Text of the determination
Determination
Case No: 389439 Determination Page 1 of 13
Case number: 389439 3 February 2016
1 Overview
1.1 Dispute
The FSP accepted the Applicant’s claim for impact damage to work premises caused
by a third party vehicle and offered to cash settle the claim for nil excess.
The dispute arises because the Applicant is dissatisfied with the FSP’s cash
settlement offer.
1.2 Issues and key findings
Is the FSP’s offer fair and in accordance with its policy obligations?
The FSP’s offer is fair and in accordan ce with its policy obligations as:
it is entitled to elect to pay for or repair the property
although the FSP’s repairer’s (A) original estimate was incomplete, the further
issues in dispute were fairly and subsequently addressed
the material establishes A’s three quotes totaling $103,490 (excluding GST) is a
fair assessment of the cost of repairs
the material establishes the cracks in the driveway were not caused by the
insured event
unless the Applicant provides objective independent evidence which satisfies the
FSP it is deregistered for GST, the policy allows the FSP to reduce the amount it
pays by the amount of any input tax credit an insured is entitled to under GST
legislation
Interest is payable on a cash settlement from 3 January 2015 until settlement as the
material establishes from that date, the FSP could reasonably have actioned its
expert’s recommendations and made further offers to the Applicant.
Is the Applicant entitled to other compensation?
The Applicant is entitled to compensation for non-financial loss pursuant to the
Service’s Terms of Reference as there was an unexplained delay between the
inspection of the property on 2 December 2014 by the FSP’s expert and A’s quotes
being obtained on 31 August 2015 which delay would have interfered with the
Applicant’s peace of mind.
1.3 Determination
This Determination is substantially in favour of the FSP.
Case No: 389439 Determination Page 2 of 13
Within 7 days of acceptance of this Determination by the Applicant, the FSP is to
elect whether it will pay for or repair the insured property.
If the FSP elects to pay for the repairs to the insured property within 3 business days
of that decision, the FSP will make the following payments to the Applicant
$103,490
statutory interest on the said sum from 3 January 2015 until settlement
$500 compensation for non-financial loss (this amount is also payable if the FSP
elects to authorise repairs).
The FSP will forthwith arrange a quote from A for work required to the internal visitor
toilet door and cash settle the Applicant for the quoted amount for this work also.
If the Applicant satisfies the FSP it is deregistered for GST, the FSP’s liability
pursuant to the policy is altered accordingly. The Applicant must provide satisfactory
proof to the FSP within 7 days of acceptance of this Determination by the Applicant.
If the FSP elects to authorise repairs by A to the insured property, then:
the building contract must make it clear the FSP is to pay for A’s work
the building works must commence promptly and in reasonable time
the temporary power supply is to be set up prior to the commencement of the
building works
the site specific safety plan is to be in place prior to commencement of work
A is to ensure the temporary security work/fence/storage container does not
interfere with a clear work area or effect vehicle entry/exit to the premises.
As the Applicant did not accept the ex gratia offer of the FSP, regarding the policy
excess, the policy terms apply unless the FSP is still willing to waive the policy
excess.
Case No: 389439 Determination Page 3 of 13
2 Reasons for Determination
2.1 Is the FSP’s offer fair and in accordance with its policy obligations?
Policy provides it is at FSP’s option to pay for or repair the property
The FSP’s policy is clear and unambiguous. I accept the policy provides the following
relevant terms:
it is at the FSP’s option to pay for, reinstate or repair the property
where the property is damaged, repair and/or restoration of the property will be to
a condition substantially the same but not better or more extensive than its
condition when new
where payment is made under the policy for the acquisition of goods or services,
the FSP is entitled to reduce the amount of payment by the amount of any input
tax credit to which an insured is entitled under GST legislation.
I am satisfied it is fair in all the circumstances, usual industry practice and makes
commercial sense when an insurer authorises repairs, the repairer authorised is a
preferred repairer. That way, the insurer can confidently warrant the repair work.
In its IDR letter, the FSP made it clear if the Applicant uses the FSP’s builder, then
the FSP will warrant the repairs and if any further costs arise during building works
these will be addressed. The FSP submits it can return the building to its pre-incident
condition by authorising repairs to its preferred bui lder, A.
The FSP is not obliged to authorise repairs to be done by the Applicant’s repairer. In
circumstances where an insured requires repair work done by its own repairer, it is
usual industry practice to cash settle the claim.
Further, the FSP’s policy makes it clear it is at its option to cash settle a claim or
repair the property. And, if the FSP cash settles the claim, it is entitled to do so by
cash settling the fair and reasonable costs of repair less GST and policy excess.
I accept the FSP’s submission it is entitled to have A undertake the repairs as
quoted, or in the alternative, cash settle the Applicant the total of A’s quoted costs
less GST.
A’s quotes totalling $103,490 (excluding GST) is a fair assessment of the co st
of repairs
The FSP engaged an engineer C to compile a Scope of Works which was used by
the builders to quote for repairs
Three quotes were obtained by the parties:
FSP’s builder J $102,762.50 .
FSP’s builder A $103,400.
Applicant’s builder G $139,975.
C reviewed all three quotes. C considered A’s quote the most comprehensive and
competitive. As a result, the FSP offered to settle the Applicant’s claim by making a
cash settlement offer of $103,400 less GST. In the alternative, the FSP submitted it
should be permitted to have A undertake the repairs as quoted.
Case No: 389439 Determination Page 4 of 13
Following discussions with the Service, the FSP agreed to increase its offer to
include the temporary power supply and work safety plan.
In response, the Applicant advised the Service’s Case Manager the replacement of a
new meter box in a different permanent location was $12,250.
The Service’s Case Manager invited the Applicant to provide a final amount sought
as full and final settlement of the claim.
By email dated 28 October 2015 the Applicant provided a letter setting out his
position claiming $118,337.89 (which included $10,757.99 GST) as follows:
o Relying on A’s quote $94,000 (excluding GST)
o Relying on A’s quote $8,500 for additional electrical works (excluding GST)
o Relying on A’s quote $990 for safety plan (excluding GST)
o FSP should make allowance for consumer price index (CPI) from the time
quotes were provided until completion of works.
The Applicant letter concludes:
“As I am relying on (A’s) prepared estimate of costs, it would be fair to say that an
average percentage for (A’s) completed works, compared with their prepared estimate
of cost, should also be added to the finalised amount. (FSP) will have this % figure.
There were a number of issues in dispute in the negotiations including:
t he Applicant’s concerns A’s estimates were incomplete
allowance had not been made for cracks in the driveway and in the building walls
A’s contract rendered the Applicant liable for repair costs
continued power supply was necessary
a safety plan was required
security measures were required
the shipping container in the front yard impacted available space
an impartial review of internal wall cracking was required
treatment of GST
treatment of excess.
The Applicant also says the FSP delayed the repair process and caused him undue
stress. Further, he says he did not at any time ask for a cash settlement.
I have carefully considered the material submitted by the parties and the parties’
numerous submissions to the Service.
Cracks in the driveway not caused by insured event
The Applicant required an impartial review of the front concrete apron cracking. It is
not clear this item is still in dispute in view of the contents of the Applicant’s final
position as it makes no mention of compensation for cracks in the driveway.
The Applicant submitted damage to concrete apron occurred due to a fire engine
entering the premises. He agreed there were pre -existing cracks but says the
concrete apron was level (not sunken) and with fewer cracks.
Submissions were made by the parties about the comparative weight of fire trucks
laden with water compared with tow trucks carrying vehicles.
The Applicant indicated he would obtain an engineer’s report but did not.
Case No: 389439 Determination Page 5 of 13
The FSP relies on an opinion from C who was a building consultant and engineer.
Both parties provided numerous images of the area.
I have carefully considered the material provided by the parties. Having considered
the material and in particular the various images of the apron, both before and after
the impact damage, I am not satisfied the front concrete apron was damaged as a
result of the insured event.
Further, I prefer the opinion of C who is a building consultant and engineer to the
opinion of and material provided by the Applicant. C’s opinion is (and C has the
necessary expertise to say) the cracking was not caused as a result of the insured
event.
A’s original estimate was incomplete but further issues are now addressed
As for the Applicant’s concerns A’s original estimate was incomplete, I have
considered the scope of works, the three quotations provided and the expert opinion
from C.
C inspected the property, prepared the Scope of Works, and reviewed the quotes
from A and the Applicant’s builder, G. In the absence of expert opinion from the
Applicant, I accept C has t he expertise to prefer A’s quote over G’s quote for the
reasons stated. C concluded A’s quotation was fair and reasonable.
The material shows a further site inspection occurred on 2 December 2014 and
further consultation took place between A and C. As a result, A was asked to revisit
the quote and adjust for and confirm inclusions for security measures, maintenance
of continuous power supply, work to an internal visitor toilet door, and internal
finishing painting works to a specific pier.
Save for the item regarding the internal visitor toilet door, I am satisfied the material
establishes both A and C have addressed these issues.
The Applicant has not rebutted rebuttal material about these issues.
In the most recent offer, the Applicant accepted A’s quotes for the power supply and
the safety plan.
Further, I am satisfied the correspondence between A and the FSP addresses other
issues in dispute including:
the internal painting works will fill the wall cracking
the FSP confirmed it is accepting all internal and external wall cracking under the
claim as noted in the Scope of Works
A has addressed and quoted regarding the continued power supply issue
A has developed and quoted for a site specific safety plan
A has addressed security measures
A’s contract can be amended to make it clear the FSP is responsible for A’s
costs.
The Applicant submitted placing contents in a shipping container in the front yard
impacts available space. In an email to the FSP dated 17 June 2015, A indicated his
intention was to place the container in the north-west corner of the front yard. The
Case No: 389439 Determination Page 6 of 13
Applicant has made no further comment on this issue and I assume this item is no
longer in dispute.
The Applicant has not otherwise provided any rebuttal material about these disputed
issues.
In summary, I am satisfied the FSP is entitled to pay for or authorise the repairs of
the property by its preferred repairer, A. I am also satisfied the three quotes from A in
total represent the reasonable costs to repair the damage caused by the insured
event.
One minor item to be quoted by A
Material is not provided by either party regarding one minor item. C agreed the
internal visitor toilet door was to be realigned to prevent it jamming, and was to be
finished by preparing and painting the door, door frame and architraves to match the
existing colour. The FSP is to arrange a quote from A regarding this minor item.
Subject to the adjustment for the internal visitor toilet door, if the FSP elects to pay
for the repairs, I am satisfied a cash settlement o f $103,490 (the addition of the
amounts quoted by A: $94,000 + $8500 + $990) is fair in all the circumstances and in
accordance with the material provided and policy terms and conditions.
Policy allows FSP to reduce the amount it pays by the amount of any input tax
credit the insured is entitled to under GST legislation
As for the treatment of GST, the policy terms are clear and unambiguous. The FSP is
entitled to reduce the amount of payment by the amount of any input tax credit the
insured is entitled to under GST legislation.
The Applicant asserted the Applicant ’s company was deregistered for GST three
years ago but has provided no independent material to support this statement. The
only independent material provided is the Certificate of Insurance dated 25
November 2013 which states the Applicant ’s company is registered for GST with the
input tax credit entitlement at 100%.
If the Applicant satisfies the FSP it is deregistered for GST, the FSP’s liability
pursuant to the policy is altered accordingly.
Policy excess was to be waived on an ex gratia basis
As for policy excess, the policy terms are clear. The FSP is entitled to deduct an
excess. However, the FSP said it will waive the policy excess on an ex gratia basis if
there is a cash settlement.
In these circumstances, where the Applicant did not accept the ex gratia offer of the
FSP, the policy terms apply unless the FSP is still willing to waive the policy excess.
FSP to make election to repair or cash settle
Within seven days of this Determination, the FSP is to elect whether it pays for the
repairs or authorise the repairs of the property by its preferred repairer, A.
If the FSP elects to authorise repairs by A, then:
the building contract must make it clear the FSP is to pay for A’s work
Case No: 389439 Determination Page 7 of 13
the building works must commence promptly and in a reasonable time
the temporary power supply is to be set up prior to the commencement of the
building works
the site specific safety plan is to be in place prior to commencement of work
A is to ensure the temporary security work/fence/storage container does not
interfere with a clear work area or effect vehicle entry/exit to the premises.
If the FSP elects to cash settle the repairs, it is to arrange a quote from A regarding
the internal visitor toilet door.
Interest payable on cash settlement
As I have determined on the material provided, and for the reasons stated, A’s
estimates of repairs costs is reasonable, there is no basis for the Applicant’s request
of A’s es timate be further adjusted.
However, I have considered the Applicant’s position regarding an adjustment for CPI
as A’s quote is dated 7 July 2014. The quote specifically states it is only valid for 30
days.
If the FSP elects to authorise the repairs of the property by its preferred repairer A,
then no adjustment is required.
However, if the FSP elects to cash settle, I consider it is fair some further adjustment
is made to the amount offered. Whilst I accept the FSP acted fairly and in
accordance with indu stry practice and policy terms, A’s first estimate did not include
the amounts now agreed regarding the power supply and safety plan. Further, there
is no explanation for the delay which occurred after A and C inspected the site with
the Applicant on 2 December 2014.
At that meeting, the FSP’s expert agreed A’s quote needed to be revisited and
adjusted and yet quotes regarding the temporary power supply and site security plan
were not obtained until 31 August 2015.
I acknowledge the parties were still in dispute regarding the concrete cracking in the
forecourt of the premises, but I consider this aspect of the dispute did not prevent the
FSP actioning the recommendations made by C in emails dated 3 December 2014.
Rather than adjust for CPI increases, I consider it is fair in all the circumstances the
FSP pay statutory interest on any cash settlement from 3 January 2015 until
settlement. This date is nominated as I consider by then the FSP could reasonably
have actioned C’s recommendations and made further of fers to the Applicant.
2.1 Is the Applicant entitled to other compensation?
FSP’s claims handling was not timely after inspection on 2 December 2014
The Applicant also claims the FSP’s claims management has affected the
presentation of the premises and caused undue stress.
The FSP has not specifically addressed this contention.
Case No: 389439 Determination Page 8 of 13
The Service’s Terms of Reference enable the Service to compensate an Applicant
for non-financial loss (capped at $3,000).
Compensation for non-financial loss is limited. FOS may decide an FSP should
compensate an Applicant for such loss only where there has been an unusual
amount of physical inconvenience, time taken to resolve a situation, or interference
with the Applicant’s expectation of enjoyment or peace of mind.
The Service takes a conservative approach to compensation for non-financial loss.
As stated earlier in this Determination, whilst I acknowledge the parties remained in
dispute about a number of matters and about the cracking in the concrete apron, the
FSP has not explained the delay between the inspection of the property on 2
December 2014 and A’s quotes being obtained on 31 August 2015.
In the circumstances of this matter, I am satisfied the FSP’s claims handling was not
timely in that period and would have interfered with the Applicant ’ s peace of mind.
Having considered all the material, I am satisfied it is fair in all the circumstances the
FSP pay to the Applicant $500 compensation for non-financial loss.
Case No: 389439 Determination Page 9 of 13
3 Supporting information
3.1 FOS approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this Determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Ombudsman Service
(FOS) decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this Determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extract
“ Section 1 – Fire and Other Defined Events (continued)
1.2 Defined Events (continued)
(7) Impact by vehicles or animals
1.3 Settlement
If you have a valid claim under Section 1, we will, at our option, pay for, reinstate, or repair
the Property on the basis set out below.
(2) All other Property
(a) For all other Property, we will Reinstate the Property but only if:
(i) replacement, rebuilding, or repair is carried out within a reasonable time. This may be at
another site providing our liability is not thereby increased;
(ii) any repair costs do not exceed the Reinstatement costs had the Property been totally lost,
destroyed, or damaged;
(iii) …
(iv) …”
Reinstatement (means)
Case No: 389439 Determination Page 10 of 13
( b) where the Property is damaged, the repair and/or restoration of the Property to a
condition substantially the same as but not better or more extensive than its condition when
new; …
GENERAL CONDITIONS
(1) Claim Procedures
(a) …
(d) we will have full discretion in the conduct of any negotiations and the settlement of any
claims;”
(10) Goods and Services Tax
Where payment is made under this policy as compensation instead of payment for the
acquisition of goods, services or other things, we will reduce the amount of payment by the
amount of any input tax credit that you would have been entitled to under A New Tax System
(Goods and Services Tax) Act 1999 had the payment been applied to acquire such goods,
services or other things. ”
3.3 Relevant expert material/statements
Correspondence between the parties.
Parties’ submissions, emails and photographs and Google maps images .
Correspondence between the parties and the Service.
Date Action
Certificate of Insurance
25 Nov 2013
(Applicant) FAMILY INVESTMENTS PTY LTD
Registered for GST: Yes Input Tax Credit: 100.00 (%)
Our records indicate the Input Tax Credit entitlement
on this policy is the amount indicated a bove. Please
advise us immediately if the entitlement differs from
that indicated.
FSP’s assessment report
and photographs
15 May 2014
Site inspection 6/5/14 .
Toyota Camry vehicle impacted the double brick
wall to the property where deliveries are taken and
stock stored resulting in structural damage to the
corner of the building .
C building consultants provided scope of works .
Photographs show damage to building .
Scope of Works described including external works
around the north - east corner of parts room , internal
works to parts room, completion and cleanup .
G quote to Applicant
28 May 2014
Quoted to carry out works as per sco pe of works
from FSP’s assessor.
Construction amount $127,250 + $ 12,725 (GST) =
$139,975.00 .
J quote to FSP Quote in accordance with Scope of Works .
Estimate $88,875 + $8 , 887.50 (GST) =
Case No: 389439 Determination Page 11 of 13
6 June 2014 $97,762.50 .
Later increased to $102, 762.50 to allow removal
and storage and return of contents .
A quote to FSP
7 July 2014
Attended site 25 June 2014 .
Quote valid for 30 days .
Quoted to carry out works outlined in Scope of
Works $94,000 + $9 , 400 (GST) = $103,400 .
Quotation review by C
Building consultants and
engineers
27 November 2014
Reviewed and compared the q uotations from
builders A and G.
C inspected the property for claimed damage and
issued a report 15 May 2014 which included the
scope of works to rectify damage .
G did not includ e equipment or asbestos removal.
A made no exclusions regarding wall cracks .
G’s quote is $26,042.00 more expensive net of
builders margin a nd GST.
Upon review C noted the biggest differences are
preliminaries inc engineers fees $6,592, concrete
$6,850 and carpentry inc windows, doors and
frames $6,300.
C carried out a review on the above prices as per
its scope of works and said the prices s ubmitted by
G are higher than industry standard for the works
required.
G allowed 20% builders margin which is an
additional $7,208 over the quote supplied by A.
Due to the above extra costs associated with the
quote from G the increase in GST is $3,325.00 .
C’s opinion is the quotation of $103,400.00
including GST provided by A is fair and reasonable
for the works required.
C reviewed the quotation and confirmed all
accepted items and work has been considered and
included.
Email from C to A
3 De cember 2014
A and C inspected the site with the Applicant on 2
December 2014 .
A asked to revisit the quote and adjust for and
confirm inclusions regarding security measures,
maintenance of continuous power supply, internal
visitor toilet door, and structur al masonry pier east
side of roller door into parts room .
Email from C to FSP’s
assessor
Including Google street
views (October 2014 and
C agrees Applicant has valid concerns regarding
security measures, continuous power su pply at the
site and internal visitor toilet door .
Hairline cracking to the east side of the roller door
Case No: 389439 Determination Page 12 of 13
February 2013)
3 December 2014
is a non - issue; gave the (Applicant) assurance that
this was not structurally significant damage, the
pier could be maintained and that the action of
i ncluded internal painting works will effectively fill
this cracking and conceal it from view.
(Applicant) raised claim that the fire brigade had
caused additional cracking and settlements to his
forecourt pavement in front of the impacted corner
based on a couple of fresh looking regions of
concrete spalling along pre - existing pavement
cracking in a settled region of the pavement in front
of the impacted corner.
Forecourt pavement has dilapidated through
extensive pre - existing cracking and settlements
and resulting patchwork unrelated to the impact
event or the fire brigade's transit over his forecourt
pavement post event .
C researched the axle loads form a typical NSW
Fire Brigade general duty truck as compared to the
rear axle load of a fully laden light to medium duty
Tow Truck and have found these axle loads to be
comparable.
Google Street View images before the event
clearly show the dilapidated condition of this
forecourt pavement including its cracked and
settled condition.
(Applicant) indicated he considered a percentage
contribution to the repair of this pavement. C did
not consider this appropriate in view of the
pavements considerable dilapidation prior to the
event and that the general duty Fire Truck would
not have loaded the pavement any wors e than
light - medium duty tow trucks frequently travelling
across his forecourt (sic).
A email to FSP
25 March 2015
Discussion regarding continued power supply .
A can make handwritten changes to contract
noting Applicant not responsible for payments
other than policy excess .
A will develop a site specific safety plan .
When necessary will affix sheeting to the
scaffolding to prevent unauthorised access and will
have a temporary security fence around the work
area .
Included in A’s costs is a part storage are a in an
on - site shipping container .
A agrees with C cracks on concrete apron are pre -
existing .
Case No: 389439 Determination Page 13 of 13
A email to FSP
17 June 2015
A made no allowance for a temporary power
supply to be set up before work commences. A can
investigate the suitability and costs.
Contract is a printed version and normal practice is
to alter with handwritten notation which c an be
initialed by both parties.
A can p repare a site specific WHS plan.
A envisages the temporary fence would be set
some 2.5 - 3 mts off the wall and can taper the
fence on the east side to assist with the rear
workshop access noting would have to move out
when repairing & painting part of the e astern wall.
Intention was to place the container in the NW
corner of the front yard .
A email to FSP
Re internal cracking
3 August 2015
As per Scope of Works, A is required to repair all
cracks, whether pre - existing or event related as
painting works are required in the noted wall areas
to eastern and northern elevations in the manner
described .
A will r epair pre - existing internal cracking and this
is included in tender amount.
FSP confirms FSP is accepting all internal and
external wall cracking under the claim as noted in
Scope of Works .
A email to FSP
31 August 2015
Temporary Power Supply ( Possibly leave
relocation as permanent ) = $ 8,500.00 + GST
WHS Plan = $ 990.00 + GST.