Home / Financial Firm (Unknown - Insurer) / Determination 406690

Determination 406690

Denial of further cracking damage claim after earlier accepted subsidence claim

FirmFinancial Firm (Unknown - Insurer)
Decided2016-03-02
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed for further cracking to their home after an earlier accepted subsidence claim, and the FSP denied it. AFCA decided in favour of the applicants, requiring the FSP to cash settle the fair repair cost less $350, check the earlier grout work and pay interest.

Having accepted and repaired the original claim, the FSP must properly repair it and could not rebut evidence that the further cracking flowed from the original subsidence.

Issues

Subjects and remedies

home or building damagepay claimpay interestreassess claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 406690 Determination Page 1 of 9 Case number: 406690 10 February 2016 1 Overview 1.1 Dispute The Applicants’ property was insured with the Financial Service Provider (FSP) in the period 17 November 2010 - 17 November 2011. The policy was an accidental damage home insurance policy and incident cover was also provided (the policy). The Applicants lodged a claim for damage to their home caused by a burst pipe in 2011. The claim was accepted and the repairs authorised by the FSP. In March 2014, the Applicants noticed cracks reappearing in their home and claimed indemnity from the FSP. The Applicants contended repair works to the cracks and to the property’s foundations undertaken as a result of the original claim were inadequate. The FSP denied the Applicants’ second claim for further damage on the basis the damage was not as a result of the original event. The FSP contends the brick footings of the property had deteriorated over time and the roof had been constructed in such a way as to put all the load onto a wall in the centre of the home, from where the majority of the cracks are originating. 1.2 Issues and key findings Is the FSP entitled to deny the Applicants’ claim ? The FSP is not entitled to deny the Applicants’ claim as the material establishes there is further damage to the insured property and as the FSP accepted the original claim and arranged repairs, the FSP must properly repair the damage in the original claim and must properly investigate the cause of damage in the original claim. The repairs in the original claim included grout injections to the foundations yet the FSP has not provided evidence of the work undertaken to the foundations in the original claim nor has its expert been able to determine the full extent of t he grout injections to the foundations as a result of the original claim. Further, the FSP’s expert has not rebutted the builders’ opinions that the further cracking was caused from the original claim. Moreover, the material establishes, at the time of the original claim , the FSP’s assessor did not properly identify the issues now identified by M with the property’s brick foundations and the roof. In all the circumstances, it is fair the FSP indemnify the Applicants for the claimed further cracking damage to the insured property. Case No: 406690 Determination Page 2 of 9 1.3 Determination This Determination is in favour of the Applicants. Within seven days of acceptance of the Determination by the Applicants, the FSP is to re-engage its builder IT to assess the cost of repairs of further cracking damage in the insured property and cash settle the Applicants the fair cost of the cracking repairs (less $350 if this amount is paid and cashed by the Applicants). If the Applicants wish to submit quotations to the FSP for the cost of repairs of the further cracking damage, they must submit quotations to the FSP within a further seven days of provision of the FSP’s quotation. If the parties are unable to resolve issues which may arise from the costing of the repair work to the further cracking damage in the insured property they may return to the Service on this specific issue. The FSP is also to ensure the work done to the foundations by the engineer U in the original claim is adequate. It is to obtain from the builder S the scope of works provided to the engineer U at the time of the original repairs. The FSP is to engage its expert M to review the scope of works and the work done by U to ensure the work done by U to the insured property was in accordance with the scope of works and adequate to stabilise and l evel the property’s foundation as identified by the FSP at the time of the original claim. If U’s work is not properly done, then the FSP is to rectify U’s work as accepted in the original claim. The FSP is to pay interest on any cash settlement in accordance with Section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from the time the claim was denied on 30 March 2015 until the date of settlement. Case No: 406690 Determination Page 3 of 9 2 Reasons for Determination 2.1 Is the FSP entitled to deny the Applicants’ claim ? FSP accepted the original claim and arranged repairs The FSP’s policy responded to a claim made by the Applicants for cracking damage caused to the insured property first noticed in March 2011. The FSP’s policy period was from 17 November 2010 until 17 November 2 011. The policy responded to accidental damage and to claims for subsidence which occurred within 72 hours of liquid escaping from the fixed pipe. The FSP accepted the claim and arranged for the damage to the property to be repaired. The FSP relied on the opinion of a structural and civil engineer [M] who inspected the property on 13 October 2011. M concluded the cracking damage was caused due to settlement of the rear foundations. M said the settlement and subsequent cracking in the property was caused by water leaking from cast iron pipes and an old ceramic pipe. M made a number of recommendations to remediate the damage A scope of works was prepared. The FSP’s assessor P asked two builders to quote. Builder S was selected to undertake repairs. Pursuant to the policy terms, the Applicants were liable to replace the pipes. The FSP accepted liability to repair the cracking damage and stabilise and level the property’s foundation by grout injection. Repairs included grout injections to foundations S prepared a lengthy report and quote dated 21 November 2011. He quoted to repair the cracking damage in the kitchen, lounge, passageway and bedrooms. S also quoted to repair the foundations. The quote says: “ Foundations 11. Allow to remove paving to rear and side wall of house to gain access to foundations. Allow to reinstate upon completion. 12. Allow to grout inject foundations to rear wall, side wall and foundations of passage walls with Urethane product such as [U] and jack foundations to level (Or as close as possible) 14. Note the levelling of the home could cause additional cracking. This should be repaired in accordance with relevant sections of the scope 15. Note repairs to brickwork ceiling should not commence until four weeks after grout injection. ….. NB: item 12 – a provisional sum of $5,000 plus GST included for this item as we are unable to cost this item” Case No: 406690 Determination Page 4 of 9 S also provided a scope of works (signed by S on 19 January 2012) which contained the same wording. S was authorised to proceed as per the scope of works. One of the reasons S was chosen by the FSP’s assessor (P) was because S had identified the use of a Urethane product to stabilise and level the foundations as specified by the engineer M. The FSP paid S for the work on 1 August 2012. S ’s invoice dated 30 July 2012 shows the sum charged for item 12 was $5,785. The grout injection was carried out by U engineering. Before making the claim, the Applicants had consulted with U as evidenced by the letter from U to the Applicants dated 2 June 2011. The letter shows U is as a company which uses its deep injection product to improve the bearing capacity of foundation materials and re-support concrete footings. The only other material from U is also provided by the Applicants. It is an invoice dat ed 30 March 2012 in the amount of $5,533.39 for “correction of concrete strip footing” at the insured property on 14 March 2012. From the correspondence provided, it is assumed the FSP paid U for the work done to the foundations at the insured property. FSP not provided evidence of work undertaken to foundations The FSP has not provided any correspondence between S and U or the scope of works to be undertaken by U. In recent correspondence with the Service, the FSP confirms it was not provided with a copy of the U scope of works. The material establishes in April 2012, the Applicants provided to P a plumber’s report confirming all the required plumbing maintenance work had been completed. S was advised and S commenced the outstanding repairs to the cracking of the internal walls and ceilings. The material shows the work continued until June 2012 as the cracking walls had to be stitched which work was specialised and the specialist was not available until June. P reported to the FSP on 1 August 2012 all the work was completed. P also reported P had contacted the Applicants who were happy with the works performed at that time and confirmed all works had been completed. However, in March 2014, the Applicants contacted the FSP advising the cracks in the master bedroom had reopened. The Applicants alleged poor workmanship by S. In submissions to the Service, the Applicants say U only strengthened the back of the house, and the work done by U was either inadequate or the house has settled significantly since the work done by U. They also say had they been made aware of problems (now identified by the FSP) with the footings and the roof, they would have addressed these issues to ensure future problems would not arise. They contend the FSP has provided bad service as the initial claim was not properly investigated in the first place. Rather, they were advised the issues with the property in the original claim would be addressed and rectified once the work was done by S and U and the pipes were repaired by the Applicants. Case No: 406690 Determination Page 5 of 9 In response, the FSP relies on a further report from M dated 30 June 2014. The FSP submits as the majority of the cracking is new, there is a new cause of the damage unrelated to the original leaking pipe. It says as the Applicants’ policy lapsed with t he FSP in November 2011, the Applicants have no cover as it cannot consider the further damage as part of the original claim. Relying on the opinion from M, the FSP contends the most likely cause of the new damage is a gradual deterioration of the brick foundations along the right side of the passageway resulting in the settlement of this wall. It says the damage is worse in this area because all the roof load is on this wall also. The FSP further contends the cause of the recent damage would not have been caused by any of the listed events in the previous policy, but the damage is caused by excluded events. FSP’s expert not rebutted opinion further cracking caused from original claim The Applicants have provided no expert material. However, the FSP re-engaged its assessor P, as well as the engineer M. And P re-attended the property with a builder from IT. The builder inspected the crack in the master bedroom wall and said he saw no evidence of bad workmanship. However, in a report to the FSP dated 25 March 2014 he said: “This large crack is a structural crack and in my opinion could have been caused from the original claim of subsidence. Although the site had been injected to compensation for the subsidence the house has continued to move until it has settled to its current position (sic) .” IT also recommended how to repair the wall permanently. He estimated the costs of repair including material and labour was $3,237.30 including GST. P reported to the FSP the cracks were not new but existing cracks which had become worse. This is contrary to the opinion of M who described the cracks both as new cracking and repaired cracking opening up again. As M considered most of the cracking was new, he posited there must be a new cause. M crawled under the house. He noted the walls to the property continue down past the timber floor and are supported on brick foundations. He said some deterioration in this brickwork was evident. He also viewed the timber roof framing through the manhole in the passageway and noted the roof pitch was such that the ridge is directly above the wall on the right side of the passageway. He concluded the most likely cause of the further claimed cracking damage is the gradual deterioration in the brick foundations and the resultant settlement of the wall on the right-hand side of the passageway which wall has settled more than other walls due to the roof load on the wall. FSP’s expert could not determine full extent of grout injections M noted the brickwork cracking and movement and in genera l says the completed repairs works were sound and performing well. He concedes some cracking appeared in the same area as the original damage and notes some new cracking is not the opening up of the old repairs. He does point to exceptions being the cracki ng at the end of the passageway and the cracking in the corner of the main bedroom. M says these cracks do not appear to have been repaired correctly and both require a brick stitch repair. Case No: 406690 Determination Page 6 of 9 However, M has not specifically commented on the work done to the foundations in the original claim, in particular, the work done by U. When M crawled under the house, he says he only went as far as the passageway door. He says he could not determine the full extent of the original U grout injection but he could see it had been placed beneath the rear wall. In other words, M was not able to confirm the grout injections had been done to the foundations of the passage walls or the full nature of the work done by U at that critical site. The FSP also does not comment on the opinion of IT or the communication between S and P reported by P on 8 December 2014. S wrote: “It may be a case of the micro grout injection has settled and some additional movement during this settlement has further aggravated the initial repairs,..” S’s quote and scope of works refers specifically at item 14 that the levelling of the home could cause additional cracking. The FSP makes no comment on this concept or the opinion of the builder IT that the claimed cracking damage could have been caused from the original claim of subsidence. Although suggestions were made that the soil may be highly reactive, no soil survey has been undertaken. It is also noted although the stormwater sumps have not been relocated at the corners of the house by the Applicants, M says this is not a cause of the new damage FSP must properly repair the damage in the original claim The FSP accepted the original claim. It authorised and paid for repairs to the insured property. Once it made this election, the FSP has an obligation to properly repair the insured building. The FSP has provided no material about the work done by U as a result of the original claim. Although M recently inspected under the insured property, he was not able to confirm the existence of or the state of the grout injections to the foundations of the passage walls. Further, the FSP has not addressed or provided compelling rebuttal material to the opinions of both S and IT that the cracking has been caused by the original subsidence claim or by the house settli ng further after the grout injections as a result of the original claim. FSP must properly investigate the cause of damage in the original claim Moreover, when dealing with the original claim, the FSP had an obligation to properly investigate the cause of damage. Whilst the FSP now contends the brick foundations have deteriorated and the roof should be re-structured to distribute the load more evenly, these issues were not identified at the time of the original claim. On the contrary, the report from the FSP’s assessor P dated 19 October 2011 shows P inspected the roof. P reported the roofing structures were all in good order. Further, P reported the house footings were in good condition too. P’s report dated 10 May 2012 establishes another roof inspectio n took place then. P reported there was an inspection with the supervisor on site and a “ceiling fixer” who said all batons in the roof are in good condition and do not require replacement Case No: 406690 Determination Page 7 of 9 Whilst it is accepted the FSP is not responsible for repairs to the brick foundations or the cost to restructure the roof to distribute the load more evenly, having considered all the material provided, I am not satisfied the FSP has established on the balance of probabilities the damage now claimed by the Applicants is new damage and/or the proximate cause of the claimed further damage is the deteriorated brick foundations and/or the design of the roof. The FSP has not addressed the opinions of S or IT. The FSP does not have U’s scope of works. The FSP’s expert M has not confirmed U undertook all the necessary works or U’s work was adequate and in accordance with the scope of works to address the subsidence in the original claim. Further, in view of the FSP’s assessor not properly identifying the issues now identified by M with the foundations and the roof, I am satisfied it is fair in all the circumstances the FSP indemnify the Applicants for the claimed further cracking damage to the insured property. The FSP is entitled to elect to repair the insured property or pay for the cost of repairs. In view of the work which is required to the brick foundations and the roof, I accept it is fair in all the circumstances the FSP pay the cost of repairs of the claimed further cracking damage to the insured property. The FSP engaged IT but his report appears to only deal with the cracking in the master bedroom. In view of IT’s report and the requirements he describes, and M’s opinion about the quality of repairs, I am not satisfied on the material provided the amount offered by the FSP ($350) is fair or adequate in all the circumstances. The FSP is to re-engage IT to assess the further cracking damage in the insured property and cash settle the Applicants the fair costs of repairs of the further cracking damage (less $350 if this amount is now paid and cashed by the Applicants). The Applicants may wish to also submit quotations for the cost of repairs of the further cracking damage to the FSP. It remains necessary for the amount of the cash settlement to be agreed, based on the quotations from the parties. The Service encourages the parties to this dispute to resolve any issues which might arise during that process. However, the parties can return to the Service if they are unable to resolve any issues arising from the costing of the repair work to the further cracking damage in the insured property. I am also satisfied that it is fair in all the circumstances the FSP ensure the work done by U was adequate as, in the original claim, the FSP accepted liability to stabilise and level the insured property’s foundation by grout injection . The FSP must now satisfy itself this work has been properly done. If it is not properly done, then the FSP is to rectify U’s work as accepted in the original claim. The FSP is to obtain from S the scope of works provided to U at the time of the original repairs. The FSP is to engage M to review the scope of works and the work done by U to ensure the work done by U to the insured property was in accordance with the scope of works and adequate to stabilise and level the property’s foundation as identified and accepted by the FSP at the time of the original claim. Case No: 406690 Determination Page 8 of 9 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. There has been a full exchange of all material i nformation relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this Determinatio n. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, commentary has been restricted to those issues considered directly relevant to the outcome only. 3.2 Relevant policy extract s Accidental damage cover We cover your buildings or contents for any accidental loss or damage. There are also a number of incidents we will cover under specific conditions - these are listed on the following pages. Incident cover provided under specific conditions Landslide or subsidence We will cover your buildings or contents for loss or damage as a result of a landslide or subsidence. We will only do this if the loss or damage occurs within 72 hours of: ...  liquid escaping from a fixed pipe, … Water or liquid damage We will cover your buildings or contents for loss or damage caused by water or liquid. We will also cover the cost of finding where the water or liquid escaped from, including the cost of repairing any damage that occurs while looking for the cause. … We will not cover the cost of repairing the item that caused the escape of water o r liquid….. We will not cover your buildings or contents for loss or damage caused by:  landslide or subsidence unless we agree to cover the incident as described under “landslide and subsidence” Case No: 406690 Determination Page 9 of 9 Exclusions to your cover Any cover we provide is subject to the following exclusions. Accidental damage cover,… We will not cover any loss or damage as a result of, or caused by:  settling, shrinkage or any movement of earth  erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear  landslide or subsidence unless we agree to cover the incident as described under “landslide or subsidence” General exclusions We will not cover any loss or damage, or liability as a result of, or rising from:  any incident that does not occur within your period of insurance  landslide or subsidence, unless we agree to cover the incident as described under “landslide or subsidence” How we settle a buildings claim We will decide how we will settle your claim If your buildings suffer loss or damage we will decide whether to:  repair  rebuild, or  pay you the cost to repair or rebuild that part of your buildings that suffered loss or damage .” 3.3 Relevant expert material/statements  Parties’ submissions, emails and photographs .  Correspondence between the parties.  Correspondence between the Applicants and the FSP’s assessor [P] .  Correspondence between the FSP and P.  FSP’s file notes (various dates) .  Letter from U Engineering to the Applicants 2 June 2011.  Tax invoice from U Engineering dated 30 March 2012 .  Builder’s report and photograph s dated 19 September 2011.  Assessor’s reports [P] and photographs (various dates) .  FSP’s structural engineer’s reports [M] and photographs (various dates) .  Scope of Works from FSP’s builder [S] dated 19 January 2012 .  S’s report and quote for proposed wor ks dated 21 November 2011.  S’s tax invoice dated 30 July 2012 .  Report from IT to FSP 25 March 2014.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.