Home / Financial Firm (Unknown - Insurer) / Determination 392065

Determination 392065

claim_denial

FirmFinancial Firm (Unknown - Insurer)
Decided2015-10-16
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Landlord insurance claim for cracking and movement damage was declined as excluded soil movement. AFCA found stormwater run-off from a neighbouring property caused part of the damage and ordered the FSP to cash settle 50% of the southern-side repair costs.

The soil movement exclusion applies only to the extent the FSP shows the damage was caused by naturally occurring soil movement rather than an insured event as proximate cause.

Issues

Subjects and remedies

pay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 392065 Determination Page 1 of 7 Case number : 392065 7 September 2015 1 Overview 1.1 Dispute The Applicants lodged a claim under their landlord insurance policy with the Financial Services Provider (FSP), for cracking and movement damage to their investment property. The Applicants believe the damage was caused by stormwater runoff from downpipes at a neighbouring property. The FSP denied the Applicants’ claim on the basis that the damage to the property was not caused by stormwater run-off (or any other event insured against under the policy), but by soil movement, which is excluded under the policy. The FSP also says that, in any event, the damage occurred before it came on risk for the property. 1.2 Issues and key findings Is the FSP liable for the damage to the Applicants’ property? While some of the damage to the property was caused by stormwater run-off from disconnected downpipes at the neighbouring property, the remainder was due to naturally occurring soil movement, which is excluded from cover under the policy. Accordingly, it is fair in all the circumstances that the FSP be liable for some (but not all) of the costs of repairing the movement damage to the property. 1.3 Determination This Determination is partly in favour of the Applicants. The FSP is to cash settle the Applicants for an amount equal to 50% of the cost of repairs to the south side of the building (or, in the event that these costs are not able to be separately identified, 25% of the total costs of the repairs). This amount is to be determined in accordance with the process set out in section 2.1 below. Case No: 392065 Determination Page 2 of 7 2 Reasons for Determination 2.1 Is the FSP liable for the damage to the Applicants’ property? Policy provides cover for insured events subject to exclusions The Applicants are required to show that, on the balance of probabilities, they have suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. If the Applicants are able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The policy provides cover for damage to the Applicants’ property caused by the insured events listed in the policy (including “storm and rainwater” and “ liquid escaping suddenly and unexpectedly”), subject to the conditions and exclusions set out in the policy. However, the policy contains a general exclusion for damage caused by, arising from or involving soil movement or settlement. Applicants consider damage was caused by stormwater run-off The property was built on a vacant piece of land owned by the Applicants and was completed in or around June 2012. The Applicants say they first noticed cracking damage to the property around one month later. Level surveys carried out by an engineer engaged b y the Applicants’ builder confirmed that the slab had “heaved” (moved upwards), causing internal damage to the property. The Applicants believe the upwards movement of the slab at their property was due to stormwater run-off flowing from the neighbouring property. They say that, the builder of the neighbouring property failed to connect the stormwater downpipes to a suitable outlet for several months, which led to rainwater run-off discharging directly onto the Applicants’ property . The Applicants believe that the water discharging from the downpipes at the neighbouring property has led to in an increase in the moisture content of the clay foundation soils around their slab, causing the soils to expand and the slab to heave. Damage occurred during period of cover In its Notice of Response, the FSP says that, even if the Applicants’ position that the damage was caused by stormwater run-off is accepted, it is not liable for the claim as the damage did not occur during the period of cover. The FSP says the Applicants took out their policy in July 2013. However, the Applicants have provided a copy of a schedule of insurance for the period commencing 3 April 2012, which confirms they had cover with the FSP for damage to the insured building during this period. Case No: 392065 Determination Page 3 of 7 On this basis, the Panel is satisfied that the damage to the property occurred during the period of cover. Applicants have established prima facie claim As noted above, the Applicants’ policy provides cover for damage caused by the insured event of storm and rainwater, including stormwater runoff from areas surrounding the site or water escaping from any drain or pipe. The Panel notes that the relevant insured event is drafted in broad terms and, on its face, extends to damage which has arisen from the effects of run-off from multiple storms over a prolonged period of time. The Applicants have provided photographs taken in early July 2012 which clearly show the stormwater downpipes at the neighbouring property discharging directly onto the soil along the south side of the property. It was shortly after this date that the cracking damage to the property first appeared. The level surveys carried out by the structural engineer (RC) engaged by the Applicants’ builder confirmed that the slab had heaved all around the perimeter. However, heave was most evident along the southern side of the property (adjacent to the discharging stormwater downpipes) and the south-east corner. A further level survey carried out by the FSP’s engineer (MP) in October 2014 produced similar results. In his report prepared in February 2015, the Applicants’ engineer (TK) indicated that the discharge of roof stormwater from the downpipes at the neighbouring property during construction had contributed to the increased moisture co ntent in the foundation soils at the Applicants’ property. On this basis, the Panel is satisfied that the Applicants have established a prima facie claim under the policy for damage caused by storm and rainwater. In this circumstances, the FSP bears the onus of establishing that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the Applicants’ claim. Policy contains exclusion for damage caused by soil movement As outlined above, the policy contains a general exclusion for damage caused by or arising from soil movement. The FSP says the expansion of the foundation soils which led to the cracking and movement damage to the Applicants’ property was not caused by water discharging from the disconnected downpipes but by naturally occurring changes in the moisture content of the soil. Further, the FSP says that, even if the discharging downpipes did contribute to the damage, it is entitled to rely on the exclusion to deny the claim, as the resultant damage has been caused by soil movement. Case No: 392065 Determination Page 4 of 7 In the Panel’s view, the exclusion for soil movement does not apply where the proximate cause (that is, the real, effective or dominant cause) of the relevant damage is an insured event under the policy (such as storm or rainwater run-off). Accordingly, the FSP will only be entitled to rely on the exclusion for soil movement to the extent that it is able to show that, on the balance of probabilities, the damage to the Applicants ’ property was caused by soil movement occurring as a result of naturally occurring changes in the moisture content of the foundation soils. Some of the damage was due to naturally occurring soil movement As outlined above, level surveys carried out by the builder ’ s engineer (in early 2014) and the FSP’s engineer (in late 2014) showed heave around the entire perimeter of the building. Both the FSP’s engineer (MP) and the Applicants’ engineer (TK) agreed that the observed movement was typical of “edge heave” due to a significant in crease in soil moisture conditions (although they held differing views about what had caused the increase in moisture). The FSP’s engineer (MP) noted that the reactive clay soils at the site were susceptible to volumetric changes resulting from an increase in moisture content. He advised that concrete slab floors poured on a relatively dry site have a tendency to gradually draw in moisture from the surrounding environment, resulting in the perimeter of the building heaving relative to the centre. MP concluded that the movement damage observed at the Applicants’ property was most likely caused by the foundation soil gradually re-establishing a new equilibrium moisture condition as a result of the significant environmental change caused by the redevelopment of the area. The Panel notes that the site on which the Applicants’ property (and neighbouring properties) was built had, until that time, remained undeveloped farm land. The Panel accepts that, in these circumstances, the construction of new dwellings can have a significant effect on the moisture content of reactive clay foundation soils. The Applicants’ engineer (TK) acknowledged that there were a number of factors which could contribute to an increase in the soil moisture content around the perimeter of a new footing system, including the omission of temporary drainage provisions and a delay in constructing perimeter pavements. The Panel notes that the heave of the slab failed to subside (and the cosmetic damage to the property continued to worsen) after the neighbour’s stormwater pipes were connected (which occurred sometime between late July 2012 and late September 2012). T he Applicants’ tenant (who moved into the property in September 2012) advised the FSP’s engineer (MP) in October 2014 that, during his tenancy, the initial cracks had worsened and new cracks had started to appear. Further, the level surveys carried out in late 2014 do not appear to show any reduction in the heave of the slab after the downpipes had been connected. Case No: 392065 Determination Page 5 of 7 The failure of the heave to subside (particularly on the southern side), together with the fact that movement is evident around the entire perimeter of the building, establishes that a significant portion of the damage to the property was due to naturally occurring earth movement, rather than the discharge of water from the neighbour’s downpipes. Discharge from downpipes has also contributed to damage However, the Panel is not satisfied that all of the cracking and movement damage to the property was caused by naturally occurring soil movement (rather than by water discharging from the neighbour’s downpipes). In particular, the Panel does not consider that the FSP’s engineer (MP) has provided an adequate explanation as to why the heave of the slab is most prominent along the south side of the building. In his report, MP suggested that the slab had suffered the greatest heave in areas which were exposed to a garden environment (due to natural soil moisture levels and garden watering), compared with areas which were surrounded by paving. However, photographs of the property show that there are relatively small garden areas located along the front (eastern) and western (rear) boundaries. Further, the Applicant has provided information which establishes that the landscaping works were not undertaken (and the tenant did not move in) until after the initial damage was discovered. While the presence of garden beds at the front of the property might go some way towards explaining the significant heave evident at the south-east corner of the building, it does not explain why the heave along the whole of the southern side is greater than at the corresponding locations on the northern side (given both are adjacent to neighbouring dwellings). There is limited information available to confirm the length of time for which the neighbour’s downpipes were disconnected. The Google street view photograph relied on by the FSP (showing the neighbouring driveway installed and the downpipes presumably connected) was not taken until July 2013 and therefore is of limited assistance. Based on the information provided by the Applicants, the downpipes are likely to have remained unconnected for between around four and eight months. In these circumstances, the Panel considers that the FSP has not established that all of the damage to the property was caused by naturally occurring soil movement. Based on the available information, the Panel considers that, on the balance of probabilities, water discharging from the downpipes contributed to part of the heave to the south side of the slab. FSP is liable for part of damage For the reasons outlined above, the Panel is satisfied that part of the damage to the Applicants’ property was caused by the discharge of water from the neighbour’s stormwater pipes during construction of the building in 2012. Case No: 392065 Determination Page 6 of 7 Having carefully considered the location of the downpipes and having regard to the meteorological data provided, the Panel considers that the effects of stormwater water discharging from the downpipes on the surrounding soil would be limited to the area in the immediate vicinity (that is, the southern boundary of the property). Further, in light of the damage to other areas of the property, the Panel accepts that the southern side would have suffered some damage, even absent the effects of the stormwater run-off. Having regard to the above, the Panel considers that it is fair in all the circumstances that the FSP be liable to the Applicants for 50% of the costs of repairing the damage to the southern half of the building. Neither party has provided any information as the nature and extent of the repairs required or the estimated costs involved. Accordingly, the FSP is to engage an appropriately qualified engineer to prepare a scope of works for the repair of the building and obtain a quotation for the repairs from an appropriately qualified contractor based on the engineer’s scope of works. The FSP should cash settle the Applicants for 50% of the estimated costs of repairing the damage to the southern half of the b uilding (or, in the event that these costs are not able to be separately identified, 25% of the total costs of the repairs). Case No: 392065 Determination Page 7 of 7 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only. 3.2 Terms of policy Subject Terms Scope of cover You are covered for damage or loss occurring during the period of cover and caused by the following events to:  when your landlord building is insured, to that landlord building Insured event – storm Ye s Storm and rainwater including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, p i pe, street gutter, guttering or surface. Insured event – escape of liquid Ye s Liquid escaping suddenly and unexpectedly from a:  water main, drain, fixed pipe, gutter, guttering, fixed tank or drain … General exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: …  soil movement or settlement

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.