Home / Financial Firm (Unknown - Insurer) / Determination 403719
Determination 403719
Additional loss of rent declined after hail storm damage to rental property
Summary
A landlord claimed additional loss of rent after a hail storm damaged his rental property and the tenant did not return. AFCA found the property was unsafe during the repair period and ordered loss of rent payment with interest, but found it was safe between 11 December 2014 and 28 January 2015.
The policy covers loss of rent while the tenant cannot safely reside in the building because of the damage, and the property was unsafe during the final repairs but not in the interim period.
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Determination
Case No: 403719 Determination Page 1 of 5
Case number: 403719 10 June 2016
1 Overview
1.1 Dispute
The applicant lodged a claim with the financial services provider (FSP) for damage to
the roof and internal ceilings of his rental property as a result of a hail storm.
The FSP authorised repairs and required the tenant to vacate the property between
27 November and 10 December 2014, during the period the electricity was
disconnected while the roof was repaired. The FSP accepts it is liable for loss of rent
for this period only.
The FSP denied the applicant‟s claim for additional loss of rent while furthe r repairs
were being undertaken.
1.2 Issues and key findings
Is the FSP required to pay the applicant any additional loss of rent?
The FSP is required to pay the applicant for loss of rent during the period of repair,
being 29 January 2015 to 13 February 2015 because:
the policy provides cover for loss of rent while the tenant cannot safely reside at
the property
the replacement of the entire ceiling in the kitchen and dining room as well as
removal of all contents in these rooms rendered the building unsafe during the
period of repair.
1.3 Determination
This determination is substantially in favour of the applicant.
If it has not already done so, the FSP must compensate the applicant for loss of rent
from 27 November 2014 to 10 December 2014 in accordance with the terms of the
policy. No interest is payable on this amount.
The FSP must also compensate the applicant for loss of rent for the period 29
January 2015 to 13 February 2015 in accordance with the terms and conditions of
the policy. Interest is payable on this amount in accordance with the Insurance
Contracts Act from 23 July 2015 to the date payment is made.
Case No: 403719 Determination Page 2 of 5
2 Reasons for determination
2.1 Is the FSP required to pay the applicant any additional loss of rent?
The a pplicant’s policy provides cover for loss of rent
The applicant lodged a claim under his landlord insurance policy, which amongst
other benefits, provides cover for loss of rent as follows:
“When your building is insured and we accept a claim, and agree that your tenant cannot safely
reside in the building becaus e of the damaged caused, we will pay the actual rent you lose
while your building is being repaired or rebuilt.”
The issue in dispute is whether the property was unsafe to live in once the power
was reconnected on 10 December 2014 and before the repairs were complete on 13
February 2015.
The tenants were required to vacate the property
The FSP appointed an assessor, CA, to attend the property and determine whether
the claim was one for accepting. CA found damage to the dining room, kitchen and
roof, which required urgent repairs. CA noted:
we have arranged for all hail damaged roof tiles to be replaced and pointing repaired
as an urgent makesafe to mitigate extent of possible costs associated with loss of rent
given tenant has been forced to move in to temporary accommodation due to the
mains power connection be disconnected. Once roof has been repaired, electrician will
be arranged to attend to re-connect primary installation and then contact [provider] for
re-connection. The tenant can then move back in. [sic]
The scope of works provided by CA identified that the tenants were required to move
furniture and contents from the affected areas in order to provide clear access to
facilitate repairs to the ceiling. The scope of works showed the entire ceiling in the
kitchen and dining rooms required replacement, as well as replacing the cornices and
lights. There was also some damage to the hallway noted in CA‟ s report. However,
CA considered the tenants would not need to move out while the repairs were
conducted.
The tenants did not return after the storm
The property had to be advertised as the tenants did not return after the storm. The
applicant says he could not advertise the property before 6 February 2015. The
a pplicant‟s real estate agent provi ded a statement in support of this.
The property was unsafe during repairs
The policy provides cover for loss of rent when the property is not safe to reside in.
CA stated that the property could be lived in once power was reconnected. However,
CA also noted that the contents of the kitchen and dining room would have to be
moved while this occurred.
Case No: 403719 Determination Page 3 of 5
„ Safe ‟ is defined in the Macquarie dictionary as, among other things:
free from danger or risk
involving no risk or mishap.
I am not satisfied the property would have been safe to live in during the repairs
given:
The ceilings needed replacing. This is necessarily hazardous for those
occupying the premises at this time, including as a result of dust.
The kitchen appliances needed relocating and it would be difficult to connect
and operate these in another room in a safe environment.
This conclusion is based on the original statements of works provided by CA in
November 2014. However, I note from the chronology provided by the FSP that this
was negotiated with the applicant and a final SOW was not provided to the applicant
until 22 December 2014. I have assumed that the final SOW was at least the same, if
not more extensive, than the original SOW.
I have also considered the numerous references provided by the applicant regarding
the requisite compliance documents required from the builder to determine the works
could be conducted in a safe environment. The FSP has noted that these are
generic documents and in some cases not applicable to a domestic repair.
Regardless, I am satisfied that due to the nature of the work required, the property
would have been unsafe while the repairs were undertaken. As a result it would have
been unreasonable to require the tenant to occupy the premises during the period of
the repairs, even had the tenant been willing to do so.
The property was safe for a period prior to the repairs being undertaken
There is no evidence that once the initial make safe work had been undertaken, but
prior to the final repairs commencing, that the property was not safe to be lived in.
The FSP had repaired the roof, reconnected the power and make safe provisions
had occurred to the property. This is for the period 11 December 2014 to 28 January
2015.
That the tenants chose not to return after the storm is a matter as between the
tenants and the applicant. The FSP‟s liability is limited to when rent was not received
due to the property being unsafe.
The FSP is required to pay additional loss of rent
The FSP has accepted that it is required to compensate the applicant for loss of rent
from 27 November 2014 until 10 December 2014.
In addition, the FSP must compensate the applicant for loss of rent for the period 29
January 2015 to 13 February 2015 (when the repairs were complete), in accordance
with the terms and conditions of the policy. Interest is payable on this additional
amount in accordance with the Insurance Contracts Act from 23 July 2015 until the
date payment in made.
Case No: 403719 Determination Page 4 of 5
3 Supporting information
3.1 The FOS approach
I have determined this dispute based on what is fair in all the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous
FOS decisions. I have taken into account all the material submitted by the parties,
both before and after the Recommendation was issued.
There has been a full exchange of all documents relied on to make this
Determination and each party has had the opportunity to address any issues raised
by the other.
3.2 Policy term
Term You are no t covered for Cover limit
Loss of rent following
damage
When your building is
insured and we accept a
claim, and agree that your
tenant cannot safely
reside in the building
because of the damage
caused, we will pay the
actual rent you lose while
your building is being
repaired or rebuilt.
Loss of rent:
Beyond the period it should
reasonably take to repair or rebuild
your building;
If your building has not been
tenant ed for more than 60
consecutive days immediat ely
before the loss or damage; or
If you d id not have a cont ract in
place at the time of the claimed
event for your building to be
tenant ed within the 30 days
immediat ely following the date of
loss or damage.
The lesser of:
12 mont hs rent; or
10% of your building sum
insured; or
The actual rent you lose.
3.3 Chronology
The following chronology was provided by the FSP, however the supporting
documents, including claim notes, were not:
Record Key points
19 November 2014 Date of storm
20 November 2014 Tenant notifies real estate agent of water affecting the kitchen
roof
24 November 2014 Claim lodged
27 No vember 2014 Electricity was disconnected
Tenant vacat ed property
Case No: 403719 Determination Page 5 of 5
28 November 2014 FSP‟s assessor inspected the damage
Damage noted to the ceiling in the kitchen and dining room
3 December 2014 FSP approves claim
4 December 2014 Cont ract and scope of works provided to applicant
5 – 15 December 2014 Scope of works negotiated
10 December 2014 Electricity reconnected
Tenant did not return to property
FSP offered loss of rent up until this da te only
22 Decem b e r 2014 Amended scope of works provided to applicant
21 January 2015 Signed contract and scope of works received by FSP
29 January 2015 Trades appointed to repair
6 February 2015 Applicant says he was a ble to start to readvertise the property
to find a new tenant from this date.
13 February 2015 Repairs completed
5 June 2015 Applicant expressed dissatisfaction with loss of rent
settlement
9 Ju ne 2015 Date original tenancy was due to expire
23 July 2 01 5 IDR respons e
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.