Denial of storm-related water damage claim to home roof
Summary
A homeowner claimed for water damage after a roof leak. The FSP denied the claim because the water did not enter through a storm-created opening and resulted from failure to maintain the roof. AFCA found the denial was permitted under the policy and that the FSP did not delay the claim or mislead the applicant.
Water entering through an opening not made by a storm, caused by failure to maintain the building, falls within the policy exclusions.
Issues
- Claim denial primary · not upheld
“The FSP is entitled to deny the claim on the basis of the terms and conditions within the policy.”
- Delay secondary · not upheld
“There is no evidence that the FSP has delayed the management of the claim or misled the Applicant.”
- Misleading conduct secondary · not upheld
“I am not satisfied that the Applicant was misled as to whether he would be covered.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
Case No: 388373 Determination Page 1 of 4
Case number : 388373 11 September 2015
1 Overview
1.1 Dispute
The Applicant has lodged a claim under his Home Insurance Essentials policy with
the Financial Service Provider (FSP), following damage to his home.
The FSP has denied the claim on the basis there is no evidence the roof of the home
has been damaged by a storm and thus the water had not entered the property
through a storm related opening.
1.2 Issues and key findings
Is the F SP entitled to deny the Applicant’s claim ?
The FSP is entitled to deny the Applicant‟s claim.
Has the FSP delayed the management of the claim or misled the Applicant?
There is no evidence that the FSP has delayed the management of the claim or
misled the Applicant.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is entitled to deny the claim on the basis of the terms and conditions within
the policy.
Case No: 388373 Determination Page 2 of 4
2 Reasons for Determination
This Determination has been the subject of a Recommendation issued by the Service
on 29 July 2015.
It was the Case Manager‟s Recommendation that the FSP was entitled to deny the
Applicant‟s claim as the Applicant was unable to establish that a storm created
opening caused the damage to the Applicant‟s home. Further , the Case Manager
was not satisfied that there was evidence that the FSP had delayed the management
of the claim or that the FSP had misled the Applicant.
The Applicant has disputed the Recommendation.
I have carefully considered all of the material provided by both parties, before and
after the Recommendation, whilst making this Determination.
2.1 Is the FSP entitled to deny the Applicant’s claim ?
The FSP is entitled to deny the Applicant’s claim
The policy covers loss or damage arising from specified listed events, including the
listed event of Storm, rainwater or runoff.
The coverage for the listed event of Storm, rainwater or runoff, contains specific
exclusions, including:
“We will not pay for loss or damage:
…
g. caused by water seeping, percolating or otherwise penetrating into the buildings
as a result of:
structural defects,
faulty design of the buildings,
faulty workmanship in the construction of the buildings, or
your failure to adequately maintain the buildings;
h. caused by wind, rainwater, hail or snow entering the buildings through an open
window or door or any opening not made by the storm, unless the loss or
damage is caused by run-off;
i. caused by water entering your buildings through an opening made for the
purpose of alterations, extensions, renovations or repairs.”
The FSP seeks to rely upon exclusions „g and h‟, above , but the exclusion „i‟ is also
relevant in the circumstances of the submissions originally made by the Applicant.
The FSP has relied upon reports from its assessor and a mainte nance contractor.
The reports include a number of helpful photographs which have been of
considerable assistance in the resolution of this dispute.
The maintenance contractor advised that the roof is aged, with issues evident to the
overlap of the roofing sheet edges, which would appear to be the cause of water
ingress.
The maintenance contractor was also of the view that the problem with the roof was
likely to have been of long term.
Case No: 388373 Determination Page 3 of 4
The Applicant has not presented any expert evidence to challenge the findings and
conclusions of the assessor and maintenance contractor.
The photographs show the aged condition of the roof and suggest a failure to
maintain the roof sheeting.
On the basis of the evidence from the assessor and maintenance contractor, I am
satisfied that the water entered the Applicant‟s premises as a result of the failure to
adequately maintain the building and that water entered the building via an opening
not made by the storm.
In those circumstances, the FSP was entitled to deny the claim.
At claim lodgement, the Applicant advised that an air conditioning contractor had
installed a new air conditioning unit in the weeks prior to the loss.
The installation of the air conditioning unit, apparently required a cable to be fed
through the roof.
The Applicant was of the view that the electrician likely did not return the roof to its
original condition and as a result this was the entry point by which water made its
way into the home.
The Applicant has not presented any evidence to support his submissions in this
regard. However, even if it was accepted that the Applicant‟s submissions provide
the explanation for the source of the water entry, the FSP would be entitled to rely
upon the exclusion „i‟ above, on the basis that the water entered the building through
an opening made for the purposes of alterations, extensions, renovations or repairs.
In any event, I am satisfied that the FSP is entitled to deny the Applicant‟s claim on
the basis of the terms and conditions of the policy.
2.2 Has the FSP delayed the management of the claim or misled the
Applicant?
There is no evidence that the FSP has delayed the management of the claim or
misled the Applicant.
I have had the opportunity of re viewing the Applicant‟s submissions in this regard and
the time lines detailed by the FSP in respect to its response to the Applicant‟s claim.
I accept that an FSP is entitled to investigate the claim, to determine whether the
FSP is required to meet the loss and damage, within the terms and conditions of the
policy.
I accept that the investigation does take some time, but that time must be
reasonable.
Having reviewed the contact between the Applicant and the FSP, I am not satisfied
that the FSP has delayed the management of the claim and I am also satisfied that
the time between claim lodgement and decision, is reasonable in all the
circumstances.
Case No: 388373 Determination Page 4 of 4
The Applicant has said that he was misled as to whether the claim for the internal
damage to the home would be covered.
I have reviewed the material presented, including the call recordings of conversations
between the Applicant and various FSP representatives.
On the basis of the information provided, I am not satisfied that the Applicant was
misled as to whether he would be covered and I am not satisfied that the Applicant
was advised that his claim was accepted.
The Applicant says that the fact that he was contacted by a provider for the purposes
of obtaining details on the replacement of his bed, a couple of day s after the FSP‟s
assessor had reviewed the incident, was sufficient to lead the Applicant to believe
that his bedroom internal damage was to be covered.
I do not accept the Applicant‟s position in this regard.
In the absence of the Applicant being specifically advised that internal damage was
accepted, I do not agree that the Applicant was entitled to assume that the internal
damage will be covered. In my view, it is not unreasonable for the FSP to investigate
all aspects of the claim, including the likely cost of replacement, “if and when the
claim was accepted” , prior to the claim having actually been accepted.
The FSP making enquiries as to the likely cost of replacement furniture, prior to claim
decision, seems an efficient part of the claims processing, rather than waiting until a
decision had been made.
Further, the Applicant was concerned that as a result of any delay and his belief that
the internal damage had been accepted, further damage was suffered to the internal
aspects of the home.
The Applicant has not presented any evidence to support his position in this regard.
Further, I note that in a conversation between the Applicant and the FSP, four days
after the lodgement of the claim, the Applicant had advised that make safe
arrangements had been completed.
Considering all of these matters, I am not satisfied that the FSP has either delayed
the management of the claim, or misled the Applicant as to whether the claim was
accepted.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.