Home / Financial Firm (Unknown - Insurer) / Determination 388933

Determination 388933

Denial of garage damage claim under strata policy

FirmFinancial Firm (Unknown - Insurer)
Decided2015-07-09
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant claimed under a strata policy for damage to a garage after the FSP denied the claim. AFCA found the loss was caused by excluded ground movement, so the denial was valid and no delay compensation was payable.

Ground movement is specifically excluded under the policy, and loss of rent only applies where the building loss is covered.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision - Denial of Claim Determination Case No: 388933 Determination Page 1 of 9 Case number : 388933 9 July 2015 1 Overview 1.1 Dispute The Applicant is a beneficiary of a Strata Insurance Policy underwritten by the Financial Service Provider (FSP), held in the name of the Owners Corporation (OC) for the residences at the property. On 8 April 2014, the Applicant lodged a claim on the policy for damage sustained to the garage at Unit 1. The FSP declined the claim on the basis that the loss had arisen from causes specifically excluded from cover. The Applicant also says that the FSP did not complete their enquiries in a reasonable timeframe, thus resulting in further loss to the Applicant. 1.2 Issues and key findings Was the FSP entitled to deny the claim? The FSP was entitled to deny the claim as the policy excludes coverage for the loss suffered by the Applicant. Is the Applicant entitled to compensation for the time taken by the FSP to deny the claim? The Applicant is not entitled to compensation for the time taken by the FSP to deny the claim. 1.3 Determination This Determination is in favour of the FSP. The FSP is entitled to deny the Applicant’s claim and is not required to pay the Applicant compensation for the time taken to deny the claim. Case No: 388933 Determination Page 2 of 9 2 Reasons for Determination This Determination has been the subject of a Recommendation issued by the Service on 22 May 2015. It was the Case Manager’s Recommendation that the FSP was entitled to deny the Applicant’s claim on the basis of the policy exclusions contained within the policy coverage. In addition, the Case Manager recommended that the Applicant was not entitled to loss of rent as the coverage for loss of rent only arose in the circumstances where the loss itself was covered by the terms of the policy, which it was not in this case. Finally, the Case Manager was of the view that the time taken by the FSP was not unreasonable and the Applicant was not entitled to compensation in the circumstances. The Applicant has disputed the Recommendation and has provided further submissions in relation to the loss. I have carefully considered all of the material provided by both parties, before and after this Recommendation, whilst making this Determination. 2.1 Was the FSP entitled to deny the claim? The FSP was entitled to deny the claim It is settled insurance law that the onus rests with the Applicant to show that the loss claimed is covered by the terms of the policy. It is only once the Applicant has established the loss was covered by the terms of the policy that the onus transfers to the FSP to demonstrate the basis on which it otherwise says it is entitled to deny the claim. The policy is an accidental damage policy, providing cover for accidental damage sustained to the Applicant’s buildings. There is no suggestion that damage was anything other than unexpected and unforeseen by the Applicant and in the circumstances I accept that the Applicant has established that the loss is covered by the terms of the policy. However, the policy must be read as a whole and it includes a number of exclusions for loss which is not covered under the terms of the policy. The FSP has provided detailed reports in support of submission that the exclusions contained within the policy apply to entitle the FSP to deny the Applicant’s claim. Having considered the reports presented by the FSP, I am satisfied that they are logical and thorough and their conclusions are compelling. The Applicant has not presented evidence to challenge the conclusions of those reports. Case No: 388933 Determination Page 3 of 9 The Case Manager within the Recommendation has provided an analysis of the reports provided by the FSP, but save for including the summary of the reports within part 3 of this Determination, I do not propose to repeat the Case Manager’s analysis here. Save, that I agree with the Case Manager, that given the reports provided by the FSP, the likely cause of the loss is ground movement which is specifically excluded under the terms of the policy. Given the evidence presented, I am satisfied that the FSP was entitled to deny the Applicant’s claim for the damage to the building. I also agree wi th the Case Manager’s conclusion that the FSP was entitled to deny the Applicant’s claim for loss of rent. The loss of rent provision detailed within the policy, only has application where the loss to the buildings themselves are covered under the terms of the policy. In this case, having made the Determination that the loss to the building is not covered under the terms of the policy, it follows that the additional benefit for loss of rent also does not apply. 2.2 Is the Applicant entitled to compensation for the time taken by the FSP to deny the claim? The Applicant is not entitled to compensation The Applicant says that the FSP has not complied with the relevant timeframes when investigating and determining to deny the claim. As a result, the Applicant says that he has suffered financial loss because the time taken by the FSP was unreasonable and as stated, not consistent with the relevant timeframes. I have carefully considered the evidence presented by the parties in this regard. Firstly, I note that the various FSP experts recommended that further investigation be undertaken to determine the precise cause of the loss. It is accepted insurance law that the FSP is entitled to take reasonable steps to establish whether or not the loss claimed is covered by the terms of the relevant policy. In this regard, the General Insurance Code of Practice details timeframes relevant to an insurer’s investigation and acceptance or denial of a claim. Having considered many similar disputes, I am aware that not all claims are straight forward and are able to be completed within the timeframes detailed within the Code of Practice. I am satisfied that the FSP was entitled to properly investigate the circumstances of the Applicant’s loss, before making a decision regarding whether to accept the claim or not. I have also given consideration to the details provided by the FSP in relation to the steps they took between claim notification and denial of the claim. Case No: 388933 Determination Page 4 of 9 Having considered the information provided, I am not satisfied that the FSP has unnecessarily or unreasonably delayed the process of this claim. The conclusion is that in the circumstances of the Applicant’s claim and loss, I am not satisfied that it is appropriate that compensation be paid by the FSP for the time taken by the FSP to deny the claim. Case No: 388933 Determination Page 5 of 9 3 Supporting information 3.1 FOS approach for this dispute A full exchange of the relevant information has taken place between the respective parties and each party has had the opportunity of addressing any issues raised. All of the provided material has been reviewed and considered. The parties have raised numerous issues in their submissions to the Service. For the purpose of this Recommendation, commentary is restricted to only those issues considered relevant to the outcome. 3.2 Expert Evidence Record Key points FSP’s expert (L) Engineer’s Report 3 Jun 2014  the inspection was conducted in the presence of the tenant  the owner had noticed movement to the garage and engaged a plumber who detected damage to the storm water pipes, and the owner is concerned that leaking storm water pipes have caused the damage to the garage  the scope of this report is to provide a professional engineering assessment of the building distress  the examination conducted was visual only  the site consists of three units of single story each, constructed approximately 20 years ago  the tenant has occupied unit one for the last eight years  a brick garage is attached to the building  the building is a timber frame, brick veneer construction built on a concrete slab with terracotta roof tiles  the garage has been constructed on perimeter strip footings and an infill concrete slab, with brick walls with engaged brick piers and lightweight roof sheeting  the subject site is relatively flat and the perimeter is unpaved with garden beds adjacent the structure  the perimeter of the garage is unpaved along the north side  a group of large sized trees were along the south side and to the northeast corner of the unit, in relatively close proximity to the structure  th e tenant provided the following information: he became aware of the separation of the brick garage wall and door/window frame approximately six years ago  the cracking and separation of the brickwork has gradually worsened over time  an inlet pipe to the hot water system had been bent out of place due to movement of the structure and paving  a crack to the party wall between units 1 and 2 was repaired by the neighbours 2 years ago but has recurred  during moderate and consistent rain events, the driveway Case No: 388933 Determination Page 6 of 9 outsid e the garage will flood  hairline cracks in the plaster and cornices in the lounge room were noted  externally, there was movement and cracking to the concrete paving to the north, with a buildup of debris between the cracks  there is major separation and cra cking between the masonry wall and garage door frame and stepped cracking at the south wall  there is cracking and major rotation to the top of the engaged brick piers to the east garage wall, as well as separation between the window frame and masonry  a flo or level survey was conducted to the unit and a brick course level survey to the shared unit and garage wall  a maximum floor level differential of 96mm was recorded across unit 1  a general pattern of settlement was observed toward the south side in the dir ection of the large trees  and footing heave was noted toward the north side  the maximum brick course level differential recorded across the garage is 104mm  a general pattern of settlement was toward the north side of the garage and footing heave toward the south side  geological surveys indicate the building is constructed on quaternary age basaltic deposits, therefore it is expected the foundation soils will consist of reactive clay  reactive clay soils experience volumetric changes with relative changes in soil moisture conditions  an increase to soil moisture contents will cause soil to swell resulting in heave, and a decrease in moisture content causes the soil to shrink resulting in settlement  the Australian Standard (AS2870) states that structural footing s founded on reactive sites under normal moisture conditions are expected to experience a degree of movement  wall cracking should be expected due to differential footing movements under normal site moisture conditions but should be limited to 1mm wide or i n rare instances 5mm  factors causing normal moisture content variation include seasonal and climatic effects and normal garden conditions  abnormal moisture conditions at the si t e can result in increased incidences of damage to the building beyond what is expected under normal conditions  the large trees adjacent the building and leaks in the stormw a ter line can result in abnormal site moisture conditions causing footing movement and damage  for water inundation of the soils to affect the structural footings, the inundation must be of a degree and duration so as to ingress to sufficient depths to increase the moisture content of the foundation clay, into which Case No: 388933 Determination Page 7 of 9 structural footings are founded  AS2870 identifies the ‘influence zone’ within which tree roots affect footing foundations  tree roots remove moisture from foundation soils and this moisture loss causes the reactive clays to shrink, resulting in differential footing settlement  the floor level survey confirms the slab of unit 1 has tilted, being higher at th e north side and falling toward the south  due to the stiffness of the slab, minimal curvature has occurred which is consistent with the lack of damage in the main building  however, tilting of the structural slab has resulted in the rotation of the joint be tween the building slab and the garage footing, causing the damage in this area  it is the opinion of this office that the observed damage is as a result of differential moisture content variation of the clay foundations caused by one or more of the followi ng contributing factors: footing settlement due to tree root drying of the soils and footing heave due to a leaking stormw a ter line at the site  to ascertain the extent of the damage from the respective causes it is recommended that the leaking pipes be rep aired and the site allowed to dry out for a period pf 12 - 18 months to allow foundation moisture to return to pre - peak levels  at the completion of the drying period, the property can be re - assessed to determine the extent of movement by the leaking pipes  no repair work should be undertaken until the site has dried properly  the damage to the garage is structural and should be considered unstable. Make safe works should be instigated and the east wall should be cordoned off to prevent human traffic in or aroun d the garage FSP’s expert (AL) Leak detection report 6 May 2014  CCTV to storm water found system is PVC in construction  two pulled connections were located  one was at the drainage gate in front of the roller door and the other in the front yard  no faults located in the sewer line in the section that was accessed  as the dw elling is of slab construction n o access to waste pipes available  considering the amount of structural damage occurring it is recommended that further CCTV of wastes and toilet sewer be un dertaken  toilet pan and waste traps require removal to do this  faults located in storm water to be dug out and repaired FSP’s expert (PB) Plumber 28 May 2015  AL completed the CCTV inspections to the storm water drainage system  CCTV of the below ground sewer drainage system found Case No: 388933 Determination Page 8 of 9 all inspected sewer drainage pipes in a serviceable condition  no defects or areas of concern were sighted during inspection FSP’s expert (L) Supplementary Engineer’s Report 2 Sep 2014  AL and PB conducted CCTV tests of the storm water and sewer lines  this revealed two pulled connections in the storm water lines, one in front of the garage and the other in the front yard  no leaks were detected in the mains or waste lines  pulling of the pipes refers to the connection of the PVC con nection being pulled apart so the pipe becomes disconnected  pulling occurs from long term ground movements that can be contributed to by soil moisture content variations which cause the reactive soils to swell and shrink  ground movement can also result in movement of the slab and stru cture  as the ground, slab and structure moves, this can in turn result in movement and pulling of the stormwater pipes causing a disconnection  the pulling of the connections has been caused by ground movements and subsequent mo vement of the slab due to soil moisture content variations caused by the drying effect of tree roots, seasonal and climatic effects and the drought conditions in Victoria between 1997 and 2010, followed by the return of normal rainfall patterns . Relevant policy provisions ADDITIONAL BENEFITS This insurance is extended to include the Additional Benefits shown below following Damage not excluded by this Section… … 18. LOSS OF RENT, TEMPORARY ACCOMMODATION AND REMOVAL COSTS We will pay the following costs where Your Unit or Common Area suffers Damage and is unable to be occupied for its intended purposes or when reasonable access to or occupancy of Your Unit or Common Area is prevented by Damage happening to other property within the immediate vicinity of Your Unit or Common Area: a. Loss of Rent Where a Unit or Common Area is leased out, or You can provide evidence by means of a signed agreement that it would have been leased out, We will pay an amount equal to the actual rent lost. We will pay up until the time the Unit is re-leased. … EXCLUSIONS We will not cover Your Insured Property for Damage arising form or caused by: … Case No: 388933 Determination Page 9 of 9 7. Erosion, collapse or any other earth movement … 11. Landslide or subsidence. We will pay for landslide or subsidence if it occurs within 72 hours after one of the following events: a. storm, rainwater or wind. b. earthquake. c. explosion. d. liquid that escapes from a fixed pipe or something attached to a pipe, a fixed gutter, fixed tank or drain. … 14. Normal settling, seepage, shrinkage, expansion, creeping, heaving or vibration. … 16. Roots from trees, plants, shrubs or grass. It the roots from trees, plants, shrubs or grass block drains or pipes, We will pay for the resultant Damage to Insured Property caused by the escape of water or liquids.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.