Text of the determination
Determination
Case No: 397145 Determination Page 1 of 6
Case number: 397145 8 December 2015
1 Overview
1.1 Dispute
In November 2013, the Applicant lodged a claim under his home insurance policy
with the Financial Services Provider (FSP) after his home suffered significant
damage in a fire.
The FSP accepted the Applicant’s claim and made arrangements to repair the
property. However, the parties were unable to agree on the nature and extent of the
repairs required and so the Applicant lodged a dispute with FOS.
The Panel issued a FOS Determination (367706) in December 2014, which provided
that the FSP was to cash settle the Applicant for the cost of the necessary repairs,
based on a revised scope of works and quotation to be provided by suitably quali fied
consultants.
The Applicant is dissatisfied with the settlement amount of $178,596.74 offered by
the FSP following this process.
1.2 Issues and key findings
Is the FSP required to increase the settlement amount?
The FSP is not required to increase the settlement amount because:
it has complied with the process for determining the settlement amount as set
out in the previous FOS Determination; and
the Applicant has not established that the building consultant appointed by the
FSP to prepare the scope of works has failed to act independently, or that the
cost estimate is otherwise inadequate.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is not required to increase the settlement amount.
Case No: 397145 Determination Page 2 of 6
2 Reasons for Determination
2.1 Is the FSP required to increase the settlement amount?
Previous Determination outlined process for determining settlement amount
As outlined above, this matter was the subject of a previous FOS Determination in
December 2014.
In that Determination, the Panel concluded that the FSP had failed to adequately
manage the process for finalising the scope of works for the repair of the fire damage
to the Applicant’s home, and was responsible for the bulk of the delay in settling the
claim.
On this basis, the Panel determined that the FSP was liable for the cost of restoring
the Applicant’s property to its condition prior to the fire.
However, the Panel concluded that, given the considerable discrepancies between
the various scopes of work and quotations provided during the claim process, it was
not possible to determine with any certainty the nature and extent of the necessary
repairs.
Accordingly, the Panel determined that the FSP was required to:
appoint a suitably qualified independent consultant (who was acceptable to bot h
parties and had not been involved in the claim to date) to undertake a detailed
assessment of the property and prepare a revised scope of works for the
necessary repairs; and
engage an appropriately qualified builder to provide a quotation based on the
revised scope of works, and cash settle the Applicant for the quoted cost of the
repairs.
Applicant is dissatisfied with proposed settlement amount
Following the issue of the previous Determination, the FSP appointed a building
consultant (S) to inspect the property and prepare a revised scope of works. The
Applicant agreed to the appointment of S, who had not previously been involved in
the claim.
A building consultant (GJ) employed by S inspected the Applicant’s property on 16
January 2015, following which he prepared a fire reinstatement inspection report and
a scope of works for the repair of the property.
An estimator (DS) employed by S provided a detailed cost estimate for the necessary
repairs of $151,379.78, based on the scope of works prepared by G J. DS’s estimate
included a margin of 15% as well as additional allowances of 6% for overheads (such
as building insurance), 5% for the cost of a project manager and 3% for unforeseen
risks.
At the Applicant’s request, the FSP agreed to increase the settle ment amount by an
additional 15%. The FSP also included an amount of $4,165 for temporary
accommodation expenses for a period of seven weeks while the repairs were
Case No: 397145 Determination Page 3 of 6
completed. These adjustments resulted in the FSP’s final settlement offer of
$178,596.74.
However, the Applicant is not willing to accept this amount in full and final settlement
of his claim, as he considers it is not sufficient to allow him to restore his property to
its condition prior to the fire. The Applicant considers that S has failed to act
independently and has been unduly influenced by the FSP in preparing the revised
scope of works and cost estimate.
FSP has complied with process outlined in previous Determination
The Panel is satisfied that, by appointing S to prepare the revised scope of works
and cost estimate, the FSP has complied with the process outlined in the previous
Determination. The Panel notes that the Applicant agreed to S being appointed to
undertake this work.
Accordingly, the Applicant will be bound by the outcome of this process, unless he is
able to establish that S has failed to act independently or that the settlement offer is
otherwise manifestly insufficient.
Available information does not establish a lack of independence by S
The Applicant says S has simply adopted the findings in reports provided by previous
contractors engaged by the FSP which provided for certain items to be cleaned or
repaired, rather than replaced. The Applicant considers the FSP has deliberately
influenced S to adopt this approach, in order to reduce the cash settlement amount.
However, having carefully reviewed the available information, the Panel does not
consider it supports the Applicant’s position.
The fire reinstatement inspection report prepared by GJ provides a detailed
assessment of the fire and smoke-related damage to each area of the property,
based on the visual inspection carried out in January 2015.
GJ’s report explains the basis on which he has identified the appropriate method for
the repair of each aspect of the damage, as reflected in the revised scope of works.
On this basis, the Panel is satisfied that GJ applied an independent mind (as well as
his own skill and expertise) in determining the repairs required to reinstate the
Applicant’s property to its condition prior to the fire.
The Panel notes that, as outlined in the previous Determination, one of the key
issues regarding the scope of repairs required concerned the extent to which it was
necessary to strip out the plasterboard wall and ceiling linings in the lower level of the
property.
The revised scope of works prepared by GJ provides for the removal and
replacement of the ceiling and wall linings throughout the majority of the downstairs
level. GJ advised that this was necessary to allow the removal of the smoke affected
wall and ceiling insulation and access to the wall ties between the internal timber
frames and the external brick walls.
Case No: 397145 Determination Page 4 of 6
The Panel acknowledges that GJ’s scope of works provides for the cleaning, repair
and/or reinstallation of certain items which the previous builder (M) had
recommended be replaced.
However, in each case, the Panel is satisfied that GJ has provided a logical and
reasonable explanation for the approach adopted in his scope of works, which was
based on his own visual inspection of the property. For example, GJ has confirmed
that:
while the main ducting and outlets of the ducted air conditioning system
suffered smoke damage and require replacement, the mechanical components
were unaffected;
while two of the wall mounted condenser units forming part of the split system
air conditioning units required replacing, the externally mounted compressors
were unaffected;
the bulk of the kitchen cabinets did not require replacing as they exhibited light
staining only which could be removed by clea ning. The cabinets did not require
removal in order to allow access to the wall frames, as these could be accessed
through adjacent rooms and external walls;
the bulk of the wiring had not been affected by smoke damage and was
protected by being double insulated as well as by the insulation to the wall and
ceiling frames;
the laundry had suffered minimal smoke damage as it was outside the main
footprint of the building and therefore required repainting only; and
the downstairs tiles did not need to be replaced as the upstairs ties (which had
been more severely affected by smoke from the fire) had responded well to
cleaning.
Accordingly, the Panel does not consider that the Applicant has established that S
failed to act independently or was unduly influenced by the FSP in preparing the
revised scope of works and cost estimate.
Provision of forged cleaning report did not alter outcome
As outlined in the original Determination, the Applicant’s trust in the FSP to properly
manage his claim was adversely affected by an incident early in the claims process,
when the FSP’s restoration sub - contractor forged the Applicant’s signature on a
report confirming he was satisfied with the results of a test clean conducted at the
property.
The FSP has previously acknowledged the forgery occurred and has apologised to
the Applicant for the actions of its sub-contractor.
The FSP has also acknowledged that the cleaning report was included in the
background materials provided to GJ when S was engaged to prepare the revised
scope of works and cost estimate.
In the Panel’s view, the provision of this document to GJ was extremely unfortunate
and inappropriate, given the significant degree of distress it had already caused the
Applicant.
Case No: 397145 Determination Page 5 of 6
However, the Panel does not consider that the provision of the forged cleaning report
altered GJ’s findings.
As outlined above, GJ’s comments in his inspection report and scope of works
indicate that he formed his views about the extent to which cleaning of various items
would be effective based on his own inspection of the property, coupled with his skills
and experience.
GJ has also confirmed in writing that his report was not based on either the cleaning
report or any earlier scopes of work prepared by the FSP’s previous contractors.
FSP is not required to increase settlement amount
For the reasons outlined above, the Panel does not consider the Applicant has
established that the FSP failed to implement the process outlined in the previous
Determination in order to determine the settlement amount.
The Applicant has not provided any independent information to establish that the
settlement amount is manifestly insufficient. The Panel notes that, as outlined above,
the estimate includes significant allowances for overheads, project management
costs and contingencies. Further, the FSP has already agreed to increase the
estimate by an additional 15%.
The Applicant says the settlement amount should be increased to reflect the final
scope of works and quotation provided by the FSP’s original bu ilder (M) following
protracted negotiations with the Applicant.
However, as outlined in the previous Determination, the Panel was not satisfied that
M’s final scope of works and quotation accurately reflected the repairs required to the
property. It was for this reason that the Panel prescribed the process set out in the
previous Determination to determine the appropriate settlement amount.
Given the Panel is satisfied that the FSP has complied with this process, the
Applicant is not entitled to any amount in addition to the amount of $178,596.74
offered by the FSP.
Applicant is entitled to temporary accommodation costs for prior period
The Applicant seeks an additional amount of $11,900 for temporary accommodation
costs for the period from October 2014 to February 2015. However, the Applicant has
not provided any additional information in relation to this aspect of his claim.
The FSP has acknowledged that it agreed to pay the Applicant’s reasonable
temporary accommodation costs for this period and has confirmed it paid the
Applicant the amount of $7,050 in February 2015 (representing 12 weeks’ rent).
On this basis, the FSP considers it has no further liability for temporary
accommodation expenses during this period.
The Panel accepts that the amount paid by the FSP satisfies its obligations to the
Applicant for the relevant period. Accordingly, unless for some reason this payment
has not been made, the FSP has no further obligations in this respect.
Case No: 397145 Determination Page 6 of 6
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the nature
of the dispute, it has been referred directly to a Panel for Determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other.
The Panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this Determination, the Panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
3.2 Additional issues
During the course of this dispute, the Applicant raised concerns about different
signatures on two letters apparently signed by the FSP’s home claims manager (DH).
However, a close inspection of one of these letters reveals notations indicating it
appears to have been signed by another employee of the FSP on DH’s behalf, which
would explain the apparent discrepancy.