Determination 399868
Balance of storm-related paving claim withheld pending engineer report
Summary
Following severe rainfall damaged the paving of a strata unit, the insurer paid part of the claim but withheld the balance until the insured obtained a hydraulic engineer's report. AFCA found the paving claim was covered and the withholding unjustified, ordering payment of the paving and leak costs, the plumbing invoices, $250 non-financial loss and interest.
No exclusion applied, and an insurer that cannot specify required rectification must pay for an expert report itself rather than hold up settlement of an accepted claim.
Issues
- Poor claim handling primary · upheld
“The FSP has not provided a valid reason why the claim has not been paid.”
- Inadequate claim investigation secondary · upheld
“The FSP's reliance on Mr RA's report (based on unsupported information allegedly provided by a former 'strata President') is more difficult to justify.”
- Delay secondary · upheld
“The FSP's decision to hold up the settlement until the insured pays for a hydraulic engineer's report, is unusual.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interestpay non financial loss
Text of the determination
Determination
Case No: 399868 Determination Page 1 of 8
Case number: 399868 3 June 2016
1 Overview
1.1 Dispute
There are two applicants in this dispute. The primary applicant, Mr R, owns a unit
(unit 5) in a strata titled complex of six units. Mr C is the chairperson of the executive
committee for the property’s owner’s corporation (and the insured party on the
contract of insurance).
On 15 October 2014, after a period of severe rainfall, the Mr R found that the paving
in his unit’s rear courtyard was damaged. The financial services provider (FSP) paid
part of the claim, but has refused to pay the balance of the claim without further
information.
1.2 Issues and key findings
Have the applicants established a prima facie claim under the policy?
The applicants have established a prima facie claim.
Has the FSP proved that an exclusion applies to decline the claim?
The FSP has not established an exclusion clause applies.
Has the FSP provided a valid reason why the claim should not be paid
immediately?
The FSP has not provided a valid reason why the claim has not been paid.
Are the applicants ’ plumbing costs covered?
The applicants’ plumbing costs should be met by the FSP.
Is the applicant entitled to non-financial compensation?
The FSP shall pay Mr R compensation of $250.
1.3 Determination
This determination is in favour of the applicants.
The FSP should compensate the applicants for any monies paid together with
interest at the rate applicable under section 57 of the Insurance Contracts Act 1984.
Case No: 399868 Determination Page 2 of 8
The FSP should arrange and pay for the costs of a hydraulic engineer’s report and
determine any further liability.
Case No: 399868 Determination Page 3 of 8
2 Reasons for determination
2.1 Have the applicants established a prima facie claim for cover under
the policy?
The FSP has agreed to pay part of the claim
The FSP accepted liability for the damage to the paving and agreed to pay for the
cost to remove the sand which had washed out from under the pavers into the
adjoining property.
However, the FSP maintains the builder of the property had deviated from the
original plans for the property (particularly with respect to the capacity of the
stormwater piping from the pit servicing the main driveway). It says the stormwater
drainage system is inadequate for the property. It has made the claim settlement
conditional on the applicants arranging for the preparation of a report on the
adequacy of the stormwater drainage system for the property, by a hydraulic
engineer.
The a pplicants disagree with the FSP’s position with respect to the stormwater
drainage system, saying the cause of the damage is primarily a leak (now fixed)
located between the drainage pit servicing the rear courtyard of unit 5 and the
drainage pit at the front of unit 4.
The applicants seek payment by the FSP for:
the repair of the paving damage
the cost incurred for the identification and repair of the leak between the
relevant drainage pits, and
the removal of the sand debris from the neighbouring property,
without the need for the insured to arrange and pay fo r a hydraulic engineer’s report.
The policy provides cover for accidental loss or damage
There is no dispute between the parties that the damage to the unit 5 rear paving is
accidental damage and that the policy responds.
Accordingly, I am satisfied that the applicants have established a prima facie claim
under the policy.
2.2 Has the FSP proved that an exclusion applies to decline the claim?
An exclusion clause does not apply
I am satisfied that the FSP is not seeking to deny liability for the damage by reli ance
on any exclusion clause in the policy.
Case No: 399868 Determination Page 4 of 8
2.3 Has the FSP provided a valid reason why the claim should not be
paid immediately?
The FSP has required the applicants to provide further information
The FSP says it requires the insured to engage a hydraulic engineer to inspect the
property and prepare a report on the adequacy of the stormwater system servicing
the property. The FSP contends that it needs this inspection and information before
settlement of the claim.
The FSP obtained expert evidence
The FSP relies on a report from Mr RA from [Name] Building Consultant and
Engineers. Mr RA, in turn, appears to have taken the word of a former ‘ strata
President ’ with respect to:
the previous stormwater overflow events at the property
what was included in the original plans for the stormwater system servicing the
building
what was installed by the builder of the property, and
when the drainage pit (outside unit 4) was installed.
Mr RA obtained information from another occupier of the units
It is noted that although Mr RA has been strongly guided by information he says he
obtained from the former ‘ strata President ’, the FSP has not provided any statement
from this person as to the advice provided. I will place limited weight on such
information.
Further, based on any such statement or information, Mr RA maintains that the
building was originally planned as including a drainage pit with 2 x 100mm PVC
pipes, whereas the builder installed only 1 pipe. There are a few problems with this:
When the building was constructed (circa 1980) PVC was not the standard for
stormwater piping.
Mr RA ’ s report refers to 100mm pipes, then 90mm pipes, in the original plans .
Copies of the plans to which Mr RA refers have not been provided.
Mr R contends that the pit outside unit 4 was installed in 1998 so could not have
been included in the original plans for the building.
Mr RA inspected the property and concluded that the main source of the water
causing the damage to the pavers is the stormwater which overflowed from the unit 4
driveway pit, and entered the subfloor area of unit 5 via a manhole door adjacent to
the unit 4 driveway pit. It is not clear if Mr RA observed the water overflowing from
the unit 4 driveway pit into the unit 5 subfloor area, however, it seems unlikely that he
did.
Even after being advised of the leak between the unit 4 and unit 5 pits, Mr RA
appears to have held to his view that the primary source of water which caused the
damage to the paving came from the unit 4 driveway pit. I am satisfied that he is
doing so mainly because of what he has been tol d by the ‘ strata President ’, which is
unsubstantiated.
Case No: 399868 Determination Page 5 of 8
While it appears that the unit 4 driveway pump failed on the night of the event, the
applicant advises the same pump was serviced two weeks prior, and when inspected
by the plumber who repaired the leak, it was operational. Although the failure of this
pump is as unfortunate as it is unexplained, I am not satisfied this is an indication that
the stormwater system is inadequate, as Mr RA suggests.
The applicant Mr R has challenged the information Mr RA says he obtained from the
former ‘ strata President ’ on a number of points. Mr R says:
The former chair of the owners corporation had a different name to that quoted
by Mr RA.
The pit/pump in front of unit 4 was installed in 1998, some 18 years prior to the
current event (not four years ago).
The main driveway is not only serviced by the pit/pump outside unit 4, but also
by a pit which drains to the kerb.
There has only been one stormwater o verflow event affecting the front of the
area in front of the property since the installation of the pit in front of unit 4, and
that is the event to which this claim/dispute relates, in 2014.
There was no event in 2011, and although there was an event in 2012, it only
affected the paving to the rear of unit 5 (not the driveway area at the front of the
units).
As part of the claim for the 2012 event, a pit and pump was installed into the
paved area of the unit 5 courtyard, as reco mmended by the FSP’s builder. The
pump, which is activated by a float valve, drains this pit to the pit at the front of
unit 4.
A leak developed between the unit 5 rear courtyard pit and the unit 4 pit, and
this is the primary source of the water which, during the 2014 event, washed
away the sand under the paving causing the claimed damage.
My conclusion is that is more likely that the leak from between the pits is the main
source of the water which caused the paving damage, and entered the unit 5
subfloor.
Importantly, Mr RA says the stormwater system is inadequate, but requires a report
by a hydraulic engineer. This suggests that he is not sure of whether the stormwater
system is adequate or not.
I find that if the FSP also takes this position, it should arrange and pay for such a
hydraulic e ngineer’s report, not put that requirement on the insur ed applicant and
hold up the settlement to Mr R until it is done. It can determine any further liability to
meet the claim.
The amount of rainfall
It is also worth noting the relative magnitude of the rainfall on 14 October 2014. The
Bureau of Meteorology records for the rainfall station (3.8km from the location of the
units) show that 143 mm fell between 9am on 13 October and 9am on 14 October
2014, and this 24 hour total is about 88% of the monthly total.
Further, the next four highest 24 hour totals, over the period 2012 to current, are:
Case No: 399868 Determination Page 6 of 8
116mm on 8 March 2012 (this appear to be the 2012 event which resulted in
previous damage to the unit 5 paving, and the installation of the pit/pump in that
location)
90 mm on 21 April 2015
85mm on 22 April 2015
84mm on 29 January 2013.
This confirms the a pplicant’s view that the 14 October 2014 event was extreme. I
also believe that stormwater systems are only required to cope with one in 20 year
events, and the 14 October 2014 event is quite possibly outside that parameter.
I am satisfied that the FSP should pay for the repair of Mr R’s paving immediately.
Further, if it wishes to do so, it should arrange for a hydraulic engineer to prepare a
report on the drainage of the property at its expense. If the report reveals specific
rectification is required, the FSP can take action based on the findings of the report.
The FSP should also immediately pay for the removal of debris from the
neighbouring property. If it has been removed and the costs met by the applicants,
the FSP shall make payment to the applicants.
Interest payable
Interest should be paid on any cash settlement on the claim. If this involves
reimbursement to applicant Mr R for costs incurred, interest should be paid from the
time the costs were paid by the applicant. If it is for cash settlement of the damage to
the paving, it should be from the date of the IDR letter on the matter (4 May 2015).
2.4 Are the applicants ’ plumbing costs covered?
The policy provides a special benefit of exploratory costs and replacement of
defective parts. Under this provision, the FSP will pay the reasonable exploratory
costs necessarily incurred in locating the source of bursting, leaking, discharging or
overflowing of tanks, apparatus or pipes used to hold or carry liquid of any kind.
The applicant Mr R has provided an invoice for $181.50 from a plumber for the
inspection of the stormwater system to the complex, and the preparation of a report
on the findings. It is not unreasonable for the FSP to pay this amount under the
exploratory costs benefit of the policy.
The policy benefit provides that the FSP will also pay for reasonable costs incurred i n
repairing the area of the insured property damaged by such exploratory work, and
repairing or replacing the defective part or parts of such tanks, apparatus or pipes (to
a limit of $1,000).
I am satisfied that the FSP should pay the costs of repairing the leak in the unit 5 pit
($236.50) under this benefit.
Interest should be payable from 4 May 2015 on these amounts.
Case No: 399868 Determination Page 7 of 8
Compensation for non-financial loss
Under the FOS Terms of Reference 9.3(b)(i) FOS can award compensation for non-
financial loss. Although the applicant Mr R has not specifically claimed
compensation, he has made mention of the slowness of the response by the FSP.
When assessing the claim, it was not unreasonable that the FSP should investigate
the circumstances of the 2012 claimed event and its relationship to the current claim.
I am therefore not convinced compensation is warranted merely because of the delay
while the claim was proceeding.
However, the FSP’s reliance on Mr RA ’s report (based on unsupported information
allegedly provided by a former ‘strata President’ ) is more difficult to justify, particular
given the evidence of the leak provided by Mr R.
Further, the FSP’s decision to hold up the settlement until the insured pays for a
hydraulic e ngineer’s report, is unusual. I c ould accept this if it were able to identify
specific rectification that was needed prior to settlement.
In the current circumstances, however, where the FSP has taken a position but
cannot specify the rectification that needs to take place, I am uncertain as to why the
FSP would not simply pay for an expert to identify those specific rectifications.
As a result of the FSP’s approach, Mr R has been putting up with damaged paving
for nearly 18 months.
On this basis, I determine compensation for non-financial loss of $250 if payable by
the FSP.
Case No: 399868 Determination Page 8 of 8
3 Supporting information
3.1 Financial Ombudsman Service (FOS) process
I have decided this dispute based on what I consider is fair in all the circumstances. I
have had regard to the relevant law, good industry practice, codes of practice and
previous decisions of the FOS.
In making this determination I have considered the entire file, including all
communications with the parties not specifically referred to in these reasons.
I am satisfied that the documents I have relied on i n making this decision have been
exchanged between the parties. As a result, I am satisfied that the parties are aware
of the issues to be considered and the submissions and evidence relevant to those
issues.