Home / Financial Firm (Unknown - Insurer) / Determination 400326
Determination 400326
claim_denial
Summary
The Applicant's storm claim was accepted, but the FSP excluded water damage to the lounge and pool room ceilings. AFCA decided in the FSP's favour, finding the water entered through defective roof sheet installation rather than a storm-made opening.
The policy excludes storm and rainwater damage caused by faulty workmanship or entry through an opening not created by the storm, and the evidence established that exclusion applied.
Issues
- Claim denial primary · not upheld“The relevant policy terms are clear and specifically exclude from cover loss or damage due to storm and rainwater that arises from faulty workmanship and/or that enters the insured building through an opening not created by the storm.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 400326 Determination Page 1 of 4
Case number : 400326 15 September 2015
1 Overview
1.1 Dispute
The Applicant held a home building and contents insurance policy with the Financial
Services Provider (FSP). A claim was lodged for damage to the insured building after
a storm event.
The FSP accepted the claim however has excluded cover for damage to the ceilings
in the lounge room and pool room. The Applicant remains dissatisfied with the FSP’s
position and is seeking for this damage to be covered under the claim.
1.2 Issues and key findings
Is the FSP obliged to cover the damage to the lounge and pool room ceilings?
The FSP is not obliged to cover the water ingress damage to the lounge room and
pool room ceilings.
The available evidence establishes, on the balance of probabilities, the water entered
due to the defective installation of the roof sheets and not a storm made opening.
Damage arising under these circumstances is clearly excluded from cover under the
policy.
1.3 Determination
This Determination is in favour of the FSP.
The FSP has established, on balance, the entitlement to decline cover for the
damage to the lounge room and pool room ceilings under the policy.
Case No: 400326 Determination Page 2 of 4
2 Reasons for Determination
2.1 Is the FSP obliged to cover the damage to the ceilings in dispute?
The damage to the lounge room and pool room ceilings is excluded from cover
The policy is a defined events contract of insurance with cover subject to the
specified policy limitations/exclusions.
In seeking cover under the policy, the onus first rests with the Applicant to establish
on the balance of probabilities that the damage claimed falls within the scope of
cover available under the policy (i.e. a prima facie claim).
Having considered the available information I am satisfied that the Applicant has
been successful in established a prima facie claim. The onus therefore rests with the
FSP to establish, on balance, an entitlement to limit cover under the claim in line with
the relevant policy exclusions.
Evidence establishes water ingress due to defective roof sheet installation
The Applicant and the FSP have made available information to support their
positions including certifications, building permits and consultant(s) reports. These
reports have been referred to in more detail within Section 3 of this Determination.
I have carefully considered the certificates and building permit made available by the
Applicant. In considering the plumbing certificates, I note they do refer to and detail
plumbing works completed at the insured property. However, these works are not
relevant to the area of the roof, materials, installation or workmanship subject of this
dispute.
I have also considered the building occupancy permit made available by the
Applicant. I note that this document does not provide any information which assists
the Applicant’s position. Fur ther, it clarifies that the document is not evidence of the
insured building being compliant with the relevant building legislation and regulations.
The FSP has made available evidence from builders appointed to the claim. This
information establishes, on balance, that the cause for the water ingress in the area
of the lounge and pool rooms relates to the installation of the flat roof sheets.
Evidence has also been made available to support the view the ends of these roof
sheets should have been turned upwards as part of their installation. I am satisfied
the available information establishes the reason for the water ingress in this area was
due to the defective installation of the roof sheets as opposed to a storm created
opening.
The relevant policy terms are clear and specifically exclude from cover loss or
damage due to storm and rainwater that arises from faulty workmanship and/or that
enters the insured building through an opening not created by the storm.
Accordingly, on the basis of the information made available by the parties and the
relevant terms of the policy, I am satisfied the FSP has been successful in
establishing an entitlement to decline cover for the lounge and pool rooms ceilings.
Case No: 400326 Determination Page 3 of 4
3 Supporting information
3.1 Relevant policy wording
6. Storm and rainwater
…
We will NOT cover:
× loss or damage caused by rain, hail or wind entering your home due to:
• a design fault, structural defect or faulty workmanship
• an opening that was not created by the storm
3.2 Consultants’ Evidence
Record Key points
Compliance Certificate
(Applicant)
28 August 2009
refers to plumbing work undert aken at the insured property
including:
sanitary plumbing
below ground drainage
above ground drainage
cold water plumbing
hot water plumbing
gas fitting.
Compliance Certificate
(Applicant)
7 September 2009
provide s date of completion for plumbing as 22 August 2009
works covered under the certificate relate to roof plumbing
the works included sup ply and installation of colourbond
fascia and gutter(s), zincalume valley gutter(s) and
associated flashings
date of completion is noted as 22 August 2009.
‘N’ Building
Occupancy Permit
(Applicant)
7 September 2009
the permit states the following:
“1. This occupancy permit is not evidence that the building,
part of the building or building work described above complies
with the Building Act 1993 or the Building Regulations 2006.”
FSP Builder’s Site
Inspection Report
notes
date of inspection is noted as 22 December 2014
the water ingress damage appeared to be two to four weeks
old
in the consultants’ opinion the damage was due to the roof
deck sheets needing to be turned up at the ends to prevent
water getting in
the deck roof is flat and if there is a lot of rain the wat er flows
over the end of the deck sheets and onto the plater ceiling
the report makes reference to No. DP 1.2 of the Australian
Building Code Board.
‘FD’ FSP’s expert
23 December 2014
attended the insured property on 22 December 2014 to
inspect and determine caus e for water ingress
in consultant’s opinion the damage was due to the roof deck
sheets needing to be turned up at the ends to prevent the
water getting in
Case No: 400326 Determination Page 4 of 4
water has run down the wall cavity and down to the pool room
and the groun d floor.