Home / Financial Firm (Unknown - Insurer) / Determination 406802
Determination 406802
Storm damage to garage retaining wall and concrete slab
Summary
The applicant's home insurer accepted a storm damage claim for the garage but disputed the retaining wall and concrete slab. AFCA found the retaining wall damage covered and the concrete slab damage excluded, with interest payable if cash settled.
AFCA preferred the applicant's expert on the cause of the retaining wall damage, while the slab damage was pre-existing and excluded under the repair of prior damage exclusion.
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Determination
Case No: 406802 Determination Page 1 of 6
Case number: 406802 8 October 2015
1 Overview
1.1 Dispute
The Applicant’s claim is made under his Home Insurance Policy, held with the
Financial Service Provider (FSP), following damage to the Applicant’s garage as a
result of a storm.
Ultimately, the FSP has accepted the Applicant’s claim but there is a dispute as to
the extent of the damage covered by the terms and conditions of the policy.
The dispute relates to the retaining wall and to the concrete slab of the garage.
1.2 Issue and key findings
Is the FSP required to meet the Applicant’s claim with regard to the retaining
wall and the concrete slab within the terms and conditions of the policy?
The FSP is required to mee t the Applicant’s claim for the damage to the retaining
wall.
The FSP is not required to meet the Applicant’s claim with regard to the concrete
slab.
1.3 Determination
This Determination is partly in favour of the Applicant.
The FSP is required to meet the Applicant’s claim insofar as it concerns the retaining
wall.
Should the FSP elect to cash settle any aspect of this part of the claim, the FSP is
required to pay interest in accordance with the Insurance Contracts Act 1984 (the
Act), on the cash settlement amount, from the date of denial of the claim to the date
of cash settlement.
The FSP is not required to meet the Applicant’s claim insofar as the concrete slab is
concerned.
In respect of the balance of the claim, already accepted by the FSP, if the FSP cash
settles any aspect of that part of the claim, the FSP is required to pay interest, on that
part, in accordance with the Act, from the date of denial of the claim, until the date of
settlement.
Case No: 406802 Determination Page 2 of 6
2 Reasons for Determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the material exchanged.
The material exchanged is extensive and this Determination will focus only upon the
issues relevant to the outcome of this dispute.
All of the material exchanged has been considered in the preparation of this
Determination.
2.1 Is the FSP required to meet the Applicant’s claim in respect to the
retaining wall and the concrete slab, under the ter ms and conditions
of the policy?
Whilst the FSP originally denied the Applicant’s claim, upon review, it accepted the
claim but a dispute remains as to the obligations of the FSP under the terms and
conditions of the policy.
The FSP relies upon an exclusion for the repair of any damage that existed prior to
the start date of the policy, amongst other exclusions.
The FSP says that the damage to the retaining wall and the concrete slab, pre-
existed the storm and the start date of the policy and thus the FSP is not responsible
for their replacement and/or repair.
The evidence regarding the cause of the damage
The respective parties have provided expert reports as to the cause of the damage.
Upon reviewing the reports, I am satisfied that there is no evidence which supports
the position that the damage to the concrete slab was caused by the storm. Rather
the evidence is that the concrete slab has been in its current state for many years
and the storm event did not contributed to its condition.
In those circumstances, I am satisfied that the FSP is entitled to deny the claim
insofar as the concrete slab is concerned.
As to the retaining wall, the Applicant has provided an expert’s report which includes
photographs and concludes that the movement of the garage structure (as a result of
the storm), has cracked the brick walls along the driveway, being the retaining wall.
The FSP’s expert observed that the retaining wall displays long term rotation and
concludes that this is a long term structural issue.
The representative of the FSP has offered the view that there is moss and grass in
the cracks in the retaining wall and that this clearly demonstrates that the movement
of the wall pre-dates the storm event. Thus, the FSP’s representative says, the
cracking of the retaining wall cannot be considered a resultant damage from the
storm event, as it is excluded from cover.
Unfortunately, the representative of the FSP did not seek clarification of this view
from the FSP’s expert.
Case No: 406802 Determination Page 3 of 6
I note that both the FSP’s expert and the Applicant’s expert took photographs of the
damaged retaining wall, yet made no reference to the existence of grass within the
cracks of the retaining wall.
Given those circumstances and the fact that the representative of the FSP did not
seek clarification from the FSP’s expert, I do not regard the FSP’s representative’s
comments as being of assistance in this matter.
As the views of the two experts differ, it is necessary to make a decision regarding
which expert’s conclusions are to be preferred.
On the one hand, the FSP has ultimately accepted liability for the garage itself and
the Applicant’s expert view is definitive that the cracked brick walls along the
driveway were caused by the movement of the garage, which arose from the storm.
On the other hand, I am satisfied that the FSP’s expert’s view is less definitive, in that
he concludes that the problem with the retaining wall is a long term structural issue,
making no comments as to whether or not there had been any contribution from the
storm.
In the circumstances of this dispute, I prefer the conclusion of the Applicant’s expert,
in respect of the retaining wall.
As such, I am satisfied that the damage to the retaining wall, on the balance of
probabilities, has arisen from an e vent covered by the terms and conditions of the
policy and the FSP should meet the cost in respect to the retaining wall.
Case No: 406802 Determination Page 4 of 6
3 Supporting information
3.1 Expert reports
Report Key points
Applicant’s engineer RB
27 April 2015
The existing single garage is an ol der free standing structure
consisting of single brick walls with engaged piers, timber framed
hipped tiled roof and a concrete suspended slab. It is a single -
storey structure viewed from the front but becaus e of the fall of
the land away from the street i t is a two - storey structure along the
other three sides. There is no evidence of the type of footing that
the garage walls had been built on.
The whole garage structure had moved as a result of the storm
which had caused extensive cracks in the brickwork of the garage
and some adjacent brick walls. There is also a separation
between the concret e garage slab and the surrounding walls.
The single brick walls of the garage have moved causing cracks
in the brickwork and are now out of plumb.
The movement of the structure had caused the appearance of a
gap between the walls and the suspended garage concrete floor.
The movement of the garage structure had cracked the brick walls
along the driveway. There is a horizont al bow in the two - storey
brick wall along th e driveway.
It is recommended that the whole garage is demolished and
replaced with a new structure designed and built in accordance
with current engineering requirements and standard building
practice.
FSP’s engineer TE
1 May 2015
The damaged roof and r oof framing requires replacement.
There is evidence of long term cracks and out ward rot ation of the
brick walls which has been occurring over an extended period of
time. These should be demolished and re - built to the garage floor
level. Repointing below fl oor level should only be undertaken if
considered sound.
The concrete floor slab is badly cracked and has been in its
current state for many years and it cannot be determined if it is
structurally sound. It requires replacement or upgrading.
The retaining wall to the front side boundary displays long term
rotation of up to 50mm at the front of the garage. It is not
considered unsound at present, but requires ongoing monitoring.
3.2 Policy Provisions
The relevant sections of the Home Insurance PDS issued to the Applicant and
applicable to the claim are:
What do these words mean?
Case No: 406802 Determination Page 5 of 6
Insured event means an event for which you can make a claim under your
policy.
Exclusions
General exclusions
General exclusions apply to all sections of your policy and describe
circumstances where your policy will not provide cover for any loss, damage or
liability arising directly or indirectly from any cause noted below.
We will not pay for death or bodily injury to any person, or loss or damage to
property caused directly or indirectly by:
9. wear and tear, rust, corrosion or deterioration;
11. mould, rot, damp or the effects of the climate or weather;
Home cover exclusions
Home cover exclusions apply to all sections of your policy and describe
circumstances where your policy will not provide cover for any loss,
damage or liability arising directly or indirectly from any cause noted
below.
We will not pay for:
1. repair of any damage that existed prior to the start date of the
policy;
2. additional costs resulting from your buildings or any part thereof
not being compliant with the most recent building codes, laws and
regulations;
15. loss or damage, other than relating to fire, caused by household
pets or any animal, bird, insect or vermin;
We will not pay for any loss, damage or legal liability caused directly or
indirectly:
18. by any failure to keep your property in good condition through
appropriate maintenance and repair;
19. where construction to your buildings required approval by the
relevant local or State building authority but their approval either
has not, or would not have been provided;
What if you need to claim?
When you claim, it can only relate to one incident and you cannot include
multiple incidents in one claim. If there is more than one incident, a
separate claim will need to be submitted and the relevant excess/es will
apply to each and every claim.
If you claim under your policy, we have the choice to settle your claim in
many ways.
Case No: 406802 Determination Page 6 of 6
We will never pay more than the sum insured shown on your policy
schedule, plus the extra amounts shown under the Extra Cover section.
1. We can settle your buildings claim by:
paying for the reasonable cost of repair or rebuilding the damaged
part of your buildings;
paying you the reasonable cost of repair or rebuilding the damaged
part of your buildings;
rebuilding the building to its size and quality before the claim; or
any combination of the above.”
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.