Storm damage to rental garage declined as pre-existing settlement and tree root damage
Summary
The applicant claimed storm damage to a rental garage after the FSP cash-settled carport and shed damage but denied the garage. AFCA found the garage damage was caused by excluded soil settlement and tree roots, so the FSP needed to take no further action.
The storm was insufficiently strong to cause structural damage, and the FSP's engineer evidence established pre-existing differential settlement accentuated by tree roots, which is excluded from cover.
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
Case No: 404730 Determination Page 1 of 4
Case number: 404730 9 May 2016
1 Overview
1.1 Dispute
The applicant lodged a claim for storm damage to her rental property with the
financial service provider (FSP).
The FSP accepted the claim for a damaged carport and shed and paid the applicant
$2,032.80 in settlement. The FSP elected to cash settle instead of performing the
repairs because it could not warrant any work performed due to the lack of a storm
water drainage system.
The FSP denied the applicant‟s claim to repair or replace the garage on the basis the
proximate cause of the damage was not storm but causes excluded from cover.
The applicant does not accept the FSP‟s decision to limit acceptance of the cla im for
damage to the carport and shed. She considers the garage damage is also due to
the storm and requires the FSP to meet this part of the claim also.
1.2 Issue and key findings
Is the FSP entitled to deny the applicant’s claim for garage damage?
The FSP is entitled to deny the applicant‟s claim for damage to the garage because
the material provided establishes the proximate cause of the damage was not the
insured event of storm as the storm event was insufficiently strong to cause structural
damage to property. Further, the material provided establishes the proximate cause
of the damage was rotation of the garage wall which had occurred over time as a
result of soil settlement (and accentuated by a tree which previously existed on the
property). As these causes of damage are excluded from cover, the FSP is entitled to
deny the claim.
1.3 Determination
This determination is in favour of the FSP.
The FSP is not required to take any further action in relation to the claim.
Case No: 404730 Determination Page 2 of 4
2 Reasons for determination
2.1 Is the FSP entitled to deny the applicant’s claim for garage damage?
Wind speed insufficient to cause structural damage
The applicant must establish on the balance of probabilities the claimed damage to
the garage was caused in the storm event of 7 January 2015. This is known as a
prima facie claim.
The material from the Bureau of Meteorology establishes this day was a very hot and
at 13:40 the maximum wind gust from the north was 70km/h. The material provided
also establishes such a wind speed is described as a gale force wind and is 8 on the
Beaufort Scale. The Scale describes the wind force as one which:
„ breaks twigs of tre es: generally impedes progress.‟
Winds described in the Scale Storm, (level 10 on the Scale) are when:
„ considerable structural damage occurs. ‟
The applicant has provided photographs of the garage. The photographs show the
garage roof has lifted from a cracked brick wall.
The FSP‟s assessor inspected the insured premises shortly after the storm event.
The assessor reported the strong winds dislodged the garage roof and timbers from
the brick wall causing cracking to the brick wall. As the permits were required to
rebuild the garage, the FSP engaged an engineer to determine the extent of damage
to the garage. The engineer reported:
„…the damage t hat has occurred to the garage is a result of differential settlement of
the footings, due to seasonal changes in the moisture content of the foundation
material, which have been accentuated by tree root drying. In our opinion it is possible
that garage wall movement was accentuated by the recent storm event .‟
The FSP then cash settled the applicant‟s claim for damage to the carport and shed
but denied the claim for damage to the garage. The applicant challenged the denial
of the claim. The FSP reviewed its decision and in its IDR letter dated 15 July 2015,
the engineer‟s report was provided to the applicant by the FSP. The applicant did not
provide any expert report to rebut the FSP‟s engineer‟s opinion.
Instead, the applicant has provided photographs of the damage to the garage and
challenged the engineer‟s opinion and inspection of the soil. The applicant says the
roof has “popped up” and yet the garage is not lower than the driveway. She submits
if there was soil movement, one side would be lower than the other, but rather, both
sides are even. She also submits the tree (which the FSP says contributed to the
damage) was removed quite some time ago. She submits the tree was a coniferous
tree which roots would not cause the garage to move.
Engineer’s opinio n establishes the garage was damaged before the storm
If the FSP seeks to deny or limit the claim, it must establish on the balance of
probabilities the claimed damage to the roof was caused by tree roots, foundation
settlement, or damage caused by previous damage which had not been repaired.
Case No: 404730 Determination Page 3 of 4
The FSP relies on an engineer‟s opinion. The engineer says:
the timber lintel over the garage opening and the roof beams of the garage where
they meet the house have been pulled away from the house
there was no evidence of tie down fixings where the garage roof beams met the
house or the garage north brick wall
the garage north brick wall has rotated outwards and this movement occurred
some time ago
it is the rotation of the brick wall rather than the storm which caused the garage
roof beams and lintel to pull away from the house
there was a large tree next to the garage in November 2010
according to the geological map, the soil in the area of the property is classified
as a moderately reactive clay site and seasonal changes in this kind of soil can
cause up to 50mm movement in the soil surface
the area where the insured property is located has experienced extremes in
seasonal change which extremes can result in differential settlement of the
footings and movement of property above.
I am satisfied the engineer who inspected the insured property on 17 February 2015
has the requisite expertise to comment on the issue in dispute. I have considered his
report together with the parties‟ photographs and the FSP‟s file notes of its
conversation with the engineer. I have also considered the material provided from the
Bureau of Meteorology and the Beaufort Scale.
As the material provided establishes the wind force on the day was insufficient to
cause structural damage, I accept if the garage roof lifted during the storm event, the
garage wall outward rotation was accentuated rather than caused by the storm event.
Further, I accept had the wall not already been in the state it was in, the garage
would have been able to withstand the weather conditions on 7 January 2015 as the
winds were not strong enough to cause the observed damage.
The applicant makes a number of contentions about the engineer‟s report, but in the
absence of expert opinion rebutting the engineer‟s opinion, I do not find the
applicant‟s submissions on their own suffici ently persuasive to rebut the material
submitted by the FSP.
On the material provided, I am satisfied on the balance of probabilities the damage to
the garage was not caused by the storm event.
Rather, the material provided establishes on the balance of probabilities the damage
to the garage occurred before the storm event as a result of differential settlement of
the footings. This had occurred as a result of seasonal changes in the moisture
content of the soil underneath the garage accentuated by the drying effect of the
roots of a large tree which had grown proximate to the garage.
As these causes of damage are excluded from cover under the FSP‟s policy, the
FSP is entitled to deny the applicant‟s claim to repair or rebuild the garage.
Case No: 404730 Determination Page 4 of 4
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS recommendation and has proceeded directly to determination.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Ombudsman Service
(FOS) decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extract
The relevant policy extracts are referred to in the FSP‟s Notice of Response dated 24
July 2015. Both the policy document and the Notice have been exchanged with the
applicant.
3.3 Other relevant material considered and relied on
Parties‟ submissions, emails and photographs .
Correspondence between the parties.
FSP‟s file notes .
Assessor‟s report .
Engineer‟s report .
Material from Bureau of Meteorology.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.