Home / Financial Firm (Unknown - Insurer) / Determination 392065
Determination 392065
claim_denial
Summary
Landlord insurance claim for cracking and movement damage was declined as excluded soil movement. AFCA found stormwater run-off from a neighbouring property caused part of the damage and ordered the FSP to cash settle 50% of the southern-side repair costs.
The soil movement exclusion applies only to the extent the FSP shows the damage was caused by naturally occurring soil movement rather than an insured event as proximate cause.
Issues
- Claim denial primary · upheld“Damage was partly caused by stormwater run-off; the FSP is liable for some (but not all) of the repair costs to the southern side.”
- Product terms interpretation secondary · upheld“The soil movement exclusion does not apply where the proximate cause of the damage is an insured event such as storm or rainwater run-off.”
Subjects and remedies
pay claim
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 392065 Determination Page 1 of 7
Case number : 392065 7 September 2015
1 Overview
1.1 Dispute
The Applicants lodged a claim under their landlord insurance policy with the Financial
Services Provider (FSP), for cracking and movement damage to their investment
property. The Applicants believe the damage was caused by stormwater runoff from
downpipes at a neighbouring property.
The FSP denied the Applicants’ claim on the basis that the damage to the property
was not caused by stormwater run-off (or any other event insured against under the
policy), but by soil movement, which is excluded under the policy. The FSP also says
that, in any event, the damage occurred before it came on risk for the property.
1.2 Issues and key findings
Is the FSP liable for the damage to the Applicants’ property?
While some of the damage to the property was caused by stormwater run-off from
disconnected downpipes at the neighbouring property, the remainder was due to
naturally occurring soil movement, which is excluded from cover under the policy.
Accordingly, it is fair in all the circumstances that the FSP be liable for some (but not
all) of the costs of repairing the movement damage to the property.
1.3 Determination
This Determination is partly in favour of the Applicants.
The FSP is to cash settle the Applicants for an amount equal to 50% of the cost of
repairs to the south side of the building (or, in the event that these costs are not able
to be separately identified, 25% of the total costs of the repairs). This amount is to be
determined in accordance with the process set out in section 2.1 below.
Case No: 392065 Determination Page 2 of 7
2 Reasons for Determination
2.1 Is the FSP liable for the damage to the Applicants’ property?
Policy provides cover for insured events subject to exclusions
The Applicants are required to show that, on the balance of probabilities, they have
suffered a loss caused by a risk insured against under the policy. This is known as a
prima facie claim.
If the Applicants are able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The policy provides cover for damage to the Applicants’ property caused by the
insured events listed in the policy (including “storm and rainwater” and “ liquid
escaping suddenly and unexpectedly”), subject to the conditions and exclusions set
out in the policy.
However, the policy contains a general exclusion for damage caused by, arising from
or involving soil movement or settlement.
Applicants consider damage was caused by stormwater run-off
The property was built on a vacant piece of land owned by the Applicants and was
completed in or around June 2012.
The Applicants say they first noticed cracking damage to the property around one
month later. Level surveys carried out by an engineer engaged b y the Applicants’
builder confirmed that the slab had “heaved” (moved upwards), causing internal
damage to the property.
The Applicants believe the upwards movement of the slab at their property was due
to stormwater run-off flowing from the neighbouring property. They say that, the
builder of the neighbouring property failed to connect the stormwater downpipes to a
suitable outlet for several months, which led to rainwater run-off discharging directly
onto the Applicants’ property .
The Applicants believe that the water discharging from the downpipes at the
neighbouring property has led to in an increase in the moisture content of the clay
foundation soils around their slab, causing the soils to expand and the slab to heave.
Damage occurred during period of cover
In its Notice of Response, the FSP says that, even if the Applicants’ position that the
damage was caused by stormwater run-off is accepted, it is not liable for the claim as
the damage did not occur during the period of cover.
The FSP says the Applicants took out their policy in July 2013. However, the
Applicants have provided a copy of a schedule of insurance for the period
commencing 3 April 2012, which confirms they had cover with the FSP for damage to
the insured building during this period.
Case No: 392065 Determination Page 3 of 7
On this basis, the Panel is satisfied that the damage to the property occurred during
the period of cover.
Applicants have established prima facie claim
As noted above, the Applicants’ policy provides cover for damage caused by the
insured event of storm and rainwater, including stormwater runoff from areas
surrounding the site or water escaping from any drain or pipe.
The Panel notes that the relevant insured event is drafted in broad terms and, on its
face, extends to damage which has arisen from the effects of run-off from multiple
storms over a prolonged period of time.
The Applicants have provided photographs taken in early July 2012 which clearly
show the stormwater downpipes at the neighbouring property discharging directly
onto the soil along the south side of the property. It was shortly after this date that the
cracking damage to the property first appeared.
The level surveys carried out by the structural engineer (RC) engaged by the
Applicants’ builder confirmed that the slab had heaved all around the perimeter.
However, heave was most evident along the southern side of the property (adjacent
to the discharging stormwater downpipes) and the south-east corner.
A further level survey carried out by the FSP’s engineer (MP) in October 2014
produced similar results.
In his report prepared in February 2015, the Applicants’ engineer (TK) indicated that
the discharge of roof stormwater from the downpipes at the neighbouring property
during construction had contributed to the increased moisture co ntent in the
foundation soils at the Applicants’ property.
On this basis, the Panel is satisfied that the Applicants have established a prima
facie claim under the policy for damage caused by storm and rainwater.
In this circumstances, the FSP bears the onus of establishing that, on the balance of
probabilities, it is entitled to rely on an exclusion under the policy or is otherwise
entitled to deny the Applicants’ claim.
Policy contains exclusion for damage caused by soil movement
As outlined above, the policy contains a general exclusion for damage caused by or
arising from soil movement.
The FSP says the expansion of the foundation soils which led to the cracking and
movement damage to the Applicants’ property was not caused by water discharging
from the disconnected downpipes but by naturally occurring changes in the moisture
content of the soil.
Further, the FSP says that, even if the discharging downpipes did contribute to the
damage, it is entitled to rely on the exclusion to deny the claim, as the resultant
damage has been caused by soil movement.
Case No: 392065 Determination Page 4 of 7
In the Panel’s view, the exclusion for soil movement does not apply where the
proximate cause (that is, the real, effective or dominant cause) of the relevant
damage is an insured event under the policy (such as storm or rainwater run-off).
Accordingly, the FSP will only be entitled to rely on the exclusion for soil movement
to the extent that it is able to show that, on the balance of probabilities, the damage
to the Applicants ’ property was caused by soil movement occurring as a result of
naturally occurring changes in the moisture content of the foundation soils.
Some of the damage was due to naturally occurring soil movement
As outlined above, level surveys carried out by the builder ’ s engineer (in early 2014)
and the FSP’s engineer (in late 2014) showed heave around the entire perimeter of
the building.
Both the FSP’s engineer (MP) and the Applicants’ engineer (TK) agreed that the
observed movement was typical of “edge heave” due to a significant in crease in soil
moisture conditions (although they held differing views about what had caused the
increase in moisture).
The FSP’s engineer (MP) noted that the reactive clay soils at the site were
susceptible to volumetric changes resulting from an increase in moisture content. He
advised that concrete slab floors poured on a relatively dry site have a tendency to
gradually draw in moisture from the surrounding environment, resulting in the
perimeter of the building heaving relative to the centre.
MP concluded that the movement damage observed at the Applicants’ property was
most likely caused by the foundation soil gradually re-establishing a new equilibrium
moisture condition as a result of the significant environmental change caused by the
redevelopment of the area.
The Panel notes that the site on which the Applicants’ property (and neighbouring
properties) was built had, until that time, remained undeveloped farm land. The Panel
accepts that, in these circumstances, the construction of new dwellings can have a
significant effect on the moisture content of reactive clay foundation soils.
The Applicants’ engineer (TK) acknowledged that there were a number of factors
which could contribute to an increase in the soil moisture content around the
perimeter of a new footing system, including the omission of temporary drainage
provisions and a delay in constructing perimeter pavements.
The Panel notes that the heave of the slab failed to subside (and the cosmetic
damage to the property continued to worsen) after the neighbour’s stormwater pipes
were connected (which occurred sometime between late July 2012 and late
September 2012).
T he Applicants’ tenant (who moved into the property in September 2012) advised the
FSP’s engineer (MP) in October 2014 that, during his tenancy, the initial cracks had
worsened and new cracks had started to appear. Further, the level surveys carried
out in late 2014 do not appear to show any reduction in the heave of the slab after
the downpipes had been connected.
Case No: 392065 Determination Page 5 of 7
The failure of the heave to subside (particularly on the southern side), together with
the fact that movement is evident around the entire perimeter of the building,
establishes that a significant portion of the damage to the property was due to
naturally occurring earth movement, rather than the discharge of water from the
neighbour’s downpipes.
Discharge from downpipes has also contributed to damage
However, the Panel is not satisfied that all of the cracking and movement damage to
the property was caused by naturally occurring soil movement (rather than by water
discharging from the neighbour’s downpipes).
In particular, the Panel does not consider that the FSP’s engineer (MP) has provided
an adequate explanation as to why the heave of the slab is most prominent along the
south side of the building.
In his report, MP suggested that the slab had suffered the greatest heave in areas
which were exposed to a garden environment (due to natural soil moisture levels and
garden watering), compared with areas which were surrounded by paving.
However, photographs of the property show that there are relatively small garden
areas located along the front (eastern) and western (rear) boundaries. Further, the
Applicant has provided information which establishes that the landscaping works
were not undertaken (and the tenant did not move in) until after the initial damage
was discovered.
While the presence of garden beds at the front of the property might go some way
towards explaining the significant heave evident at the south-east corner of the
building, it does not explain why the heave along the whole of the southern side is
greater than at the corresponding locations on the northern side (given both are
adjacent to neighbouring dwellings).
There is limited information available to confirm the length of time for which the
neighbour’s downpipes were disconnected.
The Google street view photograph relied on by the FSP (showing the neighbouring
driveway installed and the downpipes presumably connected) was not taken until
July 2013 and therefore is of limited assistance. Based on the information provided
by the Applicants, the downpipes are likely to have remained unconnected for
between around four and eight months.
In these circumstances, the Panel considers that the FSP has not established that all
of the damage to the property was caused by naturally occurring soil movement.
Based on the available information, the Panel considers that, on the balance of
probabilities, water discharging from the downpipes contributed to part of the heave
to the south side of the slab.
FSP is liable for part of damage
For the reasons outlined above, the Panel is satisfied that part of the damage to the
Applicants’ property was caused by the discharge of water from the neighbour’s
stormwater pipes during construction of the building in 2012.
Case No: 392065 Determination Page 6 of 7
Having carefully considered the location of the downpipes and having regard to the
meteorological data provided, the Panel considers that the effects of stormwater
water discharging from the downpipes on the surrounding soil would be limited to the
area in the immediate vicinity (that is, the southern boundary of the property).
Further, in light of the damage to other areas of the property, the Panel accepts that
the southern side would have suffered some damage, even absent the effects of the
stormwater run-off.
Having regard to the above, the Panel considers that it is fair in all the circumstances
that the FSP be liable to the Applicants for 50% of the costs of repairing the damage
to the southern half of the building.
Neither party has provided any information as the nature and extent of the repairs
required or the estimated costs involved.
Accordingly, the FSP is to engage an appropriately qualified engineer to prepare a
scope of works for the repair of the building and obtain a quotation for the repairs
from an appropriately qualified contractor based on the engineer’s scope of works.
The FSP should cash settle the Applicants for 50% of the estimated costs of
repairing the damage to the southern half of the b uilding (or, in the event that these
costs are not able to be separately identified, 25% of the total costs of the repairs).
Case No: 392065 Determination Page 7 of 7
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the nature
of the dispute, it has been referred directly to a Panel for Determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other.
The Panel has reviewed and considered all of the material provided by the parties.
While the parties have raised a number of issues in their submissions, for the
purposes of this Determination the Panel has restricted its commentary to those
issues which it considers directly relevant to the outcome only.
3.2 Terms of policy
Subject Terms
Scope of cover You are covered for damage or loss occurring during the period of cover and
caused by the following events to:
when your landlord building is insured, to that landlord building
Insured event –
storm
Ye s
Storm and rainwater including stormwater runoff from areas surrounding the
site, or water escaping from any water main, drain, p i pe, street gutter,
guttering or surface.
Insured event –
escape of liquid
Ye s
Liquid escaping suddenly and unexpectedly from a:
water main, drain, fixed pipe, gutter, guttering, fixed tank or drain …
General
exclusions
You are not covered under any section of the policy for damage, loss, cost or
liability caused by or arising from or involving: …
soil movement or settlement