Text of the determination
Determination
Case No: 400189 Determination Page 1 of 10
Case number: 400189 7 June 2016
1 Overview
1.1 Dispute
The applicant lodged a claim under her home insurance policy with the financial
services provider (FSP) after a tree fell on her home during severe storms in April
2015.
The FSP accepted the applicant’s claim and sought to arrange for the r epair of her
property. However, after the parties were unable to agree on a scope of works, the
FSP offered to cash settle the applicant for the estimated cost of the repairs.
The applicant says the FSP should be required to repair her property. In the event
that a cash settlement is provided, the applicant believes the settlement amount
offered is insufficient to fund the necessary repairs. She also sa ys the FSP has
mismanaged her claim.
1.2 Issues and key findings
Is the FSP entitled to cash settle the claim?
The FSP acted reasonably in seeking to cash settle the claim, given the breakdown
of the relationship between the parties.
Is the cash settlement offered by the FSP fair and reasonable?
The cash settlement amount should be increased to $164,322 to reflect the
reasonable costs of repairing the damage to the property caused by the impact of the
fallen tree and subsequent water entry issues and other associated costs.
Is the applicant entitled to compensation?
The applicant is not entitled to compensation as FSP was not solely responsible for
all of the delays and other issues experienced during the claim process.
1.3 Determination
This Determination is partly in favour of the applicant.
The FSP is to pay the applicant the amount of $164,322 in full and final settlement of
her claim. The FSP is not required to pay interest on this amount.
Case No: 400189 Determination Page 2 of 10
Case No: 400189 Determination Page 3 of 10
2 Reasons for determination
2.1 Is the FSP entitled to cash settle the claim?
Insurer is generally bound by election to repair
Under the terms of the applicant’s policy, the FSP may settle a claim for damage to
the property by arranging for its contractors to repair the damage or by paying the
applicant the cost of doing so.
It is clear from the terms of the policy that the FSP has the discretion to decide which
settlement method to adopt.
In the present case, the FSP initially elected to repair the damage to the applicant ’s
property caused by the impact of the fallen tree. The FSP arranged for its builder (AJ)
to undertake make safe repairs to the property, assess the damage and prepare a
scope of works for the necessary repairs.
Once an insurer makes an election to repair the insured property (rather than to cash
settle the policyholder for the cost of the repairs), it is generally obliged to complete
the repairs in accordance with the terms of the policy.
However, particular circumstances may arise which make the conduct of repairs by
an insurer untenable. In such cases, it is reasonable for the insurer to seek to settle
the claim by way of a cash settlement, provided that the cash settlement amount is
sufficient to allow the policyholder to engage a builder directly to complete the
necessary repairs.
FSP acted reasonably in deciding to cash settle claim
Having carefully reviewed the claim history, the Panel is satisfied that the FSP’s
proposal to cash settle its liability for the claim (rather than carry out repairs) is
reasonable in the circumstances.
The claim process has been difficult from the outset, due to the high level of distrust
between the parties.
The applicant ’s son (who has been managing the claim on his mother’s behalf)
expressed his dissatisfaction shortly after the initial inspection of the property by the
FSP’s builder. Among other things, he believes the FSP’s contractors have been
tampering with the property and falsifying documents.
After the applicant lodged this dispute with FOS, the FSP acknowledged that its initial
scope of works did not include all of the repairs required to the property and sought
to arrange a further inspection. However, the applicant was reluctant to allow the
FSP’ s contractors access to her property.
Following discussions with the FOS Case Manager, the applicant agreed to provide
t he FSP’s contractors with further access to the property so that an updated scope of
works could be prepared.
Case No: 400189 Determination Page 4 of 10
However, the relationship between the parties remained tense and it is clear that the
applicant has no confidence in the ability of the FSP’s con tractors to carry out their
appointed tasks.
In these circumstances, the Panel considers that requiring the FSP to carry out the
necessary repairs would only trigger further disputes and result in additional delays
which would not be in the applicant’s be st interests. Accordingly, the only feasible
manner in which the dispute can be resolved is by way of a cash settlement.
However, the amount of the cash settlement must be sufficient to allow the applicant
to engage a builder to repair the damage to her property caused by the impact of the
tree in April 2015.
2.2 Is the cash settlement offered by the FSP fair and reasonable?
FSP has obtained updated scope of works and quotation
As outlined above, the FSP has accepted that the initial scope of works prepared in
June 2015 did not include all of the damage to the property caused by the fallen tree.
The FSP has also acknowledged the need to review the scope of works , in
circumstances where it has been decided that the claim will be cash settled.
Where an insurer undertakes the repairs itself, the initial scope of works can be
supplemented by subsequent variations, in the event that additional damage is
discovered during the course of the repair process.
However, where the claim is cash settled, it is critical that the scope of works used to
determine the cash settlement amount is as comprehensive and accurate as
possible.
In the event of uncertainty about the extent of the repairs required (for example,
because some of the damage may not be visible), it may be appropriate to include a
contingency amount.
The FSP has also agreed to accept liability for any additional repairs required due to
the further deterioration of the property as a result of continued exposure to the
elements during the dispute process (despite the FSP considering it was not
responsible for the bulk of the delays experienced).
In accordance with a request from FOS, the FSP appointed:
a building consultant (IP) to inspect the applicant’s property and prepare a scope
of works for the repair of the damage caused by the fallen tree; and
an engineer (FC) to determine whether the impact of the tree had caused any
cracking and movement damage to the property and to assess the extent of any
damage to the roof framing.
Neither IP nor FC had previously been involved with the applicant’s claim. Both IP
and FC inspected the applicant’s property in March 2016 and prepared detailed
reports setting out their findings.
Case No: 400189 Determination Page 5 of 10
Based on the scope of works prepared by IP (having regard to the findings of FC),
the FSP obtained a quotation for the necessary repairs from its builder (AJ), who had
inspected the property shortly after the storm in April 2015.
AJ provided an itemised quotation for $136,935 (including GST), broken down by
trade.
The FSP sought to obtain a second quotation for the repairs set out in IP’s scope of
works. However, the applicant was reluctant to allow another builder access to the
property and therefore this proposal did not proceed.
Dispute concerns extent of claim-related damage and repairs required
The applicant says that the scope of works prepared by IP (on which AJ’s quotation
is based) does not include all of the damage to the property caused by the fallen tree.
While the applicant has identified numerous alleged inadequacies in the scope of
works, her primary concern is that it does not provide for the repair of cracking and
movement damage to the property, which he considers was caused by the impact of
the tree.
The applicant is also concerned that the repairs set out in the scope of works will not
be sufficient to repair all of the water and mould damage to the property caused by
the rainwater entering through the damaged roof.
The applicant also considers that the property needs to be stripped of the
plasterboard wall and ceiling linings and the particleboard flooring, in order to enable
a comprehensive structural assessment to occur.
Impact of tree did not cause cracking and movement damage
The F SP’s engineer (FC) was engaged to inspect the damage to the property and
comment on extent of damage to the timber truss roof and the condition of the
brickwork at four specific locations (identified by the applicant).
FC was also asked to consider whether there was any evidence of movement of the
building due to the impact from the tree.
In the course of his inspection, FC met with the applicant and her son, who showed
him areas of the property he considered to be of concern. FC also viewed
photographs of the property immediately after the storm showing the location of the
fallen tree.
In his report dated 29 March 2016, FC confirmed that the impact of the tree had
caused substantial localised damage to both the upper and lower roof framing.
However, FC concluded that the impact had not caused any significant cracking or
movement damage to the home.
In his report, FC identified a localised area of cracking to the underside of the upper
story ridge line of the eave at the eastern side of the property which he considered
was indicative of “minor and reversible sway” caused by the lateral impact of the tree.
Case No: 400189 Determination Page 6 of 10
However, FC confirmed that the building had not undergone any movement or
“shifting” beyond that which could be accommodated by the bracing mechanisms
incorporated as part of its design and construction.
FC noted that the lack of horizontal movement at the mortar joints and in any of the
external walls indicated that the lateral load imposed by the impact of the tree was
less than the bracing capacity of the walls.
The FSP’s building consultant (SG) measured the brick veneer walls for signs of
horizontal movement but found all areas of the property to be within allowable
tolerances prescribed by building standards.
FC considered that the cracking in the external brickwork identified by the applicant
(other than the isolated area referred to above) had been caused by differential
movement of the footings caused by naturally occurring changes in the moisture
content of the foundation soils over an extended period of time, rather than by the
impact of the falling tree.
In this regard, FC noted that:
other than in the area directly adjacent to the impact, there was no damage to the
bricks themselves;
the nature of the stepped cracking in the brickwork at areas further away from the
impact was more consistent with having been caused by naturally occurring earth
movement than by the impact of a falling tree, which would be expected to
product vertical cracks in the directly impacted areas; and
the presence of a substantial volume of water ponding against the rear wall of the
residence indicated drainage issues at the site, which is likely to have contributed
to variations in the moisture content of the foundation soils, causing cracking
damage.
The Panel accepts that, as a civil engineer, FC is appropriately qualified to identify
the existence of any cracking and movement damage at the property and determine
the cause of that damage. FC’s report provides a detailed and logical explanation a s
to how the cracking and movement damage occurred, which is consistent with the
observed facts.
Both FC and SG’s reports include close -up photographs showing a number of
sections of the brickwork which had been identified by the applicant as areas of
concern. While the applicant considers these photos have been digitally altered (and
the building measurements falsified), there is no independent information to suggest
that this is the case.
In the absence of a report from a similarly qualified exp ert which refutes FC’s
findings, the Panel is satisfied that the cracking and movement damage at the
property (other than the minor, localised damage identified by FC) was not caused by
the impact of the tree in April 2015.
Accordingly, the FSP is not liable for repairing this damage.
Case No: 400189 Determination Page 7 of 10
Revised scope of works is generally appropriate
The Panel has carefully reviewed the updated scope of works prepared by the FSP’s
building consultant (IP) and the quotation provided by FSP’s builder (AJ).
Having done so, the Panel is satisfied that these documents generally provide an
accurate assessment of the claim-related damage and the repairs required to restore
the property to its condition prior to the storm. The repairs included in S’s scope of
works are generally consistent with the claim-related damage to the property as
identified in the numerous photographs of the property provided by both parties.
The repairs set out in IP ’s scope of works are more extensive than those provided for
in the initial scope of works prepared by the FSP’s builder (AJ) in June 2015. By way
of comparison, AJ quoted a total cost of $99,890.22 for the repairs based on his June
2015 scope of works, which he has since increased to $136,935 based on IP’s
updated scope of works.
The Panel is also satisfied that IP ’s scope of works takes into account the additional
water and mould damage to the property which has occurred as a result of its
continued exposure to the elements.
Among other items, IP’s scope of works provides for the stripping out of mould
contaminated building materials in eleven separate areas of the property and the
remediation of the remaining materials using either vacuum or chemical based
treatment methods.
The applicant says that IP’s scope of works omits a number of items requ ired to
restore the property to its condition prior to the storm in April 2015.
Among other things, the applicant says that IP has failed to properly assess all of the
damage, has wrongly attributed some of the damage (such as moisture damage to
the flooring) to events other than the fallen tree and/or the subsequent water entry
and has proposed inappropriate repair methods (for example, the reuse of the
bathroom fixtures).
Prior to preparing his scope of works, IP carried out a thorough inspection of the
damage to the property, which is fully documented in his report dated 15 March
2016. In his report, IP considers in detail each of the areas of concern identified by
the applicant during the course of his inspection.
IP’s report provides a detailed analysis of the cause of the relevant damage and the
necessary repairs required, on an item by item basis.
In each case, IP identifies whether the FSP or the applicant is responsible for
carrying out the relevant repairs, depending on whether the damage was caused by
the impact of the fallen tree (and/or the subsequent water entry issues) or by factors
which are not covered under the policy. IP’s analysis is supported by numerous
close-up photographs which clearly show each item of damage.
On this basis, the Pane l is satisfied that IP’s revised scope of works was prepared
based on a comprehensive assessment of the claim-related damage.
The Panel accepts that the applicant has genuine concerns about the adequacy of
IP’s scope of works, However, in the absence of an y independent information (for
Case No: 400189 Determination Page 8 of 10
example, a report from another qualified builder) refuting IP’s findings, the Panel is
not satisfied that IP’s scope of works is materially inadequate.
Building repairs estimate should be increased
While IP’s scope of works is generally appropriate, the Panel considers that AJ’s
revised quotation of $136,935 (including GST) may not make sufficient allowance of
the reasonable cost of undertaking the repairs.
It is not clear from the information provided whether the quotation provided by AJ
includes a builder’s margin and, if so, whether the margin used reflects a commercial
arms’ length rate.
Further , it is reasonable to assume that the quote provided by the FSP’s builder was
prepared taking into account volume discounts and rebates which are commonly
made available to insurers.
The applicant has also identified several items (such as the boundary fencing,
clothes line and letter box) which the FSP’s contractors have confirmed were
damaged by the impact of the tree but whi ch do not appear to be included in AJ’s
quotation.
In addition, the Panel is not satisfied that the amount of $3,125 allowed for mould
remediation will necessarily be sufficient to carry out the required works, including
reinspection and certification by an appropriately qualified mould hygienist.
The Panel notes that, when the FSP agreed to cash settle the applicant’s contents
claim for the full contents sum insured, it also agreed to pay for the cost of returning
the stored contents to the property as part of the building claim).
The Panel has also considered the applicant’s requirement for temporary
accommodation while the repairs are carried out, which is estimated to take
approximately four months.
The Panel acknowledges that the FSP has paid the applicant the maximum
entitlement of 12 months ’ temporary accommodation benefits provided under the
policy. In addition, the FSP has paid a further two months accommodation costs on
an ex gratia basis, pending resolution of the current dispute.
The Panel accep ts that some of the delay in resolving the applicant’s claim has
occurred as a result of the reluctance of the applicant and her son to allow the FSP’s
contractors ongoing access to the property, in order to carry out a revised
assessment of the claim-related damage.
However, the material differences between the revised scope of works prepared by
IP in March 2016 and the initial scope of works prepared by AJ in June 2015
suggests that there was some validity to the applicant’s concerns about deficiencies
in the original scope of works (notwithstanding the additional damage to the property
which has occurred in the meantime).
In these circumstances, and having regard to the applicant’s age and infirmity, the
Panel considers it is appropriate that the cash settlement paid to the applicant should
include an allowance for temporary accommodation.
Case No: 400189 Determination Page 9 of 10
FSP is to cash settle claim for $164,322
Having carefully considered all of the factors outlined above, the Panel considers it
appropriate that the FSP should be require d to cash settle the applicant’s building
claim for a total of $164,322 ( representing the amount of AJ’s quotation plus an
additional 20%).
The Panel is satisfied that the resulting cash settlement amount is fair in all the
circumstances. The Panel notes that:
the total cash settlement amount includes an allowance for temporary
accommodation; and
the FSP is not required to pay interest on the cash settlement amount, as this
amount has been determined based on current estimated costs and taking into
account the delays experienced during the claim process .
2.3 Is the applicant entitled to compensation?
Applicant has not established misconduct by FSP or its contractors
The applicant has raised a number of concerns about the manner in which the FSP
handled her claim. Among other things, the applicant says the FSP’s contractors
deliberately attempted to hide the claim related damage to the property, falsified the
information provided in their reports and attempted to deceive, bully and intimi date
her and her son.
The concerns identified by the applicant raises issues of serious misconduct. The
Panel considers it inappropriate to make a finding on such matters without a
substantial weight of proof confirming the events alleged by the applicant occurred in
the manner claimed.
Having carefully reviewed the claim history and the correspondence between the
parties, the Panel is not satisfied that the available information establishes such
misconduct on the part of the FSP or its contractors.
Applicant is not entitled to compensation
The Panel acknowledges it has taken a significant length of time to finalise the
applicant’s claim.
However, for the reasons outlined above, the Panel considers that the FSP was not
solely responsible for all of the delays and other issues experienced during the claim
process.
As noted above, the Panel has taken into account the impact of delays experienced
during the claim process in determining an appropriate cash settlement amount.
In these circumstances, the Panel does not consider the applicant is entitled to any
additional compensation.
Case No: 400189 Determination Page 10 of 10
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS recommendation. Due to the nature
of the dispute, it has been referred directly to a Panel for determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The Panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, the Panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
During the course of this dispute, the Applicant has been assisted by her son. For the
purposes of this determination, submissions made by the Applicant’s son have been
treated as if they had been made by the Applicant herself.
3.2 Contents claim
FSP has paid contents sum insured
In addition to the damage to her home discussed above, the applicant also suffered
damage to her contents items when rainwater entered the home through the
damaged roof.
When the applicant lodged her dispute with FOS, she raised concerns about the
manner in which the FSP had managed her contents claim. Among other things, the
applicant sought a cash settlement for her non-salvageable contents items, as well
as access to other items which had been placed in a storage contained at the site.
During the course of the dispute, the FSP agreed to cash settle the applicant for the
full amount of the contents sum insured. Accordingly, this aspect of the dispute has
been resolved.