Home / Financial Firm (Unknown - Insurer) / Determination 393898
Determination 393898
Denial of strata building damage claim
Summary
An owners corporation claimed under a residential strata policy for cracking and bowing of a garage wall, and the FSP denied the claim relying on exclusions. AFCA found the FSP could not rely on the exclusions to deny part of the claim and ordered it to cash settle $7,920, being half the $15,840 reconstruction cost, with statutory interest.
The policy covers accidental damage, the FSP did not establish that an excluded gradual deterioration or settlement cause was the proximate cause, and the expert evidence was conflicting so a fair cost sharing was ordered.
Subjects and remedies
home or building damagepay claimpay interest
Text of the determination
Determination
General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision -
Denial of Claim
Determination
Case No: 393898 Determination Page 1 of 6
Case number : 393898 22 July 2015
1 Overview
1.1 Dispute
The Applicants represent the Owners Corporation of a residential building insured
by the Financial Services Provider (FSP). The Applicants lodged a claim under
the Residential Strata Insurance policy (the policy) for damage to the garage wall
of the property.
The FSP has denied the claim on the basis the Applicants have failed to establish
a claim under the policy. It also relies on several policy exclusions to deny
payment of the claim.
1.2 Issues and key findings
Is the FSP entitled to deny payment of the Applicants’ claim ?
The FSP is not entitled to deny payment of part of the Applicants’ claim because:
the policy covers accidental loss or damage
the accidental loss occurred during the policy period
the FSP has established a proximate cause of the damage activates the
exclusion in respect of “gradual deterioration”
it is fair in the circumstances for the cost to be shared equally.
1.3 Determination
This Determination is partly in favour of the Applicants, and partly in favour of the
FSP.
The FSP is not entitled to deny payment of part of the Applicants’ claim.
The FSP must pay the Applicant the sum of $7,920, less any applicable excess.
Interest is payable on the settlement amount, at the statutory rate, from 27 March
2015 until the date of settlement.
Case No: 393898 Determination Page 2 of 6
2 Reasons for Determination
2.1 Is the FSP entitled to deny payment of the Applicants’ claim?
The policy covers accidental loss or damage
The Applicants are required to show, on the balance of probabilities, they have
suffered a loss caused by a risk insured against under the policy. This is known
as a prima facie claim.
If the Applicants are able to establish a prima facie claim, the onus shifts to the
FSP to show, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy to deny the claim.
The Applicants’ policy provides cover for accidental damage or accidental loss,
subject to the conditions and exclusions set out in the policy. In this context, the
courts have interpreted “accidental” to mean “unintended and unexpected.” The
Applicants are entitled to a beneficial interpretation of the policy wording.
In order to establish a prima facie claim, the Applicants must show they have
suffered an accidental loss, being damage that was unintended or unexpected.
It is not in dispute the garage wall has suffered considerable cracking and bowing.
The Applicants submi t two engineers’ reports (JCS and BYP) which address
possible causes for the damage. Based on the evidence, it is accepted the wall
damage is neither intended nor expected. Accordingly, I am satisfied the
Applicants have established a prima facie claim, given the broad cover for
accidental damage provided under the policy.
The accidental loss occurred during the policy period
The FSP argues it is not required to indemnify the Applicants as they have failed
to identify an insured event has occurred during their ownership of the property.
Specifically, the FSP argues the subject wall has been in existence for over 40
years and the Applicants have owned the subject unit for the last 15 years and
cannot show an insured event occurred during this time.
In light of the broad accidental damage cover afforded by the policy and as
discussed above, the event covered under the policy is the accidental loss or
damage to the garage wall. Based on the evidence, this damage was probably
manifested during the period of ownership by the Applicants and during the period
of insurance with the FSP. I accept the damage probably had not manifested at
the time the Applicants (owner of unit 4), purchased the property. The actual date
of manifestation of damage cannot be determined.
The Applicants have established a valid claim under the policy.
In these circumstances, the FSP bears the onus of establishing, on the balance of
probabilities, it is entitled to rely on a policy exclusion to deny the Applicants’
claim.
Case No: 393898 Determination Page 3 of 6
2.2 Is the proximate cause of the damage excluded from cover?
Experts provide conflicting views on the cause of the damage
The FSP’s builder (UBS) inspected the damage and confirm ed the garage wall
had rotated on its footings, causing it to lean outwards. UBS considered the cause
of the damage to be general settlement of the foundations and general wear and
tear over time, on the basis that they did not find evidence of a defined event.
Bearing in mind this policy is not a defined event policy, this assessment by UBS
is not determinative of the cover under the policy.
The Applicants ’ first engineer (JSC) considered the possible cause of the damage
to be related to the difference in ground level between the garage floor of the
insured property and the adjacent neighbour’s much lower court yard level. The
engineer considered soil erosion and the watering of the garden bed located
between the garage footing and the neighbour’s timber sleeper retaining wall may
have also contributed to the damage. JSC did not consider the damage resulted
from general wear and tear.
A second engineer (BYP) also considered the damage to the garage wall due to
the rotation of the footing was caused by the excavation of the neighbour’s
property to below the base level of the garage footing. He noted the foundation
movement was not consistent with soil settlement caused by compaction,
shrinkage or seismic earth movement. B YP also noted the watering of the
neighbour’s garden bed would have exacerbated the problem.
The FSP’s engineer (MCS) concluded the pro ximate cause of the damage was
the close proximity of the insured property to the coast, which had caused severe
salt attack, corrosion and subsequent expansion of the external side of the
reinforcement within the mortar joints, resulting in the bowing of the wall. MCS did
not observe footing movement or rotation. MCS considered the corrosion to the
reinforcement a pre-existing issue that has been occurring over a long period of
time. It is consistent with this finding that the wall gradually deteriorated o ver a
long period.
FSP has established a cause of damage is excluded from cover
The FSP relies on the reports from UBS and MCS to deny the Applicants’ claim
on the basis the proximate cause of the damage is:
Wear and tear.
Settling shrinkage or any earth movement.
Erosion.
Rust, corrosion, gradual deterioration, wear or tear, wet or dry rot.
In order to deny the claim, the FSP must establish, a proximate or dominant
cause of the damage was one or more of the exclusions noted above.
Both JCS and BYP are consistent in their opinions of the nature and cause of the
damage. While MCS considered the proximity to the coast and the salt attack and
corrosion of the reinforcements to be the cause of the damage, it does not
address the causes raised by the Applicants’ engineers.
Case No: 393898 Determination Page 4 of 6
Although UBS considered the damage to be due to settlement and wear and tear,
JCS confirmed the damage was not consistent with wear and tear. Similarly, BYP
confirmed the movement was not due to general soil settlement.
It is clear MCS’s findings differ significantly from both the Applicants’ engineers’
reports and the FSP’s own builder’s report. While UBS and the Applicants’
engineers confirm the wall had rotated on its footing, resulting in the bowing and
cracking, MCS did not observe any footing movement.
T he Applicants’ engineers’ reports are consistent in relation to the nature and
cause of the damage, while the FSP’s builder and engineer provide two conflicting
reports. While MCS offers an alternative cause of damage, it does not establish
the salt attack and corrosion is the proximate cause of the damage, but rather that
it is a cause of damage due to gradual deterioration.
The evidence suggests the proximate cause of the damage is the excavation of
the neighbouring property below the garage footings. The fact the excavation may
have taken place prior to the inception of the policy does not preclude the
Applicants from being covered by the policy for accidental, unexpected loss which
occurred after the policy was enacted, during the period of ownership, in light of
the broad cover for accidental loss afforded by the policy.
Faced with the conflictual opinion of the various experts and with the general
wording of “accidental” damage or loss, it is appropriate in this case to invoke
Terms of Reference 8.2 which in its relevant part requires me to make a
determination that is fair in all the circumstances. I determine that the cost of
demolition and reconstruction to be shared equally.
The Applicants confirm the demolition and reconstruction of the garage wall has
now been completed due to Building Orders issued by the Council. The council
has approved the new construction. The Applicant provides invoices for the
works, in the sum of $15,840.
The FSP is required to cash settle the Applicant the sum of $7,920 less any
applicable excess. Interest is payable at the statutory rate, from 27 March 2015
until the date of settlement.
Case No: 393898 Determination Page 5 of 6
3 Supporting information
3.1 Product Disclosure Statement
“ Re sidential Strata Insurance Policy
Section 1
What is insured -
Your buildings, and your common contents and your common property, as set out in the
schedule, are insured if they are destroyed, lost or damaged...
We will cover your buildings, your common contents and your common property for any
accidental loss...
What is not insured under Section 1
We will not cover your buildings and common contents and common property for accidental
damage or accident al loss caused by:
Settling shrinkage or any movement of earth
rosion
Rust, corrosion, gradual deterioration, wear or tear, wet or dry rot …”
3.2 Expert evidence
Re port Key points
Applicants’ expert s
JCS report dated
15 October 2014
The possible cause of such rotation may be related to the
difference in ground level between the garage floor of
(insured property) and the adjacent neighbour’s much
lower courtyard level.
I have been advised by the owner of (insured property) that
the ch ange in ground level to the adjoining property
occurred a few years after the Garage was built.
The lower court yard level of the adjoining property was
achieved with the construction of a timber sleeper retaining
wall which I believe may have moved over time due to
surcharge loading from the garage of no. 4/527 Balcombe
Road, Black Rock.
Other factors which may also have contributed to the
movement include soil erosion and the watering of the
garden bed located between the garage footing and the
timber s leeper retaining wall.
As these defects may have been primary caused by the
adjoining property original development and not to the
general wear and tear of the Garage footing , an extension
of time to carry out the pro posed works should be
requested …
BYP report dated
20 November 2014 T here is no evidence of soil movement including
settlement within the other walls of the garage, floor slab or
adjoining property.
The bowing and resulting damage to the garage wall has
been caused by rotation of the strip f ooting that supports
this wall.
The footing rotation is consistent with the loss of subgrade
support to the western side of the foundation. This has
potentially been caused by the excavation of the
neighbouring property to below the base of the garage
footing and into the soil support frustum projecting at 45
Case No: 393898 Determination Page 6 of 6
down and away from the bottom edged of the footing. This
could have occurred either during the construction of the
neighbouring units or subsequently during construction of
the courtyard paving.
The foundation movement in evidence is not consistent
with soil settlement caused by compaction, shrinkage or
seismic earth movement.
The loss of support to the exposed side of the footing is
likely to have progressed even after placing uncompacted
soil back against the footing. Watering of the garden bed
created in this fill material would have exacerbated this
problem.
FSP’s expert s
UBS r eport dated
2 June 2014
My inspection confirmed the wall to have rotated on the
footing so the wall is leaning outwards by approximately
30mm. T he wall has also broken horizontally midway up its
height.
The cracks/movement are consistent with general
settlement of the foundations which have taken place over
a period of time.
MCS r eport dated
12 December 2014
In my opinion, the close proximity of the coast has caused
severe salt attack, corrosion and subsequent expansion of
the external side of the reinforcement within the mortar
joints, causing the external block work face to expand and
bow outwards towards the West.
Footing movement or rotation was not observed.
The diagonal cracking is commonly associated with footing
subsidence, but in this instance, it is difficult to diff erentiate
due to the extensive movement to the wall and all the
cracking may be attributable to the corrosion.
The corrosion to the reinforcement is a pre - existing issue
that has been occurring over a long period of time, namely
since the construction of the wall.
3.3 Terms of Reference
8.2 Dispute resolution criteria
Subject to paragraph 8.1, when deciding a Dispute and whether a remedy should
be provided in accordance with paragraph 9, FOS will do what in its opinion is fair in
all the circumstances, having regard to each of the following:
a) legal principles;
b) applicable industry codes or guidance as to practice;
c) good industry practice; and
d) previous relevant decisions of FOS or a Predecessor Scheme (although FOS
will not be bound by these).
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.