Determination 393880
Roof damage settlement amount after make-safe works
Summary
After a storm, the FSP's contractors damaged roof tiles during make-safe work. The applicants sought $7,450, being 50% of the roof replacement cost, and AFCA ordered the FSP to pay $2,500 in full and final settlement of the tile damage.
The roof was predominantly in pre-existing poor condition, so the fairer measure of loss is the roofer's quote to replace the 32 damaged tiles rather than half the roof replacement cost.
Issues
- Claim amount dispute primary · upheld
“The FSP must pay $2,500 in full and final settlement of the roof damage caused by its contractors; the applicants sought 50% of roof replacement cost.”
- Repairs or contractors secondary · upheld
“32 roof tiles were damaged by the FSP's contractors during make-safe work.”
Subjects and remedies
home or building damagenatural disasterpay claim
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
amount
Determination
Case No: 393880 Determination Page 1 of 4
Case number : 393880 22 May 2015
1 Overview
1.1 Dispute
The Applicants lodged a claim with their home insurer, the Financial Services
Provider (FSP), for damage to their home following a storm. The FSP engaged a
builder to conduct make safe repairs and report on the damage.
The Applicants state the FSP’s builder caused substantial damage to the roof and
are seeking compensation for this in the sum of $7,450. This is 50% of the cost to
replace the roof. The FSP has disputed the amount sought and maintain any
liability it owes is limited to $514.80.
The internal damage sustained has been accepted by the FSP and does not form
part of this dispute.
1.2 Issues and key findings
What is the extent of the FSP’s liability ?
The extent of the FSP’ s liability is $2,500 because:
the FSP is responsible for the loss associated with 32 tiles being damaged by
its contractors; and
the quote provided by the Applicants’ roofer for the repair of this damage is a
fairer measurement of their loss.
1.3 Determination
This Determination is substantially in favour of the Applicants.
The FSP is liable to pay the Applicants the sum of $2,500 in full and final
settlement of the damage to the roof caused by the FSP’s contractors.
Case No: 393880 Determination Page 2 of 4
2 Reasons for Determination
2.1 What is the extent of the FSP’s liability ?
The FSP is liable for 32 damaged tiles
The parties do not dispute that roof tiles were damaged by the FSP’s contractors.
The FSP has based its settlement offer on the cost to replace 32 broken tiles for
an amount of $514.80. The Applicants have not disputed this or provided any
evidence to refute that the extent of damage caused by the FSP’s contractors
exceed 32 tiles.
Instead, the Applicants states this constitutes more than half the roof. As they
have had to replace the roof, they are seeking 50% of its replacement cost.
It is unclear if the FSP has expressly admitted that it damaged these 32 tiles. Its
Notice of Response is silent in this regard. However, the letter it sent to the
Applicants on 10 March 2015 did state the following of relevance:
“[FSP] has obtained a quotation for the recently broken tiles in the amount of $514.80,
which is the cost for supplying and installing 32 tiles. Therefore, I am satisfied that
issuing a payment to you in this amount fulfil s its liability to you …” (my emphasis)
Given the language used and the basis of the FSP’s payment, I accept the FSP
does not dispute it is liable for the 32 damaged tiles.
The issue therefore remains whether its payment is sufficient to compensate the
Applicants for this damage.
The cost to replace the roof was due to its pre-existing damage
I am not satisfied that half the cost to replace the roof is a fair measurement of the
Applicants’ loss given the following:
there is no dispute the roof was old and the tiles were brittle – this was
illustrated by the fact tiles were damaged by contractors who installed a solar
hot water system shortly before the internal damage;
when purchasing the property approximately 2 years prior to the claim, they
were aware that the roof would require replacement within 5 to 10 years given
its condition; and
the cost to replace the roof included parts that were not damaged by the
FSP’s contractors, such as sarking, battens and flashing.
Based on this, it is relatively clear tha t the cost to replace the roof was
predominantly due to its pre-existing condition rather than the conduct of the
FSP’s contractors.
Therefore, I consider a fairer measurement of the Applicants’ loss would be the
cost to replace those 32 tiles.
Case No: 393880 Determination Page 3 of 4
Both parties have provided quotes to estimate the cost to replace the 32
tiles
Both parties have provided quotes. The FSP’s contractor itemised the cost by
stating the following:
“Source replacement tiles – 1 hr @ $50.00 = $50.00
32 x tiles @ $3.00 each = $96.00
Roofer (replace tiles) – 5 hrs @ $50.00 = $250.00”
Total of Above: $396.00
Henc e our allowanc e of $400.00.”
I note the final figure of $514.80 was based on $400 plus GST plus 17% builder’s
margin.
The Applicants consulted the roofer they engaged to replace the roof to obtain his
opinion as to the cost to replace the damaged tiles. He responded with the
following:
“The cost to repair the roof as it was when I quoted the re -roofing job would have been
$2500 Inc GST and includes the following.
Site set up and installation of edge protection to the effected area
delivery of materials
Labour costs (removal of broken tiles, install new roof tiles, re-bedding and pointing of the
adjacent ridge tiles)
dismantle edge prot ection
tipping fees”
The FSP has noted that its contractor has specifically broken down its quote
whilst the Applicants’ one is excessive and unsubstantiated.
However, I prefer the Applicants’ quote for a number of reasons.
The measurement of the Applicants’ loss should be based on their
contractor’s quote
First, by all accounts the roof was brittle and if not carefully navigated, additional
damage would occur. Therefore, the work required to replace 32 tiles on such a
roof would have taken more time and care than would otherwise normally be
expected.
It is unclear if the FSP’s contractor has adequately accounted for this.
Second, the Applicants’ contractor has included site set up and installation of
edge protection. This would appear a safety issue all roofers must comply with
which does not appear to have been accounted for by the FSP’s contractor.
Third, the Applicants’ contractor is more familiar with the roof as he has
conducted extensive works on it, presumably to the Applicants’ satisfaction.
Fourth, it is unclear if the author of the FSP’s qu otation specialised in roofing. The
name of the company provides no guidance in this regard and I note that the
amount allowed for the roofing was part of the overall cost associated with the
building damage.
In contrast, there is no dispute that the prim ary business of the Applicants’
contractor is roofing.
Case No: 393880 Determination Page 4 of 4
Therefore, after reviewing all of the available evidence, I consider it is fair in all the
circumstances to base the measurement of the Applicants’ loss on their roofer’s
estimate.