Text of the determination
Determination
Case No: 406547 Determination Page 1 of 10
Case number: 406547 16 June 2016
1 Overview
1.1 Dispute
The applicant lodged a claim under her home insurance policy with the financial
services provider (FSP) after her home was inundated by stormwater in March 2015.
The FSP accepted the claim and arranged for its contractors to undertake
remediation works at the property and prepare a scope of works for the necessary
repairs. However, before this process could be completed, the property was
inundated again during severe storms in April 2015.
At the applicant’s request, the FSP subsequently agre ed to cash settle her for the
damage to her contents items and the estimated cost of completing the building
repairs.
However, the applicant says the settlement amount paid by the FSP for the building
repairs is inadequate and does not address all of the damage caused by the storms
in March and April 2015. The applicant is also dissatisfied with the manner in which
the FSP handled her claim.
1.2 Issues and key findings
Is the FSP required to increase the cash settlement amount?
The FSP is required to increase the cash settlement amount to provide for the
reasonable cost of repairing the additional internal damage caused by the second
storm in April 2015 and replacing the three roof gables .
The FSP is not liable for the claimed damage to the concrete driveway, paths and
paving and the damage to the rear fence as this damage was not caused by the
storms in March 2015 and April 2015.
Is the applicant entitled to compensation?
The circumstances of the claim are not such as to justify the award of compensation.
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is required to pay the applicant an additional amount of $11,000 in full and
final settlement of her claim. The FSP is not required to pay interest on this amount.
Case No: 406547 Determination Page 2 of 10
2 Reasons for determination
2.1 Is the FSP required to increase the cash settlement amount?
Applicant’s home suffered water damage in March and April 2015
As outlined above, the applicant’s home was inundated with water on two separate
occasions in March and April 2015.
Following the initial event, the FSP arranged for its assessor (KL) and its builder (JC)
to attend the property and inspect the damage.
The FSP’s builder (JC) advised that the damage to the applicant’s property had
occurred when stormwater built up in the external side passageway and entered the
property through weep holes in the external brick cavity wall.
Both the FSP’s assessor (KL) and builder (JC) confirmed that the water had affected
several rooms at the property, inundating the carpets and damaging the timber
skirtings and walls at ground level. Various contents items stored on the floor also
suffered water damage.
Based on his inspection of the property, JC prepared a scope of works for the
necessary building repairs. The FSP accepted liability for the repair of the damage
set out in the scope of works.
However, before the repairs could be completed, the applicant notified the FSP that
the property had suffered a second inundation during severe storms on or around 21
April 2015. The applicant advised that the whole house had been affected and had
suffered further water damage.
The FSP ’s restoration contractor (S) confirmed that following the second inundation
the property was no longer habitable. Accordingly, the FSP arranged temporary
accommodation for the applicant and her husband and appointed S to carry out
drying and mould remediation works.
The FSP did not require the applicant to lodge a separate claim for the damage
caused by the storm in April 2015 and did not undertake an assessment of the
additional damage caused by this storm.
The FSP intended that, to the extent any additional repairs were required as a result
of the second storm, these repairs would be undertaken by its builder (JC) in the
course of repairing the damage caused by the initial inundation.
However, when the repairs had not been completed by July 2015, the applicants
requested a cash settlement. The FSP subsequently cash settled the applicants for a
total of $10,500 (net of the policy excess) for water damage to two bathroom vanities,
the replacement of timber skirting in three bedrooms and the study, and the painting
of the skirtings and walls in those rooms.
Case No: 406547 Determination Page 3 of 10
Dispute concerns extent of damage caused by inundation
The applicant says that the cash settlement of $10,500 paid by the FSP is not
sufficient to repair all of the damage caused by the water inundation events in March
and April 2015.
In particular, the applicant says the cash settlement amount should be increased to
provide for:
the repair of damage to the driveway, surrounding pathways, rear fence and
roof gables; and
the repair of additional damage to the interior of the home which was not
included in the initial scope of works prepared by the FSP’s builder (JC) in
March 2015.
Applicant seeks cover for damage to driveway, paths and paving
The applicant seeks cover for movement and cracking damage to the concrete
driveway, paths and paving at her property, which she believes was damaged by the
effects of stormwater in March and April 2015.
The applicant’s policy provides cover for loss or damage caused by the events listed
in the policy (including the insured event of storm), subject to the conditions and
exclusions set out in the policy.
The insured event of storm specifically excludes cover for damage caused by
erosion, subsidence, landslide, collapse, shrinkage or any other earth movement.
However, cover is provided for loss or damage caused by a landslide or subsidence
which occurs within 72 hours of (and directly because of) a storm.
The policy also excludes cover for:
cracking to paths and driveways which results from a storm (unless the paths or
driveways are washed away by the storm); and
damage caused by wear and tear and/or gradual deterioration.
In order to determine the FSP’s liability for the claimed damage, it is necessary to
determine the proximate cause of the damage (that is, the real, effective or dominant
cause).
Engineers disagree as to cause of cracking and movement damage
The applicant has provided a report from her engineer (NS) which concludes that the
claimed damage was caused by the effects of “heavy water moving with high speed
around the house and the driveway”.
In his report, NS states that the pressure and speed of the water made the soil under
the concrete move, causing horizontal movement of the paving in the direction of the
slope of the land and vertical settlement of the concrete paving due to the void
created underneath.
The engineer (DK) appointed by the FSP to determine the cause of the damage to
the driveway, paths and paving concluded that:
Case No: 406547 Determination Page 4 of 10
the cracking of the concrete had been caused by the concrete shrinking as it
dried over time, exacerbated by the lack of sufficient reinforcement; and
in areas where differential settlement was observed, this had been caused by
consolidation of the sub-grade material underneath the concrete over an
extended period of time, rather than by any single event.
Given the location of the damage, DK noted that it may have been exacerbated by
leaks from the stormwater drains. Accordingly, the FSP sought to arrange leak
detection testing of the drains.
However, the applicant advised that such testing was redundant as the local council
had undertaken further works to the stormwater system in the meantime.
Accordingly, no leak detection tests were ever carried out and therefore the existence
of a leak has not been established.
FSP is not liable for damage to driveway, paths and paving
Having carefully reviewed the available information, I consider that, on the balance of
probabilities, the cracking and movement damage to the driveway, paths and paving
was caused by gradual deterioration over time as a result of concrete shrinkage and
long-term consolidation of the material underneath.
The report provided by the applicant’s engineer (NS) provides a broad explanation as
to how he considers the damage to the concreted areas at the property occurred.
However, NS’s report is expressed in general terms and does not identify the specific
damage observed at the property.
By contrast, t he report provided by the FSP’s engineer (DW) includes numerous
photographs of each area of damage and provides a detailed analysis of the cause of
the damage in each case.
The nature of the cracking and movement damage appears more consistent with it
having occurred over an extended period of time than as the result of a specific
inundation event.
The close-up photographs of the cracks and moveme nt gaps included in DW’s report
indicate that this damage had been present for some time prior to the inundation
events in March and April 2015.
Further, Google images of the property taken in October 2014 show that cracking
damage was already present at this time, which is indicative of an ongoing issue.
While the applicant says the damage has worsened significantly following the
subsequent storms, I am not satisfied that the storms were the proximate cause of
the damage.
As outlined above, the policy does not provide cover for cracking damage to
driveways, paths and paved areas caused by stormwater (unless the area itself has
been washed away, which does not apply in the present case).
Further, to the extent that there is movement damage to these areas, I am not
satisfied this damage has occurred as a direct result and within 72 hours of the
storms experienced in March and April 2015.
Case No: 406547 Determination Page 5 of 10
For the reasons outlined above, I consider the claimed damage to the driveway,
paths and paving at the property has occurred in circumstances which are not
subject to cover under the policy. Accordingly, the FSP is not liable for this damage.
FSP is not liable for damage to fence
The applicant seeks cover for damage to the rear fence at the property, which she
says was caused by the volumes of water experienced during the inundation events.
The FSP’s builder (JC) confirmed that a section of the metal fence at the rear of the
property was leaning over and in danger of collapse. However, JC did not consider
this damage was consistent with having been caused by the effects of stormwater.
The photographs of the fence included in JC’s report show a number of dents and
other distortions to the damaged section of the fence, at a height which is not
consistent with having been caused by stormwater.
In these circumstances, I am not satisfied that, on the balance of probabilities, the
damage to the fence was caused by the storms in March and April 2015.
FSP is liable for estimated cost of replacing roof gables
During the course of this dispute, the FSP accepted liability for water damage to
three wooden gables at the front of the roof (despite the view expressed by its builder
(JC) that much of this damage was long-term and had been caused by the use of
inappropriate building materials).
The FSP advised that it would arrange for its builder (JC) to provide a quotation for
the replacement of the gables (for the purpose of determining the cash settlement
amount) or the applicant could provide her own quote.
The applicant has recently provided a quotation for $6,600 from her own repairer
(EK) for the repair of the damaged gables. The FSP has since obtained a quotation
from its own builder (JC) for the amount of $1,285.
Under the terms of the policy, where the FSP cash settles a building claim, it is
required to pay the applicant an amount which reflects the cost (to the FSP) of
undertaking the necessary repairs.
The FSP has the discretion to pay what it would cost to repair the home either on a
“new for old” basis or to a similar con dition to that which it was in before the damage
occurred.
The fact that the applicant’s repairer (EK) has quoted a significantly higher amount
for repairing the gables does not of itself establish that the quotation provided by the
FSP’s builder (JC) is i nadequate.
On its face, EK’s quotation appears excessive for the nature of the work carried out.
On the other hand, it is unclear whether JC’s quotation provides for the replacement
of all three gable ends for which the FSP has accepted liability, given that the
reference to the replacement of “new finger jointed treated pine timber decorative
gable end … to match the existing”.
Case No: 406547 Determination Page 6 of 10
In the circumstances, I consider the FSP should be required to increase the cash
settlement by a total amount of $3,000 to allow for the cost of replacing the roof
gables.
Cash settlement should be increased to allow for repair of additional damage
The applicant says the cash settlement of $10,500 paid by the FSP is not sufficient to
provide for the repair of all of the internal damage to her home caused by the
stormwater inundations in March and April 2015.
Among other things, the applicant says the cash settlement does not provide for the
cost of replacing and repainting all of the damaged timber skirting and repairing and
repainting the affected areas of the walls.
The applicant also says that up to fourteen internal and external doors were warped
by the stormwater and required replacement.
The applicant has provided a quotation for $30,800 from her builder (SJ) for the cost
of all of repairing all of the damage she says was caused by the storm.
As outlined above, the FSP did not re -assess the property to identify any additional
internal damage caused by the second storm in April 2015. The FSP says this was
because the applicant was reluctant to allow the attendance of additional contractors
at the property.
However, having carefully reviewed the FSP’s claim records, I am not satisfied that
the applicant prevented the FSP from carrying out a further assessment of the
property following the storm in April 2015.
While the applicant was reluctant to allow a plumber to carry out leak detection
testing, this was because such testing was considered to be of little utility, given the
council works which had been carried out in the meantime.
Further, it is apparent that the FSP’s restoration contractor (S) continued to attend
the property on a regular basis during May and June 2015 (with the applicant’s
consent), in order to complete the drying and remediation works.
It appears the FSP took initial steps to appoint an assessor before deciding that it
would be more efficient to defer a further inspection until S’s drying and remediation
works had been completed.
While this may have been the case, it left the FSP without a reasonable basis for
determining the settlement amount, once it agreed to cash settle the claim in July
2015.
The FSP says the applicant was obliged to provide information substantiating the
additional damage caused by the second storm and has failed to do so.
However, in circumstances where the FSP had been notified (and appears to have
accepted) that there may have been additional damage resulting from the second
storm, I consider the FSP was primarily responsible for assessing the additional
damage, for the purposes of determining an appropriate cash settlement amount.
Case No: 406547 Determination Page 7 of 10
While the applicant has in recent months failed to respond to the FSP’s proposal s for
a further assessment, this does not alter the fact that the FSP had a sufficient
opportunity to carry out a detailed assessment at the time the damage occurred.
The FSP says that, given the nature of the stormwater inundation on both occasions,
it is unlikely that the second storm event caused significant additional damage.
While this may be the case, it is difficult to confirm in the absence of further details
about the second storm event.
As noted above, the applicants advised that the second storm event affected all
rooms of the house. Further, it is clear that at least some additional damage
occurred, given that the FSP’s restoration company confirmed the property was no
longer habitable (despite it having been so prior to the second storm).
Having said that, the quotation for $30,800 provided by the applicant’s repairer (SJ)
appears excessive given the nature of the repairs to which it relates. While the
quotation sets out each relevant aspect of the repairs, it does not include a
breakdown of the total cost by reference to each item.
Further, the applicants have had multiple opportunities to provide additional
information (such as photographs) confirming the extent of the further damage
caused by the storm, but have not done so. As outlined above, they have also failed
to take up the FSP’s offers to reassess the property.
Having carefully reviewed the available information, I consider it is fair in all the
circumstances that the FSP be required to increase the cash settlement for the
building repairs by an additional amount of $8,000.
FSP is to pay applicant an additional amount of $11,000
For the reasons outlined above, I consider that the FSP should be required to pay the
applicant an additional amount of $11,000 in full and final settlement of her building
claim.
The FSP is not required to pay interest on the cash settlement amount, as this
amount has been determined based on current estimated costs and taking into
account the delays experienced during the claim process.
2.1 Is the applicant entitled to compensation?
FOS may award compensation for non-financial loss
Under the Terms of Reference, FOS may award compensation (capped at $3,000)
for non-financial loss where an applicant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
However, FOS adopts a conservative approach to the award of compensation for
non-financial loss. FOS expects applicants to be moderately robust and bear the
usual stress and inconvenience associated with an insurance claim.
Case No: 406547 Determination Page 8 of 10
Circumstances of claim do not justify award of compensation
The applicant has raised a number of concerns about the manner in which the FSP
handled her claim. Among other things, the applicant says the FSP and its
contractors unreasonably delayed the claim process and failed to respond to her
concerns in a timely manner.
It has clearly taken a significant length of time to finalise the applicant’s claim.
However, I am not satisfied that the FSP was solely responsible for all of the delays
and other issues experienced during the claim process.
Some of the delays experienced were due to the applicant disputing the FSP’s denial
of cover for the driveway, paths, paving and fence (which it was entitled to deny, for
the reasons outlined above).
Further, the applicant has on a number of occasions failed to respond promptly (or at
all) to correspondence from the FSP attempting to progress the claim. The claim
process has also been complicated by the involvement of more than one
representative acting on the applicant’s behalf.
Having carefully reviewed the claim history, I accept that there were instances of
delays and poor communication, particularly in relation to completion of the drying
and remediation works by the FSP’s restoration contractor (S).
However, I also accept that, to some extent, these issues arose as a consequence of
the significant number of claims which the FSP was required to manage following the
severe storms in April 2015 (which were classified as a natural disaster for insurance
purposes).
As noted above, I have taken into account the impact of the delays experienced
during the claim process in determining an appropriate cash settlement amount.
In these circumstances, I do not consider the applicant is entitled to any additional
compensation for non-financial loss.
Case No: 406547 Determination Page 9 of 10
3 Supporting information
3.1 FOS approach to this dispute
FOS has considered it appropriate to expedite this dispute in accordance with the
Operational Guidelines to the FOS Terms of Reference, due to the nature of the
dispute. Accordingly, this dispute has not been the subject of a FOS preliminary view
and has proceeded directly to determination.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Ombudsman Service
(FOS) decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this Determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
The applicant has been assisted by her son and daughter in law during the course of
this dispute. For the purposes of this determination, submissions made by the
applicant’s son and daughter in law have been treated as if they have been made by
the applicant herself.
3.2 Damage to contents items
In addition to the damage to her home discussed above, the applicant also suffered
water damage to her contents items.
The FSP arranged for its restoration contractor (S) to restore the applicant’s water
damaged contents items and cash settled her for those items (including carpet)
which were deemed non-salvageable. During the course of this dispute, the FSP paid
the applicant an additional amount in respect of damaged vinyl.
In her recent submissions, the applicant has not identified any outstanding issues in
relation to the contents settlement. Accordingly, for the purposes of this
determination, this aspect of the dispute has been treated as having been resolved.
Case No: 406547 Determination Page 10 of 10
3.3 Terms of policy
Subject Terms
Insured event -
storm
We cover
Loss or damage caused by a storm.
We do not cover …
loss or damage caus ed by erosion, vibration, subsidence, landslip,
landslide, collapse, shrinkage or any other earth movement, but we will
cover loss or damage caused by a landslide or subsidence proved to have
occurred within 72 hours of, and directly bec ause of a storm and not
because of erosion over time, structural fault or design fault …
resultant cracking to paths, driveways, any outdoor surfaces, but we will
cover them if they are washed away by the storm
General exclusions You are not covered under any section of this policy for damage, loss, cost or
legal liability that is caused by, arises from or involves: …
Ground movement
erosion, vibration, subsidence, landslip, landslide, collaps e, shrinkage or any
other eart h movement, but we will cover l and slide or subsidence that is
specifically covered under the following ins ured events:
Storm …
Wear, tear and gradual deterioration
Wear, tear, rust, fading, rising damp …. Or gradual deterioration such as but
not limited to: …
gradual weathering and breakdown of bricks, mortar or concrete …
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.