Determination 402263
Storm damage pergola claim refused after excess and workmanship exclusion
Summary
The applicant claimed for storm damage to a pergola roof and its rebuild at his investment property. AFCA found the roof repair cost of $689 was below the $2,000 excess, and the rebuild was excluded as due to faulty workmanship, so the FSP is not liable.
The storm damage repair cost fell below the applicable excess, and the cost of rebuilding the pergola was caused by poor workmanship, which is a general exclusion under the policy.
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
Case No: 402263 Determination Page 1 of 3
Case number: 402263 7 December 2015
1 Overview
1.1 Dispute
The Applicant has lodged a claim under his Home Building Policy for damage
sustained to a veranda at his property during a storm on or about 21 March 2015.
Whilst there is no dispute that the roof sheets were damaged during the storm, the
FSP declined the Applicant’s claim on the grounds the applicable excess of $2,000
exceed the amount of the damage and any additional damage was due to faulty
workmanship and poor design specifically excluded under the terms of the policy.
The Applicant disputes the FSP’s decision and maintains his claim for repair of the
pergola roof and replacement of the existing structure.
1.2 Issues and key findings
Has the Applicant established a claim under the terms of the policy?
There is no dispute that the Applicant has a claim under the terms of the policy for
the storm damage sustained to the roof sheets. The damage assessed to the roof
sheets at $689.00 is less than the applicable excess of $2,000. In the circumstances,
the FSP is not liable to pay the Applicant for the damage sustained to the roof
sheets.
Is the FSP entitled to refuse payment of the balance of the Applicant’s claim ?
The FSP is entitled to refuse payment of the balance of the Applicant’s claim as the
FSP has established on the balance of probabilities that the damage to the structure
other than to the roof sheets was most likely due to poor workmanship and faulty
design excluded under the terms of the policy.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is entitled to refuse payment of the Applicant’s claim.
Case No: 402263 Determination Page 2 of 3
2 Reasons for Determination
There has been a full exchange of material between the parties and eac h party has
had the opportunity of addressing the issues that arise from the information
exchanged.
Prior to making this Determination, the Applicant was provided with further
opportunity of supplying additional information in support of his claim. No further
information has been supplied.
This Determination follows consideration of all of the relevant information exchanged
and is based on what is fair in all the circumstances having regard to the relevant
legal principles, terms of the policy, good industry practice including relevant codes of
practice and prior Determinations where applicable.
2.1 Has the Applicant established a claim under the terms of the policy ?
There is no dispute that on or about 21 March 2015, there was a severe storm which
caused damage to the roof of the pergola at the rear of the Applicant’s investment
property. The Applicant claims that the pergola suffered not only roof damage , but
structural damage and needs to be replaced. The FSP maintains that the only
relevant damage suffered due to the storm was damage to the roof sheets.
The FSP arranged for SW an assessor to attend the Applicant’s property.
SW identified the following:
water bowed the roof sheets during heavy rain causing the roof sheets to split
there was damage to the rear pergola roof lining
the damage was a direct result of the heavy downpour
the damage was caused by poor workmanship in that the roof did not allow the
fall to meet current building code requirements.
In an assessment report provided on 26 March 2015, the assessor indicated that the
storm had lifted the colorbond partition roof causing leaking but otherwise this was
non urgent. According to the assessment report, there was no indication from the
tenants of prior problems with the pergola and no indication of sagging to the roof
sheets being pre-existing.
I accept given the assessment reports that the roof sheets were damaged during the
storm and I accept that the FSP would be liable to repair the roof sheets or meet the
cost to the Applicant paying the applicable excess.
The FSP has identified that the cost to repair the damaged roof sheets including GST
is $689.
The excess payable for each claim is $2,000. There is no indication that the
Applicant sought to reduce this excess.
In the circumstances, whilst I am satisfied that the Applicant has a valid claim under
the terms of the policy for the damage to the roof sheets, as the excess exceeds the
amount of the claim, I am satisfied the FSP is not liable to make any payment to the
Applicant for damage under the terms of the policy.
Case No: 402263 Determination Page 3 of 3
2.2 Is the FSP entitled to refuse the balance of the Applicant’s claim?
The FSP is entitled to refuse the balance of the Applicant’s claim.
Whilst the policy provides cover for damage caused by storm, the policy includes a
number of general exclusions that apply to all cover under the terms of the policy.
Included in the general exclusions is loss and damage arising from:
rust, corrosion, gradual deterioration, depreciation, wear and tear and
poor workmanship.
SW identified the pergola was poorly built with the roof not allowing for sufficient fall.
The quote provided by the Applicant to repair the pergola is in fact a quote to rebuild
the pergola. The quote provides two options, one to provide an outback deck patio
for $8,739 and a second to provide a cool deck insulated patio for $10,841. The
quote notes the need to pull down the existing structure (pergola).
Insofar as the Applicants claim is for the rebuilding of the pergola, I am satisfied that
this is not covered under the terms of the policy. Any need to rebuild the pergola is
due to the faulty workmanship. Any damage sustained during the storm that requires
a rebuild of the pergola would in my view be due to faulty workmanship.
In the absence of any other information, I am satisfied that the FSP is entitled to
refuse payment of the claim by the Applicant for the cost of rebuilding the pergola.