Home / Financial Firm (Unknown - Insurer) / Determination 402443

Determination 402443

Storm damage claim declined under policy exclusion for property under renovation

FirmFinancial Firm (Unknown - Insurer)
Decided2016-02-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$9,920
Non-financial loss—
Amount claimed$9,920
SourceAFCA PDF

Summary

Owners of a home under renovation claimed storm damage that the FSP declined under a renovation exclusion. AFCA ordered the FSP to pay the claim of $9,920 less excess, with statutory interest.

The insurer must prove an exclusion applies and show it sent the policy documents, and it did not fairly disclose a renovation exclusion the applicants raised at inception.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 402443 Determination Page 1 of 9 Case number: 402443 12 January 2016 1 Overview 1.1 Dispute The Applicants insured their property under the Financial Service Provider’s (FSP) Home and Contents insurance policy (the policy). The Applicants claim storm damage to the floor and ceilings of the lounge, bedroom 1 and bedroom 2 in the insured property. The claim was declined on the basis the policy specifically excludes storm damage to a property under renovation. The Applicants challe nge the FSP’s decision as they say when they incepted the policy they disclosed to the FSP the property was to be renovated. They submit they were not aware of the policy exclusion as they were not provided with the FSP’s policy documents until after the storm event. The FSP maintains its denial of the claim and submits the Applicants were advised to refer to the policy for exclusions during the inception call and submits the policy documents were dispatched to the Applicants after the call. 1.2 Issues and key findings Is the FSP entitled to deny the Applicants’ claim ? The FSP agrees there is damage caused by storm. While the FSP’s policy exclusion is very broad and on its face excludes the claim on the material provided, the FSP has not established on the balance of probabilities it dispatched the relevant documents. If standard cover was applicable, the exclusion in standard cover does not defeat the claim as the material provided does not establish the insured building was under construction. Rather, renovations were being affected to a building that was already constructed. Although the Applicants carried out repairs to the roof, at the time of the assessor’s inspection, they had not carried out repairs to the claimed damage. The material provided establishes the assessor was able to describe the claimed damage and estimate repair costs of the claimed damage. 1.3 Determination This Determination is in favour of the Applicants. Case No: 402443 Determination Page 2 of 9 If the Applicants have now repaired the claimed storm damage, the Applicants are to provide the invoices for the cost of repairs of the claimed storm damage to the FSP. Upon proof of the cost of repairs, the FSP is to cash settle the storm damage claim for the cost of those repairs less the policy excess plus statutory interest from t he time of the FSP’s IDR decision dated 23 June 2015. If the damage has not been repaired, the FSP is to pay the Applicants’ claim of $9,920 less the policy excess plus statutory interest from the time of the FSP’s IDR decision dated 23 June 2015. Case No: 402443 Determination Page 3 of 9 2 Reasons for Determination 2.1 Is the FSP entitled to deny the Applicants’ claim ? FSP agrees there is damage caused by storm The Applicants claim damage to the insured building as a result of the storm which took place on or about 30 January 2015. The FSP’s policy pr ovides cover for loss and damage caused by storm. The FSP agrees there is no dispute that there is damage to the Applicants’ property as a result of a storm. Therefore, from the material provided, I am satisfied the Applicants have established a prima facie claim. Policy exclusion is very broad and excludes the claim The onus shifts to the FSP to establish on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the damage. The FSP submits the policy provides a clear exclusion to cover storm damage to property if it is under renovation. I have considered the relevant policy terms. I am satisfied the general exclusion is very broad. The Applicants are not covered under any section of the policy for damage or loss that is caused by, arises from or involves building extensions, alterations or renovations. When the Applicants made the claim, they said there was a storm that lifted some tiles off the roof. And they claimed once the tiles were lifted, rain came into the ceiling, the ceiling fell in and the timber floorboards were damaged. In correspondence to the Service, the Applicants further explained when doing the renovations; tarpaulins were placed over the roof. They say the roof was intact. But they say the storm tore the tarpaulins, which in turn pulled tiles from the roof allowing rain into the ceiling that fell onto the floor and that in turn flooded. In those circumstances, I am satisfied the policy exclusion is sufficiently broad to allow the FSP to deny the claim as the damage was caused by or arose from or involved a building renovation. However the Applicants challenge the applicability of the policy exclusion. The Applicants submit:  when the policy commenced, they disclosed the property was to be renovated; and  they were not provided with the policy documents until after the referral of the dispute to the Service. The material establishes the policy documents include a Certificate of Insurance and a Product Disclosure Statement (PDS). Case No: 402443 Determination Page 4 of 9 The male Applicant telephoned the FSP to obtain a quote for cover on 10 April 2014. The FSP says it has no recording of the inception telephone call. Relevantly, the FSP’s file note of the inception telephone call establishes:  the male Applicant advised he will be doing renovations under $50,000; and  he was told to check the policy document for other exclusions and limits. Renovations specifically disclosed when policy commenced However, whilst I accept the FSP’s submissions that it would be unreasonable to expect the FSP’s sales consultant to advise all of the policy terms and conditions over the telephone, I do not accept that it is fair in all the circumstances, good insurance practice or acting in good faith to fail to advise of a policy exclusion which specifi cally relates to the Applicants’ situation. The Applicants specifically disclosed the situation at the time of policy inception. This is particularly pertinent in the circumstances of this claim, as the policy provides no cover under any section of the policy for damage that arises from building renovations. FSP not provided sufficient material to establish dispatch of documents The FSP submits the Applicants received the relevant policy documents. The FSP argues as the Applicants submitted to the Service a Certificate of Insurance, then they must have received the PDS. In support, the FSP merely relies upon an internal email that refers to a notice (which is not attached to the email but presumably is the first Certificate of Insurance issued 10 April 2014). The email states an insert report calls for the policy and brochure to be sent with the notice. It says its records show the notice was lodged on 11 April 2014 with Australia Post. On July 2010, the Service provided members with a Circular. The Circular describes what an FSP must do to satisfy the Service that a document is sent in disputes that depend on the Service deciding whether or not an FSP sent and an Applicant received a specific document. The FSP has not complied with the Service’s Circular. On the material provided, I am not satisfied the FSP has established to my satisfaction, on the balance of probabilities, it se nt the Certificate of Insurance dated 10 April 2014 and the PDS to the Applicants’ last known address on or about 11 April 2014 or at any other time. It has not provided a copy of the documents it says it sent to the Applicants and a copy of any record held by it showing that the documents relied on were actually sent as alleged. The insert report referred to is not provided. It has not provided a sufficiently detailed explanation of its usual process of sending documents of this sort. It has not provided a copy of any record showing the process that was followed to send the documents and, if the record was part of an internal report, an explanation of that record and/or report. There is no information to show that the address the documents were sent to was identified in the FSP’s records as the last known address of the Applicants. It has not provided its records showing the “notice” was lodged with Australia Post as alleged. Nor is there any confirming document Case No: 402443 Determination Page 5 of 9 from Australian Post. And there is no confirm ation of the FSP’s process if the documents were returned to the FSP. As for the submission that the Applicants would have received the PDS as they provided a Certificate of Insurance to the Service, the Certificate provided as part of the Applicants’ refe rral to the Service is for the subsequent renewal period. Exclusion in standard cover not applicable as home not a building under construction The FSP further submits that even if the policy cover reverted to standard cover, standard cover excludes cover for building under construction. While I acknowledge home building under the Insurance Contracts Regulations does not include a building that is in the course of construction, I am not satisfied the insured building in this dispute was a building in the course of construction. Rather, I consider the material establishes the insured building was already constructed but renovations were being affected to the already constructed building. Under the Regulations a prescribed event includes damage to a home building by storm. There is no exclusion in the relevant Regulation for a building under renovation. FSP not prejudiced as its assessor inspected and assessed claimed damage The FSP alleges it has been prejudiced as the Applicants undertook repairs prior to it being afforded an opportunity to assess the damage. It relies on a policy term that says an insured must not carry out or authorise repairs without its consent and if this occurs, it may reduce or refuse a claim. However, after the storm, the Applicants say they did not consider the policy responded to the claim. Replacement of the roof at that time and prior to claim notification was not unreasonable as it enabled the renovations to continue and prevented further water entry into the insured property. The FSP’s assessor’s report establishes the Applicants did not carry out repairs to the resultant and claimed damage inside the insured property. The assessor notes damage had occurred to the ceiling and floor. He also reports that although the roof was fully retiled, there was evidence that the ceiling had collapsed and there were water stains on remaining sections of the ceiling and the flooring was heavily water damaged. The assessor said he could not say the claimed damage was storm related. However in its Notice of Response the FSP specifically does not dispute there is damage to the Applicants’ property as a result of storm. In those circumstances, I do not accept the FSP is prejudiced. The Applicants do not claim for repairs to the roof. The Applicants claim $9,920 to $11,170 to replace the ceiling and the flooring. The ceiling and the flooring were not repaired when the FSP’s builder assessed the damage. Further, the FSP’s assessor described the resultant damage in the bedroom and the bedroom/ensuite and estimated repair costs to be $15,378. Case No: 402443 Determination Page 6 of 9 In correspondence with the Service dated 18 October 2015, the Applicants said they were unable to wait for the FSP any longer and started replacing the ceilings. If the ceilings have been replaced, the FSP has not been prejudiced as its assessor inspected and assessed the cost of repairs on 8 April 2015. The Case Manager spoke with the Applicants on 3 September 2015. The Applicants indicated the FSP’s builder C had recently attended to inspect the property. The Case Manager wrote to the FSP 14 September 2015 asking for a copy of C’s report. C’s report was not provided to the Service. The Applicants have not provided quotes or invoices for the cost of repairs. But in view of the FSP’s assessor’s estimate, and in the absence of a report from C, I am satisfied the Applicant’s claim to repair the claimed dama ge to the ceilings and floor is the three rooms is not unreasonable. If the Applicants have now repaired the ceilings and the flooring in the lounge, bedroom 1 and bedroom 2, the Applicants are to provide the invoices for the cost of repairs to the FSP. Upon proof of the cost of repairs, the FSP is to cash settle the claim less the policy excess plus statutory interest from the time of the FSP’s IDR decision dated 23 June 2015. If the damage has not been repaired, the FSP is to pay the Applicants’ claim o f $9,920 less the policy excess plus statutory interest from the time of the FSP’s IDR decision dated 23 June 2015. Case No: 402443 Determination Page 7 of 9 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this Determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extract s The relevant policy extracts are referred to in the FSP’s Notice of Response dated 26 August 2015. Both the policy document and the Notice have been exchanged with the Applicants. 3.3 Relevant expert material/statements Date Action FSP’s file note Inception call 10 April 2014  (Male Applicant) called for quote – advised of cover, excess and payment options – customer advised will be doing renovations under 50K - advised to check cover PDS for other exclu/limits - set up pol as requested - paid in full wit h cc. FSP’s file note Claim call 3 April 2015 **date and time of loss is approx** There was a bad storm that lifted some tiles off the roof. We were doing an extension at the time so got the whole roof replaced after. When the tiles lifted, rain came down into the ceiling, the ceiling fell in and the timber floorboards got damaged.  Loss date 30 January 2015 12. 00am.  Applicants’ other property noted as loss location. Case No: 402443 Determination Page 8 of 9 Certificate of Insurance (provided by FSP) Issue dat e 10/4/14 Policy for insured property Policy number ends 334  Covering letter says “please review this certificate and the enclosed Product Disclosure Statement to ensure they provide you the full cover you require”.  Period of ins urance 22/ 4/14 – 22/4/15.  Sum insured $200,000.  Excess $300. Home Details : You have told us the following about your home: it is a house it is undergoing renovation it is owner occupied Portfolio at glance : Notes 2 homes insured (other home policy number ends 729) and 2 cars insured Certificate of Insurance (provided by Applicants) Policy for insured property Policy number ends 334  No covering letter provided.  Period of ins urance 22/ 4/15 – 22/4/16.  Sum insured increased $212,000.  Excess $300. Home Details : You have told us the following about your home: it is a house it is undergoi ng renovation it is owner occupied (the Applicants annotated the Certificate indicates they reside els ewhere) Portfolio at glance: Notes 2 homes insured (other home policy number ends 729) and 2 cars insured. Builder asse ssment report (S) 8 April 2015  Assessor attended 8 April 2015.  Insured advised damage occurred 30/1/15.  Inspected and found damage had occurred to the ceiling and engineered floor.  Property currently being renovated by insured.  Insured advised in January they had removed part of the eaves and tiles and covered the roof with heavy tarps; that night the property was struck by strong winds and heavy rain caused the ceilings to collapse and flood the floor causing it to buckle.  At time of inspection, roof had been fully retiled there was evidence that the ceiling had collapsed and there was water stains on remaining section of ceiling and the flooring was protected from the works going on but was heavily water damaged.  Cannot say damages are storm related as house undergoing full renovati on and roof fully retiled.  Provided a quote for cash settlement as if there is a claim, advis ed cash settlement because of current renovations.  Described resultant damage to bedroom, bedroom ensuite, and estimated repair cost at $15,378.  Recommends an FSP assessor attend the property to determine liability cover as unsure about claims decision.  When asked why insured did not inform FSP at the time of the incident, advised he didn’t think he would be covered. FSP internal email 21 August 2015 Please see attached notice. ( N o notice provided) The insert report calls for the following ins erts to be sent with the notice: Case No: 402443 Determination Page 9 of 9 (FSP) ‐ PDS 03/12/2012 (FSP) ‐ Brochure ‐ 01/03/14 The notice lodged under run number 1538 on the 11/04/14 with Australia Post .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.