Home / Financial Firm (Unknown - Insurer) / Determination 395976

Determination 395976

Water damage to bathrooms denied as pre-existing

FirmFinancial Firm (Unknown - Insurer)
Decided2015-09-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$35,000
SourceAFCA PDF

Summary

A new homeowner claimed about $35,000 for bathroom water damage from a burst hot water pipe, which the FSP denied as pre-existing. AFCA found the burst pipe occurred after inception, and ordered the FSP to pay 50% of assessed repair and temporary accommodation costs plus statutory interest.

Once the insured shows a sudden escape of liquid from a fixed pipe, the insurer must prove an exclusion for seepage or pre-existing damage, and apportionment applies where the burst and seepage damage are both established.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 395976 Determination Page 1 of 9 Case number : 395976 18 September 2015 1 Overview 1.1 Dispute The Applicant’s claim for water damage to ensuite and main bathrooms was denied by the Financial Services Provider (FSP) on the ground the damage pre-existed policy inception. The Applicant disputes the FSP’s denial and seeks approximately $35,000 to repair damage she believes to have been caused by a leaking hot water pipe behind the ensuite vanity. The Case Manager provided the parties with a Recommendation on the issues in dispute. The Recommendation was in favour of the FSP. The FSP accepted the Recommendation but it was not accepted by the Applicant. In the circumstances, the dispute has been referred to me for Determination. 1.2 Issue and key findings Is the FSP entitled to deny all the claimed damage? The FSP is not entitled to deny all the claimed damage as the material provided establishes on the balance of probabilities that the damage caused to the bathrooms was caused by both the burst pipe which occurred after the policy commenced and by long-term seepage which occurred prior to the commencement of the policy. The material provided establishes that although there was the issues with the bathrooms identified before the policy commenced, that the hot water pipe burst after the policy commenced in circumstances where it is unlikely that the consequent damage would not have been noticed before the policy commenced. As the material also establishes there was damage to the bathrooms which existed before the policy commenced, it is fair in all the circumstances that the FSP pay 50% of the cost of repairs to the Applicant’s bathrooms and 50% of the cost of temporary accommodation. The Wayne Tank principle has no application to the dispute as the two causes of loss were consecutive and not concurrent. 1.3 Determination This Determination is substantially in favour of the Applicant. Case No: 395976 Determination Page 2 of 9 Within 7 days of acceptance of this Determination by the Applicant, the Applicant is to provide the FSP with proof of the cost of repairs to the Applicant’s bathrooms and proof of the cost of the claim for temporary accommodation to enable the FSP to assess the claim. Within 14 days of provision of the Applicant’s proof, the FSP is to assess the claim, agree the costs and make payment to the Applicant of 50% of the assessed and agreed claimed costs. The FSP is also to pay statutory interest on the amounts paid from the date of payments made by the Applicant until the date of settlement. Case No: 395976 Determination Page 3 of 9 2 Reasons for Determination I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the Recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. New material and further submissions provided after the Recommendation The Applicant was represented by a lawyer after the Recommendation. For the purposes of this Determination, any submissions/statements made by the Applicant’s lawyer have been treated as having been made by the Applicant herself. After the Recommendation was rejected, both parties made further submissions. They provided no new material save for a leak report that was referred to in the FSP’s assessor’s report but not provided by the FSP until requested by the Service. The parties essentially reiterated their positions, save that the Applicant concedes that there was pre-existing damage. But she continues to submit that the burst water pipe has caused some damage albeit on top of the pre -existing damage. She asks that damage to be apportioned. 2.1 Is the FSP entitled to deny all the claimed damage? Applicant must establish damage caused by burst pipe The Applicant must establish that she has suffered loss or damage caused by the sudden and unexpected escape of liquid from a fixed pipe. If established, the onus then shifts to the FSP to show the loss or damage was caused by seepage or slow escape of liquid over time or that the loss or damage claimed occurred before the start of the policy. Having reviewed the material carefully, I note the following timeline:  8 October 2014 the Applicant arranged a pre-inspection report of the property.  16 January 2015 Applicant took possession of the property.  17 January 2015 insurance commenced.  24 January 2015 an emergency service attended the Applicant’s property as the Applicant had noticed “water seeping through the vanity in the ensuite” .  Emergency service noted that: “burst pipe in bathroom wall had caused significant damage to the vanity and subfloor.” (The Applicant advises he inspected the damage from under the house and that she later learned that the burst pipe had also caused damage to the walls and floor o f the second bathroom as the burst pipe lies between the ensuite and main bathroom).  Emergency service was unable to locate the leak until the vanity cupboard was removed but the water leak was isolated.  28 January 2015 the Applicant arranged for a plumber B to attend and fix the burst hot water pipe. His invoice states: (attended) to repair burst copper hot water pipe in bathroom”. Case No: 395976 Determination Page 4 of 9  28 January 2015 mould remediation report provided by R.  28 January 2015 FSP’s assessor (J) attended the property and reported .  31 January 2015 C attended to provide a leak detection report. The FSP sought further information from the Applicant’s plumber about the age of the damage. In response, the Applicant’s plumber said: “He believes that the pipe leak he repaired was a fairly recent occurrence, at the most a month old.” A number of photographs were taken of the property by O in October 2014, and by R, J and C in late January 2015. Before the policy commenced, O considered the general condition of the bathrooms was acceptable. However the report does not comment upon defects that may have been concealed including leaks. O noted and photographed the lifting tile between the shower recess and bath in bathroom 1 (later photographed and referred to by R and C) and the shower tile grout deterioration in the shower – walls - screen in the master bathroom (it is assumed this is the ensuite as O described it as bathroom 2 located in the master bedroom). C’s photographs appear to deal with the main bathroom only and show the same lifting tile in bathroom 1 and the shower screen in bathroom 1. Photographs provided by R are very comprehensive and are annotated. They show the vanity is removed “due to burst hot water pipe behind” it. The annotated photographs include comments describing “a saturated timber sheet”, “mould growth next to where hot water pipe burst” and high moisture content above the mirror (which was above the vanity) “where steam has been escaping from the burst hot water pipe below.” R’s photographs also show high moisture co ntent in the shower on the same wall as the burst hot water pipe and in the adjoining master bathroom where the plasterboard wall behind the tiles is described as “saturated from steam and excess moisture”. R says the spa bath in the master bathroom “has moved due to swelling of steam saturated building materials in the bath void”. And an annotation describes “swollen sheet flooring which has popped floor tiles” in the master bathroom. (This appears to be the same tile photographed by O in October 2014). High moisture content is indicated and marked in the shower on the same wall next to the vanity in the ensuite and on the wall and floor of the master bathroom. R describes extensive work which is required including:  tiles shower and toilet to be removed in order to dry out sheet flooring in ensuite  remove toilet, mirror, shower and all tiles from wall and floor in the ensuite  spa bath to be removed in master bathroom  shower, bath and all tiles from affected areas to be removed in master bathroom. Photographs provided by J also show the vanity has been removed; the section of the wall has been removed in the ensuite bathroom; and the damaged floor in the Case No: 395976 Determination Page 5 of 9 ensuite and under the bath in the main bathroom. J has also photographed what he describes as “the leaking shower screen in the ensuite.” J is unaware the Applicant had a pre-inspection report prior to purchase but J confirms that the Applicant’s plumber had repaired the burst pipe. J confirms (and the photograph show) the ensuite bathroom and main bathroom back on to each other. J says that he organised a leak report for both bathrooms as he says it appears several leaks may be occurring in both bathrooms. J describes: “Decayed timber in the walls evident in several places… not co nsistent with a single leak event (but rather) ….long -term leaking has been occurring long before the start of the policy…” J reported that extensive works to both bathrooms will be required but provided no estimate until full details of all items that need to be removed is supplied. J said about the damage: “…. there was found to be damages sustained to both bathrooms, they have extensive timber damage (decay, mould) under the shower bases, floor tiles, and bath areas consistent with long- term leaking” J m arked the claim as “UNSURE” and reports there was pre -existing damage versus damage from the recent burst pipe. As for the cause of damage, J concluded that: “The damages …. are a direct result of what appears to be leaking issues in both bathrooms over a period of time as well as a current pipe burst.” After the Recommendation, at the request of the Service, the FSP provided the leak detection report from C. Applicant accepts there was some pre-existing damage After the Recommendation, the Applicant accepts there was pre-existing damage to the bathrooms as described in the pre-purchase report but submitted the damage caused by the burst pipe is separate to the damage described in the pre-purchase report. She sought a finding that some proportion of the damage be attributed to the burst pipe and offered to bear 25% of the cost of repairs. The FSP did not accept this proposition and continue to assert that on the balance of probabilities the water damage had occurred over time. It is submitted that as no expert or other evidence had been presented to establish which damage may have occurred during the period of insurance, it could not apportion damage. Probable burst pipe caused some damage The Applicant took possession of the property on 16 January 2015. There was no issue with water leaking through the vanity until 24 January 2015. The plumber who attended 24 January 2015 confirmed a burst pipe had caused significant damage. The plumber who repaired the burst pipe on 28 January 2015 said he believed the pi pe leak “was a fairly recent occurrence, at the most a month old”. If the pipe burst before the policy commenced on 17 January 2015, I consider it is probable that water would have begun to leak and be obvious on or before 24 Case No: 395976 Determination Page 6 of 9 January 2015. The Applicant would have had opportunity to observe the leak as she took possession on 16 January 2015. In all the circumstances and in particular the continued presence of high moisture content in the bathrooms from steam and excess moisture when readings were taken by R on 28 January 2015, I consider it is probable that the burst pipe event occurred as described by the Applicant’s plumber fairly recently and that this event caused damage to the bathrooms. Having carefully considered the material provided and the photographs, I am therefore satisfied they are consistent with a burst hot water pipe that is, a sudden and unexpected escape of liquid from a pipe on or after 17 January 2015. Probable some damage caused by seepage The Applicant therefore has established a prima facie claim. The onus shifts to the FSP to prove on the balance of probabilities an exclusion applies so that it can deny or limit its liability for the loss. Specifically, the FSP says it is entitled to deny the claim as loss or damage was caused by seepage or the slow escape of liquid over time and/or that loss or damage occurred before the start of the policy. J describes extensive timber damage in the form of decay and mould under the shower bases, floor tiles and bath areas consistent with long-term leaking. However, he does not provide a definitive opinion about the cause of damage. Rather, he is unsure and so he arranged leak tests. The leak tests were undertaken by C but it is not known if J saw the leak tests. Certainly, no further material has been provided by J of his opinion of the cause of damage after the leak tests. I accept that C identifies damage in the main bathroom identified by O in the pre- purchase report. That is, damage before the commencement of the policy. I also accept that O identified grout deterioration in the shower in the ensuite bathroom. C also identifies an issue with water leaking from the shower screen frame in the main bathroom. It is not apparent from C’s report that he has inspected the ensuite bathroom. However, having considered all the material and particularly the annotated photographs provided by R, I am also satisfied that the burst pipe in the bathroom wall caused significant damage (this is how it is described by the technician who attended on 24 January 2015) in addition to seepage damage that was probably caused by leaks in both bathrooms over time as identified by J and C. Fair that FSP pay 50% cost of repairs to bathrooms Further, even without the provision of leak reports, J accepts that damage has been sustained by leaking issues in both bathrooms over a period of time as well as the burst pipe. The Applicant proposes a 75/25 split in her favour. The FSP makes no proposal. Having considered all the material, and for the reasons stated, I am not satisfied that the FSP has established on the balance of probabilities that all of the damage in the bathrooms was caused by the slow escape of liquid over time before the policy commenced. Case No: 395976 Determination Page 7 of 9 Having considered the material, and the conclusions I draw from it as described above, I consider it is fair in all the circumstances that the FSP pay 50% of the cost of repairs to the Applicant’s bathrooms. Applicant to provide proof of cost of repairs and temporary accommodation When she brought the dispute to the Service, the Applicant says that the renovations were in process. She estimated the costs to clean and renovate the two bathrooms to be $32,000. She has provided no material about the cost of repairs. In view of its decision about liability, the FSP has provided no material about the cost of repairs either but the tenor of its reports from both J and R is that extensive work to the bathrooms was required. The Applicant is to provide evidence of the cost of repairs to the bathrooms to the FSP. The FSP is to review the invoices/evidence and/or the work done and assess the cost of repairs to the bathrooms and pay 50% of the assessed cost of repairs. The Applicant also claims that she was unable to move into her new home until the renovations were completed. She said she had to extend the lease in the current rental place she had for two months. She claims the extra rent was $3,422. The FSP’s policy provides cover for temporary accommodation if it agrees that an insured cannot live in the home as a result of an insured eve nt. I accept that the Applicant could not live in the insured property without bathrooms. The FSP’s policy also provides that it is not obliged to pay for any costs incurred beyond the period it should have reasonably taken to repair or rebuild the home. Having considered the photographs and the amount of work to be done as described by J and R I consider that it is reasonable to assume that it would take two months to repair the bathrooms. I consider it is fair in all the circumstances that the FSP pay to the Applicant 50% of the cost of extra rent. The Applicant must satisfy the FSP of the costs claimed for temporary accommodation. Wayne Tank principle has no application as two causes of loss not concurrent The FSP argues that in the circumstances of this case, the principle set down in the Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corporation Ltd [1974] QB 57 acts to defeat the claim. That case establishes the principle that if there are two concurrent causes of a loss where one is subject to cover and the other is not, an insurer is not liable for the loss. However, in this case, there were no two concurrent causes of loss. Rather, the causes of loss to the bathrooms were consecutive. First, the slow leaks identified by the FSP’s experts before the policy commenced which were followed by the burst water pipe which occurred after the policy commenced. In short, the principle set down in Wayne Tank has no application to this dispute. Case No: 395976 Determination Page 8 of 9 3 Supporting information 3.1 FOS Approach It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant Policy provisions “ What is covered … Bursting, leaking or overflowing Loss or damage caused by the sudden and unexpected escape of liquid from …. Taps, fixed pipes, water mains, fixed gutters, fixed guttering, fixed water, tanks or fixed tanks or other fixed apparatus used to hold or carry liquid of any kind What is not covered Loss or damage caused by: seepage or slow escape of liquid over time … HOME BUILDI NG COVER If your schedule shows that you have Home Buildings or Home Buildings and Cont ents cover, your buildings are covered against loss or damage caused by any of the events described on pages 14-19, which occur during the period of insurance. … General Exclusions We do not cover … We will not pay for any loss, damage or liability arising directly or indirectly from or in any way connected with any of the following ….. water seeping through or permeating walls, roofs or floors, ….. pre-existing damage or any loss or damage which occurred before the start of your policy. ” 3.3 Other relevant material Parties’ emails, lette rs, submissions and photographs. Applicant’s pre -inspection report from O. Letter from Applicant’s solicitor 22 January 2015 . Insurance schedules. Report from Emergency Home Assist. Case No: 395976 Determination Page 9 of 9 R’s notability report for mould remediation 28 January 2015 . J’s assessment report 29 January 2015. (Plumber) B’s invoice 2 February 2015 and email 10 March 2015 . C’s leak inspection report 31 January 2015 .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.