Denial of home building water leak damage claim under erosion and landslide exclusion
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
Claim - Exclusion/Condition
Determination
Case No: 388520 Determination Page 1 of 9
Case number: 388520 17 June 2015
1 Overview
1.1 Dispute
The Financial Services Provider (FSP) denied the Applicant’s claim for damage to
her home building as a result of water escaping from a leaking pipe. The damage
started occurring around early 2014.
The FSP says the damage was concurrently caused by a water leak and ongoing
atmospheric conditions and thus the Wayne Tank principle applies to defeat the
claim. Alternatively, it says the policy exclusion for “ erosion and landslide ” applies.
The Applicant disagrees and says the damage was due to a water leak, which is
covered by the policy. She wants the FSP to pay her claim in full.
1.2 Issues and key findings
Has the Applicant established an insured event caused her loss?
The Applicant has established an insured event caused her loss. The available
evidence establishes, on the balance of probabilities, the proximate cause of the
damage was a water leak, which is covered under the insured event of “leaks”.
Has the FSP established the application of an exclusion?
The FSP has not established the application of an exclusion because:
the evidence is unclear as to whether there was any earth movement
SM’s evidence (the Applicant ’s e ngineer) is very persuasive and this indicates
there was no earth movement involvement (per se) in the failure mechanism
which caused the damage.
1.3 Determination
This Determination is in favour of the Applicant.
The FSP is to settle the Applicant’s claim for damage to her property in
accordance with the terms and conditions of the policy.
The FSP is to pay for the policy benefit of “investigating leaks” in accordance
with the terms and conditions of the policy and subject to the Applicant giving
the FSP the relevant document (eg, a tax invoice) to show her expense.
If the FSP cash settles the claim, it is to pay interest on the settlement amount
in accordance with section 57 of the Insurance Contracts Act 1984 from 19
Case No: 388520 Determination Page 2 of 9
December 2014, being the date of the FSP’s final decision , to the date
settlement is made.
The FSP is also to reimburse the Applicant the cost she incurred in obtaining
her engineer report, subject to her providing the FSP with the relevant
document (eg, a tax invoice) to show her expense and subject to the limit of
$3,000 as outlined in paragraph 9.4 of the FOS Terms of Reference.
Case No: 388520 Determination Page 3 of 9
2 Reasons for Determination
On the balance of probabilities:
the Applicant must prove her loss was caused by an insured event
the FSP must then prove the claim is not covered or is otherwise excluded.
2.1 Has the Applicant established an insured event caused her loss?
Evidence indicates the cause of damage was the water leak
According to the policy details, the Applicant has cover for listed insured events
for the home building (there is accidental damage – advanced cover – but only for
contents). As the damage relates to the home building, the Applicant must
establish one of the listed insured events caused the damage.
The expert evidence (as per section 3.2 below) coincides in that the proximate
cause of damage was the water leak. Neither of the parties disputes this.
The policy covers the insured event of “leaks”, which is described as:
“Leaks are liquids that are leaking, bursting, discharging or overflowing from certain items or
devic es.”
Based on the expert evidence and the policy cover, I am satisfied the Applicant
has established the claimed loss was the result of the insured event of “leak s ”.
The FSP must now establish the claim is not covered or is otherwise excluded.
2.2 Has the FSP established the application of an exclusion?
Policy excludes earth movement no matter how it is caused
The policy has a general exclusion for “erosion and landslide”, which says:
“ General exclusions
These general exclusions apply to all of the cover we provide under your policy.
We don’t cover you under your policy for loss or damage to your home or contents
or legal liability which is caused by or arise s in connection with any of the following
items or events:
…
Erosi on and landslide Erosion, landslide, subsidence, vibration, earth shrink age or
expansion or any other earth movement no matter how it is
caused (but we do cover earthquake and we cover some
landslide or subsidence that happens within 72 hours of the
first loss or damage to your home or contents caused by the
flood or water runoff – see page 20).”
Initially, the FSP relied on this exclusion and on the Wayne Tank principle
(applied to two alleged, not inter dependent, proximate causes, ie, the water leak
and meteorological conditions).
The FS P’s engineer (IS) in its first report considered meteorological conditions
were a contributory factor. However, following receipt of the report from the
Applicant’s engineer (SM), IS issued a second report stating meteorological
conditions were not the cause.
Case No: 388520 Determination Page 4 of 9
In light of this, the FSP has said it relies only on the “erosion and landslide”
exclusion.
Evidence is unclear as to whether there was any earth movement
Both experts have an explanation for the failure mechanism that potentially
caused the damage:
IS says elevated moisture levels at the time of the leak would have caused
ground movement, which in turn, would have caused the majority of the
damage
SM says the leak would have affected the soil’s strength and cause foundation
movement, this in turn causing the reported damage.
IS accepts SM’s explanation as plausible and states both likely occurred
simultaneously to a greater or lesser extent, to result in the failure observed.
The experts’ conclusions do not assist in clarifying which of the two failure
mechanisms is more likely to have happened (or if they occurred simultaneously)
and, thus, whether there was any involvement of earth movement in the causation
chain.
SM’s evidence is more persuasive
In light of this, it would be reasonable to consider both causes contributed to the
damage. However, a further review of SM’s report and IS’s second report
persuades me that SM’s reported failure mechanism is the most likely to have
occurred. I note:
Despite SM noting a lack of specific evidence of earth movement ( heave and
settlement ), IS does not specifically address or rebut this comment in its
second report .
IS accepts SM’s findings as a plausible failure mechanism .
IS appears unsure as to contributory causes (withdrawing its position
regarding the meteorological conditions) and its own reported failure
mechanism, conceding both his and SM’s reported failure mechanisms could
have happened at the same time.
The fact IS does not address SM’s concern regarding the lack of observation of
earth movement makes IS’s findings less compelling. Without any further
information or a rebuttal, it appears findings were made without verifying there
was actual earth movement.
Further, SM appears more certain of its failure mechanism than IS given IS
changes its position regarding the meteorological conditions and concedes SM’s
findings are plausible.
Accordingly, I am satisfied, on the balance of probabilities, it is more likely the
damage occurred in the way SM described, which does not involve earth
movement as part of the chain of causation.
Case No: 388520 Determination Page 5 of 9
FSP has not established application of exclusion
The onus is on the FSP to establish the application of the exclusion on which it
seeks to rely.
In this instance, the evidence to hand is insufficient to establish on the balance of
probabilities that the exclusion for “erosion and landslide” applies to this claim.
Therefore, the FSP cannot rely on this exclusion to deny the claim.
FSP is to pay additional expenses
I consider the report the Applicant obtained from SM has been pivotal to the
findings of this decision.
Accordingly, it is fair in all circumstances for the FSP to reimburse the expenses
the Applicant has incurred in obtaining this report, subject to her providing the
adequate document for proof of expenses.
As per paragraph 9.4 of the FOS Terms of Reference, the FSP’s contribution to
the cost for the report shall not exceed $3,000.
Further, the policy has an extra benefit for “investigating leaks”. As I am not
satisfied the FSP has established the exclusion for “erosion and landslide” , it is
liable for settlement of this extra benefit as well.
Case No: 388520 Determination Page 6 of 9
3 Supporting information
3.1 FOS approach for this dispute
This dispute has not been the subject of a FOS Recommendation. Due to its
nature, FOS has considered it appropriate to proceed directly to Determination in
line with the Operational Guidelines to the FOS Terms of Reference.
There has been a full exchange of the relevant material between the parties and
each party has had the opportunity to address the issues raised.
While the parties have raised numerous issues in their submissions, for the
purposes of this Determination, I have restricted its commentary to those issues
which I consider directly relevant to the outcome only.
The Applicant is represented. For the sake of brevity and clarity in this decision,
both the Applicant and her representative have been referred to as “the
Applicant”.
3.2 Key points on relevant expert materials/statements
Record Key points
FSP’s engineer
(IS)
Report
28 Oct 2014
There is some damage, such as hairline cracks in the northern
footpath which the insured says predate the leaking water pipe.
The brickwork crack shape in the external face of southern elevation
indicates there has been relative ground movement. Other
observations are also consistent with the assessment of differential
ground movement.
The large two storey brick veneer wall has not articulation and is thus
brittle and will easily crack.
The water leak occurred in April 2013 , after a prolonged period of
rainfall recorded in the area. The so i l supporting the building would
have contained elevated moisture levels at the time of the leak.
As the leak occurred under the footpath and the surrounding soils
had a heightened soil moisture level, it would have been nearly
impossible for further additional water to drain away quickly.
Rather, the large volume of water would have migrate d throughout
the supporting building soils to those with relatively lower moisture
content until all soil would have had a similar moisture level.
Such conditions would result in some level of overall heaving of the
supporting soils under the building. Thi s then results in an overall
heaving and rising of the building.
Rain falls on the ground and drains away from the building over time.
However, the water leak occurred under the footpath and likely had
little opportunity to drain away from the building.
Th erefore, the heave in the building was largely due to the water leak
and not the rainfall.
The leak was detected and fixed coincidentally as the rainfall over the
site reduced dramatically. The perimeter ground moisture would have
Case No: 388520 Determination Page 7 of 9
drained away from the bui lding.
Then, the moisture contained and trapped within the soil under the
building would have subsequently migrated outwards, towards the
now relatively drier soils surrounding the building.
The soil in the southeast corner of the building was “retained fi ll”,
whereas the soil near the leak was “natural”. The southeast corner
would have been able to drain much easier and quicker by virtue of
the more granular nature of the fill material under the slab.
The natural ground at the leak would have drained much slower due
to its location and lower hydraulic conductivity. As the ground dried
out, soils would have shrunk and settled, but at a differential rate,
with the southeast corner being the fastest.
Therefore, it is unsurprising the location of the crack appe ars close to
the cut - fill line of the site.
The external brickwork cracking, upper level cornice distortion, floor
out of level and lower level cornice distortion relate to building
movement (heave and settlement) as a direct result of the water leak.
The damage has been exacerbated by meteorological conditions
before and after the leak and the lack of articulation in the external
building fabric.
Applicant’s
engineer (S M )
Report
2 4 Mar 201 5
Before the crack being observed in the southeast wall, there was no
prior cracking or movement. This confirms the damage has not been
impacted by any lack of maintenance or pre - existing building defects.
It is likely all relate to building movement as a result of the water leak.
IS’s report clearly shows there is no cracking in the area of the stated
heave or to adjacent retaining walls and building structure.
There was no cracking detected in the building adjacent to the
nominated water leakage point or any cracking evident to adjacent
structures (retaining walls).
T here is no vertical movement of brickwork at the crack (which is 8m
west of the corner), confirming the brickwork skin cracking is the
result of foundation rotation only. There is no failure of the foundation
footing.
The rainfall data IS used is consisten t with previous year’s recordings
and thus, not unusual.
As such, it is unusual to rely on comments that the damage has been
exacerbated by meteorological conditions in one part of one
structure, while not affecting any other part, nor any of the adjacent
retaining structures.
If meteorological conditions were a contributing factor, cracking would
have shown after the 2011/2012 summer and 2012 winter drying
period.
SM does not accept the damage was exacerbated by meteorological
conditions. Exacerbation by m eteorological damage is not
demonstrated, merely assumed.
IS says the heave was largely due to the water leak and not the
rainfall. SM does not provide any evidence to confirm observation of
heave. Consequently, the relevance of IS’s comment is lost and th e
comment the water leak heaved a residential is not supported.
The fact this causation was not evidenced during any previous time
Case No: 388520 Determination Page 8 of 9
of wet and dry periods indicates this failure mechanism is improbable.
If localised heaving was an issue as suggested, all th ese structures
would have evidence of movement and cracking.
Further, there is no evidence of heave detected.
The damage occurred following the repair of the water leak. This
suggests the drying action in the soil structure supporting the
foundation was a contributing factor.
Moisture content was maintained by non - meteorological sources (eg,
from the water leak).
A long term water leak has been listed as another probable cause .
However, there is no damage to the surrounding structures.
This is because these structures were founded on class M clays
where forces generate d by the swelling and drying cycles in the
support soil structure were insufficient to cause damage.
The sand backfill in the trenches to and from the downstairs
bathroom, plus the fill over th e natural surface would provide a
“pathway of least resistance” for water to flow from the leakage point.
The natural ground slopes in the southeast, so all the leakage water
from the water supply service would have gathered in the southeast
corner of the residence, permanently maintaining a wet condition and
low soil strength in this region.
The fact it is a long term leak would mean the low strength condition
would have been maintained in the founding soil structure until the
water leak was stopped.
Over a period, the foundation movement from the low support
strength would have generated tensile forces in the top of the brick
wall due to the rotating footing.
These tensile forces would increase over time until cracking of the
wall and lowering of the front load bearing wall occurred at the
southeast corner.
This, in turn, would result in the lowering of one end of the trusses,
until they were bearing on an internal wall.
The most probable cause of cracking was foundation movement
resulting from a leak in th e supply service.
FSP’s engineer
(IS)
Report
10 Apr 2015
IS is not saying the meteorological conditions are the contributory
cause surrounding movement and the damage. Rather, the water
leak occurred at a particular time of the year/season, which provided
a disadvantaged set of surrounding circumstances.
No damage wa s detected previously and the building was likely well
built and maintained.
However, this does not mean it does not move at all with varying
moisture conditions, it clearly does. It means the footing system has
been well built to accommodate soil movement over the life of the
structure.
It is plausible the plumbing leak caused changes in moisture levels
which could have resulted in building movement beyond what it was
originally designed for and had experienced up to that point.
IS’s mechanism relates to changes in soil moisture content causing
earth movement and subsequent foundation movement. SM’s
mechanism relates to moisture causing soil degradation and carrying
Case No: 388520 Determination Page 9 of 9
capacity and subsequent foundation movement.
Both IS and SM’s fai lure mechanisms are plausible and very likely
both have occurred simultaneously to a greater or lesser extent, to
result in the failure observed. It is not possible to determine what
proportion either mechanism contributed to the damage.
The root cause of the building movement is the water leak. The
meteorological conditions are not the cause.
The water leak changed the moisture levels in the supporting soils,
which in turn has changed the characteristics of those soils and the
building movement and damage have subsequently occurred.
3.3 Other relevant materials relied upon
Product disclosure statement with effective date 1 July 2012.
Certificate of insurance for the period 2 April 2014 to 2 April 2015.
Appendices to IS’s report dated 28 October 2014.
Various images of the building and the reported damage.
Parties’ submissions.