Text of the determination
Determination
Case No: 408467 Determination Page 1 of 10
Case number: 408467 31 December 2015
1 Overview
1.1 Dispute
The Applicant owns a unit in an apartment block which was insured under a strata
title policy issued by the Financial Services Provider (FSP) and held by the owners
corporation. In March 2015, the Applicant lodged a claim under the policy for water
damage to the unit which had occurred in November 2014.
The FSP accepted the Applicant’s claim and offered to cash settle him for the cost of
repairing the insured damage, based on a quote provided by its builder (S).
The Applicant says the cash settlement offered by the FSP is not sufficient to repair
the damage, as it is based on an incomplete scope of works. The Applicant also says
that the actions of the FSP and its contractors have resulted in his tenant vacating
the unit, causing further losses.
1.2 Issues and key findings
Is the FSP required to increase the cash settlement amount?
The cash settlement of $2,661.50 offered by the FSP reflects the reasonable costs of
repairing the damage to the Applicant’s unit caused by the water leak. Accordingly,
the FSP is not required to increase the cash settlement amount.
Is the Applicant entitled to any additional amounts?
The Applicant is not entitled to benefits for loss of rent under the policy as the water
damage did not make the unit uninhabitable. The available information does not
establish that the FSP and its contractors acted unreasonably or were primarily
responsible for the tenant vacating the premises. Accordingly, the Applicant is not
entitled to any additional amounts.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is required to cash settle the Applicant’s claim for $2,661.50, plus interest
as set out in section 2.1 below. The FSP is not required to pay any further amounts
to the Applicant.
Case No: 408467 Determination Page 2 of 10
2 Reasons for Determination
2.1 Is the FSP required to increase the cash settlement amount?
Dispute concerns scope of works and cost of repairs
The FSP accepted the Applicant’s claim for water damage to the wa lls and ceiling of
bathroom and laundry of his unit, which had been caused by a leaking bidet in the
unit above.
The Applicant (through his broker) initially provided a quote for $1,265 from his
builder (R) for the replacement of the damaged plasterboard wall and ceiling.
The Applicant subsequently provided an updated quote from R for $5,181, which also
included:
the replacement of the vinyl flooring (which had been stained by the leaking
water); and
the electrical inspection and replacement (if required) of power points in the
affected area.
After receiving R’s updated quotation, the FSP appointed an assessor (AS) to inspect
the damage and a builder (S) to prepare a scope of works and provide a quotation for
the necessary repairs.
During the course of this dispute, the FSP offered to cash settle the Applicant’s claim
for $2,661.50, based on S’s scope of works and quotation for the repair of the
damaged plasterboard and the replacement of the vinyl flooring.
The proposed cash settlement included an amount of $346.50 for the replacement of
three down lights in the bathroom. This additional amount was offered by the FSP on
an ex gratia basis to address concerns expressed by the Applicant about statements
made by the FSP’s electrician (see section 2.2 below).
The Applicant says the cash settlement offered by the FSP is insufficient because it
does not reflect the actual cost of the repairs, which he had completed by his builder
(R) in September 2015.
In particular, the Applicant says the scope of works prepared by the FSP’s builder (S)
(on which the offer was based) provides for the repair of the damaged plasterboard,
rather than its complete replacement.
The Appl icant says the cash settlement amount should be increased to reflect R’s
updated quotation, plus the cost of replacing the seven down lights in the kitchen and
bathroom.
Available information indicates damaged plasterboard could be repaired
Under the term s of the policy, the FSP can elect to cash settle the Applicant’s claim
for the reasonable cost of repairing the damaged property to a condition which is
equivalent to its condition when new.
Case No: 408467 Determination Page 3 of 10
As outlined above, the Applicant considers the scope of works pr epared by the FSP’s
builder (S) is insufficient to repair the damage to the plasterboard walls and ceiling of
his unit.
While S’s scope of works and quotation provide for the existing plasterboard to be
sanded and re-painted (at a cost of $1,890), the Applicant says the plasterboard
needs to be replaced in its entirety.
The FSP’s assessor (AS) who inspected the damaged plasterboard on 16 April 2015
(approximately five months after the water leak) considered that it could be effectively
repaired.
The Applicant has provided a copy of a product advice sheet issued by the
manufacturer (C) of the plasterboard used in the Applicant’s unit, which provides
advice about the assessment and repair of flood damage to plasterboard.
The product advice sheet states that in general, damaged plasterboard should be
replaced, especially in the case of ceilings which have been inundated. However, the
product advice sheet also makes it clear that plasterboard which has been exposed
to water should first be allowed to dry a nd then inspected for signs of deterioration or
distortion.
The advice sheet states that, where the paper has become wet or the paper lining
has deteriorated, the board strength and the holding capacity of the fixings may be
reduced. However, it also states that the existing plasterboard can be retained if after
drying it remains flat, the paper shows no sign of delaminating from the core and the
strength of the board does not appear to be affected.
The Applicant has also provided:
a copy of an email from a customer consultant (B) employed by C which
generally reflects the advice provided in C’s product advice sheet;
a product data sheet issued by C which indicates that plasterboard does not
have specific moisture resistant properties and therefore should not be used
where it will come into contact with water; and
an information sheet prepared by the relevant trade association (AW) which
states that, where dwellings which have been inundated by flood waters, the
affected plasterboard will generally need to be replaced as delamination may
occur and the stud adhesive may be compromised.
While the information provided by the Applicant confirms that careful consideration
needs to be given to the long-term effects of water damage to plasterboard, it does
not establish that all water-affected plasterboard necessarily needs to be replaced.
In particular, the product advice sheet prepared by C and the information sheet
prepared by the trade association clearly indicate that, in some situations, water-
affected plaster board can be safely retained.
Further, the product advice sheet was issued following severe flooding caused by
cyclones in northern Australia. Accordingly, the advice contained in it was provided in
the context of properties which had been inundated by flood waters for an extended
period of time.
Case No: 408467 Determination Page 4 of 10
While there is limited information available about the incident which damaged the
Applicant’s unit, given the nature of the leak and based on the photographs of the
damage provided, it does not appear to have resulted in the sustained inundation of
the property for an extended period of time.
It is not clear from the photographs of the damaged plasterboard provided by both
parties whether it could be effectively repaired. However, the photographs do not
show any obvious deterioration or distortion of the board, as would necessarily
require replacement.
The FSP’s assessor (AS) inspected the plasterboard approximately five months after
the water leak occurred, by which stage it would have dried out. AS has confirmed
that, while the paint had peeled, he did not observe any delamination or any sign of
mould growth and the plasterboard remained solid to the touch.
Accordingly, based on his experience, AS considered the existing plasterboard could
be retaine d and successfully repaired. The scope of works prepared by the FSP’s
builder (S) indicates that he agreed with this approach.
The FSP has advised that AS has over 40 years’ experience in the insurance
industry, while S is a licensed builder with over 30 y ears’ experience. On this basis, I
am satisfied that AS and S are appropriately qualified and experienced to express an
opinion as to whether the damaged plasterboard could be effectively repaired.
As discussed above, the Applicant has provided information about the general
treatment of water-affected plasterboard. However, he has not provided any
information to suggest that any of the authors of that information (C, B or AW)
inspected the actual damage to his property and therefore were in a position to
advise on the appropriate measures to take in the circumstances.
While the Applicant has provided a quotation from his builder (R) for the removal and
replacement of the damaged plasterboard, R’s quotation does not include an
assessment of the damage or address whether the plasterboard could be effectively
repaired.
In these circumstances, it was reasonable for the FSP to rely on the reports prepared
by its assessor (AS) who had inspected the damage first-hand and advised that the
plasterboard did not need to be replaced.
Settlement amount is not otherwise inadequate
The quotation provided by the FSP’s builder (S) confirms he was prepared to carry
out the repairs to the plasterboard and the replacement of the vinyl floor covering at a
total cost of $2,565 (including GST).
However, the FSP elected to offer the Applicant a cash settlement after he expressed
concerns about the skill and professionalism of the FSP’s contractors.
The fact that the Applicant’s builder has provided a higher quotation to carry out the
necessary repairs does not if itself establish that the quotation provided by S was
inadequate.
Case No: 408467 Determination Page 5 of 10
The second quotation provided by R (which includes the replacement vinyl flooring
and the electrical works) is not itemised. Accordingly, it is not possible to determine
which aspects of the works are responsible for R’s quotation exceeding that provided
by S.
However, given R initially quoted for the replacement of the plasterboard at a cost of
$1,265, it is possible that the higher cost is attributable to the replacement of the vinyl
flooring and the electrical works.
Other than R’s non -itemised quotation, the Applicant has not provided any
information which confirms that the amount of $675 quoted by S for the replacement
of the vinyl flooring is inadequ ate. The photographs provided support AS’s
description of the vinyl flooring as having been “loose laid” over the existing linoleum,
rather than adhered directly to the timber flooring.
The FSP’s electrician (SG) inspected the electrical fittings and confi rmed that there
they had not been damaged by the water leak. The Applicant has not provided any
information disputing this. Accordingly, it appears that the additional item included in
R’s updated quotation (namely, the electrical inspection and the replac ement of any
water damaged power points) is no longer required.
Given the FSP has reiterated its ex gratia offer of $346.50 for the replacement of
three down lights, it is appropriate that this amount be included in the cash settlement
(even though the down lights do not appear to have been damaged by the water
leak).
For the reasons outlined above, I am satisfied that the cash settlement of $2,661.50
offered by the FSP reflects the reasonable costs of repairing the damage to the
Applicant’s unit caused by the water leak.
It was open to the FSP to pay the cash settlement amount, despite the current
dispute. Accordingly, the FSP is required to pay interest on the settlement amount at
the rate calculated in accordance with section 57 of the Insurance Contracts Act
1984 (Cth), from 24 August 2015 until the payment date.
The FSP is not required to waive the excess of $250 which applies to each incident
for which a claim is made under the policy.
The Applicant has provided a copy of an email to the FSP which reflects his
understanding that the FSP’s consultant had agreed to waive the excess during a
telephone discussion in May 2015. However, the consultant responded the following
day denying the excess had been discussed.
The FSP says it is not its practice to waive the excess and, where its consultants
agree to do so, they would generally confirm this in writing to the customer.
Accordingly, there is conflicting information about whether or not the FSP’s
consultant agreed to waive the excess.
In any event, the FSP is entitled to impose the excess under the terms of the policy.
Even if the Applicant had established that the FSP’s consultant agreed to waive the
excess (which he has not), he has not shown that he relied on that advice to his
Case No: 408467 Determination Page 6 of 10
detriment. In these circumstances, the FSP is not bound by any advice given b y its
consultant.
2.2 Is the Applicant entitled to any additional amounts?
Applicant seeks payment for losses caused by tenant vacating
The Applicant says his tenant vacated the unit in June 2015, as a result of comments
made by the FSP’s contractors about th e safety of the down lights in the kitchen and
bathroom.
Accordingly, the Applicant seeks compensation for loss of rent during the period the
unit was empty, together with advertising and re-letting fees as well as any amounts
payable to the tenant for costs associated with vacating the unit.
Applicant is not entitled to loss of rent benefits under the policy
The policy provides for the payment of benefits for loss of rent (and re-letting costs)
where the Applicant’s unit becomes unfit to be occupied for it s intended purpose, as
a result of an insured event covered under the policy.
The damage to the walls, ceiling and floor cased by the insured event (the water
leak) did not result in the Applicant’s unit becoming uninhabitable. The tenant
continued to live in the unit for approximately six months after the damage occurred.
Accordingly, the Applicant is not entitled to payment for loss of rent or re-letting costs
under the terms of the policy.
Available information does not establish FSP’s electrician acted unreasonably
The Applicant says that, when the FSP’s electrician (SG) attended the property in
April 2015, he advised the tenant that the down lights were a potential fire hazard.
The quotation provided by the FSP’s builder (S) includes a footnote which s tates that,
during the inspection:
SG removed one of the down lights in the bathroom to determine why it was not
working;
on removing the down light, SG found a considerable amount of timber
shavings in the light fitting, some of which were in a charcoaled state; and
SG disconnected the down light and advised the tenant that she should ask the
property manager to have all of the remaining down lights in the property
inspected to ensure they were safe.
SG has subsequently confirmed that, in his view, the cha rcoaled timber shavings
indicated that the light had not been properly installed and had burnt the building
material around it.
After re-inspecting the down light on 14 May 2015, SG advised that he considered
that it did not meet the minimum clearance req uirements imposed under the
applicable Australian Standard. Following his inspection, SG provided an electrical
safety certificate confirming that he considered the down light in the bathroom to be a
potential fire hazard.
Case No: 408467 Determination Page 7 of 10
The Applicant disputes that there are any safety issues resulting from the manner in
which the down lights have been installed. He says the lights have been in place
since he purchased the property approximately eight years ago and he believes they
comply with all applicable building requirements.
During the course of this dispute, the Applicant arranged for his electrician (MS) to
inspect the down lights. The Applicant has provided an email from MS which states
that he replaced the globes to the down lights and confirmed that they were all in
good working order.
However, MS does not comment specifically on whether the installation of the lights
complied with the minimum clearance requirements and has not provided an
electrical safety certificate (apparently because he considered this to be a waste of
time and money).
Based on the available information, it is unclear whether there is an ongoing safety
issue with the down lights.
However, given the presence of charcoaled timber shavings (as reported by SG and
confirmed by S), it was prudent for SG to advise the tenant and the Applicant of a
potential safety issue.
FSP is not responsible for losses incurred due to tenant vacating
For the reasons outlined above, I do not consider the FSP’s electrician (SG) acted
unreasonably when he informed the Applicant’s tenant of a potential safety issue
relating to the lights.
On this basis, the FSP is not liable for any losses incurred by the Applicant as a
result of his tenant vacating the property.
In any event, I am not satisfied that the FSP and its contractors were primarily
responsible for the tenant vacating the property.
The Applicant has provided an email from his property manager which states that the
tenant gave notice to vacate due to the fact that the “urgent flood damage repairs”
had not been attended to since November 2014 and had become a fire hazard.
To the extent that the tenant was concerned about the potential issue with the down
lights identified by SG, it was open to the Applicant to obtain a certificate of electrical
safety confirming that there were no risks associated with these lights.
In the circumstances, this would have been a reasonable step for the Applicant to
take in order to mitigate the risk that the tenant would leave. The email provided by
the Applicant’s el ectrician (MS) did not provide sufficient detail to address the
tenant’s reasonable concerns about the safety of the down lights.
To the extent that the tenant was concerned about the delay in the repairs being
undertaken, the FSP and its contractors were not primarily responsible for these
delays.
The majority of the delay occurred due to the claim not being lodged until
approximately four months after the damage occurred, apparently as a result of
Case No: 408467 Determination Page 8 of 10
incorrect advice provided by the body corporate and its b roker. The FSP is not
responsible for this delay.
Applicant is not otherwise entitled to compensation
The Applicant is dissatisfied with the quality of service provided by the FSP and its
contractors. In particular, he says the FSP’s assessor, builder an d electrician acted
inappropriately by discussing the claim with the tenant and the property manager,
rather than dealing directly with him as the owner of the unit.
Under the Terms of Reference, FOS may award compensation (capped at $3,000)
for non-financial loss where an applicant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
The fact that the strata policy excludes cover for consequential losses does not
preclude the award of compensation where such losses have occurred as a result of
the way in which the FSP has handled his claim, rather than as a result of the insured
event itself.
However, FOS adopts a conservative approach to the award of compensation for
non-financial loss. FOS expects applicants to be moderately robust and bear the
usual stress and inconvenience associated with an insurance claim.
The parties have provided conflicting information about various events which
o ccurred during the claim process. For example, the FSP’s assessor says that he
initially tried unsuccessfully to contact the Applicant before calling the property
manager and the tenant to make arrangements to inspect the property.
However, even if the App licant’s account of events is accepted, I am not satisfied that
the stress and inconvenience he suffered due to the actions of the FSP and its
contractors is sufficient to justify the award of compensation in the circumstances
(noting that the settlement amount already includes an additional $346.50 offered on
an ex gratia basis).
To the extent that the FSP and its contractors contacted the property manager and/or
the tenant, it is likely this was done in good faith to expedite the settlement of the
Applic ant’s claim. For the reasons outlined above, I am not satisfied that the
Applicant has established that the FSP and its contractors otherwise acted
unprofessionally in managing the claim.
Case No: 408467 Determination Page 9 of 10
3 Supporting information
3.1 FOS approach to this dispute
This Determination follows the review of a Recommendation issued on behalf of the
Financial Ombudsman Service (FOS) on 12 November 2015. The Recommendation
was rejected by the Applicant.
This case has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this Determination, commentary has been restricted to those issues which are
considered directly relevant to the outcome only.
3.2 Provision of Product Disclosure Statement (PDS)
FSP is entitled to rely on terms of policy as set out in PDS
During the course of this dispute, the Applicant advised that he had not been
provided with a copy of the Product Disclosure Statement (PDS) setting out the terms
of the strata policy.
However, in circumstances where the strata policy was issued to the owners'
corporation and was arranged by a broker, the FSP was not required to provide the
Applicant with a copy of the PDS.
Accordingly, the fact that the Applicant may not have received a copy of the PDS
does not prevent the FSP from relying on the terms of the policy (as set out in the
PDS) for the purpose of settling the Applicant’s claim.
3.3 Terms of policy
Subject Terms
Settlement of
claims (Policy 1)
If Your Insured Property is damaged, We may choose to either rebuild,
replace, repair or pay the amount it would cost to rebuild, replace or repair.
The amount We pay under Policy 1 will be the cost of Replac ement at the
time of Replacement …
Replacement means:
the reasonable cost of rebuilding, replacing or repairing to a condition
which is equivalent to or substantially the same as but not better nor more
extensive than when it was new …
Case No: 408467 Determination Page 10 of 10
Subject Terms
Special benefits –
loss of rent
When You have leas ed out or can substantiat e by means of a signed
agreement that You would have leased out Your Lot/Unit or Common Area
We will pay the actual Rent You los e or would have lost if Your Lot/Unit or
Common Area is made unfit to be occup ied for its intended purpose by …
loss or damage that is admitt ed as a claim under Policy 1.