Insurer declined roof replacement after bushfire and withheld payment for contaminated water tanks
Text of the determination
Determination
Case No: 398881 Determination Page 1 of 10
Case number: 398881 31 March 2016
1 Overview
1.1 Dispute
The applicants lodged a claim for damage to their property as a result of a bushfire.
The claim was accepted and settled however the FSP has excluded the replacement
of the roof of the main premises on the basis this was not damaged by the event, but
by causes specifically excluded from cover.
1.2 Issues and key findings
Is the FSP obliged to replace or pay to replace the roof on the house?
The FSP is not obliged to replace the roof on the house as the material provided
establishes the damage to the roof was not caused by the bushfire nor by the water
bombing during the bushfire. The material establishes the dominant or proximate
cause of the damage to the roof was degradation caused by UV radiation prior to the
bushfire event; and as the roof was already deteriorated by the sun before the
bushfire, the water bombing only exposed the existing roof damage.
The FSP is obliged to clean or pay the reasonable cost to clean the cinder deposits
from the roof as the material provided establishes the cinder deposits we re caused in
the bushfire.
Is the FSP obliged to pay the applicants’ claim for the water tanks?
The FSP is obliged to pay the applicants the cost of cleaning the tanks and refilling
the tanks with drinkable water as the material provided establishes the fire left cinder
deposits on the roof and those deposits probably washed from the roof into the
drinking water tanks causing contamination.
Are the applicants entitled to other compensation?
The applicants are not entitled to other compensation as the dispute was not
particularly complex nor raised complex legal issues.
1.3 Determination
This Determination is substantially in favour of the FSP.
The FSP is not obliged to replace or pay to replace the roof on the house and need
take no further action in relation to that part of the claim.
Case No: 398881 Determination Page 2 of 10
Within seven days of acceptance of this determination by the applicants, the FSP is:
to inspect the roof and arrange to clean the cinder deposits from the roof or pay
the reasonable costs of same
pay to the applicants the sum of $1,780 to restore and refill the water tanks
pay to the applicant’s statutory interest on $1,780 from 13 October 2015 .
Case No: 398881 Determination Page 3 of 10
2 Reasons for Determination
2.1 Is the FSP obliged to replace or pay to replace the roof on the
house?
Applicants must establish damage caused accidentally by the bushfire
The applicants obtained three quotations in relation to the replacement of the roof on
the house ranging from about $42,000 to about $44,000.
The FSP is obliged to meet the applicants’ c laim to replace the roof if it is
established, on the balance of probabilities, the proximate cause of the claimed
damage was the bushfire.
The applicants submit strong winds blew ash and embers from the bushfire over the
roof of the house. They also contend damage was caused by water dropped by
helicopter on or near the house. They speculate there may have been fire retardant
chemicals in the water which damaged or caused deterioration to the roof surface.
It is not in dispute the insured home is about 24 years old, is in good condition for its
age, and has a corrugated colour bond metal sheet roof.
Applicants’ roofer says the fire accelerated the deterioration of the roof
The applicants rely on the opinion of a roofing plumber. The plumber says the roof
was in excellent condition before the fire as he replaced skylights in the property 12
months before the fire.
He inspected the roof in June 2014 and says the heat from the bushfire’s cinders and
ash accelerated the deterioration of the roof’s colour bond material. In support of his
opinion, he says the areas covered by pool pipes are also faded. He says this
suggests the deterioration of the colour coating is heat related rather than UV related.
He also says small carbon deposits are embedded in the roof and some sheets are
now showing stress with rust from the hot cinders and ash of the bushfire.
In September 2015, another roofer, (D) inspected the roof for the applicants and
noted dramatic fading and discolouration to the colour bond roof and gutters. D
recommended replacement of the roof and gutters, based on 37 years’ experience in
the roofing and sheet metal industry. D concluded:
“it is my opinion that the defects found on this roof is due to a varying degree of heat
and ember damage sustain during r ecent bushfire events (sic).”
FSP’s experts say the roof was deteriorated by the sun before the fire
The FSP relied on the opinions of its assessor, a licensed builder (S) and an
engineer whose qualifications include degrees in metallurgy and corrosion sci ence
and engineering.
The assessor inspected the insured property within days of the bushfire. His report to
the FSP deals with many matters. His focus was not on the house. Nonetheless he
notes the house was undamaged by fire. This observation may not necessarily
Case No: 398881 Determination Page 4 of 10
derogate from the applicants’ position. They say the damage to the roof was not
apparent until about two weeks after the bushfire, after heavy rain.
The FSP’s builder’s focus was on the roof of the house. The builder inspected and
photographed the roof about nine days after the bushfire on 18 February 2014. The
photographs he took are annotated and show a contrast in deterioration of the
topcoat of the roof between the northern and western facing roof planes compared
with the darker southern facing roof plane; the southern side of the corrugations are
darker; and the shaded area behind the chimney is also darker.
Having made his observations, the FSP’s builder concluded the fading and chalky
paint on the roof is a result of a known manufacturing defect. He says the state of the
roof is a maintenance related issue which occurred over time. The colour bond steel
has a warranty period of 15 years only. He estimated the roof was around 24 years
old. He said the colour coating system had deteriorated to such a point that it
provided little or no resistance to the concentrated deluges from the helicopter which
removed surface oxides, pollution deposits and some of the colour finish.
FSP’s engineer says the water bombing only exposed the existing roof damage
The FSP also engaged an engineer to inspect the roof in September 2014.
Essentially, he agreed with this opinion.
The applicants described to the engineer the roof’s deterioratio n after the fire which
included severe fading of the colour, flaking of the coating, and ember particulates
bonding to the coating. They also claimed the drinking water in tanks was
contaminated and there was water ingress into the kitchen.
The applicants attributed the damage to the heat of the fire, the deposit of hot
embers on the roof, and the deluge of water from the helicopters.
After inspection and assessment, the FSP’s engineer disagreed with the applicants’
assertions. He concluded the fire and wa ter bombing operations were not the cause
of the claimed condition of the roof. He says the fire was not hot enough and the
deluge of water only exposed the surface which was already degraded.
The engineer was thorough. He inspected and photographed the roof both from the
ground and rooftop, conducted a macroscopic examination of the colour bond
roofing, examined the cinder deposits, assessed the thermal damage to the fixtures
on the roof, considered the impact of water bombing, and assessed the reported
water leaks.
FSP’s expert reports more persuasive, supported by reasons and photographs
I have carefully considered the report and the many photographs taken. I consider
the photographs support the engineer’s findings which was the bushfire did not cause
damage to the roof. I am persuaded the roof coating was significantly degraded
already by the combination of UV and elevated temperature exposure which had
caused chalking and removal of the coating on the roof before the bushfire.
I am persuaded to that view by the observations made by the engineer (and
supported by the photographs taken) that:
Case No: 398881 Determination Page 5 of 10
the coating on the new roof sections was in good condition and did not have the
faded appearance seen on the original sections of the building
roof sections facing south were less degraded
parts of the roof which were relatively flat were in better condition, suggesting
the angle of incidence of the sun affected the rate of deterioration
faces of roof corrugations oriented to the sun were more heavily degraded
a localised area behind a chimney was less degraded as it was shaded
the roof under a solar heating blanket (installed about four years earlier) was
still significantly deteriorated, which I consider supports the contention the roof
coating was already deteriorated preceding the installation of the blanket
there was no evidence of thermal degradation or distortion to fixtures on the
house roof and alongside the house.
The engineer found no evidence of any significant corrosion of the roof where the
removal of the coating had disposed the Zincalume substrate.
Having inspected the cinder deposits and undertaken an assessment of thermal
damage to fixtures, he also said the cinders were not sufficiently hot to melt or distort
plastic items and therefore affect the colour bond finish. Further, the cinder deposits
were not bonded to the coating indicating they were not of sufficient temperature.
The engineer found black cinder deposits in the roof corrugations system with
residual deposits of cinder particulates but said as the deposits had not been welded
to the coating, they could easily be removed by wiping with a wet finger.
The engineer also found no evidence of directional bands of increased damage, had
there been a heavy deluge of water by release from the helicopter. Rather, he says
the deluge of water disturbed the already degraded surface of the coating exposing
the substrate and making the surface deterioration more evident from ground level.
Having considered the material, I am persuaded the water bombing did not damage
the roof but exposed the damage which was already there.
As for the water leak in the kitchen, having inspected the area, the engineer
concluded water seepage was from inadequate draining from a roof gutter over the
kitchen. In the absence of material from the applicants on this issue, I consider
photographs he took, support this conclusion.
The applicants submit the experts engaged by the FSP support the proposition the
deterioration was accelerated by both the fire and the water. However, on careful
consideration of the reports, I am satisfied it is the FSP’s experts’ opinion the roof’s
deterioration was not accelerated by the fire as it was not hot enough and the water
bombing did not accelerate or cause the deterioration of the roof. Ra ther, the water
bombing merely exposed the roof surface’s deterioration.
The applicants also contend the roof was in good condition prior to the fire and their
roofing plumber W supports this contention. However, having carefully considered
the photographs taken by the FSP’s engineer, I do not accept the roof was in good
condition prior to the fire. For example, the area of the roof under the solar blanket is
seen in the photographs to be deteriorated.
Case No: 398881 Determination Page 6 of 10
I also do not accept W’s opinion that as the area covered by the pools’ solar heating
pipes has still faded slightly, this suggests the deterioration of the coating on the roof
is heat related rather than UV related. Rather, I am satisfied the totality of the
material presented by the FSP’s engineer about the state of the roof supports the
contention the roof had already deteriorated before the fire because of sun damage.
The parties make contradictory submissions regarding the presence or otherwise of
fire retardant chemicals in the water used to water bomb the roof. However, I am
satisfied the FSP’s expert evidence establishes the water bombing of the roof did not
damage the roof but exposed the pre-existing damage.
The applicants impugn the independence of the FSP’s experts. The material
presented does not es tablish the FSP’s experts have a vested interest in the
outcome. Further, one of the experts is a builder and the other has qualifications in
corrosion science and engineering. Although they are not roofing plumbers, I accept
they have the necessary expertise to provide an opinion about the cause of damage
to the roof.
Further, having considered all the material submitted, I am persuaded by the FSP’s
expert’s opinions because of the comprehensive reports, the reasons given for the
opinions, and the photographs taken which support the opinions. The reports
provided by the applicants are not as comprehensive and the report from D does not
provide reasons supporting the opinion.
In conclusion, having carefully considered all the material, and for the reasons stated,
I am not satisfied the damage claimed to the roof was caused by the fire or by the
water bombing. Rather, I am satisfied the roof was already deteriorated before the
fire. I am therefore satisfied the FSP is entitled to deny the claim to replace the roof.
The FSP argues it is not liable relying on the Wayne Tank principle. However, I
consider the principle stated therein has no application to this dispute as there were
not two or more proximate causes of damage. Rather, I am satisfied the dominant or
proximate cause of the damage to the roof was degradation caused by UV radiation
exposure prior to the fire event. This cause of damage is excluded from cover.
Cinder deposits on the roof were caused by the bushfire
I am also satisfied the material provided establishes there are cinder deposits on the
roof and the cinder deposits were caused as a result of bushfire. The material
establishes the cinder deposits can be removed by cleaning.
The FSP has offered to pay for the cost of cleaning the cinder deposits from the roof.
The FSP says it cannot provide a quote for the cost of cleaning the roof as it has not
had access to the property. The applicants say they have not denied access. A
finding in this regard does not affect the outcome.
The FSP’s policy states it will either repair or pay the reasonable cost to repair
damage. The FSP is to inspect the roof and arrange to clean the cinder deposits from
the roof or pay the reasonable costs of same.
Case No: 398881 Determination Page 7 of 10
2.2 Is the FSP obliged to pay the applicants’ claim for the water tanks?
Cinders washed from the roof and contaminated the drinking water tanks
The applicants claim the roofing damage includes the guttering. They say cinders
and ash embers covered the roof and guttering and contaminated the water tanks.
As a result, the applicants say they are unable to drink water collected from the roof.
The applicants provided a quotation from E (a tank cleaning and repair operator) to
restore the drinking water tanks by pumping out and pressure cleaning the two tanks
and refilling the tanks with potable water.
The cost of restoring the tanks and refilling is $1,780.
The FSP offered to clean the residue from the roof but has not addressed the claim
the water tanks need cleaning and refilling.
Having considered the report provided by the FSP’s engineer, I am satisfied the fire
left cinder deposits on the roof. Further, while the cinder deposits can be cleaned
from the roof, I am satisfied since the fire, the cinder deposits probably washed from
the roof into the drinking water tanks causing contamination.
In those circumstances, I am satisfied the FSP is obliged to pay the applicants the
cost of cleaning the tanks and refilling the tanks with drinkable water.
The FSP has provided no information about the cost.
I am satisfied it is fair in all the circumstances the FSP pay to the applicants the
claimed amount of $1,780.
The quote from E is dated 10 September 2015. The FSP’s engineer’s report is dated
24 September 2014. The FSP is to pay to the applicants’ statutory interest on $1,780
from 13 October 2015 (7 days after receipt of the applicants’ legal representative’s
letter dated 6 October 2015). While the FSP may not have had access to the
property, I consider it had enough information to make a decision about this part of
the claim at that time. I am satisfied it was unreasonable for the FSP to withhold
payment of this amount from 13 October 2015.
2.3 Are the applicants entitled to other compensation?
Dispute was not particularly complex nor raised complex legal issues
The applicants also claim the time spent in defending the case was costly, they
incurred the cost of legal representation, and an expert report cost $300.
FOS may decide the FSP contribute to the legal or other professional costs (capped
at $3,000) incurred by applicants in the course of a dispute.
FOS provides a service which is free for applicants. If applicants choose to be
represented, they usually have to cover their legal fees themselves.
FOS does not award applicants for time spent in defending a case.
Case No: 398881 Determination Page 8 of 10
Furthermore, I am not satisfied it is fair in the circumstances the FSP should make a
contribution to the applicants’ legal and other costs. The matter was not particularly
complex nor did it raise complex legal issues. While the applicants may have
required expert assistance, the roof inspection report did not affect the outcome.
Further, the report was not persuasive as no reasons were given for the opinion.
Case No: 398881 Determination Page 9 of 10
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed a nd
considered for the purposes of this Determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Ombudsman Service
(FOS) decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this Determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law an insured bears the onus to
establish on the balance of probabilities they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities an
exclusion applies if it seeks to deny or limit its liability for the loss.
The applicants have legal representation. Any reference to the applicants in this
determination includes reference to their legal representative.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the FSP’s Notice of Response dated 27
May 2015. Both the policy document and the Notice have been exchanged with the
applicants.
3.3 Legal principles
The Wayne Tank Principle
The Wayne Tank Principle states where there are two or more proximate causes of
damage and at least one cause is excluded from cover, then the exclusion operates
to deny cover entirely and the insurer is not liable at all.
Proximate cause
Case law establishes the proximate cause of the loss is the dominant or effective
or operative cause of the loss whether or not that be the last in time or the sole
cause; if there are several causes operating contemporaneously, each must be
Case No: 398881 Determination Page 10 of 10
examined for the qualities of reality, predominance and efficiency as the active,
efficient cause that sets a relevant chain of events in action. If one cause would
have caused the harm in any case, and the other would not have done so in the
absence of the first, the first is the proximate cause; and a common sense
approach is taken to determine proximate cause.
3.4 Relevant expert material and other material relied on
Parties’ submissions, emails and photographs .
Correspondence between the parties.
Policy schedule.
FSP’s assessor’s report and photographs dated 17 February 2014.
FSP’s causation inspection report and photographs dated 26 March 2014 .
FSP’s engineer’s report and photographs dated 24 September 2014 .
Applicants’ plumber’s report and photographs dated 16 June 2014 .
Applicants’ plumber’s report dated 28 October 2014.
Applicants’ quotes to replace roof .
Applicants’ quote from E tank cleaning and repairs dated 10 September 2015 .
Applicants’ report from D Roofing dated 15 September 2015 .
Applicants’ invoice from D Roofing dated 16 September 2015 .
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.