Cyclone Yasi home and contents cash settlement amounts and temporary accommodation
Text of the determination
Determination
Case No: 400801 Determination Page 1 of 12
Case number: 400801 31 May 2016
1 Overview
1.1 Dispute
From 25 February 2003, the applicant held a home and contents insurance policy
(the policy) with the FSP. The policy provided cover for the building in the sum of
$473,000 and contents in the sum of $135,700.
The applicant lodged a claim for damage to the home and contents as result of
Cyclone Yasi. The FSP accepted the claim and settled the claim by way of cash
settlement. The applicant is dissatisfied with the settlement amounts.
1.2 Issues and key findings
Has the FSP fulfilled its policy obligations to the applicant for damage to the
home?
It is fair in all the circumstances the FSP pay to the applicant a further $12,000 for
repairs to the h ome. The FSP’s policy provides the FSP is only obliged to pay an
insured what it would cost it to repair or replace the home. The FSP arranged for
quotes on the cyclone damage. However, the quotes obtained are old, and there are
some material omissions from the costings.
It is also fair in all the circumstances the FSP pay to the applicant a further $2,500 for
temporary accommodation. The material establishes the amount payable for
temporary accommodation was unlikely to exceed $6,000. But the policy provides
two weeks for short-term accommodation as well for which the applicant has not
been adequately compensated.
Has the FSP fulfilled its policy obligations to the applicant for the damaged
contents in the home?
It is fair in all the circumstances the FSP pay a further $10,000 to the applicant for
damaged contents in the home as the material establishes while some proofs remain
outstanding, some proof has been provided by the applicant in the form of
photographs.
Is the applicant entitled to compensation?
It is fair in all the circumstances the FSP pay $3,000 compensation to the applicant.
The FSP acknowledges the event was stressful and inconvenient. The FSP has
offered to pay compensation of $3,000. The material establishes there was an
unusual degree of physical inconvenience and time taken to resolve the situation
Case No: 400801 Determination Page 2 of 12
which would have interfered with the applicant’s expectation of enjoyment and peace
of mind.
1.3 Determination
This determination is partly in favour of the applicant.
Within seven days of acceptance of this determination by the applicant, the FSP is to
pay the applicant the following further amounts:
$12,000 inclusive of interest for repairs to the home
$2,500 inclusive of interest for temporary accommodation
statutory interest on $2,500 from 30 January 2012
statutory interest on $6,043.40 from 5 July 2011 until the date it was paid
$10,000 inclusive of interest for damaged contents
$3,000 for non-financial compensation.
Case No: 400801 Determination Page 3 of 12
2 Reasons for Determination
2.1 Has the FSP fulfilled its policy obligations to the applicant for
damage to the home?
Total amount paid to the applicant by the FSP is $94,017.55
It is not in dispute Cyclone Yasi damaged the applicant’s home and contents on 2
February 2011. The dispute relates to the amount paid by the FSP for the damage.
The FSP assessed the damage. The FSP submits it has adequately settled the
applicant for the loss in accordance with the terms and conditions of the policy.
The applicant accepts the house is old but says she paid insurance for many years
and she paid cover ‘ new for old ’ . She accepts the FSP is not obliged to pay to
replace the home or contents to a better standard than before the cyclone but
contends she is not asking for that. She says she just wants the FSP to pay for the
damage which was done. She contends the claim should be paid as per her quotes
and not assessed on the basis of estimates from a Brisbane based company which is
able to buy materials far cheaper than local companies.
The FSP says it has paid a total of $85,454.55 to the applicant for damage to both
the home and contents and for temporary accommodation. After the dispute was
referred to FOS, the FSP paid a further $8,563 to the applicant for the cost of
asbestos removal. The FSP says the total paid to the applicant by the FSP is
$94,017.55 and this is adequate.
The applicant claims the cost of damage is $147,325.94. She claims contents
replacement at $44,814.04 and the cost of damage to the home at $102,511.90.
The applicant also disputes the amount paid by the FSP and sa ys the FSP has paid
her only $57,270.70. However, having considered the material provided, I am
satisfied the amount paid to the applicant by the FSP is $94,017.55 including an
amount paid for asbestos removal after the matter was referred to FOS.
In addition to amounts paid for contents (to be discussed later in this determination)
and building repairs based on the FSP own builder’s quote (amount initially paid
$32,793), I am satisfied from the information provided, the FSP’s records establish it
made the following payments for items claimed by the applicant :
emergency payment $2,500
asbestos removal $7,854 (plus the further amount of $8,563)
air monitoring $6,259
plumbing repairs $170.50
repair of irrigation hoses, installation of new shade cloth to pergola and new
garden shed, and removal of fallen trees and shrubs, $5,000
conversion of shed into living quarters $6,043.40
Policy sets out how claim to be settled
The FSP’s policy sets out how it is to settle a claim. The policy terms are clear and
unambiguous. The FSP chooses how a claim is settled. The FSP will decide if it will
Case No: 400801 Determination Page 4 of 12
repair damage, or replace home or contents, or pay an insured what it would cost the
FSP to repair or replace home or contents.
The policy says it will not pay extra to replace the home or contents to a better
standard or quality than it was before the damage occurred.
The policy defines what new for old means. The FSP will replace or repair with new
items or new materials which are available at the time of replacement or repair from
suppliers. It will replace or repair new for old regardless of age, with no allowance for
depreciation. It will replace or repair to the same type, standard and specification as
when new. It will not replace or repair to a better standard, specification or quality
than when new.
Parties’ assessments of extent of damage and cost to repair differ
The FSP’s assessor inspected and photographed the property on 7 March 2011. The
assessor reported to the FSP the wind damaged the fence, rear metal roof of the
home, and patio walls. He said water had come into the home causing interior
damage to the downstairs room, granny flat and many contents. He estimated
damaged contents were $15,000. He notes the applicant stated she was told the
walls had asbestos.
His report included a Scope of Works. It describes the damage to the laundry,
kitchen, shed /garage/carport, fence, gate and front steps. He noted water damage to
wall linings in the downstairs large room and that the granny flat damage included
floodwater on the concrete floor, water damage to an interior door and wind damage
to a screen door. He also noted wind damage to the rear roof, and walls and
windows of the patio.
The assessor took a number of photographs which show the described damage. He
also photographed 3 boxes - one shows it contains a ‘ built-in oven ’ . There are a
number of photographs of the front fence, front gates and side fence.
On 2 August 2011 the FSP received from C the builder’s pricing in the amount of
$49,739.66.
The scope of works is then more comprehensive (and later itemised) and includes
demolition costs, asbestos removal, external roof repairs, external cladding repairs
and work to the following areas
entry upper floor
kitchen
main bathroom
master bedroom and ensuite
bedroom 2,3 and 4
rumpus and/or dining room
laundry
garage
lower floor under house
external areas of house
security screen to shed
fencing and gates
Case No: 400801 Determination Page 5 of 12
In June 2015, A Builders provided a quote to repair in the amount of $44,396.83.
The applicant lists a number of discrepancies between the amount claimed and the
amount offered including:
demolition and rubbish removal
entry upper floor
laundry
lower floor
fencing
The applicant obtained quotes to undertake the following work:
Re-clad walls downstairs and remove rubbish $9,652.50 (second quote
$10,518.20)
Re-construct new laundry with windows and roof painting including clean-up
and rubbish removal $29,755 (second quote $34,100)
Finish off rear shed to make it livable $6,043.40 (this included removal of
rubbish and the installation and connection of two split system supplied by the
applicant)
Fence $8,250
Gates $3,300
Analysis of items remaining in dispute
I make the following observations regarding the applicant’s items in dispute and
areas remaining in contention or unpaid:
Entry upper floor
Both the FSP’s estimates include work to this area in the sum of $330. In the
absence of further information, I propose to make no further allowance.
Aluminum cladding $990
C’s quote includes provision for cladding in the sum of $924. In the circumstances, I
consider the FSP has fulfilled its policy obligations for this item.
Fences and gates (50m +2 double gates) $11,550
The applicant relies on a quote to replace the fence in the sum of $8,250 and gates
in the sum of $3,300. The quote includes the supply and installation of 50m of
colonial pickets and the supply of two sets of double gates to match the front fence
with colonial pickets.
The applicant says her fencing contractor said the dog wire or picket fence would
cost the same; she had two double gates, the side fence is 50m and the front fence
is 25m.
C’s quote for $2,400 refers to the removal and replacement of 20LM dog wire fence
to rear and 6LM dog wire fence (from house to front fence); and repair and re-
instatement of weld mesh gates to the front of the home.
Case No: 400801 Determination Page 6 of 12
A’s quote allows for the supply and in stallation of dog mesh rural fencing 26LM in the
sum of $1,430 and for five hours labor for a carpenter to repair and rehang the
damaged gate in the sum of $275.
Photographs taken by the assessor in March 2011 show only the front fence was
made of pickets. The photographs show no damage to the front picket fence but
show damage to the front wire gates.
The FSP says it is only obliged to replace or repair to the same type, standard and
specification as when new. Further, it says it is only obliged to repair or rebuild the
parts which were damaged by the cyclone. It is not obliged to replace undamaged
parts of the home to create a uniform appearance.
The FSP says it relies on its experts both of whom have assessed the cyclone
damage to 26LM of dog wire fence only. The applicant has provided a quote for the
supply and installation of 50m of colonial picket fencing.
Although the applicant submits the fencing contractor gave her certain advice, she
has provided no independent material to substantiate the claim the dog wire and
picket fence would cost the same.
The policy terms are clear. The FSP is not obliged to replace parts of the fence which
were not damaged by the cyclone or replace the side fence with picket fencing to
match the front fence. From A’s quote I accept the front gate, which is seen to be
damaged in the assessor’s photographs, can be repaired and rehung.
In all the circumstances, I am not satisfied the FSP is obliged to pay the amount
claimed by the applicant for the new fence and gates. I am satisfied the amount
offered by the FSP includes reasonable costs to repair the cyclone damaged fence
and gate.
Replace walls and electrical wiring and outlets $21,000
The applicant’s quotes set out the cost to re -clad the walls downstairs with fibro,
replace any damaged studs with treated timber sheets, and repaint for around
$10,000. C’s quote to do this work is $8,116. The quotes provided do not set out the
cost of electrical wiring and outlets.
C’s quote makes provision for electrical works. It specifi cally refers to the disconnect
and make safe of all fittings and hard wired appliances including air -conditioners,
cleanup and reinstate light switches and data points and hardwire new and existing
appliances but this work is not specifically costed.
A’s q uote makes no specific reference to electrical works.
C’s quote includes the replacement of all wall sheeting with FC sheeting
(approximately110.7m2). Reinstatement of wall linings, plasterboard cornices,
painting and skirtings is costed at $8,116.
Both quotes from C and A include the cost of painting wall linings.
On the information provided, I am not satisfied this part of the claim is made out.
Rather, considering photographs of the damage, and the FSP’s quotes, I am satisfied
Case No: 400801 Determination Page 7 of 12
the FSP has made sufficient allowance to replace cyclone damaged walls and has
made provision for electrical works although this is not costed.
Rebuild laundry $29,755
The applicant claims the cost of reconstructing the laundry (approximate area of
laundry 28m²) which includes, casement windows, a new roof, painting and removal
of rubbish.
C’s quote for $8,570 refers to significant work to the laundry including the supply and
installation of new walls, wall frames and roof sheets to the laundry; 4 casement
windows; floor and wall tiles; rehanging of a door; painting; and supply and
reinstatement of laundry wash tub, fixed joinery bench and cupboard.
A’s quote also includes significant work in the laundry and the supply and installation
of 4 casement windows. A’s quote including GST is $7,920.
The FSP’s policy provides the FSP is only obliged to pay an insured what it would
cost it to repair or replace the home or contents new for old. On the information
provided, I am satisfied the FSP can fulfil this obligation. On the information provided,
I am not satisfied the FSP is obliged to pay the applicant $29,755 to rebuild the
laundry.
Repair/replace damaged veranda flooring $1,600
On the information to hand, the claim for this item is unclear.
Both A and C’s quote show allowances has been made to re-polish floors to the entry
upper floor.
Further, C has made an allowance to remove , replace and repaint 1 shot edge
veranda.
The FSP’s policy provides the FSP is only obliged to pay an insured what it would
cost it to repair or replace the home or contents. On the information provided, I am
satisfied the FSP can fulfil this obligation. I am not satisfied the FSP is obliged to pa y
the applicant $1,600 for the damaged veranda flooring as I am satisfied the FSP has
made an allowance for this item already.
Replace floor coverings $3,100
On information provided, the claim for this item is also unclear. Although C’s quote
makes allowances for floor tiles in some areas, there is no reference to floor
coverings. I have made some allowance for this item in the claim for contents.
Replace kitchen $9,500
On the information to hand, the claim for this item is unclear.
While A makes no specific reference to work in the kitchen, C makes detailed
reference to the kind of work required in the kitchen including work to the arches and
skirting, wall linings, floor and wall tiles, cleaning, fixing and rehanging internal doors
and painting architrave, skirtings and cornices. An allowance for labour in the
costings for this kind of work totals $2,080 but there is no specific item for work in the
kitchen.
Case No: 400801 Determination Page 8 of 12
On the information provided I am satisfied the FSP has fulfilled its polic y obligations.
The information provided including photographs taken a short time after the cyclone,
does not establish the FSP is obliged to pay the applicant $9,500 to replace the
kitchen. I am satisfied the FSP has made sufficient allowance to repair or replace or
repaint the cyclone damaged kitchen.
Rubbish disposal
The FSP’s policy provides additional features which include temporary
accommodation costs and removal of debris costs.
C’s itemis ed quote makes an allowance for rubbish disposal in the amo unt of $540. I
am satisfied the FSP has fulfilled its policy obligations in relation to this item.
Fair in all the circumstances the FSP pay a further $12,000 for repairs to the
home
While I am satisfied C’s quote encompasses the cyclone damage, the quote is an
insurance quote and now four years old. Although the FSP obtained an up-to-date
quote from A builders in June 2015 and A’s quote is less than C’s quote, A has
omitted some items and the quote is now a year old.
The FSP’s extensive file notes show al though it can choose how the claim is settled,
it indicated it was willing to cash settle the claim or repair the damage. In the
circumstances, I consider it is no longer obligated to repair the damage.
However, taking all matters into account including:
the age of C’s quote
the ‘ insurance discount ’ implicit in C’s quote
some omissions from C’s costings
some omissions from A’s quote and costings
no specific costings on electrics and the kitchen
an allowance for supervision
an allowance for the builder’s ma rgin
and that a cash settlement does not include the FSP’s lifetime guarantee
I consider it is fair in all the circumstances the FSP pay the applicant a further
$12,000 cash settlement which amount includes some allowance for interest.
Fair in all the circumstances the FSP pay a further $2,500 for temporary
accommodation
The applicant says she was forced to live in a shed as a result of the cyclone
damage. The FSP says it offered to provide the applicant with temporary
accommodation but the applicant declined due to personal circumstances which
included remaining close to pets. The FSP also submits the quote provided by the
applicant states it was to finish off shed at rear ‘ to make livable ’ .
The quote shows the scope of work included installing two split systems air-
conditioners, running hot water, a new kitchenette, and a shower unit.
Case No: 400801 Determination Page 9 of 12
The FSP will pay for temporary accommodation costs while the home is rebuilt or
repaired to a livable condition and if an insured incident damages the home and it is
unlivable.
There is no dispute the home was damaged by the cyclone and as a result, asbestos
was an issue which, until it was dealt with, made the home unlivable.
The FSP will pay up to 2 weeks in short-term accommodation and up to 50 weeks in
residential accommodation of similar standard to the home. The FSP is not obliged to
pay for temporary accommodation costs if an insured does not need to pay for
temporary accommodation. Further, it is not obliged to pay beyond the period it
should reasonably take to replace or repair the home so an insured can live there.
C provided the only information about the time taken to make repairs. It shows the
duration of the repairs was 28 days (or 5 to 6 working weeks). No material is
provided about the cost of residential accommodation of a similar standard to the
applicant’s home. Even if I were to allow $1,000 rent per week, the only material
before me establishes repairs would have taken up to 6 weeks.
On the information provided, I consider the amount payable for temporary
accommodation is unlikely to exceed $6,000 in addition to 2 weeks in short -term
accommodation.
The material provided establishes the FSP paid for the applicant’s shed to be
converted into living quarters in lieu of paying temporary accommodation.
In about July 2011, the applicant provided material to show the costs of converting
the shed into living quarters was $6,043.40. The quote is dated 23 June 2011. In
February 2011, the FSP also made emergency funds of $2,500 available to the
applicant and in June and July 2011 the FSP paid the applicant for asbestos
removal. However, the FSP did not reimburse the applicant $6,043.40 until 2
September 2014. The FSP claims the quote was unclear. However , although unclear
I consider it is not illegible. The quote for $6,043.40 was provided again on 29 August
2014.
The material provided shows the applicant used the $2,500 emergency payment for
temporary accommodation. The FSP asked for proof but the material establishes the
FSP already had the (unclear but legible) quote at that time. Further, in all
circumstances of this matter, I consider the FSP’s request for proof is unreasonable
in circumstances where the shed was not yet converted and the home was unlivable
because of the asbestos.
I consider the material establishes the FSP would have been liable to pay at least
$6,000 temporary accommodation to the applicant in addition to 2 weeks in short -
term accommodation. The FSP has paid $6,043.40 to the applicant to convert the
shed. However, this is hardly a satisfactory living arrangement.
In all the circumstances, I consider it fair the applicant should have retained the
$2,500 emergency expenses which represents around two weeks in short-term
accommodation. The material provided indicates this amount was deducted from the
settlement amount paid to the applicant on or about 30 January 2012.
Case No: 400801 Determination Page 10 of 12
The FSP is to pay to the applicant $2,500 plus statutory interest on the said sum from
30 January 2012.
Further, the FSP is to pay statutory interest on $6,043.40 from 5 July 2011 when the
applicant first provided the quote to the FSP to convert the shed until the date it paid
this expense.
2.2 Has the FSP fulfilled its policy obligations to the applicant for the
damaged contents in the home?
Fair in all the circumstances the FSP pay a further $10,000 for contents
The applicant claims $44,814.04 for contents replacement which includes antiques
and electrical appliances.
The FSP’s material establishes it has paid a total of $ 24,834.65 for damaged
contents in 2012 and 2014.
In April 2013, the FSP reviewed material from the applicant and set out its position. It
either accepted some items, paid some items, or required further information.
The applicant asserts settlement has not been provided for electrical items. The FSP
initially requested and continues to request the applicant provide repair reports for
certain items including electrical items.
The FSP submits it has provided settlement based on quotes submitted by the
applicant and the fair and reasonable costs provided by the applicant for most of the
contents items. It has requested repair reports on electrical items as it is required to
do under the policy terms. It submits it has acted in accordance with the terms and
conditions of the policy.
The applicant says she has provided the FSP all the information it requested. She
says ‘ the appliance people told her to cut the cords off and throw them away ’ so she
did. She also says she has provided photographs of items she had and still has some
receipts for those items.
The FSP’s correspondence shows it isolated a number of items and asked for
information stating the make and model of the item, the cause of damage, and if the
item can be repaired or required replacement.
I have carefully considered the material provided by the parties. Regarding some of
the remaining items which remain in dispute, I am satisfied some proof has been
provided by the applicant in the form of photographs. Furthermore, as the laundry
was damaged in the insured event, I am satisfied it is probable the washing
machines were damaged as well. However, I note a few proofs of ownership and
value remain outstanding.
I note the policy terms relied on by the FSP. I acknowledge the requirements for
proof of ownership and value. However in the circumstances of Cyclone Yasi which
was a catastrophic event and the difficulty in these circumstances of providing the all
necessary proofs, I am satisfied it is fair in the circumstances the FSP pay the
applicant a further $10,000 including interest for the claim for damaged contents.
Case No: 400801 Determination Page 11 of 12
2.3 Is the applicant entitled to compensation?
Compensation is awarded in certain circumstances
The Terms of Reference allows FOS to direct the FSP compensate an applicant for
non-financial loss where there is an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with the applicant’s
expectation of enjoyment or peace of mind.
The maximum amount of compensation for non-financial loss is $3,000.
The FSP acknowledges an event of this nature is stressful and inconvenient. It says
it attempted to work with the applicant to resolve concerns and progress the claim.
However, in acknowledgement of the stress and the time taken to finalise the claim,
the FSP offered to pay compensation of $3,000. I understand this amount has not yet
been paid to the applicant by the FSP.
Although the FSP submits it made the offer even though the policy does not provide
compensation for non-financial loss, this does not take into account compensation
payable if FOS considers the loss is caused by the FSP’s conduct.
Fair in all the circumstances the FSP pay $3,000 compensation
The material provided shows the dispute has been ongoing for many years. There
has been many attendances by various parties and the insured building requires
repairs. The applicant says the whole experience has been stressful.
I recognise this has been a complex claim. I also acknowledge the efforts made by
the FSP to bring about the resolution of the dispute. However I also consider the
failure to provide an itemised account of the repair costs and the long running
investigations of various aspects of this claim has taken insufficient account of the
physical inconvenience and stress being experienced by the applicant.
I consider it is fair in all the circumstances the FSP pay $3,000 compensation to the
applicant as I am satisfied there has been an unusual degree of physical
inconvenience and time taken to resolve the situation together with interference with
the applicant’s expectation of enjoyment and peace of mind.
Case No: 400801 Determination Page 12 of 12
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS recommendation and has proceeded directly to determination.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Omb udsman Service
(FOS) decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
3.2 Relevant policy extract
The relevant policy extracts are referred to in the FSP’s Notice of Response dated 28
July 2015. Both the policy document and the Notice have been exchanged with the
applicant.
3.3 Relevant material considered and relied on
Parties’ submissions including assessment reports, quotes, emails,
photographs, lists of damaged items, calculations and invoices
Correspondence between the parties
FSP’s policy screens, file notes and payment screens