Home / Financial Firm (Unknown - Insurer) / Determination 392692
Determination 392692
Storm damage to home roof declined as caused by pre-existing condition
Summary
Members claimed for roof and internal water damage after a 2013 storm and the mutual society declined protection. AFCA found the damage was caused by the roof's pre-existing design and construction defects, and that the society's delays were reasonable.
Damage caused by a gradually operating cause or faulty design, materials or workmanship is excluded under the PDS, and the evidence showed pre-existing roof defects.
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
Case No: 392692 Determination Page 1 of 6
Case number : 392692 27 August 2015
1 Overview
1.1 Dispute
The Applicants are members of the Financial Service Provider (FSP), which is a
discretionary mutual society. Membership of the FSP confers on its members the
right to claim for the benefit of certain “protections”.
The Applicants lodged a claim with the FSP for damage to their home, following
severe storms associated with ex-tropical Cyclone Oswald in late January 2013.
The FSP declined to grant the Applicants protection for their claim on the basis that
the damage was not caused by the storm, but had occurred over an extended period
of time due to pre-existing issues with the roof of the property.
1.2 Issue and key findings
Is the FSP required to make any payment to the Applicants?
The available information establishes that the bulk of the damage to the Applican ts’
roof was caused by the poor condition of the roof at the time of the storm in January
2013, due to ongoing issues related to its design and construction. It is likely that
further damage to the roof occurred due to foot traffic.
The reports prepared by the various contractors who inspected the roof indicate that
the damage observed is not consistent with having been caused by the impact of tree
branches during the storm. Accordingly, the FSP acted appropriately in denying the
Applicants’ claim for prote ction.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is not required to make any payment to the Applicants .
Case No: 392692 Determination Page 2 of 6
2 Reasons for Determination
2.1 Is the FSP required to make any payment to the Applicants?
Protection provides cover for damage due to storm subject to exclusions
The rights of the Applicants as members of the mutual scheme operated by the FSP
are set out in the Product Disclosure Statement (PDS) dated 22 March 2011. The
operation of the scheme is also governed by the constitution and rules of the FSP.
The Applicants have been members of the FSP since 16 April 2010 and have
renewed their protection annually. As members, the Applicants have the right to have
a claim for damage to their home considered for payment by the FSP.
The PDS provides that the FSP will consider claims for damage caused by certain
event s (including “storm and wind”) which occur during the period of protection.
However, the PDS states that the FSP will not pay for damage caused directly or
indirectly by faulty design, materials or workmanship or by a gradually operating
cause. Further, the FSP will not pay for damage which occurs prior to the period of
protection.
The Applicants say the tiled roof at their property was damaged by tree branches and
other debris during the storm in January 2013. They say water entered through the
damaged roof tiles, causing further damage to the internal walls and ceilings. The
Applicants want the FSP to pay for the costs of re-roofing the property and repairing
the internal damage.
The FSP does not dispute that the severe storms in late January 2013 resulted in
wind-blown water entering the Applicants’ property through the roof. However, the
FSP says the damage to the roof was not caused by the storm, but by structural
issues and manufacturing defects which had existed for a number of years, resulting
in ongoing water entry.
The FSP notes the Applicants were aware of the issues with their roof for some years
prior to the storm and failed to adequately address them. Accordingly, the FSP says
the Applicants have breached their obligation under the PDS to take reasonable care
to maintain their property so as to minimise or avoid loss or damage.
Applicants’ roof had significant pre -existing damage prior to the storm
The parties have provided a number of reports and photographs in relation to the
concrete tiled roof at the Applicants’ property.
Having carefully reviewed this information, the Panel is satisfied that there were
significant pre-existing and ongoing issues with the roof prior to the storm, which
allowed water to enter the property.
The FSP’s engineer (G) who inspected the roof in February 2014 concluded that
rainwater had entered the property as a result of the pre-existing deformation and
distortion of the roof structure.
Case No: 392692 Determination Page 3 of 6
In particular, G noted that there was distortion of the tile joint lines and displacement
of the roof tiles resulting from:
the top chords of the roof trusses having bowed significantly due to insufficient
top chord bracing; and
sagging of the roof over the main living area due to long term deflection of the
timber roof beams.
G also noted the deterioration of the roof sarking, which was likely to have occurred
over a long period of time due to ongoing water entry caused by the above issues.
The photographs included in G’s report (as well as those taken by the FSP’s
assessor in December 2013) clearly demonstrate the issues identified with the
Applicants’ ro of.
The same engineer had previously assessed the Applicants’ roof in the context of a
separate claim lodged with their insurer (W) in 2006.
At that time, he identified the issues with the sagging of the structural timber beams
and the resulting distortion of the roof tiles over the main living area which he
reiterated in his later report. He also noted that there were gaps between the roof
tiles which had allowed water to enter the building. Accordingly, W denied the
Applicants’ claim for damage to the r oof on this basis.
The Applicants’ builder (CI) has confirmed that he quoted to replace the roof in its
entirety some time after the earlier claim. However, instead of undertaking a full roof
replacement, the Applicants engaged their roofer (P) to replace broken tiles and
sarking, recap and reseal the roof and apply a protective membrane in March 2008.
When the Applicants’ builder (CI) reinspected the roof following the storm, he advised
that the protective membrane applied by P was beginning to fail. The manufacturer of
the coating system has advised that this is most likely due to moisture having
penetrated the roof space over time through gaps between the tiles. This moisture
has subsequently been driven out by heat from the sun, causing the protective
membrane to blister.
The Applicants’ builder (CI) has also confirmed the views expressed by the FSP’s
engineer (G) that the roof tiles are in very poor condition and have moved due to
sagging of the roof timbers, allowing leaks to occur.
Available information does not establish impact damage
The Applicants say that a number of branches from nearby gum trees broke off and
impacted the roof during the storm, causing damage to the concrete roof tiles. They
say they have been prejudiced by the FSP’s del ay in appointing an assessor, as
these branches have since been removed.
The Panel acknowledges that there was a delay in the FSP assessing the Applicants’
claim and the Applicants had difficulties arranging for a builder to report on the
damage.
However, the Panel considers that the resulting delays were not unreasonable in the
circumstances, given the severity of the storms in January 2013 and the extent of the
damage caused throughout the region.
Case No: 392692 Determination Page 4 of 6
The Panel notes that several of the contractors who inspec ted the Applicants’ roof
gave due consideration to whether any of the damage was likely to have been
caused by the impact of tree branches during the storm. However, they concluded
that the nature of the damage was not consistent with it having been caused in this
manner.
The Applicants’ builder (CI) and the FSP’s tiler (SL) identified broken tiles on the roof.
However, both contractors noted that some of this damage had clearly occurred prior
to the application of the protective coating in March 2008, as the coating covered the
cracked areas.
Further, the FSP’s tiler (SL) considered the nature of the damage to the tiles was not
consistent with impact damage from storm debris, which would usually cause
complete destruction of some tiles and scuffing to the painted surface of other tiles.
Accordingly, SL concluded that, to the extent that some of the damage appeared
recent, it was more likely to have been caused by foot traffic on the roof following the
storm. The brittle condition and porous nature of the roof tiles (even when relatively
new) has been confirmed by many of the contractors who inspected the roof.
Available information establishes damage was due to excluded factors
Having carefully reviewed the available information, the Panel is satisfied that the
bulk of the damage to the Applicants’ roof was not caused by the storm in January
2013, but by the poor pre-existing condition of the roof due to ongoing issues related
to its design and construction.
It is possible that the impact of debris during the storm caused some additional
damage to the roof tiles. However, there is little independent information to support
this. In any event, the effect of any such damage is likely to have been minimal given
the existing condition of the roof, which required replacement in its entirety.
In these circumstances, the Panel considers that the FSP acted appropriately, and in
accordance with the terms of the PDS, by declining to provide protection to the
Applicants, on the basis that the claimed damage to the roof was caused by excluded
factors (namely, the pre-existing condition of the roof due to issues with its design
and construction and the manufacture of the roof tiles).
The Panel is also satisfied that it was the poor condition of the roof at the time of the
storm which allowed rainwater to enter the building, causing internal water damage.
There is evidence (such as long-term staining to the brickwork) that water entry to
various areas had been occurring over an extended period of time. Damage caused
in this manner is outside the scope of protection offered by the FSP.
Case No: 392692 Determination Page 5 of 6
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the nature
of the dispute, it has been referred directly to a Panel for Determination, in line with
the Operational Guidelines to the FOS Terms of Reference . The Panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other.
The Panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this Determination the Panel has restricted its commentary to those issues which it
considers directly relevant to the outcome only.
3.2 FOS jurisdiction
In its submissions, the FSP says that FOS does not have jurisdiction to require it to
pay a claim because as a mutual society (and not an insurer), the decision to grant
protection to a member (and the level of protection granted) is subject to the absolute
discretion of the Board of the FSP.
The FSP does not dispute that it is subject to FOS’s jurisdiction due to its status as a
member of FOS and the provider of a financial service to the Applicants.
Under paragraph 9.1 of the FOS Terms of Reference, FOS may determine a dispute
by requiring a financial services provider to make a monetary payment to an
applicant. It is on this basis that FOS has the power to determine that the FSP may
make a payment to a member in respect of a claim for protection.
3.3 Service issues
The Applicants are dissatisfied with the time taken by the FSP to address their claim
for protection.
As outlined in section 2.1 above, some of the delays experienced by the Applicants
were due to the widespread effect of the severe weather events in January 2013.
Further delays occurred while the FSP investigated the circumstances of the
Applicants ’ claim and obtained reports on the condition of the roof from its engineer
and tiler, and the Applicants’ builder. The FSP also sent a sample tile to the
manufacturer of the protective membra ne, to determine the cause of the issues with
the membrane.
Case No: 392692 Determination Page 6 of 6
To some extent, the time taken to investigate the claim was due to the fact that the
FSP sought to engage the same contractors who had been involved with the
Applicants’ earlier insurance claim with W in 2006.
Having reviewed the claim history, the Panel is satisfied that the approach taken by
the FSP was reasonable in the circumstances.
The FSP went to some lengths to accurately identify the cause of the damage. The
use of contractors who had previously inspected the roof assisted the FSP in gaining
a full understanding of the history of damage to the building.
3.4 Product Disclosure Statement (PDS)
Subject Terms
Protection What is protected?
You have a right to have a claim considered for loss or damage to home
buildings at the premi se s caused by an event during the period of
protection .
Definition of
“event”
Any one occurrence of number of occurrences arising directly or indirectly
from one source or original cause.
Exclusions What is not protected
We will not pay under this section … for … loss or damage caus ed directly or
indirectly by: …
evaporation, shrinkage, loss of weight, dampness, dryness, rust, corrosion
or a gradually operating cause;
faulty design, plan, specification, materials , workmanship or built in faults