Home / Financial Firm (Unknown - Insurer) / Determination 392093

Determination 392093

claim_denial

FirmFinancial Firm (Unknown - Insurer)
Decided2016-02-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$700
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The owner's home was damaged by a storm when rain entered through an open rear door. The FSP denied the carpet damage under an open-door exclusion. AFCA found section 54 of the Insurance Contracts Act prevented reliance on the exclusion and ordered $700, rejecting the roof cash settlement challenge and compensation claims.

Section 54 prevents an insurer relying on an exclusion for an insured's act or omission where it was not reasonably possible to avoid, or where it was necessary to preserve property, reducing liability only for prejudice.

Issues

Subjects and remedies

health or medicalpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 392093 Determination Page 1 of 10 Case number: 392093 4 February 2016 1 Overview 1.1 Dispute The Applicant lodged a claim under his home insurance policy with the Financial Services Provider (FSP) after his home and contents were damaged by a storm in January 2015. The FSP accepted liability for damage to certain parts of the house and cash settled the Applicant for the estimated cost of the repairs. However, the FSP denied cover for damage to the carpet in one of the upstairs bedrooms, on the basis that this damage was caused by rain entering the building through an open door. The Applicant seeks cover for the damaged carpet. He is also dissatisfied with the manner in which the FSP has handled his claim and seeks compensation for various losses suffered as a result. 1.2 Issues and key findings Is the FSP liable for the damage to bedroom 2? The damage to bedroom 2 occurred because the Applicant failed to close the upstairs rear door in sufficient time to prevent water entering the building. However, the Applicant’s delay in closing the door was due to his medical issues and because he was taking action to protect his car from hail damage. In these circumstances, section 54 of the Insurance Contracts Act 1984 (the “Act”) prevents the FSP from relying on the relevant policy exclusion to deny liability for the damage to bedroom 2. Accordingly, the FSP is required to pay the Applicant $700 for this damage. Is the cash settlement otherwise fair and reasonable? The FSP cash settled the Applicant for the reasonable cost of repairing the hail damage to his roof in accordance with the terms of the policy. The cash settlement is otherwise fair and reasonable. Is the Applicant entitled to compensation? The Applicant is not entitled to compensation because the FSP managed the claim reasonably and without undue delay. Case No: 392093 Determination Page 2 of 10 1.3 Determination This Determination is partly in favour of the Applicant. The FSP is to pay the Applicant an additional amount of $700 in full and final settlement of his claim. Case No: 392093 Determination Page 3 of 10 2 Reasons for Determination 2.1 Is the FSP liable for the damage to bedroom 2? Policy excludes cover for damage caused by rain entering through open door The Applicant’s policy provides cover for damage to his home caused by storm, subject to the conditions and exclusions set out in the policy. The FSP acknowledges that the Applicant’s property was damaged by a storm on 31 January 2015. The FSP accepted liability for damage to the roof, ceilings and external wall of the property and cash settled the Applicant for the cost of the necessary repairs. The cash settlement of $5,816 paid to the Applicant in March 2015 included an amount of $750 for the replacement of the water damaged carpet and underlay in bedroom 3 of his house. The carpet in bedroom 3 had been damaged by wind driven rain entering through closed louvre windows. The FSP acknowledges that the carpet and underlay in bedroom 2 were also damaged by rain which entered through a flyscreen door at the rear of the property. However, the FSP says it is entitled to deny liability for the damage to bedroom 2 because the policy excludes cover for damage caused by rain entering the building where a door is not closed. While the flyscreen door was closed when the storm hit, the timber door was open and this allowed water to enter the property, damaging the carpet and underlay. Accordingly, the relevant policy exclusion applies to the water damaged carpet and underlay in bedroom 2. However, I will now consider whether section 54 of the Act prevents the FSP from relyin g on this exclusion to deny the Applicant’s claim for this damage. Section 54 limits circumstances in which FSP may rely on policy exclusion Under section 54 of the Act an insurer may not rely on a policy exclusion to refuse to pay a claim because of some act or omission by the insured after the contract was entered into, where:  the act or omission was necessary to protect the safety of a person or to preserve property; or  it was not reasonably possible for the insured person not to do the act (or omission). In the present case, given the wording of the policy exclusion on which the FSP seeks to rely, I consider the relevant omission is the failure by the Applicant to close the timber door. The FSP says section 54 does not apply in these circumstances because the application of the relevant policy exclusion does not depend on an act or omission of the Applicant, but solely on the fact that the door remained open. Case No: 392093 Determination Page 4 of 10 However, section 54(6)(b) makes it clear that references in section 54 to an act or omission are taken to include an act or omission that has the effect of altering the state or condition of the Applicant’s home (including whether the door was open or closed). The FSP also says that applying section 54 in these circumstances would undermine the legal right of an insurer to rely on exclusions which are clearly set out in the policy documents (and therefore the Applicant is taken to have accepted). However, the terms and conditions of a contract of insurance are entered into subject to the overriding application of any relevant laws (including the Insurance Contracts Act). Section 54 is expressly intended to limit the circumstances in which an insurer can rely on a policy exclusion which would otherwise be available to it. Accordingly, I am satisfied it is appropriate to consider the application of section 54 in the context of this dispute. FSP is unable to rely on policy exclusion for failing to close the door In discussions with the FSP shortly after he lodged his claim, the Applicant confirmed that the rear door was open when the rain began but rain had already entered the property by the time he managed to shut the door. The Applicant has subsequently confirmed that he was home alone at the time of the storm. He says that, although he managed to close the door within a few minutes after the rain commenced, by that time the damage had already occurred. The Applicant says he was unable to close the door more quickly because:  he first moved his car under cover so it would not suffer hail damage; and  his movement was impaired by pre -existing lower limb issues which limited the speed with which he could get upstairs to close the door. As outlined above, the FSP will be unable to rely on the policy exclusion if it was not reasonably possible for the Applicant to close the door or if his failure to do so was necessary to preserve property. The Applicant has provided copies of medical reports which indicate he has a minor physical impairment resulting from previous injuries and operations to his right foot. Further, at the time of the storm, the Applicant was still recovering from an arthroscopy on his right knee carried out around six months earlier. While there is no independent information to support the Applicant’s account of what occurred during the storm, his version of events is supported by the available medical information and is consistent with his earlier discussions with the FSP. Further, the Applicant’s account is consistent with how a reasonable person might be expected to react in the event of a sudden storm – namely, by taking action to preserve his property by moving his car under cover and closing any open doors or windows. In these circumstances, it is reasonable that the Applicant would prioritise moving his car ahead of shutting the rear upstairs door, given the significant damage hail stones can inflict on motor vehicles in a very short space of time. Case No: 392093 Determination Page 5 of 10 The FSP disputes that the Applicant was unable to close the upstairs door and says he simply chose not to. However, based on the availab le information, I am satisfied that the Applicant’s actions were motivated by a desire to minimise the extent of the overall damage to his property by protecting his car first, followed by his home. There is nothing to suggest that the Applicant would have deliberately or recklessly allowed his home to be damaged, particularly given he did take action to close the door, albeit that such action was delayed. Based on the medical evidence, it is also reasonably likely that the Applicant was prevented by his impairment from closing the door as quickly as he might otherwise have been able. The FSP says that, given the sudden onset of the storm, the damage to the carpet would have occurred during the initial downpour and therefore regardless of whether the Applicant was able to quickly close the door. However, I do not accept this is the case. The report prepared by the FSP’s building consultant (M) indicates that the damage to the carpet and underlay in bedroom 2 occurred when water entered through the rear door and flowed over the vinyl floor of the hallway and into bedroom 2. M’s description of the manner in which the damage occurred suggests that it was not immediate and may well have been prevented, had the Applicant closed the door promptly. For the reasons outlined above, I am satisfied that the Applicant failed to close the door in time to prevent damage because it was not reasonably possible for him to do so (given his medical issues) and because he was taking alternate actions which were necessary to preserve his property. In these circumstances, section 54 applies to prevent the FSP from relying on the relevant policy exclusion to deny the Applicant’s claim for damage to the carpet and underlay in bedroom 2. FSP should cash settle Applicant for $700 for additional carpet damage The cash settlement paid to the Applicant in March 2015 included an amount of $750 for the replacement of the damaged carpet and underlay in bedroom 3. The Applicant has confirmed that bedroom 2 is smaller than bedroom 3. During the course of this dispute, the Applicant incurred an additional cost for visiting his doctor to obtain a statement about his medical condition. While this statement was of some relevance, it did not materially advance the Applicant’s position, given the other medical information already available. In the circumstances, I consider the FSP should pay the Applicant the amount of $700 in respect of the damage to bedroom 2. In determining this amount, I have taken into consideration the passage of time. Accordingly, the FSP is not required to pay interest on this amount. Case No: 392093 Determination Page 6 of 10 2.2 Is the cash settlement otherwise fair and reasonable? FSP is not liable for roof maintenance issues The cash settlement paid to the Applicant in March 2015 included the amount of $3,798 for storm damage to the corrugated asbestos roof at the property. Under the terms of the policy, the FSP may choose to settle a claim for building damage by arranging for the repair or replacement of the damaged item or by paying the Applicant the amount it would reasonably cost to repair. The cash settlement paid by the FSP was determined based on a quotation provided by the FSP’s roofing contractor (R) for the repair of hail damage to the surface coating of the roof, which had exposed the fibro sheets. R ad vised that this damage could be repaired by applying two coats of epoxy material followed by coats of a colour coating. In his quotation , R identified additional repairs which were required to the Applicant’s roof, including replacing deteriorated screws and washer plates and filling missed screw holes and minor cracks. However, the FSP denied liability for these items based on R’s advice that they were maintenance issues (and therefore unrelated to the storm in January 2015). Under the terms of the policy, the FSP is not liable for damage caused by corrosion, wear and tear and/or gradual deterioration. During the course of this dispute, the Applicant has advised that his roof was inspected approximately one year before the claim and found to be in an acceptable condition. However, the report provided by the FSP’s building consultant (M) confirms that the additional damage identified by R was caused by excluded factors such as corrosion and gradual deterioration. M’s report includes a photograph which shows corrosion to the roof screws and washer plates. The Applicant has not provided any independent information which refutes M and R’s findings. In these circumstances, I am satisfied that the FSP was not liable for the “maintenance” issues identified by M an d R, as these issues were caused by factors which are excluded under the policy. Cash settlement for roof is fair and reasonable Before the storm occurred, the Applicant was considering replacing the roof. He had had obtained a quote from his roofing contractor (RM) for $10,471 to replace the original roof with a corrugated zinc roof. However, there is no information to suggest that the hail damage to the roof resulting from the storm in January 2015 could not be effectively repaired in the manner (and for the amount) set out in R’s quotation. On this basis, I am satisfied that the cash settlement paid by the FSP for the roof damage was fair and reasonable. Under the terms of the policy, the FSP is entitled to Case No: 392093 Determination Page 7 of 10 cash settle the Applicant for the reasonable cost of the repairs. The FSP is not liable for the full cost of replacing the roof. Based on the available information, I am satisfied that the other elements of the cash settlement are also fair and reasonable. 2.3 Is the Applicant entitled to compensation? FOS may award compensation for financial and non-financial loss Under the Terms of Reference, FOS may award compensation (capped at $3,300) for consequential financial loss incurred by an Applicant in connection with their claim. FOS may awarded an additional amount (capped at $3,000) for non-financial loss where an applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. However, FOS takes a conservative approach to the award of compensation for non- financial loss. FOS expects applicants to be moderately robust and bear the usual stress and inconvenience associated with an insurance claim. Applicant is diss atisfied with FSP’s claim handling The Applicant has raised a number of concerns about the manner in which the FSP has managed his claim. Among other things, the Applicant says that:  when he tried to contact the FSP, he was placed on hold for long periods of time and one of the FSP’s consultants had a faulty headset;  the FSP’s after -hours service was unable to provide details of his claim;  the FSP’s consultants were abrupt and dismissive;  the FSP’s assessor arrived at his property an hour early so he had t o take time off work;  the FSP’s internal disputes resolution manager harassed him by sending letters to his home address rather than his nominated post office box;  he took time off work to attend the FSP’s branch office; and  he has suffered financial losses and been hospitalised due to stress resulting from the delay by the FSP in settling his claim. FSP did not unreasonably delay claim settlement The Applicant says that the delays by the FSP in settling the claim have resulted in the cost quoted by his roofing contractor for replacing his roof increasing by $1,060. He says he has also suffered stress and inconvenience as a result. Having carefully reviewed the claim history, I am satisfied that the FSP settled the claim reasonably promptly. The Applican t’s claim was assessed and settled in less than two months from the date of lodgement to the date the cash settlement amount was paid. Case No: 392093 Determination Page 8 of 10 I accept that the Applicant experienced some delays during the claim process (for example, because the FSP’s building con sultant failed to bring a ladder to the initial assessment and therefore a second inspection was required). However, I do not consider that any delays experienced by the Applicant were unreasonable, given the overall circumstances of the claim. Accordingly, the Applicant is not entitled to compensation for the increase in the cost of having his roof replaced or for any non-financial losses arising from the time taken to resolve his claim. FSP managed claim reasonably overall Having carefully reviewed the claim history (including the contemporaneous telephone notes recorded by the FSP’s consultants), I am satisfied that FSP managed the Applicant’s claim reasonably overall. The FSP has apologised to the Applicant for some of the difficulties experienced during the claim process and has attempted to explain to him why these issues may have occurred. For example, the FSP has advised that its after-hours service has been set up to deal with requests for emergency assistance only, which is why it was unable to provide him with all the information requested . Some of the concerns identified by the Applicant raise issues of serious misconduct (for example, harassment) on the part of the FSP and its employees. It is inappropriate to make a finding on such matters without a substantial weight of proof confirming the events alleged by the Applicant occurred in the manner claimed. In the absence of any such confirming proofs, I am not satisfied that the Applicant has established any misconduct on the part of the FSP or its contractors. In the circumstances, I am not satisfied that any award of compensation is justified. Applicant is not entitled to refund of excess The FSP deducted an excess of $500 from the settlement amount paid to the Applicant in March 2015. This is consistent with the terms of the policy, which provide that an excess of $500 is payable when the FSP accepts a claim. The Applicant has sought a refund of the excess, on the basis that his claim was initially only partly accepted and due to the poor service provided by the FSP. However, I am satisfied that the FSP was entitled to impose the excess in accordance with the policy. For the reasons set out above, I do not consider that the manner in which the FSP handled the Applicant’s claim entitles him t o a refund of the excess payment. Case No: 392093 Determination Page 9 of 10 3 Supporting information 3.1 FOS approach to this Determination This Determination follows the review of a Recommendation issued on behalf of the Financial Ombudsman Service (FOS) on 29 October 2015. The Recommendation was rejected by the FSP. This case has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, commentary has been restricted to those issues which are considered directly relevant to the outcome only. 3.2 Issue of policy During the course of this dispute, the Applicant advised that he had been misled by the FSP’s agent when he took out the policy. However, the Applicant has not provided details of any specific information provided by the FSP’s agent which is of direct relevance to the current claim. On this basis, any issues of misleading conduct are outside the scope of this Determination. 3.3 Terms of policy Subject Terms Insured event – storm Covered Loss or damage caused by storm, including cyclone, hail, wind, snow or rain … Not covered … Loss or damage caused by or resulting from: …  rain entering the building due to poor maintenance, or where openings, doors or windows are not closed … General exclusions Your policy does not cover any loss or damage that is caused by or arises from: …  wear and tear, gradual deterioration or fading;  rust c orrosion, oxidisation …. Case No: 392093 Determination Page 10 of 10 Subject Terms Payment of excess Your excess An excess is an amount you’re required to pay if we accept your claim. The excesses that apply to your policy will be shown on your policy schedule. Settlement of claims When we agree to pay a claim for loss or damage: We may choose to pay:  the reasonable cost of repair, or  the reasonable costs of replacement to new condition with property of the same size and specification or with items as near to original as is currently possible, or  a cash amount. If we agree to pay cash, we’ll pay the amount it would reasonably cost to repair or replace the property. 3.4 Section 54 of Insurance Contracts Act “ 54 Insurer may not refuse to pay claims in certain circum stance s (1) Subject to this section, where the effect of a contract of insurance would, but for this section, be that the insurer may refuse to pay a claim, either in whole or in part by reason of some act of the insured or of some other person, being an act that occurred after the contract was entered into but not being an act in respect of which subsection (2) applies, the insurer may not refuse to pay the claim by reason only of that act but the insurer’s liability in respect of that claim is reduced by the amount t hat fairly repres ents the extent to which the insurer’s interests were prejudiced as a result of that act. (2) Subject to the succeeding provisions of this section, where the act could reasonably be regarded as being capable of causing or contributing to a loss in respect of which insurance cover is provided by the cont ract, the insurer may refus e to pay the claim. (3) Where the insured proves that no part of the loss that gave rise to the claim was caused by the act, the insurer may not refuse to pay the claim, by reason only of the act. … (5) Where: (a) the act was nec essary to protect the safety of a person or to preserve property; or (b) it was not reasonably possible for the insured or other person not to do the act, the insurer may not refuse to pay the claim by reason only of the act. (6) A reference in this section to an act includes a reference to: (a) an omission; and (b) an act or omission that has the effect of altering the state of codition of the subject -matter of the contract or allowing the state or condition of that subject-matter to alter. ”

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.