Determination 395412

claim_amount_dispute

FirmFinancial Firm (Unknown - Insurer)
Decided2016-02-15
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$64,829
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A unit owner claimed temporary accommodation and special benefits after a fire in a strata property, with a long delay in settling the claim. AFCA found both parties contributed to delay, awarded 50% of temporary accommodation costs plus landscaping, lot owners' contributions and $3,000 legal costs, and rejected the environmental improvements benefit.

Temporary accommodation is payable only for the period reasonably necessary to resolve and rebuild, reduced to the extent the claimant contributed to delay.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 395412 Determination Page 1 of 13 Case number: 395412 4 February 201 6 1 Overview 1.1 Dispute The Applicant owns a unit which was severely damaged by fire in August 2011. At the time of the fire, the unit was insured under a strata title policy issued by the Financial Services Provider (FSP) and was also insured under a separate home insurance policy held by the Applicant with a nother insurer (Insurer X). Following the fire, the Applicant lodged claims under both policies, which were accepted by both insurers. After protracted negotiations, the Applicant settled his claim under the home insurance policy for $493,161 in July 2014. The Applicant now seeks payment of certain special benefits under the strata policy, which he says were not included in the settlement paid under the home insurance policy. The FSP says the Applicant is not entitled to the special benefits claimed because he has unreasonably delayed the progress of the claim and has been more than adequately compensated for his loss under the home insurance policy. 1.2 Issues and key findings Is the Applicant entitled to payment of temporary accommodation benefits? Both the FSP and the Applicant contributed to the lengthy delays experienced during the claim process. In these circumstances, the FSP should pay the Applicant temporary accommodation benefits for 50% of the period leading up to settlement of his claim against Insurer X under his home insurance policy (excluding the period for which Insurer X has paid benefits). The Applicant is also entitled to payment of temporary accommodation benefits for the period reasonably required to rebuild the property following the settlement with Insurer X. Is the Applicant entitled to any other amounts? The Applicant is entitled to the maximum amounts payable under the policy for landscaping costs and lot owners‟ contributions. He is also entitled to partial reimbursement of his legal costs. However, the Applicant is not entitled to the special benefit for environmental improvements as the conditions for this benefit have not been satisfied. Case No: 395412 Determination Page 2 of 13 1.3 Determination This Determination is partly in favour of the Applicant. The FSP is required to pay the Applicant the following amounts in full and final settlement of his claim:  the amount of $49,829 for temporary accommodation costs, plus interest calculated on the basis set out in section 2.1 below;  the amount of $12,000 in respect of special benefits for landscaping costs and lot owners‟ contributions provided for under the policy, plus interest calculated on the basis set out in section 2.2 below; and  the amount of $3,000 as reimbursement of legal fees. Case No: 395412 Determination Page 3 of 13 2 Reasons for Determination 2.1 Is the Applicant entitled to temporary accommodation benefits? Applicant seeks payment for period from September 2012 The strata policy provides for payment of the reasonable cost of temporary accommodation necessarily incurred by the Applicant if his unit becomes unfit to be occupied for its intended purpose as a result of damage which is accepted as a claim under the policy. Under the terms of the strata policy, the Applicant is entitled to payment from the date of the fire until the time he is able to reoccupy his unit following completion of repairs. The strata policy does not impose a maximum time period for the payment of benefits. The Applicant was paid temporary accommodation benefits by Insurer X for the maximum period provided under the home insurance policy, being the first twelve months after the fire. The Applicant now seeks payment of additional temporary accommodation benefits by the FSP under the strata policy for the further period from 1 September 2012. It is unclear whether the Applicant‟s house has as yet been rebuilt and, if so, when this occurred. The FSP says it should not be liable for payment of temporary accommodation benefits as the Applicant is responsible for the delay in finalising the claim. The FSP says that, but for the Applicant‟s unreasonable interference in the claim process, the claim would have been finalised and the unit rebuilt within twelve months after the fire. The Applicant disputes the FSP‟s position and says that the delay in resolving the claim is wholly attributable to the actions of the FSP and its contractors. Benefits are limited to period reasonably required to resolve claim and rebuild As outlined above, the strata policy provides for the payment of temporary accommodation benefits “necessarily incurred” by the Applicant until his unit is able to be reoccupied. In the Panel ‟s view, the use of the expression “necessarily incurred” has the effect of limiting benefits to the period reasonably required to resolve the claim and allow the damaged unit to be rebuilt. To the extent that the resolution of the claim has been delayed by the actions of the FSP or its contractors, the Applicant is entitled to payment of temporary accommodation during this period, as these factors were outside his control. However, to the extent that the Applicant has contributed to the delay in finalising the claim (either by acting unreasonably or by failing to act promptly to progress the claim), his entitlement to temporary accommodation benefits will be reduced. Case No: 395412 Determination Page 4 of 13 This result arises because the Applicant cannot be considered to have “neces sarily incurred” temporary accommodation costs for any period during which he could reasonably be expected to have taken action to progress the claim. As outlined above, the Applicant settled his claim under his home insurance policy with Insurer X in July 2014. Under the terms of the settlement, he received a total of $493,161, with the final instalment of $175,000 paid on 17 July 2014. The available information indicates that the settlement amount was agreed on the basis that the Applic ant‟s unit could not be effectively repaired and would need to be rebuilt. Once the Applicant received the settlement payment from Insurer X, he was in a position to commence the rebuilding process. Accordingly, from 17 July 2014 onwards, the Applicant is only entitled to temporary accommodation benefits for the period reasonably required to rebuild his unit. FSP and its contractors have contributed to delays in resolving claim It is clear that it has taken an extended period of time to resolve the Applican t‟s claim. Both parties have provided extensive submissions (and supporting documentation) outlining various reasons for the substantial delays experienced during the claim process. Having carefully reviewed this information, the Panel considers that the FSP and its engineer (M) have been partly responsible for the delays in the claim process. The initial delays in resolving the claim occurred when the Applicant raised various concerns and queries about the initial scope of works prepared by the FSP‟s engineer (M). A key area of dispute between the Applicant and the FSP concerned whether a planning permit was required for the building works, as well as the extent to which the works were required to comply with changes to building standards since the unit was constructed approximately 50 years earlier. In part, these issues turned on whether the fire damage to the unit could be effectively repaired or whether the unit needed to be completely rebuilt. The Applicant says the initial scope of works prepared by t he FSP‟s engineer (M) was inadequate and failed to fully reflect the works required to restore the unit to its condition when new, including any extra costs necessarily required to upgrade the property to comply with current statutory requirements (as provided for under the policy). The Applicant says the FSP and M failed to consider the concerns he raised about the initial scope of works. He notes that M lodged an application for a building permit in December 2011, despite the Applicant having expressly refused to provide his consent to the application, until the outstanding issues with the scope of works were resolved. Case No: 395412 Determination Page 5 of 13 The FSP and its engineer (M) consider that the Applicant has failed to co-operate and has unreasonably sought to interfere with the claim process, in order to pursue his own agenda of having the unit completely rebuilt rather than repaired. In the Panel‟s view, the available information establishes that, on the balance of probabilities, the initial scope of works prepared by the FSP‟s eng ineer (M) was inadequate. During the initial discussions between the Applicant and M in early 2012, the Applicant obtained confirmation from the local council that a planning permit would be required for the reinstatement of the unit. The council‟s letter notes that the exemption for repairs and routine maintenance to an existing building is not available, given the extent of the damage to the Applicant‟s unit. The FSP says that the council‟s letter is not determinative of the question as to whether planni ng permission was required, as the council‟s view was based solely on the information submitted by the Applicant (a copy of which has not been provided). The FSP has also suggested that, to the extent a planning permit was required, this requirement arose solely because the Applicant was seeking to have the garage reinstated as a habitable room, which meant that the property needed to be rebuilt at a higher level to satisfy flood overlay conditions imposed by the statutory water authority. Having carefully reviewed the information provided (including the planning permit ultimately issued for the rebuild), the Panel is not satisfied that the need for planning permission arose solely as a result of improvements to the building sought by the Applicant, rather than as a result of the damage caused by the fire. The Panel notes that in December 2013 (over two years after the fire), the FSP‟s engineer (M) revised his scope of works to include relevant planning requirements. The Panel is also satisfied that the material provided by the Applicant establishes that there were other deficiencies in M‟s scope of works. The Panel notes that in June 2011, the FSP and Insurer X made an initial offer to cash settle the Applicant‟s claim for a total of $250,043 (with liability to be shared equally between the two insurers). The proposed settlement amount was based on the average of the quotations obtained by the FSP from four different builders, based on M‟s scope of works (which by that stage had been revised to include certain additional items, such as double glazing). Insurer X subsequently increased the cash settlement offer to $298,471, based on the revised scope of works prepared by M in December 2012, which incorporated additional planning requirements. In June 2014, the Applicant obtained a comprehensive and detailed report from his architect (BM) which identified numerous substantive omissions from M‟s scope of works (including issues with the proposed design of the footing identified by a structural engineer (DK) who was engaged by BM to review the scope of works). Case No: 395412 Determination Page 6 of 13 The Applicant‟s architect (BM) also engaged a quantity surveyor (DB) who estimated that it would cost approximately $503,000 to reinstate the Applicant‟s property. Shortly after the Applicant provided copies of these reports to his home insurer (Insurer X), Insurer X agreed to settle the Applicant‟s claim for $ 493,161 (including $19,960 for demolition costs). The FSP was not a party to this settlement and was not involved in the preceding negotiations. The Panel acknowledges that it is not clear from the limited information provided on what basis the settlement amount was agreed or why Insurer X agreed to substantially increase its earlier offer. The deed of release signed by the Applicant states that the settlement amount includes interest, GST and legal costs. Nevertheless, the Panel is satisfied that the contents of the detailed expert reports obtained by the Applicant of themselves as sufficient to establish that a number of the concerns he raised about M ‟s initial scope of works were justified. The fact that Insurer X was prepared to significantly increase its settlement offer following the provision of these reports provides additional support for the Applicant‟s position that the initial cash settlement offer made by the FSP and Insurer X in June 2012 was manifestly inadequate. In these circumstances, the Panel considers that, by failing to adequately address the Applicant‟s concerns about M‟s scope of works, the FSP has significantly contributed to the delay in resolving the Applicant‟s claim. The FSP has also contributed to the delays experienced during the claim process by failing to take appropriate action to progress the claim – for example, the FSP failed to promptly respond after being notified by the Applicant that he had settled the building component of the claim with Insurer X. Applicant has also contributed to delays in resolving claim While the Panel considers many of the concerns raised by the Applicant during the claim process were valid, it is not satisfied that the Applicant has taken all reasonable steps to progress the claim promptly. There were several prolonged periods during the claim process where the Applicant took minimal action to progress the claim. In particular, there was a period of almost six months between the Applicant ‟s rejection of the initial settlement offer from the FSP and Insurer X (in June 2012) and his subsequent provision of a counter-offer of $500,000 (based on an alternative scope of works he had obtained) in December 2012. An email sent by Insurer X in November 2012 indicates the Applicant had undertaken to provide a counter proposal in order to progress the claim. There was a further period of almost five months between the date Insurer X provided its increased settlement offer of $298,471 in December 2013 and the date the Applicant provided his own expert reports to Insurer X (supporting his rejection of the revised offer) in June 2014. Case No: 395412 Determination Page 7 of 13 While the Panel accepts that there may have been impediments to the Applicant progressing the claim, the Panel is not satisfied that the various explanation provided by the Applicant justify the extent of the delays on his behalf during the claim process. The Panel notes that the Applicant had the benefit of legal representation for a significant proportion of the claim process. The Panel accepts that, given the terms of the policy, the FSP should have been aware that the Applicant may seek temporary accommodation benefits for the entire period during which the claim remained unresolved. Further, the Applicant expressly advised the FSP of his intention to seek these benefits in January 2013. However, in circumstances where the Applicant‟s failure to take prompt action has resulted in further delays, the Panel considers that the FSP ‟s obligation to pay the Applicant‟s temporary accommodation costs should be reduced to reflect these delays. Applicant is entitled to temporary accommodation benefits for 20 months As outlined above, the Applicant has been paid temporary accommodation benefits by Insurer X for the period to 1 September 2012. The Panel considers that, from the date the Applicant received the building settlement amount from Insurer X in mid-July 2014, he was in a position to commence the rebuilding process. For the reasons outlined above, the Panel considers that both the FSP and the Applicant have contributed to the delays which occurred between September 2012 and July 2014. On this basis the Panel considers it is fair in all the circumstances that the FSP be required to pay the Applicant temporary accommodation benefits for 50% of the period between September 2012 and mid-July 2014 (equivalent to approximately 11 months‟ worth of benefits). The lease agreements for the Applicant‟s rental property confirm that he paid monthly rent of $2,433 between 1 September 2012 and 24 November 2013, which increased to $2,477 from then onwards. On this basis, the Panel considers the FSP should be required to pay the Applicant temporary accommodation benefits in the amount of $27,536 for the period between September 2012 and mid-July 2014, being approximately 50% of the rental costs incurred during this period. The Applicant has provided limited information about the steps taken to reinstate the property following the settlement reached with Insurer X in July 2014. While a planning permit for the rebuild was issued in March 2015, it is unclear when the Applicant applied for the permit and what further action he has taken since it was issued. There is also limited information from which to determine how long it would reasonably have taken to rebuild the property once the planning permit was obtained. Case No: 395412 Determination Page 8 of 13 The initial quotations provided by the FSP‟s builders (based on M‟s original, incomplete scope of works) estimated that the works would take approximately four and a half months, while the alternative scope of works obtained by the Applicant from his contractor (Z) specified a period of 18 weeks for scaffolding hire. Having carefully reviewed the available information (including the various scopes of work and costings provided by the parties), the Panel considers it reasonable in the circumstances to assume a total period of nine months for the rebuilding process. On this basis, the Panel considers the FSP should be required to pay the Applicant an additional amount of $22,293 representing nine months‟ worth of temporary accommodation benefits from July 2014 onwards. The FSP is required to pay interest on the amounts payable as temporary accommodation benefits, at the rate calculated in accordance with section 57 of the Insurance Contracts Act 1984 (Cth). Interest is to be calculated on the basis that temporary accommodation benefits would have been payable quarterly in advance. 2.2 Is the Applicant entitled to any other amounts? Applicant is not entitled to environmental improvement benefit Special Benefit 8 of the strata policy provides for the payment of up to $10,000 worth of environmental improvements (not previously installed), where:  the insured property is damaged by an e vent insured against under the policy; and  the cost to rebuild or repair the damaged portion is more than 25% of what the cost would have been had “Your Insured Property” been totally destroyed. The Applicant seeks payment of $10,000 for the cost of installing solar panels and a grey water recycling system when the property is rebuilt. The FSP says the Applicant is not entitled to this benefit because the cost of rebuilding the property (based on the settlement reached with Insurer X) is less than 25% of the cost had the entire property been destroyed. Based on the policy definition of “You”, the reference to “Your Insured Property” in Special Benefit 8 refers to the insured property as a whole (that is, all seven units). At the time of the fire in August 2011, the property was insured for a maximum sum insured of $1,998,000. Accordingly, 25% of this amount is equal to $499,500. However, the terms of Special Benefit 8 refer to the actual rebuilding cost, rather than the maximum sum insured specified under the policy. In circumstances where the Applicant‟s unit was one of seven which formed part of the strata plan, it is highly unlikely that the cost of rebuilding his unit would exceed 25% of the cost of rebuilding all seven units. Even if the 25% threshold in Special Benefit 8 were considered by reference to the sum insured for the entire strata plan, the Panel is not satisfied that the actual cost of rebuilding the Applicant‟s unit exceeds that amount. Case No: 395412 Determination Page 9 of 13 The Applicant says the cost of rebuilding his unit exceeds $500,000, as reflected in the alternative scope of works provided by his contractor (Z) and the costs estimate provided by his quantity surveyor (DS). The FSP disputes this and says that the cost estimates provided by the Applicant include various items which are properly characterised as special benefits under the strata policy, such as the water tank and irrigation system (rather than as part of the cost of the rebuild). The FSP also notes that the settlement deed executed by the Applicant and Insurer X states that the settlement amount of $493,161 is inclusive of interest and legal costs (and therefore this amount may exceed the actual cost to rebuild). In circumstances where there is conflicting information about the actual cost of rebuilding the Applicant‟s property, the Panel considers the settlement amount of $493,161 negotiated with Insurer X represents a reasonable estimate of the cost to rebuild. The settlement amount was agreed after protracted negotiations during which both parties had the benefit of legal representation and with the benefit of the expert reports and cost estimates obtained by the Applicant. For the reasons outlined above, the Panel is satisfied that the cost of rebuilding the Applicant‟s unit does not exceed 25% of the co st of rebuilding the entire strata property. Accordingly, the Applicant is not entitled to the special benefit for environmental improvements provided under the policy. Applicant is entitled to benefit of $10,000 for landscaping costs Special Benefit 14 of the strata policy provides for the payment of reasonable costs necessarily incurred in replacing or repairing damaged trees, shrubs, plants, lawns or rockwork at the property following an insured event (up to a maximum of $10,000). The Applicant seeks payment for landscaping costs in relation to works required as part of the rebuilding of the property. He has provided a quotation from his landscaper (PH) for landscaping costs including the construction of reinforced concrete planters and the supply and installation of additional garden soil, trees and shrubs (at a total cost exceeding $10,000). The FSP considers the Applicant is not entitled to the special benefit for landscaping costs, on the basis that he has already been adequately compensated for these costs under the settlement reached with Insurer X. As outlined above, the settlement agreement entered into by the Applicant and Insurer X does not provide an itemised breakdown of the settlement amount (other than separately identifying the amount of $19,960 paid for demolition costs. The Applicant‟s home insurance policy provides cover for the insured “home”, which is defined to include any “fixtures or home improvements” at the site. Case No: 395412 Determination Page 10 of 13 However, the definition of “home improvements” states that, while thi s expression includes permanent structures such as garages, pools and carports, it does not include trees, shrubs or soil. Given the Applicant‟s home insurance policy expressly excludes cover for landscaping costs, the Panel considers the settlement amount paid by Insurer X is highly unlikely to have included an allowance for such costs. On this basis, the Panel is satisfied that Special Benefit 14 of the strata policy provides a separate and additional benefit to the benefit which the Applicant has received under his home insurance policy. Based on the available information, the Panel is satisfied that the Applicant has established an entitlement to the payment of Special Benefit 14. Accordingly, the FSP is required to pay the Applicant an additional $10,000 for landscaping costs. The FSP is required to pay interest on this amount at the rate calculated in accordance with section 57 of the Act from 3 April 2013 (being the date of the decision by the FSP‟s Internal Dispute Resolution department) until the payment date. Applicant is entitled to $2,000 for lot owners’ contributio ns and fees During the course of this dispute, the FSP agreed to pay the Applicant the maximum benefit of $2,000 provided under Special Benefit 1(g) of the strata policy for contributions, levies, maintenance and other fees paid by the Applicant during the period his unit was unable to be occupied as a result of the fire. The Applicant says he has never received this amount. Unless the FSP can provide reasonable evidence establishing that this amount has already been paid, it is required to pay the Applicant the amount of $2,000 in accordance with the terms of Special Benefit 1(g). The FSP is required to pay interest on this amount at the rate calculated in accordance with section 57 of the Act from 3 April 2013 (being the date of the decision by the FSP‟s I nternal Dispute Resolution department) until the payment date. Applicant is entitled to reimbursement of $3,000 for legal costs The Applicant seeks reimbursement of $17,637 for legal costs incurred during the course of this dispute. The costs claimed by the Applicant relate solely to the period after he settled his claim against Insurer X under his home insurance policy. Under paragraph 9.4 of the FOS Terms of Reference, FOS may require a financial services provider to contribute to legal costs incurred by an applicant in the course of their dispute. However, a financial services provider will generally not be required to contribute more than $3,000 unless exceptional circumstances apply. The Panel accepts that, in circumstances where the FSP was represented by solicitor, it was not unreasonable for the Applicant to also seek legal representation. Case No: 395412 Determination Page 11 of 13 The Panel also acknowledges that the Applicant reasonably required the assistance of his lawyers to respond to various legal concepts (such as co-insurance) which were raised by the FSP‟s lawyers during the course of the claim. However, the Panel is not satisfied that the outstanding issues remaining under the strata policy (following settlement of the building claim) were so complex as to require the ex tensive involvement of lawyers on an ongoing basis. In the Panel‟s view, the engagement of lawyers has not contributed to the efficient and effective resolution of the current dispute. For the reasons outlined above, the Panel considers that the FSP should be required to pay the Applicant the amount of $3,000 as partial reimbursement of legal fees. However, the Panel is not satisfied that exceptional circumstances exist which would warrant the payment of any additional amount. Case No: 395412 Determination Page 12 of 13 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered a ll of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, the Panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. During the course of this dispute, the Applicant has been represented by his solicitor. For the purposes of this Determination, submissions made by the Applicant‟s solicitor have been treated as if they have been made by the Applicant himself. 3.2 Terms of policy Subject Terms Scope of cover Policy 1 – Insured Property … We insure You up to the Sum Insured shown for Policy 1 on the Schedule, against ACCIDENTAL LOSS or DAMAGE to Your Insured Property which occurs during the Period of Insurance… Spe cial benefits Special Benefits are included in addition to Your Sum Insured for Policy 1. Special Benefit 1(a) – temporary accommodation When You occupy Your Lot/Unit We will pay the reasonable cost of Temporary Accommodation You necessarily incur if Your Lot/Unit is made unfit to be occupied for its intended purpose by:  loss or damage that is admitted as a claim under Policy 1 … We will pay …  … from the time of the Event until the time You reoccupy Your Lot/Unit following completion of rebuilding, repairs or replacement … Temporary Accommodation … means , as regards any Lot/Unit occupied by the Lot Owner, an amount of money calculated on the basis of the annual rentable value (including any „outgoings‟ that would have been payable by a tenant or lessee) that would have applied immediately prior to the happening of loss or damage. Case No: 395412 Determination Page 13 of 13 Subject Terms Special Benefit 1(g) – lot owners’ contributions We will pay, up to $2,000 a Lot/Unit, for contributions, levies, maintenance and ot her fees You are required to pay during the period Your Lot/Unit is made unfit to be occupied for its intended purpose by loss or damage to Your Insured property that is admitted as a c laim under Policy 1. Special Benefit 8 – environmental improvements If Your Insured Property is:  damaged by an Event claimable under Policy 1 and  the cost to rebuild, replace or repair the damaged portion is more than twenty five percent (25% ) of what the cost would have been had Your Insured Property been totally destroyed; We will, in addition to the cost of environmental improvements claimable under Policy 1, also pay up to $10,000 for the cost of additional environmental improvements not previously ins talled such as rainwater tanks, solar energy and grey water recycling systems. Special Benefit 14 – landscaping We will pay up to $10,000 for the reasonable costs You or a Lot Owner necessarily incur in replacing or repairing damaged trees, shrubs, plan ts, lawns or rockwork at Your Situation lost or damaged by an Event claimable under Policy 1.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.