Home / Financial Firm (Unknown - Insurer) / Determination 399935

Determination 399935

Settlement of fence impact and storm damage claims

FirmFinancial Firm (Unknown - Insurer)
Decided2015-12-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$2,200
Non-financial loss—
Amount claimed$4,500
SourceAFCA PDF

Summary

The applicant claimed for a vehicle impact to a brick fence and for storm damage to her home under a home and contents policy. AFCA found the insurer's $2,200 settlement offer fair and ordered it paid, with no interest or other compensation.

The applicant bears the onus of proving a covered loss, and the storm damage was excluded because it resulted from poor roof maintenance, so the offer was fair.

Issues

Subjects and remedies

home or building damagelanguage or cultural barriermotor vehicle collisionnatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 399935 Determination Page 1 of 8 Case number: 399935 25 November 2015 1 Overview 1.1 Dispute The Applicant’s property is insured with the Financial Service Provider ( FSP) under a Home and Contents Insurance Policy (the policy). The Applicant claims in September 2012 a four-wheel-drive vehicle backed into the brick fence of her home twice and the resultant cost to repair the damage to the fence is $4,500. The FSP submits its assessor inspected and determined only a 3m section of fence was damaged due to one four-wheel-drive vehicle impact, not the entire 18m length of fence. It contends the remaining damage is as a result of prior impact and rotation of the foundations. The Applicant also claims in December 2013 rain caused internal damage to walls, ceilings and framing in the insured property. The FSP says it is not liable to pay the claim as the rain would not have entered the property but for poor maintenance of the roof which cause of damage is excluded from cover. Nonetheless, in good faith, the FSP offered to settle the storm damage claim for $876.26 net of excess. The FSP offered to settle the impact claim and the storm damage claim for $2,200 which offer was rejected by the Applicant. The Applicant also says the claim has caused stress and anxiety. The FSP denies the stress has been caused by its claims management. 1.2 Issues and key findings Is the FSP’s offer to settle the claim for impact damage to the fence fair? The FSP’s offer to settle the claim for impact damage to the fence is fair as the Applicant has not established on the balance of probabilities all of the fence was damaged when the four-wheel-drive vehicle impacted the fence in September 2012. While the Applicant has provided statements from neighbours made in 2015 and photographs of the fence after the impact, the Applicant has provided no photographs of the fence before the impact and has not explained her daughter’s contemporaneous statement that the impact damage near the driveway was caused by the Applicant in a separate and earlier incident. Case No: 399935 Determination Page 2 of 8 Is the FSP’s offer to settle the claim for storm damage fair? The FSP’s offer to settle the storm damage claim is fair in all the circumstances as the material establishes on the balance of probabilities the rain would not have entered the property, and the damage would not have occurred, but for poor maintenance of the roof which cause of damage is excluded from cover. Further, if there is additional damage to the insured property, the FSP is not liable for this additional damage as the material establishes it was due to the Applicant’s failure to complete the maintenance required to the roof. The FSP’s offer to settle the impact claim and storm damage claim by paying $2,200 is fair in all the circumstances. Has the FSP handled the claims appropriately? While accepting disputes and claims are stressful, a careful consideration of the FSP’s file notes establishes the FSP tried to resolve the claims and the dispute fairly and in a timely manner. 1.3 Determination This Determination is in favour of the FSP. If the Applicant accepts this Determination, within seven days of acceptance the FSP is to settle the impact claim and storm damage claim by paying to the Applicant a total of $2,200 (assuming cheques issued to the Applicant in settlement of the claims have not been cashed). The FSP is not obliged to pay statutory interest on $2,200 as its offers to settle the claims were made in a timely manner. The FSP is not obliged to pay other compensation to the Applicant pursuant to the Terms of Reference. Providing the Applicant pays another policy excess, it remains open to the Applicant to submit a further claim for the other impact damage to the fence near the driveway to the insured property. Case No: 399935 Determination Page 3 of 8 2 Reasons for Determination The Applicant is represented in this dispute and any references to any submissions made by her representative will be referred to as references to and submissions made by the Applicant. 2.1 Is the FSP’s offer to settle claim for impact damage to the fence fair? Applicant has onus to establish fence damaged as claimed The Applicant must establish on the balance of probabilities she has suffered a loss caused by an event to which the policy responds, that is, the entire fence was damaged by two impacts on 24 September 2012.This is known as a prima facie claim. Once established, the onus shifts to the FSP to prove on the balance of probabilities an exclusion applies if it seeks to deny the claim. The Applicant claims on 24 September 2012 a vehicle backed into the brick front fence twice. She claims the impacts damaged the fence and its foundations. As a result of the impacts, she claims the FSP is liable to repair the whole fence. She has provided quotations for repairs to the whole fence for $4,500 and $4,400. The FSP contends it is only liable for the cost to repair a 3m section of the fence which it says was the only part of the fence damaged by the one impact in September 2012. It says it has fairly settled the claim by paying to the Applicant the sum of $1,070 net of the policy excess $250. The FSP’s policy provides it will cover loss or damage caused by collision with the fence by any vehicle. The Applicant must establish the damage claimed was caused by the collision with the fence by a vehicle on 24 September 2012. In support of her position, the Applicant has provided photographs of the damaged fence and letters from her neighbours. In an email to the Service, the Applicant wrote: “A 4WD who was visiting neighbours property exactly across the street… had reversed in an attempt to drive out, collided with the right side of the brick fence of (insured property), after the driver panicked, drove forward then try to reverse into the driveway of (insured property) to drive out but had collided once again with (the Appl icant’s) front fence driveway entry side as seen in first diagram of the photos (sic).” The photographs provided are annotated and show damage to the front fence described as first impact and damage to the front fence near the letterbox and driveway described as the second impact. Three neighbours have provided letters all of which say essentially that before the accident the fence was not damaged at all. Not long after the claim was made, the FSP arranged for L (the FSP’s building consultant) to inspect a nd photograph the fence. L’s photographs confirm the fence is damaged in two areas. When L attended the insured property, he discussed the circumstances of the claim with the Applicant’s daughter. She confirmed a person Case No: 399935 Determination Page 4 of 8 who was visiting the neighbour acros s the road, miscalculated their vehicle’s position and reversed directly into the middle section of the fence. The Applicant’s daughter also told L the end brick pier and part of the face brick wall work were damaged some time ago when the Applicant inadve rtently reversed her own vehicle into the fence. L reports the collision by the 4 wheel drive vehicle was not reported to the police and the Applicant unsuccessfully attempted to have the driver of the 4 wheel drive vehicle pay the repair cost of the fence. L confirmed remedial work was required to partially reconstruct a small 3m section of brick work in the middle of the front fence where the 4 wheel drive vehicle impacted. He estimated the cost to reinstate this part of the fence to be around $1,320. L also reported to the FSP most of the fence is leaning away from the property due to the foundation rotating. For this reason, L suggested to the Applicant, before reconstructing the fence, it may be prudent to demolish the entire front brick fence structure but that the FSP would only be liable for the impact damage and the cost to reinstate the 3m middle section. Contemporaneous statement made by Applicant’s daughter not explained The Applicant has provided three unsworn statements from neighbours made in 2015 saying before the accident, the fence was not damaged at all. However, the Applicant has not explained or rebutted her daughter’s contemporaneous statement to L that the end brick pier and part of the brick work was not damaged in the 4 wheel d rive vehicle impact but was caused when the Applicant inadvertently reversed her own vehicle into the fence. Further, the Applicant has provided no photographs of the fence before the 4 wheel drive vehicle impact. When I consider all the material provided and particularly the unexplained contemporaneous version provided by the Applicant’s daughter, the photographs of the scene of the collision, and the distance between the two points of impact, I consider it highly improbable the second impact by the 4 wheel drive vehicle occurred in the manner described. On the material provided, I am not satisfied on the balance of probabilities the second area of damage was caused by a second collision with the fence by the four- wheel-drive vehicle in September 2012. T he Applicant’s invoices state the fence is about 18m long. If the Applicant’s quotes to repair the fence were accepted, the entire fence could be repaired for $4,500. I consider the offer made and paid by the FSP to contribute $1,070 (less policy excess) to be fair in all the circumstances. It fairly compensates for the 3m area which sustained damage as a result of the impact in September 2012. As the Applicant has not established a prima facie claim, comment on the FSP’s reliance on a policy exclusion is redundant. Case No: 399935 Determination Page 5 of 8 Providing the Applicant pays another policy excess, it remains open to the Applicant to submit a further claim for the other impact damage to the fence near the driveway to the insured property. 2.2 Is the FSP’s offer to settle the storm damage cla im fair? FSP must establish policy exclusions enable it to deny the claim The Applicant must establish on the balance of probabilities she has suffered a loss caused by an event to which the policy responds, that is, the claimed damage was caused by a storm event in December 2013. This is known as a prima facie claim. Once established, the onus shifts to the FSP to prove on the balance of probabilities an exclusion applies if it seeks to deny the claim. The Applicant claims rain on 3 December 2013 caused internal damage to the walls, ceilings and framing in the insured property. The FSP says it is not liable to pay the claim as the rain would not have entered the property but for poor maintenance of the roof which cause of damage is excluded from cover. In good faith, it offered to pay $876.26 net of excess for internal damage once the maintenance repairs to the roof were completed. In October 2014, the Applicant advised there was additional damage. The FSP submits it is not liable for this damage as it was due to the Applicant’s failure to complete the maintenance work. The Applicant also submits had she known the roof tiles required maintenance, she would have maintained them. She further complains the assessor inspected the property when she was not at home and overlooked the extent of damage. She says the assessor only stood under the hole and observed the damage from a distance. Had he inspected the room thoroughly and looked inside the roof, he would have seen the full extent of the damage. The Applicant has provided undated photographs of the ceiling and cornices in the master bedroom. There are no photographs of the claimed damage inside the roof. The Applicant requires the FSP re-attend with a Turkish interpreter to reassess and repair all the damage to the ceiling and framing. She says she has since attended to the maintenance of the roof. The FSP’s policy provides cover for loss or damage caused by storm including rain. The policy also says the FSP is not liable to cover loss or damage caused by or resulting from rain entering the insured property because of poor maintenance. The FSP arranged for its assessor T to inspect the property on 10 December 2013. T inspected the property with the Applicant’s daughter. T was told during heavy rain a week earlier, water entered the ceiling in the master bedroom. T inspected and photographed the damage. T found there was water damage to the ceiling in the master bedroom. T obtained a quote to repair and replace damaged insulation and plasterboard and paint the ceiling and cornices in the amount of $1,126.29. Rain entered the insured property because of the poor condition of the roof Case No: 399935 Determination Page 6 of 8 T inspected and photographed the roof also. T said the roof of the insured property was in poor condition as the pointing to the ridge caps had deteriorated and some tiles have been disturbed which allowed water to enter the master bedroom ceiling. Although there was a storm event which caused damage to the insured property, I am satisfied the material establishes on the balance of probabilities the damage was caused by or as a result of rain entering the b uilding because of poor maintenance. The roof was poorly maintained as the ridge caps had deteriorated and some tiles had been disturbed which allowed water to enter the master bedroom ceiling. In these circumstances, the FSP is not liable to pay the claim. Applicant on notice she was required to carry out maintenance repairs I have carefully considered the FSP’s file notes. The file notes show the Applicant was well aware from the time the claim was assessed by T that she had to attend to the maintenance issues identified by T before the internal damage would be repaired. The FSP’s file notes show the FSP and /or its assessor made many attempts to follow up the Applicant about the claim and the maintenance repairs. Having considered the material provided, if subsequent damage has occurred then the FSP is not liable. The Applicant was on notice she was required to carry out maintenance repairs. The repairs were not carried out in a timely fashion. The policy terms are clear. The FSP may refuse a claim if a n insured has not taken reasonable care to maintain and protect the property and has not taken reasonable care to prevent further loss or damage to the property once an event has occurred. The Applicant’s failure to have the maintenance repairs completed t o the external roof in a timely fashion led to the further damage allegedly caused. The Applicant must establish the damage claimed was caused by the rain event in December 2013. Although she claims there was damage inside the roof at the time of the insp ection by T, having considered T’s report, and the photographs he took contemporaneously with the rain event, I am satisfied on the balance of probabilities the damage to the insured property is as described and assessed by T. As for her complaint the assessor inspected the property when she was not at home, the property was inspected and assessed in the presence of the Applicant’s daughter. The FSP’s file notes show the Applicant’s daughter dealt with the Applicant’s claim up until the time she withdrew i n September 2014. The policy clearly establishes the FSP may choose to pay the reasonable cost of repairs or a cash amount. It is not obliged to carry out the repairs itself. Having considered the material provided and the policy terms, and for the reasons stated, the FSP’s offer to settle the storm damage claim and the impact damage claim for $2,200 is fair in all the circumstances. The FSP is not required to re-attend with a Turkish interpreter to reassess and repair the damage to the ceiling and framing. Case No: 399935 Determination Page 7 of 8 2.3 Has the FSP handled the claims appropriately? Compensation is only payable in certain circumstances The Applicant submits she is 62 years old, with health issues and a fragile and terminally ill partner. She says the stress of the dispute has placed a huge anxiety on them and adversely affected their health. The FSP says it has handled the claims reasonably. The primary contact on the claims up until October 2014 was the Applicant’s daughter who spoke good English. In October 2014, when the Applicant took over conduct of the claims, the FSP offered to seek a translator for the Applicant but she indicated she would go to the branch as she knew of a Turkish speaking person available to her there. The FSP says its case notes confirm its branch tried to assist the Applicant. Further, the FSP says if there has been any delay with these claims, the delay was caused by the Applicant. The Service may decide the FSP should compensate an Applicant for non-financial loss (capped at $3,000). However compensation for non-financial loss is limited. The Service may decide an FSP should compensate the Applicant for such loss only where there has been unusual amount of physical inconvenience, time taken to resolve the situation, or interference with the Applicant’s expe ctation of enjoyment or peace of mind. Whilst I accept insurance claims and disputes are stressful, having considered the submissions made and having carefully reviewed the FSP’s file notes, I am satisfied the FSP has assessed the claims, communicated its decisions and acted in a timely fashion in relation to the claims. Further, the file notes show it continued to review the claims and attempted to bring about the resolution of the claims in a timely manner. Having considered the material provided, I am not satisfied an award of compensation is justified in the circumstances of these claims and this dispute. Case No: 399935 Determination Page 8 of 8 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this Determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the FSP’s Notice of Response dated 12 June 2015. Both the policy document and the Notice of Response have been exchanged with the Applicant. 3.3 Relevant expert material/statements  Parties’ submissions, emails and photographs .  Correspondence between the parties.  Correspondence between the FSP’s assessors and the FSP .  FSP’s file notes .  Neighbours’ letters .  Report from L (FSP’s building consultant) 27 December 2012.  Report from T (FSP’s building consultant) 10 December 2013.  Invoices from the Applicant 23 November 2014.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.