Storm damage claim to path and retaining wall declined

FirmFinancial Firm (Unknown - Insurer)
Decided2015-10-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$1,000
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insured's claim for storm-related damage to a concrete path and boundary retaining wall was declined. AFCA found the damage was excluded and ordered only refund of the $1,000 excess if not already paid, declining compensation for the claims delay.

The effective cause of the path damage was long-term structural faults in the retaining wall and stormwater system, and the policy excludes both erosion over time and retaining walls.

Issues

Subjects and remedies

home or building damagenatural disasterrefund fees or charges

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 408089 Determination Page 1 of 8 Case number: 408089 28 October 2015 1 Overview 1.1 Dispute The Applicant lodged a claim on his Home and Contents Policy after a concrete path in the insured property slipped and fell away during a storm. The retaining wall between his and his neighbour‟s property was also damaged. The FSP denied the claim. It submits the Applicant has not established the damage was caused by a single storm event; the pavement moved due to settlement which is excluded by the policy; and retaining walls damaged by a storm event are also excluded by the policy. The Applicant disputes the denial of his claim. He asserts the path and retaining wall were damaged due to very heavy rainfall and landslide in April 2015. He also complains about the claims process. 1.2 Issues and key findings Is the FSP obliged to pay the Applicant’s claim ? While the FSP‟s policy covers damage to walls and paths, the damage to the walls and paths must be caused by an insured event and not by an excluded event. Even if it was accepted the damage to the retaining wall was caused by the insured event of storm, the policy terms are clear. The policy does not cover loss or damage to retaining walls. As for the damage to the path, even if it is accepted the damage to the path was caused by subsidence which occurred within 72 hours of the storm event, the preponderance of the expert opinion is the real or effective cause of the damage to the path was erosion over time caused by structural faults in the design of the retaining wall and the stormwater drainage system. Damage caused by erosion over time and structural faults are excluded from cover. Is the Applicant entitled to compensation? The Applicant is not entitled to compensation as although the assessment was delayed, there was not an unusual amount of time taken to respond to the claim. Further, the FSP has apologised for any inconvenience and frustration experienced as a result of the claims process. Case No: 408089 Determination Page 2 of 8 1.3 Determination This Determination is in favour of the FSP. The FSP need take no further action in relation to the claim, save to refund the policy excess to the Applicant, if it has not already done so. Case No: 408089 Determination Page 3 of 8 2 Reasons for Determination 2.1 Is the FSP obliged pay the Applicant’s claim ? Rainfall event 21 and 22 April 2015 Subject to terms and conditions, the FSP‟s policy provides cover for loss or damage caused by an insured event during the period of insurance which event includes a storm. The Applicant bears the onus to establish on the balance of probabilities the claimed loss was caused by storm as defined in the policy. The Applicant claims on 22 April 2015 there was “ferocious rainfall” and “water was running like a river”. He says the next day, he noticed severe movement of the concrete path way down the left side of the house and the boundary retaining wall was leaning out significantly. He acknowledges this was seen in autumn 2014 but says this was imperceptible. He says the situation worsened after the heavy rainfall during April and in the first half of May 2015. When the Applicant claimed for this damage in May 2015, the FSP recorded the following description of the incident: “ Due to a landslide the concrete path split/separated from the main slab, affecting neighbouring brick fence ...” While the Bureau of Meteorology (BOM) do not record particularly significant rainfall in the months of April and May 2015, the BOM records show on 21 and 22 April 2015, 119.4mm and 105.8mm of rain fell in the local area. The Applicant retained a builder (BC) to quote to repair the damage. BC inspected the property and reported: “… (he) found the retaining wall has moved due to heavy rain within a few short hors, which overwhelmed the retaining wall. Also severe damage of the concrete pathway down the left side of the hose (sic).” Prima facie claim established Having considered the material submitted by the Applicant, I am satisfied a storm event occurred on 21 and 22 April 2015 as a result of which there was severe movement of the concrete path down the left side of the house and movement of the boundary wall. I am satisfied the Applicant has established a prima facie claim. The onus shifts to the FSP to prove on the balance of probabilities an exclusion applies if it seeks to deny or limit its liability for the loss. Policy does not cover loss or damage to retaining walls The Applicant says after the storm the boundary retaining wall “was leaned out significantly”. The FSP says even if the damage was attributed to the one-off storm event, the policy excludes loss or damage to retaining walls. Case No: 408089 Determination Page 4 of 8 I have considered the cover provided by the policy. The policy terms are clear and unambiguous. Even if damage was caused by the storm, the policy does not cover loss or damage to retaining walls. Expert agrees path settled severely As for the damage to the path, both the FSP‟s assessor and engineer (MP) agree the concrete path along the side of the house has settled severely. But, based on reports from its assessor and MP, the FSP declined to pay the claim. It contends the damage was caused by excluded events such as erosion and settlement. Further, whilst it acknowledges the Applicant noticed a worsening of the path following heavy rain in April, it submits the damage cannot be attributed to a single event as is required by its policy terms. Rather it submits the damage was due to a number of minor flooding events since construction of the path which have gradually worsened the damage to the path. The assessor noted the Applicant told her after the heavy rain in April 2015, the path was not safe to walk on. She says he also told her in winter 2014 he began to notice movement within the pathway. The Applicant acknowledges damage was seen in 2014, but says it was imperceptible and the situation worsened after the April 2015 heavy rain. MP wrote his opinion was based on two pieces of information one of which was the Applicant told him the settlement had been gradual and the recent heavy rain had made the damage worse. The Applicant says he did not discuss with the engineer whether the settlement was gradual or as a result of a single flooding. Nonetheless, I accept the Applicant acknowledges movement, albeit small, had been noticed in the path before the rainfall event in April 2015. Further, there was a second reason for the engineer‟s opinion. He said: “The appearance of the path and the adjacent surfaces indicates that most of the movement and damage has been long-standing. Concrete surfaces at locations of differential movement such as at the front and around the displaced trench gate have a weathered mossy appearance. Gap infill materials also appear to have been in place for some time.” Both engineer and the assessor took a number of photographs of the property. I have considered those photographs carefully and agree the appearance of the path and adjacent surfaces indicate long-standing damage. Whilst I acknowledge the point made by the Applicant that the FSP‟s agent filled the gap between the retaining wall and the damaged pathway with recycled building materials, other gaps where the pathway has dropped and moved away from the house show plant growth in the gaps indicative of long-standing damage. Expert establishes damage to path caused over time by structural fault in both the stormwater drainage system and the retaining wall MP described the retaining wall and its height and thickness and said the ratio was such that the wall was structurally inadequate. Thus he said when soil behind the wall became wet, pressure is exerted which exceeds the strength of the wall and the wall is pushed forward. This creates a gap which allows backfill soil to enter which in Case No: 408089 Determination Page 5 of 8 turn reduces the support for the path. The gap also allows more water to enter during the next rainstorm, repeating the cycle of wall movement. MP also described the stormwater drainage and the size of the pipes which do not have adequate capacity to carry the volume of water collected by the sumps during heavy rain. Having considered these features, MP described a sequence of events which he sai d led to the current condition of the path. MP said the damage to the path was caused because it settled and this occurred over a period of time. The path settled because it was constructed on inadequately compacted filling. Further, the inadequate stormwater drainage allowed too much water to flow on the path during heavy rain. When the path was flooded, the soil became wet and the wall moved forward. The wall also moved forward because it was structurally inadequate. This sequence of events and the ensuing damage to the path occurred every time it rained. Effective causes of the damage to the path are excluded from cover In short, it was the engineer‟s opinion the damage to the path was caused by the structural fault in both the stormwater drainage system and the retaining wall and this caused settlement which damaged the path over time. The policy terms are clear. These causes of damage are excluded from cover. I acknowledge the Applicant‟s builder has provided an opinion about the cause of damage. However, having considered the opinion, the builder only comments on the cause of damage to the retaining wall. He says it moved due to heavy rain. Although he notes the concrete pathway was damaged, he does not give an opinion as to the cause of damage to the concrete pathway. Even if I was to infer it was the builder‟s opinion the damage to the concrete path was also caused by the heavy rain, I prefer the expert report from the engineer, MP. His report is more persuasive because of his qualifications as a structural engineer and because of the detail of the investigation into the cause of damage. Further, I consider the photographs support MP‟s opinion. The policy covers damage to the Applicant‟s home. While home includes walls, fences and pathways, the damage to the home must be caused by a single insured event. The damage cannot be caused by an excluded event. The Applicant says he noticed a subsidence of the path the next morning after the storm. The FSP‟s policy will cover loss or damage caused by subside nce if it occurs within 72 hours and directly because of a storm. However, having considered all the expert material, I consider the effective cause of the damage was not the storm event, but the structural faults in the stormwater drainage system and the retaining wall. With the heavy rainfall, there were several causes operating contemporaneously. But having considered the expert material carefully, I am satisfied the effective cause of the damage to the path was the structural faults in both the stormwater drainage system and the retaining wall and this caused settlement which damaged the path over time. In the absence of these faults, the heavy rain in April 2015 would not have caused damage to the path. The policy terms are clear. These causes of damage are excluded from cover. Case No: 408089 Determination Page 6 of 8 If not already done so, the excess of $1,000 paid by the Applicant to the FSP should be refunded. 2.2 Is the Applicant entitled to compensation? The Applicant complains about the FSP‟s claims management and time taken to respond to the claim. The Applicant made the claim on 15 May 2015. Although the FSP failed to properly instruct the first assessor who attended the property on 22 May 2015, by 4 June 2015, an assessor attended the property to report on the damage and the cause of t he damage. The assessor advised the Applicant the FSP‟s policy did not respond to the Applicant‟s claim. The FSP further advised the Applicant the claim was declined by email and by letter dated 16 June 2015. The FSP also arranged for a structural engineer to report to it about the damage and the cause of the damage. He reported to the FSP on 7 August 2015. By letter dated 12 August 2015, the FSP made its final decision to decline the claim. FOS may award compensation in certain circumstances FOS may decide an FSP should compensate the Applicant for non-financial loss (capped at $3,000) only where there has been an unusual amount of physical inconvenience, time taken to resolve the situation, or interference with the Applicant‟s expectation of enjoyment or peace of mind. FOS takes a conservative approach to compensation for non-financial loss. Whilst inconvenience is a form of non-financial loss, FOS considers compensation should not be provided when the Applicant merely suffers inconvenience that is a normal part of doing business. FOS expects an Applicant to be moderately robust and bear the normal degree of inconvenience experienced when a problem arises. Not an unusual amount of time taken to resolve the matter and the FSP apologised The FSP canvassed this issue in its IDR letter dated 12 August 2015. It acknowledged there were delays in responding to correspondence and there was an initial error with the instruction provided to its first assessor which resulted in the assessment not being completed in a timely manner. It apologised for any inconvenience and frustration the Applicant may have experienced as a result of the claims process. Having carefully considered the material provided, I am not satisfied there was an unusual amount of time taken to resolve the situation. Although the first assessment was delayed, the claim was responded to and formally declined about a month after the claim was made. Further, I acknowledge the apology made by the FSP in its IDR letter. In all the circumstances, I do not consider it is fair or appropriate an award of compensation be made. Case No: 408089 Determination Page 7 of 8 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this Determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extract s “ What we cover - your home Your home that you own or are responsible for and use primarily for domestic purposes and including the following at the insured address:  ….outdoor walls, gates, fences and any structural improvements on land  garden borders, pathways and paved or concreted floor areas  retaining walls which are located within the boundaries of the insured address What you are covered for - Insured events If you have a home insurance policy, we cover your home for loss or damage at the insured address caused by an insured event during the period of insurance. Storm We cover Loss or damage caused by a storm We do not cover loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or damage caused by a landslide or subsidence that occurs within 72 hours of, and directly because of, a storm and not because of erosion over time, structural fault or design fault loss or damage to retaining walls, sea walls, garden borders and free standing outdoor walls; Case No: 408089 Determination Page 8 of 8 resultant cracking to paths, driveways, any outdoor surfaces, but we will cover them if they are washed away by the storm General exclusions You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events: • „Storm‟ (see page 20); • „Flood‟ (see page 19); • „Earthquake and Tsunami‟ (see page 21); • „Explosion‟ (see page 25) Glossary of important words and phrases Incident or event means a single event, accident or occurrence which you did not intend or expect to happen.. Storm means a storm, cyclone or severe atmospheric disturbance. It can be accompanied by strong winds, rain, lightning, hail, snow or dust. ” 3.3 Relevant expert material/statements considered  Parties‟ submissions, emails and photographs .  Correspondence between the parties.  Policy renewal document 13 May 2014.  BOM daily weather observations April and May 2015.  FSP‟s policy and claims screens.  FSP‟s Authority to first assessor 21 May 2015 .  Second assessor‟s report and photographs 4 June 2015 .  Structural engineer‟s repor t (MP) and photographs 7 August 2015.  Structural engineer‟s email to FSP 17 September 2015 .  Applicant‟s invoice and quote from builder 20 August 2015 .