The applicants claimed that a leaking pipe caused extensive cracking and gaps in their home, and the insurer accepted only some of the damage. AFCA upheld the denial of the disputed damage as ground movement, but ordered the insurer to scope and repair or cash settle the accepted cracking and possibly the cracked tiles in the leak area.
The disputed damage pre-existed the policy and resulted from excluded ground movement, as shown by the pre-purchase report and the continued movement after the leak was repaired.
Subjects and remedies
home or building damagereassess claimrepair or rectify
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount
Case number: 403537 7 September 2015
1 Overview
1.1 Dispute
The Applicants claim for damage to their property as a result of a leaking pipe. The
Financial Services Provider (FSP) accepted liability for some of the damage namely
cracking above the hallway and laundry door openings. It declined the following
claimed damage as it submits it was caused by ground movement and/or tree roots,
or had pre-existed the period of cover:
a gap of 1.5 inches between the front door and floor,
cracks in the lounge, laundry, kitchen and bedroom,
a large gap between the window frame and the wall,
a large gap between the brick veneer and the wall at the front of the house,
cracked floor tiles.
The Applicants maintains all the claimed damage was caused by the leaking pipe.
1.2 Issue and key findings
Is the FSP entitled to deny the disputed damage?
The FSP is entitled to deny the disputed damage as the available material
establishes:
the disputed damage occurred before the period of cover
the disputed damage did not result from an insured e vent but from ground
movement.
The FSP accepted localised damage in the area of the broken pipe. If the broken
floor tiles as shown in photographs provided are within this area, then cover for the
broken tiles should be accepted too.
1.3 Determination
This Determination is substantially in favour of the FSP.
The FSP is not required to indemnify the Applicants for the disputed damage.
If this Determination is accepted by the Applicants, within 14 days of acceptance the
FSP is to arrange a scope of works and assess the cost of repairs for the cracked
tiles (if in the area of localised damage) and for the cracking above the hallway and
laundry door openings and repair that damage or cash settle the Applicants for the
cost of repairs to that damage.
Case No: 403537 Determination Page 2 of 6
Case No: 403537 Determination Page 3 of 6
2 Reasons for Determination
2.1 Is the FSP entitled to deny the disputed damage?
Applicants have the onus to prove an insured event
The FSP has accepted some damage has been caused by the claim event. It
accepts that liquid escaped under the house in December 2012 and as a result of
that insured event, it has accepted damage above the doorway openings for the hall
and laundry.
The FSP has not accepted all the damage claimed to other areas to the home. The
disputed damage includes:
a gap of 1.5 inches between the front door and floor
cracks in the lounge, laundry, kitchen and bedroom
a large gap between the window frame and the wall
a large gap between the brick veneer and the wall at the front of the house
cracked floor tiles.
The FSP says this damage pre-existed the commencement of the policy and in any
case has been caused by events such as differential ground movement which
occurred over an extended period of time. It submits it is entitled to deny this part of
the claim as this cause is excluded by the terms of the policy.
On the balance of probabilities:
the Applicants must prove an insured event caused all the claimed damage
before the cover commenced
if proven, the FSP must then prove all the claimed damage is not covered or is
otherwise excluded.
Applicants have not established disputed damage occurred during the
period of cover
Under the policy, the FSP covers loss or damage caused by an insured event which
happens during the period of cover. The cover commenced on 15 February 2010 and
renewed annually.
In making its decision, the FSP relied upon the expert report of a civil engineer (F)
who attended the property, took photographs and undertook a floor level survey on
29 January 2013. The FSP also relied upon a pre-purchase inspection report dated 6
October 2010. Relying on these reports, the FSP says that the leaking water only
caused localised damage. Otherwise it says the remainder of the claimed damages
were present prior to the purchase of the property as evidenced by the pre-purchase
report. It also says there is a large tree in close proximity to the property which has
been a contributing factor to the damage.
In disputing the FSP’s decision, the Applicants obtained an architect’s report some
two years after the claim event.
The architect said the internal cracking most likely occurred as a result of a rapid
increase in moisture in the highly reactive clay base. The architect said the most
Case No: 403537 Determination Page 4 of 6
common source of cracking is a change in moisture conditions to the soil. He
provided a summary of and discussed the several possible causes of differential
moisture in soil. He concluded the cracking to the walls was probably mostly due to
the leaking pipe under the home. He also said it was not likely that nearby trees were
the major cause of moisture problems in the soil leading to cracking but conceded
the trees may be a minor contributor to the movement.
Architect’s report not persuasive as does not address the pre -inspection
report
The architect acknowledged the Applicants obtained a pre-inspection report prior to
the property’s purchase. However, the architect makes no comment on the pre -
inspection report. It is possible the architect has not seen the pre -inspection report
otherwise he may have commented on issues identified in the pre-inspection report
which may have influenced his findings.
I consider the architect’s report is not persuasive without commentary about the
issues that were noted in the property’s pre -inspection report. I note particularly that
the pre-inspection report identifies a number of issues which are also the subject of
this claim such as bowing and separation to the front wall from the window
framework, external cracking to mortar and internal wall cracking, all of which are
described in the pre-inspection report as consistent with some movement over the
years.
Damage caused by ground movement which is excluded from cover
The FSP relies on an engineer’s report that the damage is the result of long -term
differential footing movement caused by a combination of factors including an
inadequate footing system, unpaved perimeter of structure, recent drought conditions
and close proximity of trees and vegetation.
Based on the engineer’s report and photographs, I agree that the damage identified
in the pre-inspection report are still present. Further, I have considered carefully the
photographs taken by F in January 2013 compared to the photographs taken by the
architect some two years later. I agree that the ar chitect’s photographs show that the
damage and movement at the house has continued and increased despite the
plumbing leak being repaired in December 2012 and the area affected by the leak
having had adequate time to dry. This persuades me that other causes relied on by
the FSP are the proximate causes of the disputed damage.
Having considered the available information, and for the reasons stated, I am
satisfied the property has suffered from ground movement over the years and that
the FSP has established, on the balance of probabilities that an insured event has
not caused the disputed damage but that it:
occurred prior to inception of the policy and has been ongoing; and
resulted from ground movement (an excluded cause).
The FSP only obliged to pay for damage within localised area of leak
In his second report, F considered that given the damage had increased in severity
from 2013 to 2015, he was of the opinion that it was most likely that all of the damage
to the property had been caused by differential drying settlement.
Case No: 403537 Determination Page 5 of 6
However, the FSP does not resile from its original position to pay for the isolated
damage to the plaster finishes in the vicinity of the leak.
Based on photographs provided, there also appears to be cracked floor tiles to what
appears to be the entry to the bathroom. F’s floor level survey shows the laundry,
toilet and bathroom to be within the approximate area affected by the water leak. No
comment has been made by either F or the architect about the cracked tiles.
If the cracked tiles are in the area affected by the water leak as shown in F’s floor
level survey and fall within the area of the localised damage, then I am satisfied that
the FSP is also to include the cost to repair/replace those tiles in any settlement with
the Applicants.
Case No: 403537 Determination Page 6 of 6
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this Determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Ombudsman Service
(FOS) decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this Determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
3.2 Relevant policy extract
The relevant policy extracts are referred to in the FSP’s Notice of Response dated 1
November 2013. Both the policy document and the Notice have been exchanged
with the Applicants.
3.3 Relevant expert material/statements
Parties’ submissions, emails and photographs .
Pre-inspection report 6 October 2010.
Plumber’s report 17 January 2013 .
FSP’s assessor’s report 16 January 2013 .
FSP’s engineer’s reports 18 February 2013 and 23 June 2015.
Applicants’ architect’s report 16 February 2015 .