Text of the determination
Determination
Case No: 409123 Determination Page 1 of 15
Case number: 409123 18 December 2015
1 Overview
1.1 Dispute
The Service made a Determination (“the first Determination”) in favour of the
Applicants on 28 February 2015. The Service determined the FSP was required to
accept the Applicants’ claim in accordance with the terms and conditions of the policy
and pay the cost of expert reports and compensation.
The FSP has paid the cost of expert reports and compensation.
After the Determination, both parties assessed the claim and provided further expert
opinion about the costs to repair the insured property as a result of the insured event.
On or about 23 June 2015, the FSP paid the Applicants $100,713.05 being its
assessment of the cost of repairs as a result of the insured event plus interest.
Relying on its experts’ opinions and costings, the Applicants contend this does not
adequately compensate them for the loss.
1.2 Issues and key findings
Does the FSP’s offer fairly assess the cost to repair the da mage from the
insured event?
Relying on the expert material provided in the first Determination and in this
Determination, the Panel is not satisfied the amount offered by the FSP in
satisfaction of the first Determination was sufficient. Relying on the expert material,
the Panel accepted the damage claimed by the Applicants was caused by the
insured event and, save for some minor adjustments, the Panel accepted the
Applicants’ claim for the cost of repairs.
Are the Applicants entitled to compensation?
While time has been taken to resolve the assessment of the claim, which the Panel
accepts would have caused inconvenience and stress, the Panel considers the
amount of compensation paid already ($1,500) remains adequate compensation.
The Panel is satisfied the nature of the issues involved in the dispute the subject of
this Determination, required expert opinion. The Panel relied on the Applicants’
expert reports in making this Determination. Subject to the Applicants providing proof
of the cost of the further expert reports, the Panel considers it is fair in all the
circumstances the FSP reimburse the Applicants the cost of the further expert reports
obtained in support of the claim in this Determination.
Case No: 409123 Determination Page 2 of 15
1.3 Determination
This Determination is substantially in favour of the Applicants.
Subject to the Applicants accepting the Determination, within 5 business days of
acceptance, the FSP is to:
pay to the Applicants $159,205.80 (that is, in addition to the $100,713.05
already paid by the FSP to the Applicants)
pay statutory interest on the said sum from 18 July 2014 until date of payment
reimburse the Applicants the costs of expert reports obtained in support of their
claim in this Determination (subject to invoices/receipts as proof) .
Case No: 409123 Determination Page 3 of 15
2 Reasons for Determination
2.1 Does the FSP’s offer fairly assess the cost to repair the damage
from the insured event?
Parties’ scopes of work differ substantially
Both parties consulted experts to assess the loss and damage to the insured
property.
The Applicants continue to consult J, the engineer who first inspected the property for
them on or about 15 April 2014. J provided a scope of works after consultation with
an underpinning expert and various trades. The underpinning expert M also attended
the site on 14 April 2015.
The scope of works prepared by J for the Applicants totals $279,884 including GST.
Both J and M say the foundations subsided because of the underground water flow
from the leaking pipe. M says the insured property has sustained substantial damage
and the works necessary to rectify this are extensive and difficult. M advises to
properly level the house, piers and headstocks need to be applied to a further area,
as, when foundations subside, that subsidence puts pressure further along the
foundation strip.
M’s quo te describes the underpinning required and has costed it at $76,380.76
including GST.
The Applicants submit the insured property must be rectified back to the condition it
was in prior to the water leak and repairs cannot be undertaken properly without first
re-levelling the substructure. The Applicants submit there is substantial subsidence
cracking and foundation movement to the south-eastern corner of the property which
the FSP characterises as pre-existing damage, despite the pre-purchase reports not
identifying any noticeable cracks.
In the first Determination, the FSP consulted with a number of experts but did not re-
engage these experts to assess the loss consequent upon the first Determination.
The FSP engaged a civil engineer/building consultant, MC.
MC reviewed the FSP’s expert reports from the first Determination. He also inspected
the site with the male Applicant and his builder on 16 March 2015 and again on 22
April 2015.
On the second occasion, MC inspected the site with S who prepared a scope of
works for the FSP after inspection of the insured property. The scope of works relied
on by the FSP after the second inspection totals $95,172.20. This amount together
with interest has been paid to the Applicants.
The material establishes a number of reasons why the scopes of work (the Scopes)
differ. The FSP calculated the difference between the construction costs allowed by J
(after consultation with trades and with M) and by MC (after consultation with S) in
the amount of $135,251.
Case No: 409123 Determination Page 4 of 15
FSP’s expert’s r easons for his scope of works are rebuttable
The FSP submits the first Determination did not hold the FSP responsible for
rectification of pre-existing issues, repairing damage which had occurred due to
excluded risks or replacing undamaged property. It says the major difference
between the Scopes is the installation cost of underpinning 30 piers and costs
associated with repair of damage caused by those works. The FSP does not accept
the costs for re-levelling the lounge room tiled floor and the cracking repairs to the
upstairs and downstairs walls on the western side of the house. It submits the
Applicants’ scope of works restores the entire property to its original condition.
When MC first inspected the property he was concerned to distinguish between the
gradual aged deterioration of the building and damage caused by the burst water
pipe. He said the house was in less than average condition and noted damage which
he said was either poor workmanship, non-compliant building works or the damage
was too remote from the water leak.
MC agreed the footing at the south-east corner of the house may require
underpinning but wanted to consult with another of the FSP’s experts, A. He said to
adopt M’s installation costs, is an obvious improvement in the original structure of the
insured property.
A provided reports relied on by the FSP and referred to in the first Determination.
MC prepared a scope of works not only based on his visual inspection of the property
but also on the basis of a previous scope of works prepared by the FSP’s expert
engineer I and dated 22 November 2013. Engineer I’s reports were also relied on by
the FSP and referred to in the first Determination
MC wanted to meet with the Applicants’ expert J and undertake a GPR survey to
detect for voids under the footing in the vicinity of the leak but this did not occur.
MC noted there was no evidence of movement or cracking in the extensive area of
floor tiling to the lounge, and this influenced his view of the extent of damage caused
by the leaking water pipe.
MC consulted with the engineers from I and the geotechnical engineer, A, to identify
and differentiate the pre-existing damage. He says engineers I and A agreed if there
was any significant settlement in the concrete floor of the lounge room, it would be
highly likely there would be obvious evidence of cracking in the large ceramic floor
tiles and neither he, engineer I or A observed this kind of damage.
MC concluded therefore, the out of level lounge room concrete slab either occurred
prior to the installation of the tiles or the concrete floor slab was never level. The
Panel notes this kind of reasoning was rebutted by J in the report dated 21 August
2014 provided in the first Determination.
J submitted the floor level survey indicates there is a floor level difference of about
84mm across the floor slab within the estimated flow path of the water leak. J says
this out of level is visually obvious. J says it is highly unlikely the floor was
constructed out of level and/or it was not detected in the pre-purchase inspection
(also referred to in the first Determination). Based on J’s opinion, which was
accepted by the Panel in the first Determination, the Panel agrees it is unlikely the
Case No: 409123 Determination Page 5 of 15
floor was constructed out of level due to the innocuous contents of both the pre-
purchase inspection report and the entry condition report (both referred to in the first
Determination).
Another reason for MC’s opinion was he found no visible evidence of washouts,
voids or erosion as referred to by M. However, the Panel has reconsidered the expert
reports relied on by the FSP in the first Determination. The Panel notes the engineer
I comments when he first inspected the insured property on 17 January 2013, that a
visual inspection of the house confirmed the soil underneath the house on the
eastern side had eroded due to the water leak.
Further, MC disputes a subsidence of 170mm and says if this occurred there would
be evidence of catastrophic mo vement. He says I’s engineers agree. However the
Panel notes there is no corroborating material from I’s engineers submitted by the
FSP for the purposes of this Determination. MC submits in those circumstances the
170mm subsidence must have been pre-existing.
The Panel notes reports from the Applicants’ expert engineers, J and B, submitted
and accepted by the Panel in the first Determination. Both note the level of difference
and both note the area of greatest settlement is coincident with the area of the
reported leak. Both conclude the movement is not the result of issues posited by the
FSP’s experts but say the movement is due to the water leak and would not have
occurred without the water leak. Therefore, neither J nor B agree the 170mm
subsidence was pre-existing.
Relevant material from the first Determination about the damage and the nature
of repairs required
In making its offer of settlement, the Panel considers the FSP cannot reiterate
arguments about causation which were not accepted by the Panel in the first
Determination. Further, while relying on MC’s opinion in this Determination, the Panel
notes the FSP has not taken into account observations made by the other experts it
relied on in the first Determination.
In particular, aside from the observations already made in this Determination, the
Panel notes the following relevant material from the first Determination:
The water leak was very significant as evidenced by the water consumption
advice.
The FSP’s assessor inspected the property 10 Januar y 2013 and noted the
patio structure was breaking away from the main house as the ground was
subsiding and dropping about 150mm out of level over a length of about 9
metres. Photographs taken by the assessor show severe cracking in and
around the patio at that time.
The FSP’s engineer, I, inspected the insured property on 17 January 2013 and
confirmed the soil underneath the house on the eastern side had eroded
extensively. This addresses one of MC’s concerns. Engineer I said this was due
to a prolonged mains water leak. Engineer I was of the opinion there was
extensive undermining of the footings throughout the eastern side of the house
and it was highly likely large voids were present under the slab of the house.
Although Engineer I noted pre-existing cracks, he also said fresh cracking was
due to the new stress caused by the foundation movement.
Case No: 409123 Determination Page 6 of 15
On 22 November 2013, Engineer I prepared a scope of works for damage to the
dwelling and the veranda which allowed $7,000 for soil testing, and some
provision for engineering work. He also allowed for demolition and disposal of
the entire remaining veranda/patio area adjacent to the east elevation of the
dwelling and for a structural engineer to inspect the house footings and ground
to the south-east corner of the dwelling to advise if variation for the scope was
required prior to construction of the new veranda. Engineer I also included in
the scope at that time the supply and construction of a new concrete step
footings/piers for the veranda but only allowed footings 900mm deep.
When engineer I re-inspected the site 18 November 2013, he noted a 68mm fall
to the south-east corner of the dwelling across the 4m width of the lounge room
and also noted cracking reappearing in the master bedroom above. Although he
was of the opinion the damage was a result of ongoing issues, as well as the
leak, he wanted further investigation, including an extensive geotechnical
investigation.
A was then engaged by the FSP to determine the nature of the on-site soils. A
said when the insured building was built, less substantial footings were required
to indoor/outdoor areas such as the rear left hand side of the insured property.
A noted the challenge to determine whether there was any old damage which
had been reactivated by the recent drainage event and what might constitute
new damage. (Engineer I had also noted the footing in the south-west corner of
the dwelling was 450mm deep and was considered adequate at the time of
construction). The Panel considers this material is relevant to propositions put
by the FSP regarding poor workmanship or non-compliant building works.
But more relevantly to the question of the quantum of the claim, A said the
rectification work was not going to be simple and described substantial
underpinning to a depth of at least 6 metres.
Although engineer I’s view was there was noticeable pre -existing damage
above the subsided area, and only a portion of the damage or cost of repairs
should be related to the leak, he agreed the only viable solution is to use deep
screw piering; and further, that because underpinning an isolated area may
encourage further cracking, he would not recommend partial works.
Expert material establishes relevelling of lounge floor and extensive
underpinning is now required because of damage from the insured event
While the Panel accepts the FSP is only responsible for the cost to repair the loss or
damage to the building as a result of the insured event, the Panel is not persuaded
the material establishes the re-levelling of the lounge room floor and the installation
cost of underpinning 30 piers, and costs associated with repair of damage caused by
those works, was not caused by the insured event.
Both M and J are clear in their opinion. The FSP does not dispute M’s 42 years of
experience in rectification work. The first Determination accepted damage to the
insured property was caused by the water leak. M is very clear in his professional
advice. In order to prevent further damage occurring, M says it is advisable to rectify
the subsidence as soon as possible and there is no shortcut to the rectification.
Whatever their opinions on causation, the FSP’s experts I and A accept this analysis.
Case No: 409123 Determination Page 7 of 15
Although the Panel notes the rectification cost may be an improvement to the
Applicants’ property, the Pa nel accepts the material establishes the damage caused
by the insured event can only be properly rectified as described by M. Further, the
FSP’s experts I and A agree with the kind of solution proposed by M.
In other words, the damage caused by the insured event cannot be permanently
rectified unless the building is re-levelled. The Panel does not accept that re-levelling
would have been necessary but for the significant insured event that occurred.
Therefore the Panel accepts all of the cost of re -levelling the building has been made
necessary as a consequence of the insured event.
Accordingly, although some areas of the underpinning are to the west of the property
and away from the water leak, the preponderance of the expert evidence is a
shortcut cannot be taken. Once the foundation subsided because of the water leak,
the cost of repairs necessitated piers to a depth of 6m and partial repairs are not
recommended by the experts.
Fair to accept some reductions from Applicants’ scope of works
MC analysed J’ s quote for repair costs and made some other observations in his
report dated 13 July 2015. In the absence of rebuttal evidence from J, or the
Applicants, the Panel accepts J’s quote can be reduced for some costs such as the
electrical costs and the cost o f the scaffolding, rubbish and builder’s clean. The Panel
considers other reductions are not properly made as they relate to or are as a result
of the underpinning.
Whilst the Panel accepts the Applicants are entitled to the cost of underpinning on
the west side of the insured property (for the reasons stated above), the Panel is not
persuaded the FSP is obliged to pay for the cost of repairs to the external western
wall, external front wall, front entry and all bedrooms (other than the main bedroom
which is above the south-east corner of the insured property).
The Panel considers these areas are too far from the area of the leak and the flow
path as described by J in his reports in the first Determination.
Taking into account these considerations, and addi ng in the builder’s margin and
GST, the Panel considers it is fair in the circumstances to reduce J’s quote by
$25,506.
The Panel notes the policy term which describes how the FSP will settle a building
claim. The Panel acknowledges it is at the FSP’s opti on to decide whether to repair
or pay the cost to repair. The first Determination did not stipulate the FSP was to
cash settle the Applicants’ claim. Rather, the FSP was to accept the Applicants’ claim
in accordance with the terms and conditions of the policy.
Having elected to cash settle the Applicants’ claim, the FSP has transferred all of the
risk of the repair costs to the Applicants. The Panel acknowledges the FSP is entitled
to make this election under the policy. The Panel also acknowledges the FSP is only
to pay the cost of repairing the insured building to the condition it was in just before
the loss or damage occurred, and this Determination may mean some parts of the
insured building may be repaired to a condition better than it was in just before the
loss or damage occurred. However, in view of the expert opinion about the
Case No: 409123 Determination Page 8 of 15
rectification works, the Panel considers that outcome is fair in all the circumstances
especially as the risks involved with extensive repairs are now transferred to the
Applicants.
On the information provided and for the reasons stated, the Panel accepts the repair
costs caused by the insured event are $254,378 including GST.
The Panel notes the FSP has paid to the Applicants $95,172.20 plus interest.
The Panel determines the balance payable to the Applicants is $159,205.80 plus
statutory interest on the said sum accruing from 18 July 2014.
2.2 Are the Applicants entitled to receive further compensation?
$1,500 already paid by FSP for compensation remains fair
In the first Determi nation, the Panel considered the Applicants had suffered an
unusual degree of inconvenience and established an entitlement to compensation.
The Panel considered an amount of $1,500 was fair in all the circumstances. The
FSP has paid the Applicants the compensation.
The Panel accepts the FSP is entitled to challenge an insured’s scope of works. The
FSP calculated its assessment of the Applicants’ entitlement and paid it on 23 June
2015.
Whilst the Panel acknowledges the stress and further time taken to reso lve this
dispute, the Panel considers the amount already paid for compensation of $1,500
remains fair in all the circumstances.
2.3 Are the Applicants entitled to receive further compensation for
professional costs?
Reports needed to rebut FSP's assessment and Panel relied on reports
In the first Determination, the Panel determined the Applicants were entitled to
compensation for professional costs incurred.
The Panel acknowledges the FSP has paid the Applicants’ claims in this regard.
The Panel notes the Applicants have engaged experts again in order to deal with the
FSP’s assessment of the claim after the first Determination.
As stated in the first Determination, pursuant to paragraph 9.4 of the FOS Terms of
Reference, FOS may require an FSP to contribute to professional costs incurred by
Applicants in the course of their dispute.
The Panel is satisfied it was necessary for at the Applicants to obtain further
assistance from experts to rebut the FSP’s assessment. Further, the Panel relied on
the expert reports in reaching this Determination.
The FSP is therefore required to reimburse the Applicants the cost of the expert
reports obtained relevant to this Determination (subject to receipts/invoices as proof).
Case No: 409123 Determination Page 9 of 15
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this Determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Ombudsman Service
(FOS) decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this Determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
3.2 Policy extracts
Policy ext racts are referred to in the FSP’s Notice of Response dated 15 September
2015. Both the policy document and the Notice have been exchanged with the
Applicants.
3.3 Relevant expert material/statements
Parties’ submissions, emails and photographs submitted in the first
Determination.
Parties’ e xpert reports submitted in the first Determination and extracts below.
Parties’ submissions, emails and photographs submitted in this Determination.
Parties ’ expert reports submitted in this Determination and extracts below.
Date Action
FSP’s expert A’s report
Dated 4 February 2014
Rectification work is not going to be simple .
Underpinning the main footings with engineer designed
headstocks supported on screw piers is the only realistic
solution we can offer, but we cannot offer any advice on
the depth of screw piers within the budget of this report,
however we do believe it will be significantly deeper than
6 metres .
Because of the nature of the soils at depth, there will be
ongoing settlements on the site and we ca nnot exclude
the possibility that after underpinning, at some undefined
time into the fut ure, that unsightly cracking might occur in
Case No: 409123 Determination Page 10 of 15
the area of the dwelling not underpinned .
Veranda and outdoor/indoor area will need reconstructing
and fully the whole foot ing system (including the slabs )
will need to be fully suspended on screw piers.
FSP’s expert I’s report
Dated 6 February 2014
…the only viable solution apart from underpinning the
dwelling, if necessary, is to use deep screw piering. We
note underpinnin g an isolat ed area of this dwelling may
encourage further cracking in the future and would
therefore not recommend partial works. We expect an
underpinning project for the entire dwelling would cost
substantial fees....
Applicants’ underpinning and
constr uction expert M
Quote 21 April 2015
Quote to remove and reinstate the area only where
underpinning is required; construct 30 conc rete piers and
headstocks to a maximum depth of 6m including engineer
and GST $76,380.76 .
Includes 5 piers west wall; 10 piers patio; 4 piers antrum
east end; 6 piers east wall; 5 piers internal wall centre .
Notes if the antrum area is not carried out deduct
$9,133.96 but still need to do the house wall .
Applicants’ underpinning and
construction expert M report
Dated 7 September 2015
Attended site 14 April 2015 .
Extensive experience in rectification work of this nature .
Damage appears to be caused by a single extreme event
such as a water leak in the south eastern corner of the
residence .
Advisable to rectify the subsi dence to prevent further
costly damage .
30 concrete piers and headstocks are required to carry
out the proper rect ification to re - level the house.
Piers need to be placed furt her along the foundation, as
when the foundations subside it puts pressure furthe r
along the foundation strip; to properly level the house,
piers and headstocks are required to the further area to
assist with jacking the foundation back to the original
level .
Hous e has substantial damage and works to rectify are
extensive and difficult .
No shortcut to rectify the property .
Applicants’ engineer J’s
scope of works
Dated 15 May 2015
J inspected site with male Applicant 15 April 2014 to
provide SOW and quotes from underpinning cont ractor
and ot her trades to return dwelling back to pre - even t
condition .
SOW developed based on geotechnical soil test
completed by FSPs’ expert A (from report dated 4/2/14) .
Testing not completed foot underpinning or repair
purposes; further soil testing for underpinning will need to
be completed prior to commencement of repairs .
Although A reported soils may bear at 3500 - 4500,
consulted wit h M and allowed underpins to a dept h of
approximately 6m to be allowed until f inal design soil test
Case No: 409123 Determination Page 11 of 15
completed.
S OW includes plumbing, underpinning and rectific ation
bui lder but not geotechnical testing, underpinning design
and engineering supervision .
During underpinning repair work, existing pipes could be
damaged by drilling and re - levelling so they should be
surveyed at first and located to reduce damage and then
surv eyed again at the completion of works to ensure no
damage – obtained SOW from plumber .
Once underpins installed and floor levelled wait 6 months
before cosmetic repairs completed .
There is subsidence to the dwelling foundation and slab
causing areas of the house to be out of level and a series
of bored concrete piers are required .
Because of foundation movement there are cracks and
sticking doors; a builder quoted for cosmetic repairs
required to back patio, veranda, external western wall,
external front wall: front entry, lounge, kitchen, downstairs
bathroom, laundry, WC, main bedroom, bedrooms
2,3,4,5, and landscaping .
Appendix A illustrates the extent of the underpins .
Geotechnical testing and underpin design $5,800 plus
GST .
Supervision through proje ct 6% of total project cost .
Plumbing work $9,790 including GST .
Underpinning estimate $76, 380. 76 .
Repair costs total $276, 884 .
Applicants’ consulting
engineer J report
Dated 14 September 2015
Level survey J did in April 2014 indicated the current
levels of the floor were outside accept able limits specified
in relevant Australian Standards and compared to the
estimated flow path of the water leak indicated
subsidence of the foundation caused by the water leak.
Confirmed by the report from the underpinning contractor,
his site inspection, and evidence provided by the owners
all suggest the movement and cracking damages
observed to the dwelling are consistent with the effects of
an underground water pipe leak.
FSP’s report from civil
engineer MC
Dated 24 March 2015
Reviewed FSP’s expert reports including scope of works
prepared by I on 22/11/13 which allowed $7,000 for soil
testing , engineer rectification design etc and $5,000 if
underpinning is completed; the abolishment of veranda
patio area ad jacent to east elevation; structural engineer
to inspect house footings at south east corner; described
work required for new conc rete strip footings for the
veranda/patio and work required .
Inspected and photographed 16/ 3/15 with male Applicant
and his bu ilder AH .
Hous e is in less than average condition and MC seeks
clarification in respect to the distinction between the
gradual age deterioration of building and damage caused
Case No: 409123 Determination Page 12 of 15
by burst water pipe .
External paving not to be included as is old damage or
poor workmanship or not damaged at all .
External steps, retaining walls and masonry walls are
either poor workmanship, non - compliant building works
and highly unlikely that leaking pipe caused obvious
structural damage .
Applicants say southern wall of house req uires screw
piles which requires the demolition and rec onstruction of
the southern deck due to the differences in floor levels in
the house. Agrees the footing at the south east corner of
the house may require underpinning; the level of the
house has (gene rally) remained the same; seeks
permission to consult with A to determine an adequate
solution to re - support the south - east corner of the house;
external cracking to south east corner is slight and can
easily be repaired; GPR survey required to detect for
voids under the footing in the vicinity of the leak and these
will require filling; survey should be completed on all of the
masonry walls to determine the extent of filling and
reinforcement to the masonry walls; cracking in the
external wall of the east veranda or east deck are slight
and can easily be repaired; no evidence of movement
cracking in the extensive area of floor tiling to the lounge
room so our opinion there has been no movement in floor
levels due to water leak and we believe screw piling un der
the southern external wall not required as no evidence of
movement; difference in levels on floor slab inconclusive
as it assumes slab initially constructed horizontal which is
often not the case; many pre - existing valleys in the laying
of lounge room floor tiles and re - levelling lounge room
floor should not be included in SOW as the lounge room
has not been constructed level; damage to door head is
due to corrosion not building movements; sliding doors in
poor condition due to poor maintenance.
Souther n deck on the house; there is obvious movement
in the joint bet ween the horizontal tiles on the deck and
the vertical external wall of the house and a dip in tiles
indicating movement; can’t say until explorative work done
and GPR survey .
Minor cracking in internal walls of the house. Agrees there
is considerable amount of minor cracking in the internal
walls of the house which would easily be repaired but
GPR survey will inform. Providing GPR survey confirms
continued foundation support, says any cracks in ground
floor walls more than 4m from the water leak or the sout h
east corner of the house are not caused by the water leak;
except for the south east corner of the house any first -
floor ceiling and wall cracking not caused by leak; except
for south - east corner of the house the minor cracking in
the walls/ceilings due to gradual deterioration.
Case No: 409123 Determination Page 13 of 15
Missing tiles on internal stair riser; Gluing ceramic tiles to
timber is poor building practice, a maintenance issue not
related to wat er leak .
Roof maintenance - mo vement in the ceiling lining joists
due to age deterioration .
Crack in the wall joint in the robe at the western end of the
house due to age deterioration.
Repairs to the north deck of the house - poor workmanship
and poor building practices are not related to building
movements .
Minor cracking in the ceilings linings and wall linings noted
in areas away from the south - east corner are matters of
poor maintenance .
Repairs to the east deck of the house - probably unsound
building works and non - compliant but we need a GPR
survey; obvious evidence of movement cracking .
Footings in the south east corner of the house have
settled and require underpinning but we need more
detailed information and wanted to consult with A .
Nort h deck has dry rot .
Wanted GPR survey .
FSP’s report from civil
engineer MC
Dated 2 April 2015
Prepared scope of works on the basis of recent visual
inspection of the property 16/3/ 15 and on the basis of
previous SOW prepared by I dated 22 November 2013
which was modified to include additional damage
considered to be caused by a leaking water pipe at the
eastern end of the house .
Notes prepared without additional investigation .
Internal wall cracking very slight which can be easily
repaired, external cracking in the south - east corner of the
hous e moderate and can be repaired .
Cont ractor must visit the site to make their own
assessment .
SOW set out in detail in the report and includes
photographs and detailed descriptions regarding
demolition of the east Veranda or east deck and work to
the lounge room, plumbing, electrical, glazing, painting,
landscaping and cleaning .
FSP’s builder’s quotation S
Dated 13 April 2015
$85,842.97 GST inclusive .
Estimate only as site inspection required to confirm details
and measurements .
Refre shed quotation from S
Dated 28 May 2015
Revised scope of works after inspection with MC on 22
April 2015 costed at $95,170.20 plus interest less excess .
S could not confirm lounge area moving as no sign of
cracking to floor tiles and walls ; the o nly cracking
movement to walls was from the action of the attached
v eranda .
Area of balcony to the canal frontage elevation of the
property said have subsided; S and MC thought that was
Case No: 409123 Determination Page 14 of 15
due to usual movement expected in a canal block .
FSP’s report from ci vil
engineer MC
Dated 10 June 2015
MC says in a later report he was at the site meeting 22
April 2015 with S and he ran through what was agreed
and not agreed noting it was agreed that new footings
proposed by I for the reconstruction of the east Veranda
would support the south east corner of the house .
Dispute conc erns the relevelling of the lounge room as
MC said no evidenc e of movement in the tiling installed on
the concrete floor (and not included in I’s SOW) .
Dispute conc erning repair to the upstairs and downstairs
walls on the western side of the house - MC unlikely that
isolated cracks on the house being 10 - 3 metres away
from the water pipe repair could be attri butable to the
burst wat er pipe.
FSP’s report from civil
engineer MC
Dated 13 July 2015
Has attended 2 site meetings and has spoken with the
engineers from I and the geotechnical engineer from A to
identify and differentiate the pre - existing damage .
A greed that if there was any significant settlement in the
concrete floor of the lounge room i t would be highly likely
there would be obvious evidence of cracking in the large
ceramic floor tiles and this was not seen by I or A or MC .
MC says the out of level lounge room conc rete slab is pre -
existing - occurred prior to the installation of the tile s or
the concrete floor slab was never level .
Included underpinning and stabilisation of the external
south - east corner which will be inc orporated in the new
900mm deep footing for the east deck since this new
footing is alongside the cracked section of ex ternal wall .
To install 30 6m deep underpinning peers is an obvious
improvement in the original structure of the building and
this represents a signific ant difference in the co sts
associated with repair work.
Describes other examples of pre - existing poor
w orkmanship and pre - existing inadequate design .
Suggested the engineering experts meet and discuss
technical issues relating to scope with the possibility of
agreement .
Analysed and commented on scope of works provided by
J and concluded the difference in c osts is $135,251; the
majority of the difference in the quotations is the
underpinning piers and the cost of repairing damage
caused by that work .
FSP’s report from civil
engineer MC
Dated 17 September 2015
Reviewed material from M and J and says they have
failed to give any consideration to the pre - existing
condition of the building .
MC found no visible evidence of washouts, voids, erosion
on the canal side of the property and says is no visible
evidence to support the theory of under slab washouts
an d wants the GPR survey and meeting with J to discuss .
Case No: 409123 Determination Page 15 of 15
Disputes subsidence of 170mm and says there would also
be evidence of catastrophic movement and so concludes
the 170mm must have been pre - existing (says he has
consulted wit h engineers from I and they agree). Also
says that the extremely poor and non - compliant building
works visible in eastern external deck the house mak es it
likely that the 170mm subsidence pre - existed the break in
the water pipe .
External damage to the wall in the south - east corner ha s
been caused by non - compliant and dangerous
construction of eastern external deck .
Underpinning of the south - east corner has been included
in the footings of the new construction of the eastern
deck .