Home / Financial Firm (Unknown - Insurer) / Determination 392913

Determination 392913

claim_denial

FirmFinancial Firm (Unknown - Insurer)
Decided2016-05-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$29,020
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for January 2011 storm and rainwater damage to his farm home, and the FSP denied liability over delay, subsidence and flood exclusions after offering 30% of repair costs. AFCA found the storm was the proximate cause, the FSP had not shown prejudice, and ordered payment of the $29,020 repair estimate with no interest.

The storm and rainwater event was the proximate cause of the loss, so the subsidence and flood exclusions did not apply and the FSP had not proven prejudice from the delay.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 392913 Determination Page 1 of 13 Case number: 392913 27 April 2016 1 Overview 1.1 Dispute In October 2012, the applicant lodged a claim under a Countrypak Insurance Policy held with the financial services provider (FSP) for storm damage sustained to the domestic property in January 2011. The FSP says the applicant refused to allow the loss assessor to inspect the property or cancel the repair authority to his stumper (SRU) before the property could be inspected by the FSP’s representatives. The FSP initially offered to pay 30% of the cost of repairs. It now denies liability on the grounds, it has been prejudiced by the delay in lodging the claim, that the subsidence did not occur within 72 hours of the storm event and the policy excludes flood damage. 1.2 Issues and key findings Has the applicant established the damage was caused by an insured event? The applicant’s policy is a listed event policy that provides cover for a variety of events including damage caused by storm, rainwater or wind. The weight of the evidence establishes that there was a severe storm/rainwater event in January 2011 that imp acted on the applicant’s property. The Panel is satisfied the applicant has established a prima facie claim for damage caused by an insured event. Is the FSP entitled to deny liability for the claim? The FSP is not entitled to deny liability for the claim. The Panel is of the view that the proximate cause of the loss was the insured event of storm/rainwater and that the FSP has not established the application of any relevant exclusion. Has the FSP been prejudiced as a result of the applicant’s delay in lodg ing the claim? The Panel whilst acknowledging the delay has impacted on the FSP’s ability to investigate the claim, is not satisfied that the FSP has established prejudice sufficient to allow it to either deny liability for the claim or limit its liability beyond that set out under section 2.4 of this determination. Case No: 392913 Determination Page 2 of 13 1.3 Determination This Determination is in favour of the applicant. The FSP is to liable pay the applicant the sum of $29,020 being the estimated cost to repair the property based on the assessment by the FSP’s building consultant SG. Given the circumstances of this dispute, the Panel does not believe it is appropriate to award interest. Case No: 392913 Determination Page 3 of 13 2 Reasons for determination 2.1 Has the applicant established the damage was caused by an insured event? Dispute initially arose as to whether or not the applicant had received the FSP’s Product Disclosure Statement (PDS). Initially it was thought that the applicant had incepted the policy through his own broker. It has now been conceded that the broker acted as agent for the FSP. The Panel accepts the applicant had been provided a copy of the PDS and a copy of the insurance schedule. The policy provides two levels of cover; listed events cover under cover one, or accidental cover under cover two. The policy schedule identifies that the applicant had selected listed events cover. Applicant has established an insured event The applicant reported the January 2011 storm lifted the veranda on the north side of the property peeling it back over the roof with rain water entering through the roof space and damaging the lounge, dining, kitchen and family rooms. Rainwater runoff was reported to have flowed under the house with at least one third of the applicant’s farm under water. The surface water remained under the home for about two weeks with movement of the home beginning within a week. The applicant arranged for roof repairs and did not lodge a claim at that time. Over the ensuing months, he was in and out of hospital which further delayed the lodgement of the claim. The claim was eventually lodged on advice from a building consultant. The Panel is satisfied that the applicant has established an insured event namely storm/rainwater and that damage arose as a result of storm/rainwater. In these circumstances, if the FSP is to deny liability for the claim, the FSP must establish either it has been prejudiced by the applicant’s conduct to the extent that it is entitled to refuse to pay them or an exclusion applies. 2.2 Has the FSP established an exclusion applies to the claim? Although the FSP does not specifically refer to an exclusion, it has referred to the policy excluding cover for claims arising from subsidence. In these circumstances, the Panel is required to consider what was the proximate cause of the loss. Proximate cause of damage The proximate cause of the loss is a question of fact depending upon the circumstances of each case. The proximate cause is not necessarily the first or last or sole cause of the loss. It is the effective or dominant or operative cause of the loss. If there are several causes operating contemporaneously, then each must be examined for their qualities of predominance and efficiency as the active efficient Case No: 392913 Determination Page 4 of 13 cause that sets a relevant train of events in motion. If one cause would have resulted in the harm in any case and the other would not have done so in the absence of the first, then the first is the proximate cause. Commentary provided by a geotech specialist has submitted that the stumps lost their load bearing capacity as a result of the stormwater entering the sub-floor area of the home. The FSP has questioned the accuracy and reliability of this report. The FSP’s loss assessor refers to the flow of rainwater having not ‘knocked’ the house from its foundation or stumps. The loss assessor argues that the initial movement observed by the applicant was not due to any building movement or subsidence but due to high moisture levels causing the timbers to swell. The Panel is not satisfied that this is accurate. The applicant was present at the property within the relevant period and witnessed the movement. The Panel notes the loss assessor accepts it is likely that some subsidence occurred to the applicant’s residence as a result of the storm event. It was a significant storm event. Some areas received their annual rainfall within a two day period. Given the circumstances the Panel is satisfied that the proximate cause of the loss was the storm and rainwater. A claim arose because of the storm and rainwater. Insofar as there was subsidence, it is likely that that commenced within the relevant period of 72 hours in any event. In the circumstances, the Panel is not satisfied the FSP has established the exclusions apply. 2.3 Has the FSP been prejudiced by the applicant’s conduct? The FSP says that the applican t’s delay in lodgement of the claim has prejudiced its ability to assess the claim and determine liability. It is not enough however to show what could or might have happened. The FSP must be able to establish what would have happened if the act or omission had not occurred. Courts have said that not only must they establish what would have happened but also what monetary loss has been suffered as a result. The FSP has argued that the loss assessor was prejudiced by the applicant proceeding with the restumping despite being warned against doing so. The Panel does not understand, based on the evidence provided, why the loss assessor was unable to attend the applicant’s property at some time during the restumping process. There is reference to the need for an engineer however, the loss assessor is an experienced person and would have been able to observe the restumping. The applicant’s stump specialist SRU who conducted the repairs advised that the stumps required replacement despite being in good condition because they could not be repacked according to current standards. Case No: 392913 Determination Page 5 of 13 Initial repairs completed were the result of a severe storm/rainwater event The applicant describes the severe weather events experienced in January 2011 resulting in the damage. According to the applicant, some emergency repairs were required and these repairs were completed by his share farmer’s son. It is unclear exactly how much was spent on these repairs. The applicant states that he spent approximately $600 to repair spouting and cappi ng which was conducted over the next few weeks. The loss assessor confirmed that he was aware the main house roof and verandah were repaired by the applicant with the assistance of his neighbour. He had been provided particulars of this. The FSP’s consulta nt SG was able to observe these repairs. The FSP was able to appoint an engineer. The engineer confirmed that 36 timber stumps had been replaced. The re-stumping company reported the stumps were badly settled after the rain. The building had undergone some degree of damage as a result of the storm event. The engineer suggests that the red gum stumps would have reached their serviceable life or exceeded it. There is no evidence that this was the case nor evidence that the property had suffered any similar damage prior to the insured event. It is unclear whether the engineer or FSP sought further information from SRU as to the condition of the stumps or discussed the issue about the serviceable life of the stumps. In the Panel’s view, based on the information provided and considering the fact that the repacking of the stumps was not a viable option due to current standards, the Panel accepts the FSP should meet the liability in respect to the restumping. 2.4 Is the FSP entitled to limit its settlement? The FSP’s e ngineer considered that the rain event contributed 30% of the damage. He considered the repairs should include those items that have already been undertaken including restumping and relevelling alongside some minor patching and painting and reflashing of the roof penetrations. The FSP’s consultant SG estimated the cost of the repairs to the property at $29,020. The applicant has already expended at least $19,000 towards the restumping of the property. There is no dispute that some of the damage to the internal part of the property would have been caused by the restumping including cracking of plaster and other walls. Whilst the Panel accepts that the property may have had some pre-existing damage, given the age of the property and the construction of the property, the Panel accepts that most likely the majority of the internal damage as identified by the FSP’s consultant SG would have flowed from the storm/rainwater damage in 2011. When considering the extent of any prejudice or reduction in the FSP’s liability, it is necessary to consider the overall circumstances in which this claim has arisen. Case No: 392913 Determination Page 6 of 13 The applicant was not initially going to lodge a claim. It was his intention to complete the repairs himself. When he realised it was more serious than first thought, he arranged to fix the damage at his own cost. It was only when informed of the possibility of the claim against an insurer, that he lodged the claim. Wanting to mitigate the loss, he wanted it fixed quickly. The FSP was aware he was going ahead with this work. It could have arranged someone to attend the property. It could have had a local builder look at the property and provide a report. The applicant is an elderly man in ill-health living in a rural property who had a substantial history of insurance with the FSP. There is nothing to question his credibility. Whilst the Panel accepts that the FSP is entitled to look at each claim in its merits, the Panel when considering the overall position of this matter is not satisfied that the FSP has established any significant prejudice as a result of the applicant’s behaviour. In the Panel’s view, it is fair in all the circumstances that the FSP meet the applicant’s claim by paying the applicant the damages as assessed by SG in the sum of $29,020. The Panel accepts that this quotation does not allow for contingencies which might arise during the course of repairs; to this extent the FSP is entitled to limit its liability to the amount assess ed in SG’s quotation. Case No: 392913 Determination Page 7 of 13 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, the Panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. 3.2 Policy Schedule ‘ Supplementary Product Disclosure Statement This Supplementary Product Disclosure Statement (Supplementary PDS) is dated 30 April 2008 and will apply to policies taken out, or with a renewal effective date, on or after 30 April 2008. The information in this Supplementary PDS updates and should be read with the last Product Disclosure Statement you received for the policy specified in your policy schedule (PDS) and any other applicable Supplementary PDS.’ 3.3 Product Disclosure Statement ‘ Domestic farm buildings means : … Anything permanently built, permanently constructed or permanently installed on your property for domestic purposes. … ◆ Storm, rainwater or wind . This includes storm, rainwater or wind damage to: • Gates, fences or walls that are attached to, and are part of, the structure of the domestic farm buildings. • Gates, fences or walls that are not attached to, and are not part of, the structure of the domestic farm buildings. We will only pay for any section of a gate, fence or wall made of brick, stone, metal or frame-supported corrugated fibrous material. The frame supporting the corrugated fibrous material must be made of brick, stone or metal. Case No: 392913 Determination Page 8 of 13 • Gates, fences or walls whic h are made of timber that are not attached to, and are not part of, the structure of the domestic farm buildings. We will only pay for gates or fences 20 years old or less. • Free -standing fences that do not have a supporting frame, but only if the fences are made from corrugated fibrous material. The fences must have been installed and constructed according to the manufacturers specifications. We will not pay for storm, rainwater or wind damage: • To shade cloth, swimming pool covers including solar covers, plastic liners for swimming pools. • Where water enters the domestic farm buildings because of structural defect, faulty design or faulty workmanship when the building was constructed. • Where water enters the domestic farm buildings through an opening made for any building renovation or repair work. We do not provide cover for damage by flood. ◆ Landslide or subsidence . Cover only applies when the landslide or subsidence occurs within 72 hours and is contributed to or caused by one of the following events: • Storm, rainwater or wind. • Earthquake, subterranean fire or volcanic eruption. • Explosion. • Liquid that escapes from a fixed pipe or something attached to a pipe, fixed gutter, fixed tank or drain. This cover also applies to gates, fences and retaining walls that are attached to, and are part of, the structure of the domestic farm buildings. … What all sections of this policy do NOT cover Any cover we provide is subject to the following exclusions. We will NOT pay claims arising from the following: … ◆ Landslide or subsidence except as detailed on pages 18, 28 and 29.’ 3.4 Timeline of events Date Event January 2011 Date of loss. October 2012 Claim lodgement with the FSP and the FSP says the Applicant refused to allow the loss adjustor to inspect the property . 22 October 2012 Restumping works are carried out and loss adjustor Case No: 392913 Determination Page 9 of 13 was able only inspect the externals. No one was home to inspect the internal damage. December 2013 Loss assessor visits the property and identifies some internal storm damag e. However, he was unsure whether the cracks related to restumping work or any other cause . February 2013 Loss adjustor notified that water ran under the property caused subsidence for months. March 2013 Engineer appointed by the loss adjustor but unable to visit the property due to accessibility issues . 3.5 Loss Assessor’s Report dated 20 January 2013 ‘ The terrain around the residence is slightly sloping. There is a concrete path around the entire house. The southern and eastern side of the house has ground levels above the sub-floor areas of the house - this has the potential of allowing rainwater run-off from the south or south eastern direction to flow underneath the building and this is not a good building design. … The Insured reported that during the storm event, he was at home and strong winds had lifted the veranda on the north western side of the house and this was peeled backwards over the roof of the main house. Rainwater entered the roof space due to the storm damage and entered the lounge room, dining/kitchen and family rooms. Rainwater run-off had flowed underneath the Insured's house however this water did not flow into the building interior. According to the Insured at least 1/3'd of his farm was under water. This surface water continued to flow underneath the Insured's house for about 2 weeks. The Insured stated that there was no ponding of water underneath the house, just continual flow of moving water. About 1 -weeks after the storm event, the Insured first noticed that the front door would not open as it had swollen and need to be planned to allow movement. Similar problems developed with the rear door and internal doors. With regards to the damaged roof and veranda, the Insured arranged for their share farmers son to carryout repairs and the original veranda roof was repositioned and fixed. Over time, the Insured noticed cracks developing in the walls and ceilings in most rooms of the house. At times these cracks were up to 20 mm in width however these have since closed up. Cracks to the concrete paving around the house had developed about 6 - 7 months after the storm event. The Insured also advised that following the storm event he was in and out of hospital on a regular basis. At the time of registering this claim with your office, your Insured had arranged for the house to be completely restumped by [Stumps Specialist] at a cost of $19,000.00 and this was completed by the Insured despite our advice to the Insured that this work should cease to allow us to inspect the property and that continuing with this repair could jeopardise his claim. The Insured refused to comply and continued with the restumping. … Cause: Rainwater. Case No: 392913 Determination Page 10 of 13 Loss/Damage: Building Claim: The Insured is claiming for extensive cracking that has occurred to walls and ceiling throughout his building interior as a result of rainwater run-off that occurred underneath his house as a result of the storm event. We note cracks are predominately in areas of ceiling and wall joints; diagonal cracks above door ways and windows; cracks below windows and cracks below cornices. We note that these cracks are consistent with movement to the house however we are unable to comment on whether these movement cracks are from general earth movement; rainwater run-off or from the process or restumping (which requires the house to be jacked up and then lowered onto the new stumps and the flooring relevelled.) We have noted all areas of cracking however we consider that this is best to be commented on by either an Engineer of Building Consultant. The Insured is also claiming for storm damage suffered to his veranda roof and main dwelling roof as a result of strong winds and rainwater entry into the roof space through the storm created opening. We have noted water stains to the ceiling, cornices and walls in the kitchen/dining room, family room and lounge room. This water staining is consistent with rainwater entry either from storm created damage (when the veranda roof was lifted) or from roof gutters being unable to cope with the heavy rainfall and back flowing into the roof space. From advice provided to us by the Insured, subsidence damage to the building did not occur within 72 hours of the storm event. We consider that the Insured has a valid claim for damage from wind and rain due to the veranda roof lifting and creating a storm created opening or from roof gutters overflowing. We also consider that your Insured has jeopardised his claim by having restumping carried out prior to our inspection of the property. We are aware that the act of restumping and relevelling does create internal cracks to walls, ceilings, cornices etc. We are now not able to determine if the cracks now observed were in existence prior to the restumping being undertaken. We therefore await your further instructions regarding the appointment of either an Engineer or S Building Consultants to provide advice on the various causes of damage presented at the premises. Once this is known, we can report in more detail on the areas of policy liability. S Building Consultants can also provide a detailed Scope of Works on the necessary repair to the dif ferent areas or cause of damage.’ 3.6 Engineer’s report dated 3 August 2013 ‘ The owners have claimed that inundation from a rainstorm in January 2011 has caused significant movement to the stump foundation system and resulting in substantial cracks in internal walls. The dwelling is a timber framed construction with steel sheet roof and timber floors. It consists of two distinct portions with the original component having a weatherboard cladding and red-gum stumps and a later addition with asbestos cement Cladding built on concrete stumps. The original construction appears to have been built in the 1920's (indicated by the style and condition of the timber weatherboards). The asbestos cement portion appears to be a 1950's construction. (It was confirmed later by the owner that the dwelling was constructed in I 927 and additions were undertaken in the 1950's and the 1960's). Case No: 392913 Determination Page 11 of 13 An inspection beneath the dwelling indicates that the 36 timber stumps under the original portion of the dwelling have been replaced. The remainder of the concrete stumps appeared to be satisfactory although there was not enough under-floor space to excavate beside these stumps to examine their base sole plate. The timber floors throughout the dwelling appeared to be in good condition with only relatively minor variations in floor level … According to the re-blocking company that undertook the repairs the timber stumps were in "good" condition but had badly settled because of the site flooding. Apparently these timber stumps had settled by as much as 80mm and were outside the acceptable re-packing limit requiring replacement. The concrete stumps had generally performed much better with only minor settlements and were given a general "jack & pack" adjustment. From the author's experience with dwellings of this age it is expected that the timber stumps under the original portion of the dwelling would be at the end of their life expectancy. There are no signs of salt damage to the concrete stumps and it is the author's opinion that these stumps have a life expectancy in excess of 30 years. There is minor damage to internal wall linings throughout the dwelling but is particularly noticeable in the wall between the Lounge/Dining Room and the Family Room. Most internal walls show movement between the cornice and the wall sheeting resulting in dust marks down the walls. The raked ceiling in Bedroom 2 has dropped but does not appear to be related to flooding event. General movement in the flashing has caused the flue to the free standing wood fire in the Family Room to leak resulting in a water stain in the ceiling. In summary it is the author's opinion that the building has undergone some degree of damage as a result of the rainfall event but because of the vastly different ages in the construction and the likely degree of pre-existing movements it is considered that the event has contributed approximately 30% of the damage. Repairs should include those items that have already been undertaken (restumping and re-levelling) along with some minor patching & painting and reflashing of roof penetrations. ’ 3.7 S Building Consultant’s Report dated 5 February 2014 ‘ Whilst being directed through the internal rooms of the residence, I observed a large water stain measuring approximately 800mm in diameter to the plasterboard ceiling lining of the living area, adjacent to the wall junction common to the dining room. A second area of water damage to the living room was observed to the plasterboard ceiling lining adjacent to the flue penetration of the slow combustion wood heater. Gaining access to the external roof of the residence, I observed the penetration of the flue to the slow combustion wood heater. Closer inspection revealed that the hood which provides weatherproofing to the top of the flue was dislodged from its correct position and it is my opinion that this would allow stormwater to ingress the cavity between the outer and inner flues and into the internal areas of the residence. I also noticed that the flexible sealant, which provides a weatherproof seal to the junction between the external flue and the attached external roof flashing, displayed an opening which would also allow the ingress of stormwater to the internal plasterboard ceiling lining of the living room. It is my opinion that this has been the cause of the damage to the ceiling lining adjacent to the flue to the living room. Whilst accessing the external roof, I observed that a modified metal ridge capping had been installed to the roof of the later addition to the residence. On its western side, which faces the direction of prevailing weather, the end of the capping was completely Case No: 392913 Determination Page 12 of 13 open, resulting in the timber roof frame being completely exposed. This opening was also directly above the location of the water stain to the living room ceiling at the wall junction common to the dining room and it is my opinion that this has been the cause of the water ingress. During my inspection, the Insured had stated that part of the metal roof sheeting, some barge capping and a section of cladding to the gable end of the roof had become dislodged and damaged as a result of the storm event. To the western elevation of the roof, I observed that one new length of metal roof sheeting, a new metal barge capping and a section of fibrous cement sheet gable end cladding had been recently installed. The Insured also mentioned that the underground septic tank, located to the eastern side of the residence, had been destroyed as a result of the storm event and associated flooding. It is my opinion, however, that the septic tank will only require emptying to ensure that it is no longer full of water and therefore operational. In my opinion, a flooding event would not result in the septic tank being structurally damaged. My attention was also drawn to a water storage tank located at the northern end of the eastern elevation of the residence. The insured stated that as a result of the storm, the footings for the tank support had been compromised and had developed a very minor lean. I observed that the tank support appeared to be 'home made'. Its four support legs were installed above ground in large metal tins filled with concrete. There was no evidence to indicate that these were also attached to a properly designed footing system. In addition, at the time of my inspection, no overflow provision was connected to the tank, indicating that whenever the tank overflowed, the excess water would flow onto the ground beneath the tank, thereby compromising the integrity of the footing system. Based on the engineer's advice that 30% of building damage (including allowance for restumping costs already completed by the Insured) is attributed to this storm event - this would amount to a settlement offer as follows: • Restumping c osts- completed by [Stumps Specialist] • Repair costs for resultant damaged (as per S Building Consultants Sub total) 30% of repair costs (as per engineer's cash settlement recommendation $19,000.00 $29,020.00 $48,020.00 $14,406.00 .’ 3.8 S Building Consultant’ s further report dated 22 May 2015 ‘ It is generally acknowledged throughout the construction industry that timber stumps have an effective service life of between 20 to 30 years. Whilst timber stumps may appear to be in perfect condition above ground, below ground, they deteriorate slowly over time as a result of natural organic processes. According to the Insured, the original half of the residence was constructed in 1927, some 84 years prior to the rainfall event and it is my opinion that this section of the residence would have been displaying significant evidence of subsidence resulting from the natural deterioration of the stumps. This point would tend to be confirmed within the Engineering Report dated 3 August, 2013, which was completed by [Engineer] of F Consulting, which states, in part "According to the re-blocking company that undertook the repairs the timber stumps where in "good" condition but had badly settled because of the site flooding. (Note: This infers that the reblocking company was also familiar with the condition of the stumps prior to the rainfall event which is incorrect.) Apparently these timber stumps had settled by as much as 80 mm and were outside the acceptable re-packing limit requiring replacement." Case No: 392913 Determination Page 13 of 13 It is my opinion that there is little doubt that whilst the rainfall event may have impacted the stumps to the residence in some way, the stumps were well beyond their effective service life and already in need of replacement prior to the weather event. The replacement of stumps commonly results in cracking to the various linings to the internal areas of a residence. In relation to the water damage displayed to the plasterboard ceiling lining to the living area, adjacent to the wall junction common to the dining room and to the plasterboard ceiling lining adjacent to the flue penetration of the slow combustion wood heater, it is my opinion that the extent of damage caused to each of these locations could have been substantially mitigated if the residence had been occupied on a full-time basis. Since the Insured lives in Queensland and the property is only frequented several times each week by the Insured's brother who maintains the house garden, minor maintenance related issues are able to persist unaddressed to cause significant resultant damage as has been the situation here. In relation to the water tank and the diesel fuel tank, it is my opinion that these were most likely installed around the time that the residence was initially constructed and the farm commenced operations. It is my further opinion that the installation of each fixture would most likely not have been completed by a registered building practitioner and as such, would not have been constructed with formerly engineered footings. In consideration of this and the time which has presumably elapsed since both installations, it is my opinion that some deterioration in the integrity of the installed footing over the long term period should have been expected. ’ 3.9 Macquarie’s Online Dictionary ‘ Subside 1. to sink to a low or lower level. 2. to become quiet, less violent, or less active; abate: the laughter subsided. 3. to sink or fall to the bottom; settle, as lees; precipitate. … Subsidence noun 1. the act or process of subsiding. 2. the collapse of a section of the surface of the ground to create a hole, as by mine subsidence, or by the water saturation of the soil, or by groundwater extraction from an aquifer’.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.