Determination 387579
Cash settlement amount for fire claim
Summary
After a house and contents fire, the complainant was cash settled $301,422 for the building and $132,942 for contents and sought the full building and contents sums insured. AFCA found the settlement complied with the policy and made no further order.
The policy lets the insurer settle by paying the reasonable cost to rebuild or replace, whichever is less, not necessarily the full sum insured.
Issues
- Claim amount dispute primary · not upheld“The cash settlement paid by the FSP satisfies its obligations under the terms of the policy.”
- Delay secondary · not upheld“the Panel is satisfied that the FSP did not unreasonably delay settlement of the Applicant's claim.”
- Failure to disclose secondary · not upheld“The Panel does not accept that the FSP was required to advise the Applicant that he was over-insured.”
Subjects and remedies
home or building damageno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building – Home Contents - FSP
Decision - Claim amount
Determination
Case No: 387579 Determination Page 1 of 9
Case number : 387579 7 May 2015
1 Overview
1.1 Dispute
The Applicant lodged a claim under his home insurance policy with the Financial
Services Provider (FSP) after his home suffered extensive damage and his
contents were destroyed in a fire in December 2013.
The FSP accepted the claim and obtained a scope of works and a quotation for
the rebuilding of the home. As the Applicant had sold the property, the FSP cash
settled him for the quoted cost of rebuilding. The FSP also cash settled the
Applicant for an amount equal to the cost of replacing all of his contents items,
based on quotations he had provided.
The Applicant is dissatisfied with the amount of the cash settlement. He wants the
FSP to pay him the full amount of the building sum insured and the contents sum
insured.
1.2 Issues and key findings
Is the FSP required to pay the full amount of the building sum insured?
The Applicant‟s home was capable of being rebuilt for an amount less than the
building sum insured. The Applicant has not established that the amount of the
cash settlement was inadequate to fund the rebuilding of the home. Accordingly,
the FSP has settled the building claim in accordance with the terms of the policy
and is not required to pay the Applicant the full amount of the building sum
insured.
Is the FSP required to pay the full amount of the contents sum insured?
The FSP settled the Applicant‟s co ntents claim in accordance with the terms of
the policy, based on the quoted cost of replacing contents items damaged in the
fire. The Applicant has not established that the amount of the cash settlement was
inadequate. Accordingly, the FSP is not required to pay the Applicant the full
amount of the contents sum insured.
1.3 Determination
This Determination is in favour of the FSP.
The cash settlement paid by the FSP satisfies its obligations under the terms of
the policy. Accordingly, the FSP has no further liability to the Applicant.
Case No: 387579 Determination Page 2 of 9
2 Reasons for Determination
2.1 Is the FSP required to pay the full amount of the building sum
insured?
FSP settled the claim in accordance with policy provisions
Under the terms of the Applicant‟s policy as set out in the Product Disc losure
Statement (PDS), the FSP may decide to settle a claim for damage to his home
by:
arranging for its contractors to repair the damage or rebuild the home (if the
Applicant agrees);
paying the Applicant the reasonable cost of repairing or rebuilding the home
(whichever is the lesser); or
if the FSP considers the home to be a total loss or otherwise chooses to do
so, paying the Applicant the building sum insured.
It is clear from the terms of the policy that the FSP has the discretion to decide
how to settle the Applicant‟s claim.
In the present case, the FSP initially offered to arrange for its contractors to
demolish and rebuild the Applicant‟s home, on the basis that this was less
expensive than repairing the damage to the existing home. However, the
Applicant later advised the FSP that he preferred a cash settlement.
Accordingly, the FSP offered to cash settle the claim by paying the Applicant an
amount equal to the cost of the demolition and rebuild, based on the scope of
works and quotations prepared by its contractors.
At some stage during the course of the claim process, the Applicant sold the
property, following which it was no longer possible for the FSP to arrange for the
demolition and rebuild.
In the circumstances, the Panel is satisfied that the settlement of the claim by
payment of a cash settlement equivalent to the cost of demolishing and rebuilding
the property is consistent with the FSP‟s obligations under the policy. The policy
provides that the FSP may settle the claim by paying the Applicant the reasonable
cost to repair or rebuild (whichever is the lesser).
Available information does not establish settlement amount is insufficient
In order to determine its liability for the building claim, the FSP engaged its
building consultant (IN) to prepare a scope of works for the repair of the damage
to the Applicant‟s home .
However, based on advice from its builder (E), the FSP determined that the
building could be demolished and completely rebuilt for an amount which was less
than the cost of repairing the fire damage. The Panel notes that this may have
been due to the manner in which the existing building had been constructed and,
in particular, the use of asbestos.
Case No: 387579 Determination Page 3 of 9
Accordingly, the FSP determined the building cash settlement amount based on
separate quotations provided by the FSP‟s builder (E) for the demolition ($29,436)
and rebuilding ($272,986) of the Applicant‟s home.
The builder (E) confirmed in a letter dated 23 June 2014 that he had prepared the
rebuilding quotation on the basis of information about the existing property
provided by the building consultant (IN) who had prepared the detailed scope of
works.
The FSP cash settled the Applicant for $301,422, being the sum of the total
amounts quoted by its builder (E) for the demolition and rebuild, less the
applicable excess.
The Applicant has not identified any specific concerns with the information about
the property included in IN‟s scope of works, on which E based his quota tion for
the rebuilding of the home. However, he says that the amounts quoted by E are
not sufficient to provide for the rebuilding of the property.
In support of his position, the Applicant has provided an alternative quotation
prepared by his builder (M) based on IN‟s scope of works , which estimates the
cost of rebuilding the home to be $480,690.10.
Under the policy, the FSP is required to cash settle the Applicant for the
reasonable cost of repairing or rebuilding the home (whichever is the lesser).
The quote provided by the Applicant‟s builder (M) is based on carrying out repairs
to the existing dwelling in accordance with IN‟s scope of works. However, the FSP
has advised that this approach is more expensive than demolishing and rebuilding
the home in its entirety.
Accordingly, in order to be directly comparable to the quotation provided by E, M‟s
quotation would need to provide for the demolition and rebuild.
In any event, the Panel does not accept that the fact that another builder has
quoted a higher amount for the cost of the rebuild necessarily means that E‟s
quote is insufficient. It is not uncommon for there to be a significant difference
between the quotes provided by different builders.
The Applicant says that the FSP offered him the a lternative of obtaining a quote
from his own builder but has not taken M‟s quotation into account in determining
the cash settlement amount. However, the Panel notes that the quotation
provided by the Applicant‟s builder (M) is dated November 2014 and ther efore
was not obtained until several months after the cash settlement had been paid.
The Panel notes that, prior to the sale of the property, the Applicant had the
option of having the FSP‟s builder (E) undertake the works , at the FSP‟s cost, if
he was concerned that the quoted cost was insufficient to fund the rebuild.
This would have meant that the FSP bore the risk of any additional costs in the
event that the scope of works and quotation proved inadequate. The Applicant
would also have had the benefit of the lifetime guarantee provided under the
policy.
Case No: 387579 Determination Page 4 of 9
The Applicant says that he was forced to sell the property due to the delay in
settling his claim. However, he has not provided any information to support this
(and it is not clear, based on the information provided, exactly when the property
was sold).
In the circumstances, the Panel is satisfied that the FSP did not unreasonably
delay settlement of the Applicant‟s claim, having regard to the nature of the claim
and the issues which arose in relation to the repair or rebuilding of the property.
For the reasons outlined above, the Panel considers that the cash settlement of
$301,422 for the building claim is fair and reasonable, and complies with the
FSP‟s obligations under the policy.
FSP is not required to pay the total buildings sum insured
The Applicant says that the FSP should be required to settle him for the full
amount of the building sum insured under the policy (being $444,307).
The PDS states that the maximum amount payable for a building claim under the
policy is the building sum insured.
The policy provides that the FSP may decide to pay the Applicant the sum insured
where it considers his home to be a total loss (that is, the cost of repairing the
property exceeds the value for which it is insured).
However, in the present case, there is no information to suggest that the
Applicant‟s home was a total loss. While the FSP decided to demolish and rebuild
the property, it did so on the basis that this was less expensive than repairing the
existing building.
As outlined above, there is no information to suggest that the Applicant‟s home
was not capable of being demolished and rebuilt for the amount quoted by the
FSP‟s builder (E) (being 302,422) . This amount is significantly less than the
building sum insured.
The FSP is not required to pay the full building sum insured, if it can repair or
rebuild the Applicant‟s home for a lesser amount. To require the FSP to pay the
full sum insured in these circumstances would result in the Applicant receiving a n
amount which exceeds the value of his loss.
FSP was not required to advise the Applicant that he was over-insured
The Applicant says that, when he first insured his home with the FSP in August
2012, he relied on the guidance provided on the FSP‟s website for the purpose of
determining the building (and contents) sum insured. He notes that the FSP has
subsequently increased the sum insured on an annual basis.
Given that the quotation obtained by the FSP provides for the demolition and
rebuild of the property for an amount less than the building sum insured, the
Applicant says that he was clearly over-insured.
The Applicant says that the FSP should have advised him that he was over-
insured. In the absence of such advice, the Applicant says that the FSP should
Case No: 387579 Determination Page 5 of 9
pay him the full amount of the building sum insured for his current claim, given
that he has paid premiums calculated on this amount.
The policy renewal documentation sent to the Applicant in or around July 2013
(for the policy period during which the fire occurred) set out the building sum
insured for the relevant policy period.
The certificate of insurance for the policy renewal stated that the sum insured had
been increased to take into account rising costs, but noted that the Applicant
should check that the sum insured covered the replacement value of his home
and contents.
Generally, an insured is responsible for reviewing the terms and conditions on
which insurance cover is offered and confirming that it is appropriate for their
needs. In the case of a home insurance policy, the amount of the building sum
insured is one of the matters which should be considered by an insured in
deciding whether to accept the cover offered.
Prior to renewing his policy, the Applicant had the opportunity to consider the
amount of the proposed building sum insured. The Applicant renewed his policy
based on the proposed building sum insured of $ 444,307 set out in the policy
documentation.
The Panel accepts that, in accordance with its usual practice, the FSP increased
the Applicant‟s building sum insured by around 5% each year. The Panel notes
that this is consistent with good industry practice and is intended to address the
widespread problem of under-insurance.
However, it was ultimately the Applicant‟s decision to accept the renewal of his
policy on the terms offered by the FSP, including the building sum insured
specified in the renewal certificate.
The Panel does not accept that the FSP was required to advise the Applicant that
he was over-insured. The FSP did not have sufficient information available to it to
determine the appropriate sum insured for the Applicant‟s home. While the FSP
provided guidance, the Applicant was best placed to choose the amount of the
sum insured.
The fact that the Applicant renewed his policy and paid premiums based on a
higher sum insured than the amount quoted by the FSP‟s builder for the
demolition and rebuild of his home does not of itself entitle him to payment of the
sum insured.
The Applicant‟s entitlements in relation to the settlement of his claim are
determined in accordance with the terms and conditions of the policy. While the
policy states that the building sum insured is the maximum amount which the FSP
is obliged to pay, it does not require the FSP to pay this amount in any particular
case. As outlined above, the Panel is satisfied that the cash settlement amount
paid by the FSP satisfies its obligations under the terms of the policy.
Case No: 387579 Determination Page 6 of 9
2.2 Is the FSP required to pay the full amount of the contents sum
insured?
FSP settled claim in accordance with policy provisions
Under the terms of the policy as set out in the PDS, the FSP may decide to settle
the Applicant‟s contents claim by:
repairing or replacing the damaged items (with an item of the same or similar
type and quality , on a “new for old” basis );
paying the Applicant the reasonable cost (to the FSP) of repairing or replacing
the items or providing him with store credits to replace an item from one of the
FSP‟s nominated suppliers; or
paying the Applicant the contents sum insured.
It is clear from the terms of the policy that the FSP has the discretion to decide
how to settle the Applicant‟s contents claim.
In the present case, the FSP settled the Applicant‟s contents claim by paying him
a total of $132,942 by way of a combination of cash and store credits. The FSP
has not disputed that all of the Applicant‟s contents were destroyed by fire.
The contents settlement amount was determined based on quotations provided
by the Applicant for the replacement of his contents, in accordance with a list of
items provided by the FSP.
The policy provides that the FSP may settle the claim by paying the Applicant the
reasonable cost of replacing his contents items on a new for old basis.
Accordingly, the settlement of the contents claim based on quotations for the
replacement of the damaged items complies with the FSP‟s obligations under the
policy.
Available information does not establish settlement amount is insufficient
The Applicant says the printout of contents items provided by the FSP did not
include all of his damaged items. He also says it was unreasonable for the FSP to
expect him to review this list and obtain replacement quotations within a short
timeframe following the fire.
It is not clear from the available information whether the print-out provided by the
FSP provided general guidance on the usual types of contents items contained in
an equivalent property or was based on a speci fic inventory of the Applicant‟s
damaged items.
In either case, it was open to the Applicant to identify any specific items which
were not included on the printout. While the Applicant says the printout did not
include all items, he has not provided details of any specific items omitted.
The Panel acknowledges that it can be difficult and distressing for an insured to
be required to provide detailed information about their lost contents items within a
short period following the fire. Accordingly, an insurer should ensure that this
process is handled carefully and compassionately.
Case No: 387579 Determination Page 7 of 9
The Applicant says that he had difficulty obtaining an appropriate cash settlement
amount as the FSP queried the information he provided in relation to various
items. However, the Applicant has not provided any independent information to
support this.
The Panel notes that the process adopted in the present case resulted in the
Applicant being settled for his contents items within a relatively short space of
time, around two months after the fire. This enabled him to take steps to replace
his contents items.
In the circumstances, the Panel does not consider that the Applicant has
established that the contents settlement amount is insufficient to allow him to
replace his damaged contents.
FSP is not required to pay the total contents sum insured
The Applicant says that the FSP should be required to settle him for the full
amount of the contents sum insured under the policy (being $221,602).
The PDS states that the maximum amount payable for a contents claim under the
policy is the contents sum insured.
While the policy provides that the FSP may decide to pay the Applicant the
contents sum insured, the FSP is not required to do so, if it can replace the
Applicant‟s damaged c ontents items for a lesser amount.
To require the FSP to pay the full contents sum insured in these circumstances
would result in the Applicant receiving an amount which exceeds the value of his
loss.
For the reasons set out above in relation to the building settlement amount, the
Panel does not accept that the FSP is required to pay the Applicant the full
contents sum insured simply because he renewed his policy and paid premiums
based on this amount.
The Panel considers that the manner in which the FSP s ettled the Applicant‟s
contents claim is fair and reasonable, and complies with the FSP‟s obligations
under the policy.
Case No: 387579 Determination Page 8 of 9
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Reference. The Panel
consists of an Ombudsman and two representatives with consumer and insurance
experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
The Panel has reviewed and considered all of the material provided by the
parties. While the parties have raised a number of issues in their submissions, for
the purposes of this Determination the Panel has restricted its commentary to
those issues which it considers directly relevant to the outcome only.
3.2 Other matters
In addition to the cash settlement amounts for his building and contents claim
discussed in sections 2.1 and 2.2 above, the FSP paid the Applicant temporary
accommodation benefits for 12 months following the fire, in accordance with the
terms of the policy.
The payment of temporary accommodation benefits is not in dispute and therefore
has not been addressed in this Determination.
3.3 Terms of policy
Subject Terms
Buildings cover What we pay for – Buildings Insurance
… The most we pay for your home is the Buildings sum insured.
How claims are
settled
How we settle your buildings claim
We will choose to settle your claim for loss or damage to your
home or „other cover‟ in one of the following ways:
1. If you agree, we can a rrange for our preferred repairers,
suppliers or builders to repair or rebuild your home ...
2. Pay you the reasonable cost to repair or rebuild your home ….
3. Pay you the buildings sum insured.
We may do this when we consider the building to be a total
loss or when we choose to do so.
Sum insured Your current Certificate of Insurance shows the amount of
Case No: 387579 Determination Page 9 of 9
Subject Terms
insurance you have under your policy as the:
Buildings sum insured, and/or
Contents sum insured.
Make sure you insure your home and contents for their
replacement value. To help you estimate your replacement value,
visit our website at [FSP‟s website] and use our buildings and
contents calculators.
Buildings sum insured
The Buildings sum insured is the amount of insuranc e you choose
to cover your home …
Contents sum insured
The contents sum insured is the amount of insurance you choose
to cover your contents.
Settlement of
contents claims
What we pay for – Contents Insurance
If we agree to cover your claim under Contents Insurance, then
we can choose to pay your claim through any of these ways:
repair an item, or
replace an item with the same or similar type and quality, or
pay you the reasonable costs of what it wou ld cost us to repair
or replace the items, or
provide you with store credits to replace an item from one of our
nominated suppliers, or
pay you the sum insured or provide you with store credits from
one of our nominated suppliers to the value of the sum in sured .
…
Conditions
we can nominate the repairer or supplier and claims settlement
method
if you don't agree with the method of settlement we choose, we
will pay you what it would cost us to repair or replace the item.
Contents
replacement value
If we replace an item that is part of your contents, we will replace
it with a new one.
This is known as „new for old‟.