Text of the determination
Determination
Case No: 392913 Determination Page 1 of 13
Case number: 392913 27 April 2016
1 Overview
1.1 Dispute
In October 2012, the applicant lodged a claim under a Countrypak Insurance Policy
held with the financial services provider (FSP) for storm damage sustained to the
domestic property in January 2011.
The FSP says the applicant refused to allow the loss assessor to inspect the property
or cancel the repair authority to his stumper (SRU) before the property could be
inspected by the FSP’s representatives.
The FSP initially offered to pay 30% of the cost of repairs. It now denies liability on
the grounds, it has been prejudiced by the delay in lodging the claim, that the
subsidence did not occur within 72 hours of the storm event and the policy excludes
flood damage.
1.2 Issues and key findings
Has the applicant established the damage was caused by an insured event?
The applicant’s policy is a listed event policy that provides cover for a variety of
events including damage caused by storm, rainwater or wind.
The weight of the evidence establishes that there was a severe storm/rainwater
event in January 2011 that imp acted on the applicant’s property. The Panel is
satisfied the applicant has established a prima facie claim for damage caused by an
insured event.
Is the FSP entitled to deny liability for the claim?
The FSP is not entitled to deny liability for the claim. The Panel is of the view that the
proximate cause of the loss was the insured event of storm/rainwater and that the
FSP has not established the application of any relevant exclusion.
Has the FSP been prejudiced as a result of the applicant’s delay in lodg ing the
claim?
The Panel whilst acknowledging the delay has impacted on the FSP’s ability to
investigate the claim, is not satisfied that the FSP has established prejudice sufficient
to allow it to either deny liability for the claim or limit its liability beyond that set out
under section 2.4 of this determination.
Case No: 392913 Determination Page 2 of 13
1.3 Determination
This Determination is in favour of the applicant.
The FSP is to liable pay the applicant the sum of $29,020 being the estimated cost to
repair the property based on the assessment by the FSP’s building consultant SG.
Given the circumstances of this dispute, the Panel does not believe it is appropriate
to award interest.
Case No: 392913 Determination Page 3 of 13
2 Reasons for determination
2.1 Has the applicant established the damage was caused by an insured
event?
Dispute initially arose as to whether or not the applicant had received the FSP’s
Product Disclosure Statement (PDS). Initially it was thought that the applicant had
incepted the policy through his own broker. It has now been conceded that the broker
acted as agent for the FSP. The Panel accepts the applicant had been provided a
copy of the PDS and a copy of the insurance schedule.
The policy provides two levels of cover; listed events cover under cover one, or
accidental cover under cover two. The policy schedule identifies that the applicant
had selected listed events cover.
Applicant has established an insured event
The applicant reported the January 2011 storm lifted the veranda on the north side of
the property peeling it back over the roof with rain water entering through the roof
space and damaging the lounge, dining, kitchen and family rooms.
Rainwater runoff was reported to have flowed under the house with at least one third
of the applicant’s farm under water. The surface water remained under the home for
about two weeks with movement of the home beginning within a week.
The applicant arranged for roof repairs and did not lodge a claim at that time. Over
the ensuing months, he was in and out of hospital which further delayed the
lodgement of the claim. The claim was eventually lodged on advice from a building
consultant.
The Panel is satisfied that the applicant has established an insured event namely
storm/rainwater and that damage arose as a result of storm/rainwater.
In these circumstances, if the FSP is to deny liability for the claim, the FSP must
establish either it has been prejudiced by the applicant’s conduct to the extent that it
is entitled to refuse to pay them or an exclusion applies.
2.2 Has the FSP established an exclusion applies to the claim?
Although the FSP does not specifically refer to an exclusion, it has referred to the
policy excluding cover for claims arising from subsidence. In these circumstances,
the Panel is required to consider what was the proximate cause of the loss.
Proximate cause of damage
The proximate cause of the loss is a question of fact depending upon the
circumstances of each case. The proximate cause is not necessarily the first or last
or sole cause of the loss. It is the effective or dominant or operative cause of the loss.
If there are several causes operating contemporaneously, then each must be
examined for their qualities of predominance and efficiency as the active efficient
Case No: 392913 Determination Page 4 of 13
cause that sets a relevant train of events in motion. If one cause would have resulted
in the harm in any case and the other would not have done so in the absence of the
first, then the first is the proximate cause.
Commentary provided by a geotech specialist has submitted that the stumps lost
their load bearing capacity as a result of the stormwater entering the sub-floor area of
the home. The FSP has questioned the accuracy and reliability of this report.
The FSP’s loss assessor refers to the flow of rainwater having not ‘knocked’ the
house from its foundation or stumps. The loss assessor argues that the initial
movement observed by the applicant was not due to any building movement or
subsidence but due to high moisture levels causing the timbers to swell. The Panel is
not satisfied that this is accurate. The applicant was present at the property within the
relevant period and witnessed the movement.
The Panel notes the loss assessor accepts it is likely that some subsidence occurred
to the applicant’s residence as a result of the storm event. It was a significant storm
event. Some areas received their annual rainfall within a two day period. Given the
circumstances the Panel is satisfied that the proximate cause of the loss was the
storm and rainwater. A claim arose because of the storm and rainwater. Insofar as
there was subsidence, it is likely that that commenced within the relevant period of 72
hours in any event.
In the circumstances, the Panel is not satisfied the FSP has established the
exclusions apply.
2.3 Has the FSP been prejudiced by the applicant’s conduct?
The FSP says that the applican t’s delay in lodgement of the claim has prejudiced its
ability to assess the claim and determine liability.
It is not enough however to show what could or might have happened. The FSP must
be able to establish what would have happened if the act or omission had not
occurred. Courts have said that not only must they establish what would have
happened but also what monetary loss has been suffered as a result.
The FSP has argued that the loss assessor was prejudiced by the applicant
proceeding with the restumping despite being warned against doing so.
The Panel does not understand, based on the evidence provided, why the loss
assessor was unable to attend the applicant’s property at some time during the
restumping process. There is reference to the need for an engineer however, the loss
assessor is an experienced person and would have been able to observe the
restumping.
The applicant’s stump specialist SRU who conducted the repairs advised that the
stumps required replacement despite being in good condition because they could not
be repacked according to current standards.
Case No: 392913 Determination Page 5 of 13
Initial repairs completed were the result of a severe storm/rainwater event
The applicant describes the severe weather events experienced in January 2011
resulting in the damage. According to the applicant, some emergency repairs were
required and these repairs were completed by his share farmer’s son. It is unclear
exactly how much was spent on these repairs. The applicant states that he spent
approximately $600 to repair spouting and cappi ng which was conducted over the
next few weeks.
The loss assessor confirmed that he was aware the main house roof and verandah
were repaired by the applicant with the assistance of his neighbour. He had been
provided particulars of this. The FSP’s consulta nt SG was able to observe these
repairs.
The FSP was able to appoint an engineer. The engineer confirmed that 36 timber
stumps had been replaced. The re-stumping company reported the stumps were
badly settled after the rain. The building had undergone some degree of damage as
a result of the storm event.
The engineer suggests that the red gum stumps would have reached their
serviceable life or exceeded it. There is no evidence that this was the case nor
evidence that the property had suffered any similar damage prior to the insured
event.
It is unclear whether the engineer or FSP sought further information from SRU as to
the condition of the stumps or discussed the issue about the serviceable life of the
stumps.
In the Panel’s view, based on the information provided and considering the fact that
the repacking of the stumps was not a viable option due to current standards, the
Panel accepts the FSP should meet the liability in respect to the restumping.
2.4 Is the FSP entitled to limit its settlement?
The FSP’s e ngineer considered that the rain event contributed 30% of the damage.
He considered the repairs should include those items that have already been
undertaken including restumping and relevelling alongside some minor patching and
painting and reflashing of the roof penetrations.
The FSP’s consultant SG estimated the cost of the repairs to the property at $29,020.
The applicant has already expended at least $19,000 towards the restumping of the
property.
There is no dispute that some of the damage to the internal part of the property
would have been caused by the restumping including cracking of plaster and other
walls. Whilst the Panel accepts that the property may have had some pre-existing
damage, given the age of the property and the construction of the property, the Panel
accepts that most likely the majority of the internal damage as identified by the FSP’s
consultant SG would have flowed from the storm/rainwater damage in 2011.
When considering the extent of any prejudice or reduction in the FSP’s liability, it is
necessary to consider the overall circumstances in which this claim has arisen.
Case No: 392913 Determination Page 6 of 13
The applicant was not initially going to lodge a claim. It was his intention to complete
the repairs himself. When he realised it was more serious than first thought, he
arranged to fix the damage at his own cost.
It was only when informed of the possibility of the claim against an insurer, that he
lodged the claim. Wanting to mitigate the loss, he wanted it fixed quickly. The FSP
was aware he was going ahead with this work. It could have arranged someone to
attend the property. It could have had a local builder look at the property and provide
a report.
The applicant is an elderly man in ill-health living in a rural property who had a
substantial history of insurance with the FSP. There is nothing to question his
credibility.
Whilst the Panel accepts that the FSP is entitled to look at each claim in its merits,
the Panel when considering the overall position of this matter is not satisfied that the
FSP has established any significant prejudice as a result of the applicant’s behaviour.
In the Panel’s view, it is fair in all the circumstances that the FSP meet the applicant’s
claim by paying the applicant the damages as assessed by SG in the sum of
$29,020. The Panel accepts that this quotation does not allow for contingencies
which might arise during the course of repairs; to this extent the FSP is entitled to
limit its liability to the amount assess ed in SG’s quotation.
Case No: 392913 Determination Page 7 of 13
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the nature
of the dispute, it has been referred directly to a Panel for Determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other.
The Panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this Determination, the Panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
3.2 Policy Schedule
‘ Supplementary Product Disclosure Statement
This Supplementary Product Disclosure Statement (Supplementary PDS) is dated 30
April 2008 and will apply to policies taken out, or with a renewal effective date, on or
after 30 April 2008.
The information in this Supplementary PDS updates and should be read with the last
Product Disclosure Statement you received for the policy specified in your policy
schedule (PDS) and any other applicable Supplementary PDS.’
3.3 Product Disclosure Statement
‘ Domestic farm buildings means :
…
Anything permanently built, permanently
constructed or permanently installed on your
property for domestic purposes.
…
◆ Storm, rainwater or wind . This includes storm,
rainwater or wind damage to:
• Gates, fences or walls that are attached to, and
are part of, the structure of the domestic farm
buildings.
• Gates, fences or walls that are not attached
to, and are not part of, the structure of the
domestic farm buildings. We will only pay
for any section of a gate, fence or wall made
of brick, stone, metal or frame-supported
corrugated fibrous material. The frame
supporting the corrugated fibrous material
must be made of brick, stone or metal.
Case No: 392913 Determination Page 8 of 13
• Gates, fences or walls whic h are made of
timber that are not attached to, and are not
part of, the structure of the domestic farm
buildings. We will only pay for gates or fences
20 years old or less.
• Free -standing fences that do not have a
supporting frame, but only if the fences are
made from corrugated fibrous material. The
fences must have been installed and constructed
according to the manufacturers specifications.
We will not pay for storm, rainwater or wind damage:
• To shade cloth, swimming pool covers including
solar covers, plastic liners for swimming pools.
• Where water enters the domestic farm
buildings because of structural defect, faulty
design or faulty workmanship when the
building was constructed.
• Where water enters the domestic farm
buildings through an opening made for any
building renovation or repair work.
We do not provide cover for damage by flood.
◆ Landslide or subsidence . Cover only applies when
the landslide or subsidence occurs within 72 hours
and is contributed to or caused by one of the
following events:
• Storm, rainwater or wind.
• Earthquake, subterranean fire or volcanic
eruption.
• Explosion.
• Liquid that escapes from a fixed pipe or
something attached to a pipe, fixed gutter,
fixed tank or drain.
This cover also applies to gates, fences and
retaining walls that are attached to, and are part
of, the structure of the domestic farm buildings.
…
What all sections of this policy do NOT cover
Any cover we provide is subject to the following
exclusions.
We will NOT pay claims arising from the following:
…
◆ Landslide or subsidence except as detailed on pages
18, 28 and 29.’
3.4 Timeline of events
Date Event
January 2011 Date of loss.
October 2012 Claim lodgement with the FSP and the FSP says the
Applicant refused to allow the loss adjustor to inspect
the property .
22 October 2012 Restumping works are carried out and loss adjustor
Case No: 392913 Determination Page 9 of 13
was able only inspect the externals. No one was home
to inspect the internal damage.
December 2013 Loss assessor visits the property and identifies some
internal storm damag e. However, he was unsure
whether the cracks related to restumping work or any
other cause .
February 2013 Loss adjustor notified that water ran under the property
caused subsidence for months.
March 2013 Engineer appointed by the loss adjustor but unable to
visit the property due to accessibility issues .
3.5 Loss Assessor’s Report dated 20 January 2013
‘ The terrain around the residence is slightly sloping. There is a concrete path around
the entire house. The southern and eastern side of the house has ground levels above
the sub-floor areas of the house - this has the potential of allowing rainwater run-off
from the south or south eastern direction to flow underneath the building and this is not
a good building design.
…
The Insured reported that during the storm event, he was at home and strong winds
had lifted the veranda on the north western side of the house and this was peeled
backwards over the roof of the main house. Rainwater entered the roof space due to
the storm damage and entered the lounge room, dining/kitchen and family rooms.
Rainwater run-off had flowed underneath the Insured's house however this water did
not flow into the building interior. According to the Insured at least 1/3'd of his farm was
under water. This surface water continued to flow underneath the Insured's house for
about 2 weeks. The Insured stated that there was no ponding of water underneath the
house, just continual flow of moving water.
About 1 -weeks after the storm event, the Insured first noticed that the front door would
not open as it had swollen and need to be planned to allow movement. Similar
problems developed with the rear door and internal doors.
With regards to the damaged roof and veranda, the Insured arranged for their share
farmers son to carryout repairs and the original veranda roof was repositioned and
fixed.
Over time, the Insured noticed cracks developing in the walls and ceilings in most
rooms of the house. At times these cracks were up to 20 mm in width however these
have since closed up.
Cracks to the concrete paving around the house had developed about 6 - 7 months
after the storm event.
The Insured also advised that following the storm event he was in and out of hospital
on a regular basis.
At the time of registering this claim with your office, your Insured had arranged for the
house to be completely restumped by [Stumps Specialist] at a cost of $19,000.00 and
this was completed by the Insured despite our advice to the Insured that this work
should cease to allow us to inspect the property and that continuing with this repair
could jeopardise his claim. The Insured refused to comply and continued with the
restumping.
…
Cause:
Rainwater.
Case No: 392913 Determination Page 10 of 13
Loss/Damage:
Building Claim:
The Insured is claiming for extensive cracking that has occurred to walls and ceiling
throughout his building interior as a result of rainwater run-off that occurred underneath
his house as a result of the storm event.
We note cracks are predominately in areas of ceiling and wall joints; diagonal cracks
above door ways and windows; cracks below windows and cracks below cornices. We
note that these cracks are consistent with movement to the house however we are
unable to comment on whether these movement cracks are from general earth
movement; rainwater run-off or from the process or restumping (which requires the
house to be jacked up and then lowered onto the new stumps and the flooring
relevelled.)
We have noted all areas of cracking however we consider that this is best to be
commented on by either an Engineer of Building Consultant.
The Insured is also claiming for storm damage suffered to his veranda roof and main
dwelling roof as a result of strong winds and rainwater entry into the roof space through
the storm created opening.
We have noted water stains to the ceiling, cornices and walls in the kitchen/dining
room, family room and lounge room. This water staining is consistent with rainwater
entry either from storm created damage (when the veranda roof was lifted) or from roof
gutters being unable to cope with the heavy rainfall and back flowing into the roof
space.
From advice provided to us by the Insured, subsidence damage to the building did not
occur within 72 hours of the storm event.
We consider that the Insured has a valid claim for damage from wind and rain due to
the veranda roof lifting and creating a storm created opening or from roof gutters
overflowing.
We also consider that your Insured has jeopardised his claim by having restumping
carried out prior to our inspection of the property. We are aware that the act of
restumping and relevelling does create internal cracks to walls, ceilings, cornices etc.
We are now not able to determine if the cracks now observed were in existence prior to
the restumping being undertaken.
We therefore await your further instructions regarding the appointment of either an
Engineer or S Building Consultants to provide advice on the various causes of damage
presented at the premises. Once this is known, we can report in more detail on the
areas of policy liability.
S Building Consultants can also provide a detailed Scope of Works on the necessary
repair to the dif ferent areas or cause of damage.’
3.6 Engineer’s report dated 3 August 2013
‘ The owners have claimed that inundation from a rainstorm in January 2011 has
caused significant movement to the stump foundation system and resulting in
substantial cracks in internal walls. The dwelling is a timber framed construction with
steel sheet roof and timber floors. It consists of two distinct portions with the original
component having a weatherboard cladding and red-gum stumps and a later addition
with asbestos cement Cladding built on concrete stumps. The original construction
appears to have been built in the 1920's (indicated by the style and condition of the
timber weatherboards). The asbestos cement portion appears to be a 1950's
construction.
(It was confirmed later by the owner that the dwelling was constructed in I 927 and
additions were undertaken in the 1950's and the 1960's).
Case No: 392913 Determination Page 11 of 13
An inspection beneath the dwelling indicates that the 36 timber stumps under the
original portion of the dwelling have been replaced. The remainder of the concrete
stumps appeared to be satisfactory although there was not enough under-floor space
to excavate beside these stumps to examine their base sole plate. The timber floors
throughout the dwelling appeared to be in good condition with only relatively minor
variations in floor level
…
According to the re-blocking company that undertook the repairs the timber stumps
were in "good" condition but had badly settled because of the site flooding.
Apparently these timber stumps had settled by as much as 80mm and were outside the
acceptable re-packing limit requiring replacement. The concrete stumps had generally
performed much better with only minor settlements and were given a general "jack &
pack" adjustment.
From the author's experience with dwellings of this age it is expected that the timber
stumps under the original portion of the dwelling would be at the end of their life
expectancy. There are no signs of salt damage to the concrete stumps and
it is the author's opinion that these stumps have a life expectancy in excess of 30
years. There is minor damage to internal wall linings throughout the dwelling but is
particularly noticeable in the wall between the Lounge/Dining Room and the
Family Room. Most internal walls show movement between the cornice and the wall
sheeting resulting in dust marks down the walls. The raked ceiling in
Bedroom 2 has dropped but does not appear to be related to flooding event.
General movement in the flashing has caused the flue to the free standing wood fire in
the Family Room to leak resulting in a water stain in the ceiling.
In summary it is the author's opinion that the building has undergone some degree of
damage as a result of the rainfall event but because of the vastly different ages
in the construction and the likely degree of pre-existing movements it is considered that
the event has contributed approximately 30% of the damage.
Repairs should include those items that have already been undertaken (restumping
and re-levelling) along with some minor patching & painting and reflashing of roof
penetrations. ’
3.7 S Building Consultant’s Report dated 5 February 2014
‘ Whilst being directed through the internal rooms of the residence, I observed a large
water stain measuring approximately 800mm in diameter to the plasterboard ceiling
lining of the living area, adjacent to the wall junction common to the dining room. A
second area of water damage to the living room was observed to the plasterboard
ceiling lining adjacent to the flue penetration of the slow combustion wood heater.
Gaining access to the external roof of the residence, I observed the penetration of the
flue to the slow combustion wood heater. Closer inspection revealed that the hood
which provides weatherproofing to the top of the flue was dislodged from its correct
position and it is my opinion that this would allow stormwater to ingress the cavity
between the outer and inner flues and into the internal areas of the residence.
I also noticed that the flexible sealant, which provides a weatherproof seal to the
junction between the external flue and the attached external roof flashing, displayed an
opening which would also allow the ingress of stormwater to the internal plasterboard
ceiling lining of the living room. It is my opinion that this has been the cause of the
damage to the ceiling lining adjacent to the flue to the living room.
Whilst accessing the external roof, I observed that a modified metal ridge capping had
been installed to the roof of the later addition to the residence. On its western side,
which faces the direction of prevailing weather, the end of the capping was completely
Case No: 392913 Determination Page 12 of 13
open, resulting in the timber roof frame being completely exposed. This opening was
also directly above the location of the water stain to the living room ceiling at the wall
junction common to the dining room and it is my opinion that this has been the cause of
the water ingress.
During my inspection, the Insured had stated that part of the metal roof sheeting, some
barge capping and a section of cladding to the gable end of the roof had become
dislodged and damaged as a result of the storm event. To the western elevation of the
roof, I observed that one new length of metal roof sheeting, a new metal barge capping
and a section of fibrous cement sheet gable end cladding had been recently installed.
The Insured also mentioned that the underground septic tank, located to the eastern
side of the residence, had been destroyed as a result of the storm event and
associated flooding. It is my opinion, however, that the septic tank will only require
emptying to ensure that it is no longer full of water and therefore operational. In my
opinion, a flooding event would not result in the septic tank being structurally damaged.
My attention was also drawn to a water storage tank located at the northern end of the
eastern elevation of the residence. The insured stated that as a result of the storm, the
footings for the tank support had been compromised and had developed a very minor
lean. I observed that the tank support appeared to be 'home made'. Its four support
legs were installed above ground in large metal tins filled with concrete. There was no
evidence to indicate that these were also attached to a properly designed footing
system. In addition, at the time of my inspection, no overflow provision was connected
to the tank, indicating that whenever the tank overflowed, the excess water would flow
onto the ground beneath the tank, thereby compromising the integrity of the footing
system.
Based on the engineer's advice that 30% of building damage (including allowance for
restumping costs already completed by the Insured) is attributed to this storm event -
this would amount to a settlement offer as follows:
• Restumping c osts- completed by [Stumps Specialist]
• Repair costs for resultant damaged (as per S Building Consultants Sub total)
30% of repair costs (as per engineer's cash settlement recommendation
$19,000.00
$29,020.00
$48,020.00
$14,406.00 .’
3.8 S Building Consultant’ s further report dated 22 May 2015
‘ It is generally acknowledged throughout the construction industry that timber stumps
have an effective service life of between 20 to 30 years. Whilst timber stumps may
appear to be in perfect condition above ground, below ground, they deteriorate slowly
over time as a result of natural organic processes. According to the Insured, the
original half of the residence was constructed in 1927, some 84 years prior to the
rainfall event and it is my opinion that this section of the residence would have been
displaying significant evidence of subsidence resulting from the natural deterioration of
the stumps. This point would tend to be confirmed within the Engineering Report dated
3 August, 2013, which was completed by [Engineer] of F Consulting, which states, in
part "According to the re-blocking company that undertook the repairs the timber
stumps where in "good" condition but had badly settled because of the site flooding.
(Note: This infers that the reblocking company was also familiar with the condition of
the stumps prior to the rainfall event which is incorrect.) Apparently these timber
stumps had settled by as much as 80 mm and were outside the acceptable re-packing
limit requiring replacement."
Case No: 392913 Determination Page 13 of 13
It is my opinion that there is little doubt that whilst the rainfall event may have impacted
the stumps to the residence in some way, the stumps were well beyond their effective
service life and already in need of replacement prior to the weather event. The
replacement of stumps commonly results in cracking to the various linings to the
internal areas of a residence.
In relation to the water damage displayed to the plasterboard ceiling lining to the living
area, adjacent to the wall junction common to the dining room and to the plasterboard
ceiling lining adjacent to the flue penetration of the slow combustion wood heater, it is
my opinion that the extent of damage caused to each of these locations could have
been substantially mitigated if the residence had been occupied on a full-time basis.
Since the Insured lives in Queensland and the property is only frequented several
times each week by the Insured's brother who maintains the house garden, minor
maintenance related issues are able to persist unaddressed to cause significant
resultant damage as has been the situation here.
In relation to the water tank and the diesel fuel tank, it is my opinion that these were
most likely installed around the time that the residence was initially constructed and the
farm commenced operations.
It is my further opinion that the installation of each fixture would most likely not have
been completed by a registered building practitioner and as such, would not have been
constructed with formerly engineered footings. In consideration of this and the time
which has presumably elapsed since both installations, it is my opinion that some
deterioration in the integrity of the installed footing over the long term period should
have been expected. ’
3.9 Macquarie’s Online Dictionary
‘ Subside
1. to sink to a low or lower level.
2. to become quiet, less violent, or less active; abate: the laughter subsided.
3. to sink or fall to the bottom; settle, as lees; precipitate.
…
Subsidence
noun 1. the act or process of subsiding.
2. the collapse of a section of the surface of the ground to create a hole, as by
mine subsidence, or by the water saturation of the soil, or by groundwater
extraction from an aquifer’.