Text of the determination
Determination
Case No: 402005 Determination Page 1 of 10
Case number: 402005 12 April 2016
1 Overview
1.1 Dispute
The Applicants’ investment property sustained damage after impact by a fallen gum
tree in September 2014. The property sustained further damage in April 2015 after
severe storms. The Applicants made a claim on their policy underwritten by the
financial services provider (FSP).
The FSP accepted the claim, however the Applicants consider the FSP’s settlement
offer is not comprehensive, is inadequate to complete the repairs to the insured
property and does not take into account the full period of loss of rent.
1.2 Issues and key findings
Is the FSP’s offer fair and reasonable?
The FSP’s offer is not fair and reasonable because it did not provide f or the air
conditioners, the side gate or a builders ’ margin.
The offer was also not fair and reasonable because it did not take into account loss
of rent during the period of repair.
1.3 Determination
This determination is substantially in favour of the Applicants.
The FSP must cash settle the damage to the property for $81,193 in accordance with
the terms and conditions of the policy. Interest is payable on this amount at the rate
prescribed by the Insurance Contracts Act from 1 April 2015 to the date of payment.
In the event the Applicants are advised the air conditioning units are uneconomical to
clean or repair, the Applicants are to provide such written advice to the FSP. The
FSP is then required to cash settle the claim for the air conditioners in accordance
with terms and conditions of the policy. No additional excess is to apply.
The FSP must cash settle the Applicants’ loss of rent claim for $24,440 in
accordance with the terms and conditions of the policy. Interest is payable on this
amount at the rate prescribed by the Insurance Contracts Act from 17 July 2015 to
the date of payment.
Case No: 402005 Determination Page 2 of 10
2 Reasons for determination
2.1 Is the FSP’s settlement offer fair and reasonable?
The Applicants did not accept the settlement offered by the FSP
The FSP originally offered the Applicants $23,000 to repair the damage to their
rented property following a gum tree falling in September 2014. This was the lower of
two quotes obtained by the FSP. The other quote was for approximately $38,000.
Given the Applicants had received two quotes in the vicinity of $66,000 and had been
advised to obtain engineering advice about structural damage (which request had
been passed on to the FSP), they rejected this offer.
There was also subsequent storm related damage that was initially not accepted by
the FSP to be as a result of the unrepaired tree damage. The FSP subsequently
altered its position. As such, this dispute relates to one claim and only one excess is
payable.
The FSP obtained a scope of works was obtained from an engineer (M), who
estimated that the cost for both tree and storm damage would be $58,000. The FSP
then allowed for loss of rent for 13 weeks from the date of the storm, until the date of
the offer. The total offer was therefore $64,000.
The Applicants rejected this offer on the basis a number of items had not been
costed and the loss of rent did not account for a period of repair.
FOS subsequently required the FSP to obtain a builder ’ s quote for M ’s scope of
works. This was provided by AB and quoted $62,600 (not including a builders ’
margin). This compares to the Applicants’ quote of $127,000 which included a 20%
builders’ margin as well as provision to repair the wall (which was not accounted for
in AB’s quote).
There are a number of aspects of the FSP’s se ttlement offer that are in dispute
The Applicants state the FSP ’s proposed offer of settlement is inadequate because it
has failed to provide for:
damage to the side wall as a result of impact by the gum tree
replacement of carpets
replacement of the floor
replacement of the air conditioning units
replacement of the kitchen
replacement of the bedroom wardrobes, and
the misalignment of the side gate.
The Applicants also consider the FSP’s offer for loss of rent to be inadequate.
Case No: 402005 Determination Page 3 of 10
Damage to the side wall was not the result of impact from a fallen tree
The Applicants ’ builder (C) considered the brick corner had dropped from the
expansion joint to the corner and was leaning outwards. He stated it had dropped
further from his visit on 21 January 2015 to 15 June 2015.
The Applicants also state prior to the tree impact there was no cracking or significant
widening of the expansion joint on the side of the house. There was also no cracking
internally. The brickwork misalignment was not obvious to them.
M inspected the wall and determined the wall to be both horizontally and vertically
plumb, which was supported by readings from a spirit level. M explained the visual
discrepancy was due to a “pig in the brickwork”.
M considered there was no evidence or suggestion of any significant brickwork
movement, cracking or subsidence to the adjoining concrete footpath, to indicate
movement as a result of the tree impact.
M considered any cracking and movement along the articulation joint within the brick
wall was consistent with general foundation reactivity and earth movement.
On balance, having reviewed all the available material, I am not satisfied that the
Applicants have established that the brick work in this area requires replacement as
a result of the tree falling (or the storm). The Applicants requested the advice of an
engineer, having received advice from their builders that this should be sought. That
advice is that the brickwork does not require replacement and I accept this is a
reasonable conclusion.
There is no evidence the carpets require replacement
The FSP did not originally assess the carpets. However, the FSP engaged a new
builder AB on 28 September 2015.
AB stated that there was no visible damage to the bedroom ca rpets, which were not
mouldy. The Applicants query how this can be possible when their tenant’s insurer
said there was a total loss of all furniture and household items due to mould
infiltration. They seek $2,000 to replace the carpets.
However, no evidence has been provided of damage to the carpets nor has any
evidence been provided from the tenant’s insurer to support the position of the
Applicants.
As such, I am not satisfied that the carpets require replacement.
The replacement of the flooring is not required
The Applicants provided photos to show that the floor was very slightly warped and
also state there is a noticeable softening and bounce underfoot in that whole affected
area. They submit the floor has sustained structural water damage and
approximately 4 - 5 sqm requires addressing at a cost of $1,000. They submit this
damage was not detected earlier due to the tenant’s furniture.
AB considered there was no damage to the floor other than wear and tear.
Case No: 402005 Determination Page 4 of 10
Even with the photo, on the evidence before me, I am not persuaded the floor
requires replacement as a result of the storm. This is based not only on AB’s advice,
but also because the Applicants’ builder, C, did not make any allowance for
replacement of the floor in his updated quote. This quote was provided after the
tenants had left the property (and the damage would have become visible).
Provision should be made for the air conditioners
The FSP notes there was no visible damage to the air conditioning units. AB
recommended they be service tested for $600 excluding GST.
The Applicants are concerned the units are spreading mould spores and that this
caused the total loss of their tenants ’ possessions, including their clothes. C made a
$3,500 provision for the air conditioning units in his updated quote. The Applicants’
obtained a quote for replacement of the units at $4,443.
It is reasonable to allow for $660 (including GST) for the servicing and cleaning of the
air conditioning units. In the event the Applicants are advised that this is
uneconomical and / or the units require replacement, the Applicants are to provide
this written advice to the FSP. On receipt of the advice, the FSP must settle the claim
in respect of the air conditioners, in accordance with the terms and conditions of the
policy. No additional excess is to apply.
Replacement of the kitchen is not necessary
AB could not identify damage to the kitchen joinery without invasive investigation.
The Applicants explain that the tenants’ insurance assessor advised that household
items including all kitchen appliances were affected, including fridges, microwaves,
kitchen utensils and dishes. They cannot understand how the kitchen could be
deemed safe in these circumstances. However, no evidence was provided of the
damaged kitchen.
I accept that there is no visible damage to the kitchen joinery. As such, I am not
persuaded that the $30,000 the Applicants seek for the kitchen replacement is
warranted.
Replacement of the bedroom wardrobes has been taken into consideration
The bedroom wardroom was identified in M ’s scope of works as requiring
replacement. It has therefore been taken into account in AB’s quote and does not
require separate consideration.
Misalignment of side gate
M’s scope of works referred to the painting of the side gate but did not allow for
repairs regarding its misalignment. A further $1,000 is to be included, consistently
with C’s quote.
AB’s quote is not sufficient
AB’s quote was for $62,501, with no builders ’ margin. Quotes previously provided on
behalf of the parties allowed for a 20% for builders ’ margin.
Case No: 402005 Determination Page 5 of 10
There was also no allowance of the air conditioning units or replacement of the side
gate.
This means a fair settlement sum to repair the damage is $81,193, calculated as:
Item Amount
AB’s quote (excl GST) $59,910
Air conditioning units $ 600
Side gate $ 1,000
Sub - total $ 61,510
Plus builders’ margin (20%) $ 12,302
Sub total $ 73,812
10% GST $7,381
TOTAL $ 81,193
The FSP ’s offer for loss of rent was inadequate
The FSP offered to pay loss of rent of $470 per week from 20 April -17 July 2015
which is approximately 13 weeks, amounting to $6,110. The start date was chosen
based on the date of the storm, which rendered the property unliveable. The end
date of 17 July 2015 was chosen as this was the date the offer was made.
No provision was made by the FSP for the period of repair.
The policy provides for loss of rent where the property is unliveable from the date of
loss or damage until the premises is suitable for tenants to move in again (assuming
there is no ongoing lease liability).
Given the offer of settlement made on 17 July 2015 was $58,000 and offered the loss
of rent component did not include a repair period, it was reasonable for the
Applicants to reject this offer and await a determination from FOS. This is particularly
given the history of the dispute which saw the FSP offer a very low sum for the
original works that may have been inadequate to repair the initial damage caused by
the fallen tree. (I note that as at 17 July 2015, M considered only $3,000 need be
allowed for the further damage caused by the storm.)
The Applicants stated their builder estimated the repair would take between 14-16
weeks. This included damage to the wall, which has been found to not be part of the
claim.
AB considered there to be a lead time of 10 working days, and work duration of 25
working days (albeit this was in September 2015). This is 7 weeks, not allowing for
any rain delays or the like. It is fair to provide for 8 weeks rent for the period of repair.
The period for rent loss commenced on 20 April 2015. As FOS has not been advised
the repairs have been undertaken, I assume the property remains vacant. As such, a
Case No: 402005 Determination Page 6 of 10
further 8 weeks will exceed the maximum 52 weeks permitted under the policy.
Accordingly the Applicants are entitled to 52 weeks rent at $470 per week. This is
equal to $24,440.
Interest is payable on this at the rate prescribed by the Insurance Contracts Act. It is
fair in all the circumstances for interest to run from 17 July 2015, being the date the
FSP was in a position to make an offer for loss of rent that included a period for
repair.
No additional compensation to be awarded because of delay
The Applicants complain of the delays caused by the FSP in resolving their claim.
The Applicants requested the FSP obtain an engineer’s opinion in September 2014,
based on advice from their builders. This was a reasonable request, however it was
not acted on until 22 April 2015, two months after the Applicants had provided their
own quotes and after the further storm.
Had the engineer ’ s report been obtained initially the engineer could have provided a
scope of works at this time (September 2014) rather than on 10 July 2015. It is
possible works could have been agreed and completed such that the additional
damage caused by the storm was prevented. The FSP has accepted that the storm
damage was caused from the unrepaired tree damage.
In these circumstances it is fair for interest to be paid at the rate prescribed by the
Insurance Contracts Act from 1 April 2015, by which time the initial claim should have
been resolved and repairs made.
As I have made interest payable for the whole of the works from this time, it is not
appropriate for a payment for non financial loss to also be made.
Case No: 402005 Determination Page 7 of 10
3 Supporting information
3.1 The FOS Approach
I have determined this dispute based on what is fair in all the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous
Financial Ombudsman Service (FOS) decisions. I have taken into account all the
material submitted by the parties.
There has been a full exchange of all documents relied on to make this
Determination and each party has had the opportunity to address any issues raised
by the other.
This dispute has been expedited to a determination. No recommendation was issued.
3.2 Chronology
Date Event
28 March 2014 Tenancy commences
3 September 2014 Fallen gum tree during a storm, impacting home and garage.
26 September 2014 Real estate mana ger wrote to FSP, supplying phot os and
information regarding dam a ge.
Confirmed C and R had been engaged to quote on repairs.
Both stated they had concerns regarding structural damage
to the property and could not accurately quote for repairs until
an appropr iate scope of works is compiled by a building
consultant with additional reports from structural and geo - tech
engineers .
1 October 2014 Adjuster inspected property.
Tree impacted roof at the back quarter of the property
About 60 tiles broken or cracked but roof is under a tarpaulin
and assessor was looking at it from ground level.
Several rafters and battens were broken.
Eaves may have collapsed and need replacement and
painting. Same with barge board and gutters.
Two windows h ave moved, and will need corking,
Security gate damaged, may need replacement.
Flue is damaged
Internal damage minor some movement in the skylight shaft.
Garage roof will need compete replacement. Eaves have
moved and will need painting. Same applies to fascia boards.
Rake out and repoint mortar where there is a hairline crack in
the brickwork.
8 October 2014 FSP contacted builders RG and ABS to obtain quote s
Case No: 402005 Determination Page 8 of 10
Date Event
10 October 2014 RG conducted site visit
13 October 2014 A BS conducted site visit.
RG quotes $37,760 including 20% builders ’ margin.
RG then allows an additional $792 for combustion stove
repairs and air conditioning repairs.
20 October 2014 ABS quotes $22, 874. 50, with no builders margin
28 October 2014 Assessor recommended going with l ower quote of ABS as it
could see no real reason for the differen ce in t h e tenders, but
considered RG’s to be far more specific . Th e biggest
di fferenc e was in respect of painting costs.
7 November 201 4 FSP’s quotes from builders sent to Applicants
20 November 2014 Assessor’ s reports note s the Applicants wish to obtain t heir
own quot es .
19 December 2014 Quotes still being sought from Applicants .
21 January 2015 C’s pr operty damage report and quote.
$65,868 including allowance for PC items and 20% builders ’
margin.
27 January 2015 Applicants still attempting to obtain builders quotes.
20 February 2015 R ’s quote $67,129, including 20% builders margin
Additional PC items of $5,500 for damaged footings (subject
to engineering advice)
24 February 2 015 Applicant’s quot es obtained and submitted to the FSP
20 April 2015 FSP notified of further property damage following storms
22 April 2015 FSP appoints engineers, M to determine:
o Reas ons for movements in the side wall, and
o Reviewing tenders presented and providing guidance
as to which is more accurate.
27 April 2015 M’s report
Claimed movement in south ea s tern external brick veneer not
due to impact. Any reconstruction of the brickwork is
unnecessary and pointless.
While M received all four quotes, only comments on the two
provided by t h e FSP, being ABS and RG.
Recommends using RG as a b a sis for settlement negotiation,
but states an additional $3,000 allowance should be made
following damage to plasterboard resulting from April storm.
Case No: 402005 Determination Page 9 of 10
Date Event
T he external articulation joint also requires new sealant.
11 May 2015 FSP offered Applicants $22, 674.50 to resolve the claim.
This was ba sed on ABS report less applicab le exce ss a s well
as engineer’s report (M ) .
22 May 2015 The Applicants say the t enant’s insurer deemed their
contents a total loss due to mould and the house no longer
liveable due to health safety concerns.
Tenants consequently moved out immediately.
28 May 2015 Applicant s reject off er and wish matter to be referre d to
Ombudsman.
15 June 2015 C’s amended quote
$126,984 incl u ding an allowanc e of $96,200 for PC items and
builders margin of 20%
T h is includes rectific ation of damage from April 2015 storms.
8 July 2015 Assessor reported of further damage to rear lounge room,
kitchen / dini ng entry / hallway and to side b edroom robe.
Says ten ants’ insurers t hought the damage was due to water
entry from unrepaired damaged roof.
Report says “our builder confi rmed that this was not the case”
States that en try was not in the vicinity of the area of roof
which was tarped or where the damaged back brick wall was
exposed.
10 July 2015 M produced a scope of works for both damage caused by the
tree and the storm.
17 July 2015 M provided estimate for scope of works
Damage estimated at $57,970, including builders’ margin of
15%.
FSP offered this, together with l oss of rent – 13 weeks ($470
per week ) from 20 April 2015 until 17 July 2015 .
Total of FSP’s offer was $64 ,080
28 Septem b e r 2015 FSP obtained builder’s quote from ABS based on M ’s scope
of works.
Quote is for $62,601, wit h builders margin at 0%
Case No: 402005 Determination Page 10 of 10
3.3 Relevant policy extracts
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.