Home / Financial Firm (Unknown - Insurer) / Determination 397219

Determination 397219

Refusal of claim for earthquake or structural damage to investment property

FirmFinancial Firm (Unknown - Insurer)
Decided2016-06-30
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$12,549
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The landlord applicant claimed for structural damage to his investment property, which he attributed to a December 2014 earthquake. The FSP refused liability, and AFCA, using an independent engineer, found the damage was not proximately caused by an insured event. AFCA nonetheless required the FSP to stand by its prior offers, totalling $12,548.50.

The proximate cause of the damage was pre-existing design and construction defects rather than the low-magnitude earthquake, so the policy did not respond, although the FSP's initial investigation was inadequate.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 397219 Determination Page 1 of 12 Case number: 397219 15 April 2016 1 Overview 1.1 Dispute The applicant lodged a claim under his landlord insurance policy with the financial services provider (FSP) after his real estate agent notified him of major damage to his investment property in January 2015. The rafters had pulled away from the main supporting beam of the roof, causing gaps in the ceiling and large cracks in the walls. At the time the applicant lodged his claim, he was unsure whether the damage had been caused by strong winds, a recent earthquake or earth movement due to a burst pipe under the bathroom. Based on reports provided by its contractors, the FSP accepted that part of the damage to the property had been caused by water leaking from a cold water pipe. However, the FSP concluded that the remainder of the damage had been caused by naturally occurring earth movement. The FSP offered to cash settle the applicant for $10,498.50 in respect of the damage for which it accepted liability. Based on further investigations carried out by his own engineers, the applicant now believes the damage to the property was caused by an earthquake in December 2014. The applicant has been advised that the property needs to be deconstructed and rebuilt and seeks cover for the necessary works, together with compensation for various losses suffered during the claim process. 1.2 Issues and key findings Is the FSP liable for the damage to the applicant’s property ? The FSP is not liable for the da mage to the applicant’s property because the available information does not establish that the proximate cause of the damage was the earthquake in December 2014 (or any other event insured against under the policy). 1.3 Determination This Determination is substantially in favour of the FSP. The FSP is not liable for the applicant’s claim. Case No: 397219 Determination Page 2 of 12 However, it is fair in all the circumstances that the FSP be required to stand by its earlier offer. Accordingly, the FSP is required to pay the applicant the amount of $12,548.50. Case No: 397219 Determination Page 3 of 12 2 Reasons for Determination 2.1 Is the FSP liable for the damage to the applicant’s property? Policy provides cover for insured events subject to exclusions The applicant is required to show that, on the balance of probabilities, he has suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. If the applicant is able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The a pplicant’ s policy provides cover for damage caused by the events listed in the policy, including the insured events of:  earthquake; and  burst pipes, leaks and overflows . However, the policy contains general exclusions for any damage caused directly or indirectly by or in any way connected with:  defects, structural or design faults, faulty workmanship or faulty design;  damage to the building (or any part of the building) that at the time it was built was not compliant with the relevant local government regulations, or the requirements of any other statutory authority. The reports prepared by the various contractors appointed by both parties confirm there is extensive damage to the applicant’s property. The observed damage includes significant separation of the cathedral roof rafters above the central supporting beam, displacement of the roof tiles, movement of the brick veneer walls and cracking to the internal wall linings. Level surveys of the floors indicate that significant differential movement has occurred. However, the FSP will only be liable for the claimed damage if the proximate cause of the damage (that is, the real, effective or dominant cause) was one of the events insured against under the policy. Based on a detailed report provided by his engineer (GH), the applicant says the damage was caused by the effects of forces generated by an earthquake which occurred in early December 2014. The FSP disputes that the cracking and movement damage to the applicant’s property was caused by the earthquake in December 2014. The FSP says the magnitude of the earthquake was insufficient to cause the observed damage. The FSP says the damage was caused by the inadequate manner in which the building was designed and constructed. Accordingly, in order to determine the extent of the FSP’s liability under the policy, it is necessary to determine the proximate cause of the damage. Case No: 397219 Determination Page 4 of 12 Both parties (and FOS) have obtained expert reports on cause of damage After the applicant lodged his initial claim in January 2015, the FSP appointed an engineer (IL) to determine the cause of the damage. On attending the property, IL observed water pooling under the house and arranged for leak detection testing and CCTV investigations of the supply and stormwater pipes. These investigations identified a leaking cold water pipe in the bathroom, as well as various defects affecting the storm water drains. IL concluded that the effects of water leaking from the pipes had exacerbated the cracking and movement damage to the property. However, he considered that this damage pre-existed the current issues with the pipes and was attributable to long term differential movement due to naturally occurring variations in the highly reactive clay soils. Based on the findings in IL’s report, the FSP offered to cash settle the applicant for 50% of the costs of repairing the damage to the property, based on a brief scope of works prepared by its builder (AJ). It has since become apparent that the scope of works (and the cost estimate provided by AJ) significantly underestimates the damage to the property. The appli cant rejected the FSP’s settlement offer and disputed IL’s findings that the damage was caused by the effects of water leaking from the pipes at the property. When the FSP failed to respond to his concerns, he engaged his own engineer (GH) to determine the cause of the damage. As outlined above, GH concluded that the damage to the applicant’s property was caused by the earthquake which occurred in early December 2014. Data available on the public website of Geoscience Australia (the Federal government agency responsible for monitoring earthquake activity) confirms that an earthquake with a magnitude of 3.3 on the Richter scale occurred in Pakenham at approximately 6:00am on 3 December 2014. In his report dated 18 March 2015, GH says that the forces generated by the earthquake entered the property through the corner of the rear and right walls and exited through the corner of the front and left walls, leaving a visible permanent wave formation. GH concluded that the overwhelming majority of the damage to the property was caused by the effects of the earthquake which altered the relationship between the ground and the building and destabilised the structural connections within the house. GH says the earthquake triggered an ongoing failure mechanism which has resulted in the damage continuing to worsen. When the FSP failed to accept the conclusions outlined in GH’s report, the applicant lodged his dispute with FOS. During the dispute process, the FSP sought to appoint another engineer (who had not previously been involved with the claim) to inspect the property and provide his view as to whether the damage had been caused by an earthquake. Case No: 397219 Determination Page 5 of 12 However, the applicant was unwilling to allow the FSP’s engineer to attend the property. He considered that the FSP had already had a sufficient opportunity to assess its liability for the claim and should rely on the conclusions reached by GH in his report. The Panel accepts that, during its initial investigations, the FSP focussed on an escape of water from leaki ng pipes as the most probable cause of the damage and did not consider the other potential causes identified by the applicant when he lodged his claim. This was no doubt due in part to the substantial volume of pooled water observed at the site and the specific issues with the pipes identified during the plumbing investigations. However, the Panel considers it was reasonable for the FSP to seek to appoint a second engineer to inspect the property, following receipt of GH’s report. The FSP is entitled to seek an opinion from its own consultants in order to accurately assess its liability under the policy based on the explanation as to the cause of damage put forward by the applicant’s engineer. Under the policy, the applicant is required to co-operate and assist the FSP with its enquiries, including by allowing its consultants to inspect the property. After reviewing the available information and in light of the applicant’s unwillingness to allow a further inspection by the FSP, the Panel reached the view that it was appropriate for FOS to appoint an independent engineer in order to ensure a fair outcome to the dispute, in accordance with paragraph 8.3 of the FOS Terms of Reference. Both parties consented to the appointment of the engineer (GC) nominated by FOS, who was initially engaged to report on the cause of the damage and prepare a scope of works and cost estimate for the necessary repairs. However, as a cost control measure, the Panel subsequently agreed that GC’s initial work should be limited to providing the causation report, in order to determine the threshold issue of liability (with issues relating to quantum to be addressed as part of the remedy provided for in the final determination, if applicable). GC’s initial inspection was undertaken by way of site visit on 2 December 2015 which was also attended by the applicant and his engineer (GH), the FSP and the two Panel members who were available to attend. During the site visit, the applicant’s engineer (GH) highlighted the key areas of damage to the property and explained why he believed the damage had been caused by the earthquake in December 2014. The FOS-appointed engineer (GC) subsequently returned to the property to carry out further inspections. He also arranged for a surveyor to conduct level surveys at the property. In his report dated 4 February 2016, the FOS-appointed engineer (GC) concluded that the damage to the property had not been caused by the earthquake in December 2014 (or by the escape of water from leaking pipes). Case No: 397219 Determination Page 6 of 12 GC considered that all of the damage had occurred as a direct result of inadequate design and construction methods, which had caused the building to progressively subside downwards and “spread laterally”. Among other issues, GC stated that:  the walls were not sufficiently braced, which was a critical design omission given the building had a cathedral ceiling which was parallel to the roof rafters and therefore offered limited rigidity to the walls;  the absence of a triangulated roofing structure (that is, a rafter, wall and ceiling joins triangle) and the lack of sufficient wall bracing meant that the high central wall was supporting the majority of the roof load;  the roof rafters were not sufficiently connected to the central ridge beam in order to prevent them from spreading over time;  the depth of the concrete strip footings was inadequate to prevent differential movement, given the prevailing soil conditions; and  the subfloor ventilation was insufficient to enable the removal of moisture from the sub-floor area, contributing to expansion of the floorboards and outward pressures on the walls and brickwork at floor level. The applicant has subsequently provided a further detailed submission from his engineer (GH) in response to GC’s report, together with a re port from another engineer (PR). He has also provided his own opinion (as a geotechnical engineer) on GC’s report, which has been peer -reviewed by a further engineer (EH). Panel has considered views expressed by all consultants As outlined above, the various consultants appointed by the parties have reached differing conclusions about the underlying cause of the cracking and movement damage to the applicant’s property. The Panel has carefully reviewed the reports prepared by the various consultants (together with the other information provided) in order to determine the proximate cause of the damage. In doing so, the Panel has considered the report provided by the FOS-appointed independent engineer (GC) alongside the reports provided by the other qualified and experienced consultants. As outlined above, GC was appointed by FOS to provide the Panel with additional information for the purpose of determining this dispute, in circumstances where the applicant was reluctant to agree to a further inspection by th e FSP’s contractors. Nevertheless, the fact that GC was appointed by FOS does not of itself mean that the Panel will give GC’s views any greater weight than those of the other experts. The Panel has reviewed all of the expert reports provided and has assessed each report on its merits. The Panel accepts that each of the engineers who have been engaged to express their opinion as to the cause of the damage is appropriately qualified to do so. Case No: 397219 Determination Page 7 of 12 The applicant and his consultants have accused the FOS-appointed engineer (GC) of bias, fundamental errors and a complete lack of understanding of basic engineering principles. However, having regard to GC’s qualifications and experience, the Panel is not satisfied that the serious allegations made by the applicant and his consultants have been substantiated. In the Panel’s experience, it is not unusual for highly qualified engineers to reach different (and conflicting) conclusions about the proximate cause of observed damage to a property. This outcome does not necessarily indicate bias or incompetence on the part of any of the engineers involved. Property had pre-existing long-term damage The reports prepared by the various consultants (and the photographs included therein) confirm that the property had pre-existing damage. This damage appears to have occurred several years before the more recent damage was identified in December 2014. In particular, the photographs show a number of steel angle plates affixed to the roof rafters in the hallway and front bedroom, in an apparent attempt to reinforce this area of the building. However, it is doubtful whether these repairs would have been effective in the long term, given the plates were bolted to non-structural timber packers. The applicant has confirmed that these repairs were made before he purchased the property in or around April 2010. The repairs were not apparent at the time, as timber packers had been installed over the angle plates. The applicant’s en gineer (GH) says that the pre-existing issues with the rafters were caused by another, earlier earthquake which affected the property. However, the Panel is not satisfied that there is sufficient information available to support this conclusion. In his report, GH refers to an earlier earthquake with a magnitude of 5.5 which occurred near Moe on 19 June 2012. However, this earthquake cannot have caused the pre-existing damage to the applicant’s property, as this damage was already present when he purchase d the property in 2010. The report provided by the additional engineer (PR) engaged by the applicant in early 2016 does not address the pre-existing damage to the property or provide any explanation as to when and how it occurred. The applicant says that the property had performed satisfactorily during the period of approximately 45 years since it was constructed. He notes that regular inspections carried out by his real estate agent prior to the earthquake in December 2014 did not identify any issues with the property and it remained safe and habitable at that time. Case No: 397219 Determination Page 8 of 12 It is clear that the damage to the applicant’s property has progressed significantly since late 2014 (and has continued to worsen in the period since he lodged his claim). However, the fact that the real estate agent did not identify any damage does not establish that there was no pre-existing damage present at the time the earthquake occurred. The bracing of the roof rafters is clear evidence of pre-existing damage. The report prepared by the FOS-appointed engineer (GC) also identifies signs of past repairs to various areas in the brick veneer walls (including varying mortar joints, colours and textures, window sill finishes and missing weather strips). However, the applicant’s engineer (GH) h as suggested alternative explanations for the variations in the appearance of the walls, including actions taken by the builder at the time of construction and/or steps taken subsequently to address ordinary wear and tear issues over the life of the building. Damage was not caused by escape of water Following receipt of GC’s report, the FSP has advised that it no longer considers that the damage was caused by the escape of water from leaking pipes at the property (as advised by IL), but accepts GC’s finding s that the damage was due to inadequate design and construction. The applicant and his consultants have also challenged the fi ndings in IL’s report. They say that IL’s conclusions that the damage has been caused by water flowing from the damaged pipes is not consistent with the features of the site. Having carefully reviewed the reports provided and having regard to the nature and extent of the damage to the applicant’s property, the Panel is satisfied that the water leaks identified during the FSP’s initial investigations were not the proximate cause of the damage. Earthquake would not generally be expected to have caused damage As outlined above, the applicant says the damage to the property was caused by the earthquake with a magnitude of 3.3 which occurred on 3 December 2014. Data from the Geoscience Australia website confirms that the epicentre of the earthquake was located 10 kilometres underground at Pakenham (approximately 32 kilometres from the applicant’s property). The available information suggests that this earthquake was one of the most severe earthquakes affecting the Melbourne metropolitan region in the last 40 to 50 years (noting that this region is generally classified as a low seismic region). Geoscience Australia has estimated that the earthquake on 4 December 2014 would have been felt by people up to approximately 30 kilometres away. This is consistent with the applicant’s tenant recalling that she noticed the earthquake at the time. However, the information about the earthquake provided on the Geoscience Australia indicates that the earthquake would not be expected to have caused any damage at all, even in areas located close to the epicentre. Case No: 397219 Determination Page 9 of 12 The disclaimer provided on the Geoscience Australia website notes that the damage radius should be taken as a very rough guide only, as the level of shaking during an earthquake is affected by factors such as the depth of the earthquake, local geology and soil conditions. The website also notes that the effect of an earthquake on any particular building will depend on the quality and type of design and construction. In his report, the applicant’s engineer (GH) acknowledges that, based on the Modified Mercalli Scale commonly used to measure earthquake intensity, the earthquake on 4 December 2014 would have been highly unlikely to cause property damage. The applicant’s engineers say that his property was severely affected by the earthquake due to a number of features which made it vulnerable to earthquake damage. In particular, GH has referred to the single level, cathedral roof-style structure of the building and the angle of orientation of the building to the shock waves generated by the earthquake. GH says these features explain why the applicant’s property suffered extensive damage, while other surrounding properties (including those with a similar style of construction) were apparently unaffected. Available information does not establish earthquake was proximate cause Having carefully reviewed the reports provided by the various consultants, the Panel is not satisfied that, on the balance of probabilities, the proximate cause of the damage to the applicant’s property was the earthquake which occurred on 4 December 2014. As outlined above, the available information indicates that an earthquake of the magnitude recorded would be highly unlikely to cause significant (if any) damage to properties located in the immediate vicinity of the epicentre. Nevertheless, the Panel ackn owledges the advice provided by the applicant’s experts indicates that it is possible for an earthquake of relatively low magnitude to cause property damage in particular cases. However, the available information suggests that such damage is likely to occur in exceptional circumstances only. As outlined above, the applicant’s property had evidence of repairs carried out a number of years prior to the December 2014 earthquake – namely, the affixing of angle braces to the rafters towards the front of the property. The nature of the pre-existing damage sought to be addressed by these repairs is consistent with the damage which is the subject of the current claim. It appears from the photographs provided that the angle braces were attached to the cathedral roof rafters in an attempt to prevent the separation of the rafters. As outlined above, the FOS-appointed engineer (GC) identified a number of aspects of the building’s design and construction which he considered were inadequate and had led to the building “spreading” outwards over time. Case No: 397219 Determination Page 10 of 12 The issues identified by GC included insufficient bracing of the walls (in circumstances where the cathedral-style design of the roof placed relatively high loads on the walls) and inadequate connection of the rafters to the central ridge beam. The Panel acknowledges that the plans for the building were approved by the local council when it was constructed in the late 1960s. The Panel also acknowledges that the applicant and his engineer (GH) have disputed GC’s conclusions th at the design and construction of the building did not comply with the building code in force at the time (being the Uniform Building Regulations 1961). However, another engineer (PR) appointed by the applicant has acknowledged that the property had insufficient wall bracing and roof connections to withstand the force of the earthquake in December 2014. In particular, PR stated that the connection of the roof rafters to the supporting beam was very poor and was therefore susceptible to failure at low levels of lateral load. PR also noted that the high gravity load resulting from the weight of the terra cotta roof tiles would have exacerbated the damage. In these circumstances, the Panel is not satisfied that, on the balance of probabilities, the earthquake on 4 December 2014 was the proximate cause (that is, the real, effective or dominant cause) of the claimed damage to the applicant’s property. In the Panel’s view, the available information (when considered as a whole) strongly supports the conclusion that the damage was caused by pre-existing factors affecting the property. In this regard, the Panel notes:  the relatively low intensity of the earthquake on 14 December 2014;  the unusual features of the building’s design and construction (in particular, the loosely connected cathedral-style roof); and  the presence of pre-existing damage of a similar nature which does not appear to have been adequately repaired. FSP is not liable for applicant’s claim For the reasons outlined above, the Panel is not satisfied that the claimed damage to the applicant’s property was caused by the earthquake in December 2014 (or any other event insured against under the policy). Accordingly, the FSP is not liable for the damage to the applicant’s property. The FSP has agreed to assess any claim made by the applicant under the “Loss of Rent Extra” cover provided under the policy, in respect of losses sustained after his tenants moved out of the property after his engineer advised it was no longer habitable. However, any claim for “Loss of Rent Extra” cover is subject to the terms and conditions of that cover, as set out in the Product Disclosure Statement. Case No: 397219 Determination Page 11 of 12 2.2 Is the applicant entitled to any other amounts? FSP should be required to stand by its previous offer As outlined above, the FSP initially offered to cash settle the applicant for $10,498.50, representing 50% of the costs of repairing the damage to the property as estimated by its builder (AJ). The FSP’s offer was based on the findings of its engineer (IL ) that the damage to the property was partly due to naturally occurring earth movement and partly due to the effects of water from the leaking pipes. In its Notice of Response lodged with FOS in September 2015, the FSP offered the applicant an additional amount of $2,050 as an ex gratia payment as compensation for its failure to provide an outcome in a timely manner and as partial reimbursement for the costs incurred by the applicant in obtaining his engineer’s report. The Panel considers it was not unreasonable for the applicant to seek to obtain his own engineer’s report, in circumstances where the FSP did not promptly respond to his concerns about IL’s report (and the FSP has subsequently distanced itself from the conclusions reached in that report). However, in cases such as the present, the Panel would not ordinarily require the FSP to reimburse the applicant for the professional costs (amounting to over $20,000) he has incurred during the course of this dispute. The Panel will usually only require an insurer to reimburse an applicant for professional costs where the reports provided by the applicant’s consultants have been relied upon by the Panel in finding that the insurer is liable to indemnify the applicant for the disputed damage under the terms of the policy. The Panel considers that the initial steps taken by the FSP to investigate the applicant’s claim were inadequate and further consideration should have been given to the concerns raised by the applicant about IL’s report. Nevertheless, the Panel also recognises that the FSP sought to carry out a further assessment of the damage in mid-2015 which the applicant was not prepared to allow. Having regard to the claim history, the Panel considers that it is fair in all the circumstances that the FSP be required to stand by its earlier offer and pay the applicant the amount of $12,548.50. The FSP is not required to pay interest on this amount as it has previously been rejected by the applicant. Case No: 397219 Determination Page 12 of 12 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.