Denial of storm damage claim for swimming pool following Cyclone Marcia

FirmFinancial Firm (Unknown - Insurer)
Decided2015-12-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed$34,853
SourceAFCA PDF

Summary

The homeowner claimed storm damage to a swimming pool after Cyclone Marcia, and the FSP denied the claim under insured-event limits and exclusions. AFCA found subsidence within 72 hours of the storm was covered and the storm was the proximate cause, so the FSP must settle the claim under the policy with interest if paid in cash.

Storm cover extends to subsidence within 72 hours of a storm, and the dominant operative cause of the loss was the storm rather than excluded seepage or the insurer's proposed cause.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 407654 Determination Page 1 of 8 Case number: 407654 23 December 2015 1 Overview 1.1 Dispute The Applicant lodged a claim under his home insurance policy for storm damage caused to his swimming pool. The Applicant says the damage was caused by Cyclone Marcia on 20 February 2015. The Financial Services Provider (FSP) denied the claim on the grounds the loss did not fall within an insured event and fell within one of the exclusions clauses. 1.2 Issues and key findings Have the Applicants established an insured event? The Applicant has established an insured event because:  the cyclone caused the subsidence of the backfill material resulting in damage to the pool within 72 hours, and  there is no evidence any failure (if there was one) to have the backfill cement stabilised, would have prevented the damage. Has the FSP established an exclusion applies? The FSP has not established an exclusion applies because the proximate cause of the damage was the storm. 1.3 Determination This Determination is in favour of the Applicant. The FSP is to settle the claim in accordance with the terms and conditions of the policy. In the event a cash settlement is made, interest is to be paid on that amount in accordance with the Insurance Contracts Act from 21 July 2015 to the date payment is made. Case No: 407654 Determination Page 2 of 8 2 Reasons for Determination 2.1 Have the Applicants established an insured event? The policy provides some cover for storm damage The Applicant has the onus of establishing the claim falls within the policy. The policy covers loss or damage caused by storm, but does not cover subsidence unless that subsidence occurs within 72 hours of a storm (and is not due to structural fault or design). Storm cover is also limited in that it does not cover loss or damage to swimming pools where it is caused by water leaking down the sides, against the sides or getting underneath the pool. Relevant extracts from the policy are set out in section 3.2 below. The experts explain how the damage occurred The Applicants obtained a report from AW, at the request of the FSP. That report is consistent with a report obtained by the FSP from JH. AW and JH are consistent in that:  the cyclone caused excessive rain, and  due to the rain, the sodden backfill material subsided and made its way down the side of the pool wall causing damage to the sides and underneath of the pool. JH included an intermediate step to say the rain saturated the ground such that the hydrostatic pressure of the ground exceeded the pressure of the pool, causing the bowing of the pool shell, and the backfill then slumped into that void. BB, also engaged by the FSP, was not able to determine a cause of the damage. The findings of the expert reports are set out in section 3.3 below. The Applicant has established an insured event I accept the storm resulted in subsidence as shown in the photos provided by the experts and that such subsidence led to the damage to the pool. Given the Applicants lodged their claim within four days of the cyclone, I am satisfied the subsidence occurred within 72 hours of the storm. JH considered the pool shell had not been installed according to Australian Standards in that the backfill was not cement stabilised. The Applicants dispute this. The FSP did not produce the relevant Australian Standard and JH did not comment that the failure to have the cement caused the damage. In other words, JH did not conclude that had the cement been present the damage would not have occurred. I note JH‟ s report states the purpose of the cement is to prevent the backfill from flowing under the pool should distortion occur. However, JH was referring to minor shell movements that may occur during the life of the pool. There was no reference Case No: 407654 Determination Page 3 of 8 to such reinforcement being capable of preventing damage that may result from a cyclone. Further, I do not accept the damage to the pool was caused by water leaking down the sides, against the sides or getting underneath the pool. The expert repor ts do not refer to the “leaking” of wat er being the cause of the damage. The onus is therefore on the FSP to establish it has a basis to exclude the claim. 2.2 Has the FSP established an exclusion applies? The proximate cause of damage was the storm The FSP referred to general exclusions for subsidence and seepage of water contained in the policy. In respect of the exclusion regarding subsidence this has been considered above. The policy also excludes loss or damage caused by, arising from or involves water seeping or running:  through the earth (hydrostatic water seepage)  down the sides or underneath swimming pools … causing them to move, change shape, lift or leak through their hydrostatic valves. JH was of the view that hydrostatic pressure as a result of the storm, caused the damage to the pool. In determining the cause of the damage, it is necessary to determine the proximate cause of the damage. This is the dominant, effective or operative cause of the loss, whether or not that be the last in time or the sole cause. Having considered all the available evidence, even if the hydrostatic water seepage referred to in JH‟s report was a cause of the damage, it was not the operative cause of the loss. This also applies to any water seeping or running down the sides and underneath the pool (although this was not referred to directly in the reports). The proximate cause of the loss was the storm. The FSP is therefore not entitled to deny the claim. 2.3 Other matters It is unclear how many assessments were made of the pool The Applicants referred to there being four rather than three people that came to assess the damage to their pool, but only three reports were produced to FOS. The FSP did not respond to this allegation. However, as this Determination is in favour of the Applicants there is no need to pursue this issue. It is not appropriate to award compensation for non financial loss The Applicants also complained about the poor service they received from the FSP, in particular the numerous times they were placed on hold for lengthy periods of time. Case No: 407654 Determination Page 4 of 8 They also complain about the length of time the FSP took in respect of their claim. The chronology above shows the Applicants obtained a report and quote for repairs within one month of the cyclone. The FSP, however, took nearly four months after receiving the Applicants‟ quote, to conduct their own enquiries and then deny the claim. While it is understandable the Applicants are dissatisfied with the service the y received from the FSP, in this instance, I do not consider it appropriate to award an amount for non financial loss. Case No: 407654 Determination Page 5 of 8 3 Supporting information 3.1 The FOS Approach I have determined this dispute based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties. There has been a full exchange of all documents relied on to make this Determination and each party has had the opportunity to address any issues raised by the other. This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it was appropriate to proceed directly to a Determination in line with the Operational Guidelines to the FOS Terms of Reference. 3.2 Relevant policy terms Words with special meanings Storm means a storm, cyclone or severe atmospheric disturbance. It can be accompanied by strong winds, rain, light ning, hail, snow or dust. Storm We cover Loss or damage by a storm We do not cover – … – loss or damage caus ed by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or damage caus ed by a landslide or subsidenc e that occurs within 72 hours of, and directly becaus e of, a storm and not because of erosion over time, structural fault or design fault; … – the cost of cleaning mud or clearing debris out of tanks, swimming pools or spas, including replacing or storing the wat er; – loss or damage to swimming pools or underground tanks caused by wat er leaking down the sides, against the s ides or getting underneath them… General exclusions You are not covered under any section of this policy for damage, loss, cost or legal li ability that is caused by, arises from or involves: … Ground movement Case No: 407654 Determination Page 6 of 8 erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other eart h movement, but we will cover landslide or subsidence that is specifically covered und er the following insured events: – „Storm‟ (see page 18)… Seepage of water water seeping or running: – through the eart h (hydrostatic water seepage); – … – down the sides or underneath swimming pools or spas causing them to move, change shape, lift or leak t hrough their hydrostatic valves… 3.3 Expert reports Report Extract A W‟s report 3 March 2015 “ It is most probable that the resultant damage to the fibreglass pool shell has been occasioned by impact from excessive surface ground water and subsequent subsidence of the backfill material originally placed behind the pool shell walls at the time of the original installation. … A lthough the pool is likely to have sustained numerous varieties of inclement weat her patterns over the past 9 years or so, such a volume of excessive rain water over a short period of time over that weekend is most likely to have attributed to the failure of the structural fibreglass shell. The combination of excessive wat er entering the surrounding soil beside the pool and the over all weight of the sodden soil has impacted the structure. The sodden backfill material originally placed behind the pool shell as part of the original installation and entering stormwater has subsided and made its way down the side of the wall causing the resultant bulging whilst additional backfill material has entered the underside of the pool floor subsequently pushing the shell upwards causing a significant bulge which varies from 40 to 70mm higher than the adjacent floor.” BB‟s report 7 May 2015 “ The failure of the foundation soils could be a myriad of issues; possible negligenc e by installer, though this should have shown up before 10 years. Unforseen sink hole under pool location, old root ball deteriorating and leaving void (The area was previou sly bush). There is evidence of soil voids to left hand side of pool and this is area were overland water flow would be restrained and could have been forced under pool shell. We would not be able to confirm 100% cause due to these variables, if further co ncerned a geot echnical engineers report of soils and foundation could be undertaken to review why the pool shell foundation become undermined and the pool failed… It is clear the pool was in good order and appeared well maintained, as maintained by the own er. On advice by pool specialists the pool shell has Case No: 407654 Determination Page 7 of 8 Report Extract failed and cannot be repaired, and needs to be replaced. The failure of pool foundation is clearly evident and as advised by owner has be affected by amount of overland flowing water from recent storms h as been undermining pool shell foundation. We are unsure the cause of the subsidence as not ed above, if this would affect the claim. ” [sic] JH‟s report 19 June 2016 “ INSPECTI ON RESULT The evidence indicates that the pool shell has not been installed in a ccordance with the requirements of the Australian Standard AS 1839 - Swimming Pools - pre moulded fibre reinforced plastics - installation. This standard recognises that minor shell movement will occur during the life of the structure and hence requires th at the backfill be cement stabilised. That is, the backfill will maintain its shape and not collapse or flow under the pool should distortion to the shell occur. The voids beside the left side of the pool reveal that the sand backfill has not been cement stabilised and has slumped. A substantial rainfall event occurred from 20 to 22 February 2015 (confirmed from BOM web site). As a result, the ground has become saturated and ground water pressure has built up due to the slope of the rear yard, which has e xceeded the hydrostatic pressure within the pool, resulting in the floor of the fibreglass pool shell bowing upwards (ridge identified earlier in this report ). The left side wall of the pool shell (near the bottom of the pool) has then moved inwards. This has left a void behind these movements and the sand backfill has slumped into the void. Given the extent of movement of the pool shell that has occurred, the pool is not recoverable. Replacement would be required to reinstate the pool to the condition th at it as in prior to the rainfall event. SUMMARY The ground has become saturat ed from the substantial rainfall event that occurred from 20 - 22 February 2015, and ground water pressure has built up which has exceeded the hydrostatic pressure within the pool, resulting in the floor of the fibreglass pool shell bowing upwards (ridge identified earlier in this report). The left side wall of the pool shell (near the bottom of the pool), has then moved inwards. ” Case No: 407654 Determination Page 8 of 8 3.4 Chronology Date Event 2009  Pool installed 2011  Applicants purchase property with pool already installed 20 February 2015  Cyclone Marcia 24 February 2015  Applicants lodge claim with the FSP 27 February 2015  Applicants advised by FSP to obtain a report for the pool damage 3 March 2015  Applicants provide a report from AW to the FSP 4 March 2015  FSP confirms receipt of the pool report from the Applicants and requests Applicants to obtain a quote for repairs. 11 March 2015  Applicants obtain a quote for repairs 13 March 2015  Applicants provided the FSP with a quote to replace the pool for $34,853 27 March 2015  FSP refers the claim to their builders (BB) for a report. 7 M ay 2015  BB provides report to FSP 2 June 2015  FSP engaged an engineer (JH) to inspect the pool 19 June 2015  JH provides report 21 July 2015  FSP denies the claim based on JH‟s report only. 3 September 2015  FSP issued its final decision l denying the claim.