Strata building subsidence claim declined under earth movement exclusion and for late lodgement
Text of the determination
Determination
Case No: 399213 Determination Page 1 of 5
Case number: 399213 28 January 2015
1 Overview
1.1 Dispute
This matter involves a claim by the Applicants under their Residential Strata Plan
Insurance Policy, held with the Financial Service Provider (FSP), following damage to
the insured property.
The FSP has denied the Applicants‟ claim on the basis:
of the specific exclusion within the policy for earth movement, no matter how
caused,
the FSP has been prejudiced by the delay in the Applicants lodging the claim.
1.2 Issues and key findings
Is the FSP entitled to rely upon the exclusions within the policy to deny the
Applicants’ claim ?
The FSP is not entitled to rely upon the exclusion within the policy to deny the
Applicants‟ claim .
Has the FSP been prejudiced by the delay in the Applicants lodging the claim?
The FSP was prejudiced by the Applicants‟ delay because the movement worsened
over time.
The FSP is entitled to reduce its obligation under the policy to the extent it has been
prejudiced by the Applicants ‟ delay in lodging the claim.
1.3 Determination
This Determination is in favour of the Applicants.
The FSP is required to meet the Applicants ‟ claim within the terms and conditions of
the policy, to the extent that it reflects the cost of repairs for the loss and damage
existing as at October 2012.
The FSP is to pay interest on any cash settlement, in accordance with the Insurance
Contracts Act 1984 (the Act), from the date of denial of the claim, to the date of
settlement.
Case No: 399213 Determination Page 2 of 5
2 Reasons for Determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the material exchanged.
This Determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principals, terms of the policy, good industry practice and where applicable, prior
Determinations.
2.1 Is the FSP entitled to deny the Applicants’ claim on the basis of
exclusions within the policy?
Coverage of the policy
The Applicants‟ Residential Strata Plan Insurance Policy provides coverage in the
event of accidental loss and damage and the Product Disclosure Statement (PDS)
details:
What You are insured against
This policy insures You against:
accidental damage to the Building and burglary or theft of goods, plant or equipment
included in the definition of Building, occurring at the Strata Land during the Period
of Insurance for up to the „Building Sum Insured‟
…..
The coverage provided by the policy is subject to exclusions which include:
What is not insured
Your policy does not insure You against:
1. damage directly caused by:
…..
earth movement (except earthquake) no matter how caused (emphasis added),
including erosion, vibration, subsidence, seepage, saturation, creeping, landslip,
mudslide, collapse, shrinkage, settling, expansion and heaving
….
4. damage that is:
….
Cracking (other than cracking of bath tubs, shower recesses, wash basins, sinks,
toilet bowls and cisterns), chipping, splitting, tearing, staining, scratching or denting,
unless directly caused by fire, lightning, earthquake, storm, explosion, burglary,
theft, vandalism or impact by a vehicle, aircraft or aerial device
….
Case No: 399213 Determination Page 3 of 5
Further, the coverage provided by the policy is subject to general conditions and the
PDS details:
General conditions
applying to all policies
….
What you must and must not do if You make a claim or an event happens that might
lead to You making a claim
You must:
do everything You can to limit loss, damage or injury and to prevent further loss,
damage or injury resulting from the event
….
immediately tell Us about the claim or the event and send Us written details when
We require this
immediately send Us any correspondence You receive about the claim or the event
….
You must not without Our prior consent:
carry out repairs or dispose of any damaged property until We have had the
opportunity to inspect it
…..
It is accepted insurance law that the Applicants have the initial onus to establish that
they have suffered loss and damage which is covered by the terms and conditions of
the policy.
The FSP‟s onus to show the basis on which it otherwise seeks to deny the claim,
including the exclusion for earth movement, no matter how caused, only arises once
the Applicants have established that the loss and damage claimed is covered by the
terms and conditions of the policy.
Circumstances of the loss
On the basis of the evidence presented, the Service accepts that the loss and
damage arises from a failed water service which has liquefied the sand subsoils
under the centre area of the building, reducing bearing capacity of the soil to support
the weight of the unit building.
The evidence confirms that there was a failed water service and as stated this has
led to the loss and damage.
The failed water service was neither intended nor foreseen and thus the damage that
followed is accidental under the terms of the policy.
Indeed, the FSP acknowledges that the damage claimed by the Applicants to the
building, is covered under the terms and conditions of the policy.
However, the FSP relies upon the exclusion for earth movement, no matter how
caused, as the basis on which it seeks to deny the Applicants‟ claim.
Case No: 399213 Determination Page 4 of 5
Specifically, the FSP says:
“T he question I have of you, is if a policy of insurance specifically states that its
intention is to exclude all claims for movement of earth regardless of what has caused
the movement of earth, on what basis do you believe that it can bring proximate cause
back in to overrule the exclusion and override the contract of insurance?”
In support of its position, the FSP has referred to a number of decisions of the
Service.
The Service does not agree that by raising the question of proximate cause, the
Applicants and/or the Service is seeking to override the contract of insurance.
Rather, consideration of the proximate cause is not only a necessary step in the
assessment of all insurance claims, but also a necessary step for the purposes of
implementation of the contract of insurance.
The evidence in this dispute confirms that it was the leaking water from the failed
water service, which led to the movement of the earth and resulted in the damage
suffered to the Applicants‟ home.
As such, the Service is satisfied that the proximate cause of the loss and damage, is
the failed water service and that this was accidental damage as contemplated by the
terms and conditions of the policy.
On the basis of the evidence presented, the Service is satisfied that this is not a
matter where there is more than one proximate cause, or that there are concurrent
causes.
In this dispute, the evidence confirms that the single proximate cause is the failed
water service.
The earth movement, is as a result of the failed water service.
The Service is also satisfied that given that the loss and damage arises from the
proximate cause of the failed water service, being accidental damage, the FSP is not
entitled to rely upon its exclusion for eart h movement, to deny the Applicants‟ claim.
In this regard the Service refers to a number of earlier decisions, including 407678, in
support of this position.
As such, the FSP is required to meet the Applicants‟ claim within the terms and
conditions of the policy.
2.2 Has the FSP been prejudiced in its assessment of the claim?
The evidence confirms that the failed water service occurred in or about February
2012.
The evidence also confirms that the Applicants engaged a plumber in October of
2012 and the leak from the failed water service was repaired.
However, the Applicants did not lodge their claim until October 2014. The Applicants
have advised that the claim was not lodged at an earlier date as the Applicants were
unaware that they were entitled to claim.
Case No: 399213 Determination Page 5 of 5
It would appear from the evidence presented that the building showed signs of
movement during the course of 2012.
Within an email to the Service of 20 November 2015, the Applicants have said:
“Immediately after the water leak the building started showing very rapid signs of
dropping, unfortunately it was approximately six months until we realised that it was
probably due to the water leak. At this stage we started calling to get quotes for
underpinning…”
As such and on the basis of this email it would appear that the Applicants became
aware of the movement in the building during the course of 2012.
The Applicants advised that they were unable to obtain quotations in relation to the
underpinning but when they were getting what they called „ private work ‟ done to one
of the units, a tiler suggested that they call an underpinning company that the tiler
knew and the tiler also suggested that they contact the insurance company.
The Applicants say that it was only at this time did they realise that an insurance
claim could be made and they immediately called the FSP in October 2014.
The evidence suggests, that the movement of the building has occurred over time
and worsened between 2012 and 2014.
As such, the FSP has been prejudiced in its ability to assess and attend to the
damage claimed.
In those circumstances, the FSP is entitled to limit its liability to the extent of damage
occurring as at October 2012.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.