Roof damage settlement amount after make-safe works

FirmFinancial Firm (Unknown - Insurer)
Decided2015-05-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$2,500
Non-financial loss—
Amount claimed$7,450
SourceAFCA PDF

Summary

After a storm, the FSP's contractors damaged roof tiles during make-safe work. The applicants sought $7,450, being 50% of the roof replacement cost, and AFCA ordered the FSP to pay $2,500 in full and final settlement of the tile damage.

The roof was predominantly in pre-existing poor condition, so the fairer measure of loss is the roofer's quote to replace the 32 damaged tiles rather than half the roof replacement cost.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount Determination Case No: 393880 Determination Page 1 of 4 Case number : 393880 22 May 2015 1 Overview 1.1 Dispute The Applicants lodged a claim with their home insurer, the Financial Services Provider (FSP), for damage to their home following a storm. The FSP engaged a builder to conduct make safe repairs and report on the damage. The Applicants state the FSP’s builder caused substantial damage to the roof and are seeking compensation for this in the sum of $7,450. This is 50% of the cost to replace the roof. The FSP has disputed the amount sought and maintain any liability it owes is limited to $514.80. The internal damage sustained has been accepted by the FSP and does not form part of this dispute. 1.2 Issues and key findings What is the extent of the FSP’s liability ? The extent of the FSP’ s liability is $2,500 because:  the FSP is responsible for the loss associated with 32 tiles being damaged by its contractors; and  the quote provided by the Applicants’ roofer for the repair of this damage is a fairer measurement of their loss. 1.3 Determination This Determination is substantially in favour of the Applicants. The FSP is liable to pay the Applicants the sum of $2,500 in full and final settlement of the damage to the roof caused by the FSP’s contractors. Case No: 393880 Determination Page 2 of 4 2 Reasons for Determination 2.1 What is the extent of the FSP’s liability ? The FSP is liable for 32 damaged tiles The parties do not dispute that roof tiles were damaged by the FSP’s contractors. The FSP has based its settlement offer on the cost to replace 32 broken tiles for an amount of $514.80. The Applicants have not disputed this or provided any evidence to refute that the extent of damage caused by the FSP’s contractors exceed 32 tiles. Instead, the Applicants states this constitutes more than half the roof. As they have had to replace the roof, they are seeking 50% of its replacement cost. It is unclear if the FSP has expressly admitted that it damaged these 32 tiles. Its Notice of Response is silent in this regard. However, the letter it sent to the Applicants on 10 March 2015 did state the following of relevance: “[FSP] has obtained a quotation for the recently broken tiles in the amount of $514.80, which is the cost for supplying and installing 32 tiles. Therefore, I am satisfied that issuing a payment to you in this amount fulfil s its liability to you …” (my emphasis) Given the language used and the basis of the FSP’s payment, I accept the FSP does not dispute it is liable for the 32 damaged tiles. The issue therefore remains whether its payment is sufficient to compensate the Applicants for this damage. The cost to replace the roof was due to its pre-existing damage I am not satisfied that half the cost to replace the roof is a fair measurement of the Applicants’ loss given the following:  there is no dispute the roof was old and the tiles were brittle – this was illustrated by the fact tiles were damaged by contractors who installed a solar hot water system shortly before the internal damage;  when purchasing the property approximately 2 years prior to the claim, they were aware that the roof would require replacement within 5 to 10 years given its condition; and  the cost to replace the roof included parts that were not damaged by the FSP’s contractors, such as sarking, battens and flashing. Based on this, it is relatively clear tha t the cost to replace the roof was predominantly due to its pre-existing condition rather than the conduct of the FSP’s contractors. Therefore, I consider a fairer measurement of the Applicants’ loss would be the cost to replace those 32 tiles. Case No: 393880 Determination Page 3 of 4 Both parties have provided quotes to estimate the cost to replace the 32 tiles Both parties have provided quotes. The FSP’s contractor itemised the cost by stating the following: “Source replacement tiles – 1 hr @ $50.00 = $50.00 32 x tiles @ $3.00 each = $96.00 Roofer (replace tiles) – 5 hrs @ $50.00 = $250.00” Total of Above: $396.00 Henc e our allowanc e of $400.00.” I note the final figure of $514.80 was based on $400 plus GST plus 17% builder’s margin. The Applicants consulted the roofer they engaged to replace the roof to obtain his opinion as to the cost to replace the damaged tiles. He responded with the following: “The cost to repair the roof as it was when I quoted the re -roofing job would have been $2500 Inc GST and includes the following. Site set up and installation of edge protection to the effected area delivery of materials Labour costs (removal of broken tiles, install new roof tiles, re-bedding and pointing of the adjacent ridge tiles) dismantle edge prot ection tipping fees” The FSP has noted that its contractor has specifically broken down its quote whilst the Applicants’ one is excessive and unsubstantiated. However, I prefer the Applicants’ quote for a number of reasons. The measurement of the Applicants’ loss should be based on their contractor’s quote First, by all accounts the roof was brittle and if not carefully navigated, additional damage would occur. Therefore, the work required to replace 32 tiles on such a roof would have taken more time and care than would otherwise normally be expected. It is unclear if the FSP’s contractor has adequately accounted for this. Second, the Applicants’ contractor has included site set up and installation of edge protection. This would appear a safety issue all roofers must comply with which does not appear to have been accounted for by the FSP’s contractor. Third, the Applicants’ contractor is more familiar with the roof as he has conducted extensive works on it, presumably to the Applicants’ satisfaction. Fourth, it is unclear if the author of the FSP’s qu otation specialised in roofing. The name of the company provides no guidance in this regard and I note that the amount allowed for the roofing was part of the overall cost associated with the building damage. In contrast, there is no dispute that the prim ary business of the Applicants’ contractor is roofing. Case No: 393880 Determination Page 4 of 4 Therefore, after reviewing all of the available evidence, I consider it is fair in all the circumstances to base the measurement of the Applicants’ loss on their roofer’s estimate.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.