Determination, the Panel determined the Applicants were entitled to compensation for professional costs incurred. The Panel acknowledges the FSP has paid the Applicants’ claims in this regard. The Panel notes the Applicants have engaged experts again in order to deal with the FSP’s assessment of the claim after the first Determination. As stated in the first Determination, pursuant to paragraph 9.4 of the FOS Terms of Reference, FOS may require an FSP to contribute to professional costs incurred by Applicants in the course of their dispute. The Panel is satisfied it was necessary for at the Applicants to obtain further assistance from experts to rebut the FSP’s assessment. Further, the Panel relied on the expert reports in reaching this Determination. The FSP is therefore required to reimburse the Applicants the cost of the expert reports obtained relevant to this Determination (subject to receipts/invoices as proof). Case No: 409123 Determination Page 9 of 15 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this Determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, commentary has been restricted to those issues considered directly relevant to the outcome only. 3.2 Policy extracts Policy ext racts are referred to in the FSP’s Notice of Response dated 15 September 2015. Both the policy document and the Notice have been exchanged with the Applicants. 3.3 Relevant expert material/statements  Parties’ submissions, emails and photographs submitted in the first Determination.  Parties’ e xpert reports submitted in the first Determination and extracts below.  Parties’ submissions, emails and photographs submitted in this Determination.  Parties ’ expert reports submitted in this Determination and extracts below. Date Action FSP’s expert A’s report Dated 4 February 2014  Rectification work is not going to be simple .  Underpinning the main footings with engineer designed headstocks supported on screw piers is the only realistic solution we can offer, but we cannot offer any advice on the depth of screw piers within the budget of this report, however we do believe it will be significantly deeper than 6 metres .  Because of the nature of the soils at depth, there will be ongoing settlements on the site and we ca nnot exclude the possibility that after underpinning, at some undefined time into the fut ure, that unsightly cracking might occur in Case No: 409123 Determination Page 10 of 15 the area of the dwelling not underpinned .  Veranda and outdoor/indoor area will need reconstructing and fully the whole foot ing system (including the slabs ) will need to be fully suspended on screw piers. FSP’s expert I’s report Dated 6 February 2014  …the only viable solution apart from underpinning the dwelling, if necessary, is to use deep screw piering. We note underpinnin g an isolat ed area of this dwelling may encourage further cracking in the future and would therefore not recommend partial works. We expect an underpinning project for the entire dwelling would cost substantial fees.... Applicants’ underpinning and constr uction expert M Quote 21 April 2015  Quote to remove and reinstate the area only where underpinning is required; construct 30 conc rete piers and headstocks to a maximum depth of 6m including engineer and GST $76,380.76 .  Includes 5 piers west wall; 10 piers patio; 4 piers antrum east end; 6 piers east wall; 5 piers internal wall centre .  Notes if the antrum area is not carried out deduct $9,133.96 but still need to do the house wall . Applicants’ underpinning and construction expert M report Dated 7 September 2015  Attended site 14 April 2015 .  Extensive experience in rectification work of this nature .  Damage appears to be caused by a single extreme event such as a water leak in the south eastern corner of the residence .  Advisable to rectify the subsi dence to prevent further costly damage .  30 concrete piers and headstocks are required to carry out the proper rect ification to re - level the house.  Piers need to be placed furt her along the foundation, as when the foundations subside it puts pressure furthe r along the foundation strip; to properly level the house, piers and headstocks are required to the further area to assist with jacking the foundation back to the original level .  Hous e has substantial damage and works to rectify are extensive and difficult .  No shortcut to rectify the property . Applicants’ engineer J’s scope of works Dated 15 May 2015  J inspected site with male Applicant 15 April 2014 to provide SOW and quotes from underpinning cont ractor and ot her trades to return dwelling back to pre - even t condition .  SOW developed based on geotechnical soil test completed by FSPs’ expert A (from report dated 4/2/14) .  Testing not completed foot underpinning or repair purposes; further soil testing for underpinning will need to be completed prior to commencement of repairs .  Although A reported soils may bear at 3500 - 4500, consulted wit h M and allowed underpins to a dept h of approximately 6m to be allowed until f inal design soil test Case No: 409123 Determination Page 11 of 15 completed.  S OW includes plumbing, underpinning and rectific ation bui lder but not geotechnical testing, underpinning design and engineering supervision .  During underpinning repair work, existing pipes could be damaged by drilling and re - levelling so they should be surveyed at first and located to reduce damage and then surv eyed again at the completion of works to ensure no damage – obtained SOW from plumber .  Once underpins installed and floor levelled wait 6 months before cosmetic repairs completed .  There is subsidence to the dwelling foundation and slab causing areas of the house to be out of level and a series of bored concrete piers are required .  Because of foundation movement there are cracks and sticking doors; a builder quoted for cosmetic repairs required to back patio, veranda, external western wall, external front wall: front entry, lounge, kitchen, downstairs bathroom, laundry, WC, main bedroom, bedrooms 2,3,4,5, and landscaping .  Appendix A illustrates the extent of the underpins .  Geotechnical testing and underpin design $5,800 plus GST .  Supervision through proje ct 6% of total project cost .  Plumbing work $9,790 including GST .  Underpinning estimate $76, 380. 76 .  Repair costs total $276, 884 . Applicants’ consulting engineer J report Dated 14 September 2015  Level survey J did in April 2014 indicated the current levels of the floor were outside accept able limits specified in relevant Australian Standards and compared to the estimated flow path of the water leak indicated subsidence of the foundation caused by the water leak.  Confirmed by the report from the underpinning contractor, his site inspection, and evidence provided by the owners all suggest the movement and cracking damages observed to the dwelling are consistent with the effects of an underground water pipe leak. FSP’s report from civil engineer MC Dated 24 March 2015  Reviewed FSP’s expert reports including scope of works prepared by I on 22/11/13 which allowed $7,000 for soil testing , engineer rectification design etc and $5,000 if underpinning is completed; the abolishment of veranda patio area ad jacent to east elevation; structural engineer to inspect house footings at south east corner; described work required for new conc rete strip footings for the veranda/patio and work required .  Inspected and photographed 16/ 3/15 with male Applicant and his bu ilder AH .  Hous e is in less than average condition and MC seeks clarification in respect to the distinction between the gradual age deterioration of building and damage caused Case No: 409123 Determination Page 12 of 15 by burst water pipe .  External paving not to be included as is old damage or poor workmanship or not damaged at all .  External steps, retaining walls and masonry walls are either poor workmanship, non - compliant building works and highly unlikely that leaking pipe caused obvious structural damage .  Applicants say southern wall of house req uires screw piles which requires the demolition and rec onstruction of the southern deck due to the differences in floor levels in the house. Agrees the footing at the south east corner of the house may require underpinning; the level of the house has (gene rally) remained the same; seeks permission to consult with A to determine an adequate solution to re - support the south - east corner of the house; external cracking to south east corner is slight and can easily be repaired; GPR survey required to detect for voids under the footing in the vicinity of the leak and these will require filling; survey should be completed on all of the masonry walls to determine the extent of filling and reinforcement to the masonry walls; cracking in the external wall of the east veranda or east deck are slight and can easily be repaired; no evidence of movement cracking in the extensive area of floor tiling to the lounge room so our opinion there has been no movement in floor levels due to water leak and we believe screw piling un der the southern external wall not required as no evidence of movement; difference in levels on floor slab inconclusive as it assumes slab initially constructed horizontal which is often not the case; many pre - existing valleys in the laying of lounge room floor tiles and re - levelling lounge room floor should not be included in SOW as the lounge room has not been constructed level; damage to door head is due to corrosion not building movements; sliding doors in poor condition due to poor maintenance.  Souther n deck on the house; there is obvious movement in the joint bet ween the horizontal tiles on the deck and the vertical external wall of the house and a dip in tiles indicating movement; can’t say until explorative work done and GPR survey .  Minor cracking in internal walls of the house. Agrees there is considerable amount of minor cracking in the internal walls of the house which would easily be repaired but GPR survey will inform. Providing GPR survey confirms continued foundation support, says any cracks in ground floor walls more than 4m from the water leak or the sout h east corner of the house are not caused by the water leak; except for the south east corner of the house any first - floor ceiling and wall cracking not caused by leak; except for south - east corner of the house the minor cracking in the walls/ceilings due to gradual deterioration. Case No: 409123 Determination Page 13 of 15  Missing tiles on internal stair riser; Gluing ceramic tiles to timber is poor building practice, a maintenance issue not related to wat er leak .  Roof maintenance - mo vement in the ceiling lining joists due to age deterioration .  Crack in the wall joint in the robe at the western end of the house due to age deterioration.  Repairs to the north deck of the house - poor workmanship and poor building practices are not related to building movements .  Minor cracking in the ceilings linings and wall linings noted in areas away from the south - east corner are matters of poor maintenance .  Repairs to the east deck of the house - probably unsound building works and non - compliant but we need a GPR survey; obvious evidence of movement cracking .  Footings in the south east corner of the house have settled and require underpinning but we need more detailed information and wanted to consult with A .  Nort h deck has dry rot .  Wanted GPR survey . FSP’s report from civil engineer MC Dated 2 April 2015  Prepared scope of works on the basis of recent visual inspection of the property 16/3/ 15 and on the basis of previous SOW prepared by I dated 22 November 2013 which was modified to include additional damage considered to be caused by a leaking water pipe at the eastern end of the house .  Notes prepared without additional investigation .  Internal wall cracking very slight which can be easily repaired, external cracking in the south - east corner of the hous e moderate and can be repaired .  Cont ractor must visit the site to make their own assessment .  SOW set out in detail in the report and includes photographs and detailed descriptions regarding demolition of the east Veranda or east deck and work to the lounge room, plumbing, electrical, glazing, painting, landscaping and cleaning . FSP’s builder’s quotation S Dated 13 April 2015  $85,842.97 GST inclusive .  Estimate only as site inspection required to confirm details and measurements . Refre shed quotation from S Dated 28 May 2015  Revised scope of works after inspection with MC on 22 April 2015 costed at $95,170.20 plus interest less excess .  S could not confirm lounge area moving as no sign of cracking to floor tiles and walls ; the o nly cracking movement to walls was from the action of the attached v eranda .  Area of balcony to the canal frontage elevation of the property said have subsided; S and MC thought that was Case No: 409123 Determination Page 14 of 15 due to usual movement expected in a canal block . FSP’s report from ci vil engineer MC Dated 10 June 2015  MC says in a later report he was at the site meeting 22 April 2015 with S and he ran through what was agreed and not agreed noting it was agreed that new footings proposed by I for the reconstruction of the east Veranda would support the south east corner of the house .  Dispute conc erns the relevelling of the lounge room as MC said no evidenc e of movement in the tiling installed on the concrete floor (and not included in I’s SOW) .  Dispute conc erning repair to the upstairs and downstairs walls on the western side of the house - MC unlikely that isolated cracks on the house being 10 - 3 metres away from the water pipe repair could be attri butable to the burst wat er pipe. FSP’s report from civil engineer MC Dated 13 July 2015  Has attended 2 site meetings and has spoken with the engineers from I and the geotechnical engineer from A to identify and differentiate the pre - existing damage .  A greed that if there was any significant settlement in the concrete floor of the lounge room i t would be highly likely there would be obvious evidence of cracking in the large ceramic floor tiles and this was not seen by I or A or MC .  MC says the out of level lounge room conc rete slab is pre - existing - occurred prior to the installation of the tile s or the concrete floor slab was never level .  Included underpinning and stabilisation of the external south - east corner which will be inc orporated in the new 900mm deep footing for the east deck since this new footing is alongside the cracked section of ex ternal wall .  To install 30 6m deep underpinning peers is an obvious improvement in the original structure of the building and this represents a signific ant difference in the co sts associated with repair work.  Describes other examples of pre - existing poor w orkmanship and pre - existing inadequate design .  Suggested the engineering experts meet and discuss technical issues relating to scope with the possibility of agreement .  Analysed and commented on scope of works provided by J and concluded the difference in c osts is $135,251; the majority of the difference in the quotations is the underpinning piers and the cost of repairing damage caused by that work . FSP’s report from civil engineer MC Dated 17 September 2015  Reviewed material from M and J and says they have failed to give any consideration to the pre - existing condition of the building .  MC found no visible evidence of washouts, voids, erosion on the canal side of the property and says is no visible evidence to support the theory of under slab washouts an d wants the GPR survey and meeting with J to discuss . Case No: 409123 Determination Page 15 of 15  Disputes subsidence of 170mm and says there would also be evidence of catastrophic movement and so concludes the 170mm must have been pre - existing (says he has consulted wit h engineers from I and they agree). Also says that the extremely poor and non - compliant building works visible in eastern external deck the house mak es it likely that the 170mm subsidence pre - existed the break in the water pipe .  External damage to the wall in the south - east corner ha s been caused by non - compliant and dangerous construction of eastern external deck .  Underpinning of the south - east corner has been included in the footings of the new construction of the eastern deck .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.