Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
Amount
Determination
Case No: 387530 Determination Page 1 of 9
Case number : 387530 28 July 2015
1 Overview
1.1 Dispute
In March 2009, the Applicant lodged a claim under his home building insurance
policy with the Financial Services Provider (FSP) for damage to his home caused
by water leaking from a burst pipe.
The extent of the FSP’s liability for the claimed damage was the subject of a
previous FOS Determination (322608) issued by the Panel in January 2012. The
Panel determined that the FSP was required to cash settle the Applicant for 100%
of the costs of rebuilding the extension area of the home (including the concrete
slab) and 50% of the costs of repairing the termite damage to the main part of the
house.
The FSP has cash settled the Applicant for over $300,000, in accordance with the
previous Determination. However, the Applicant seeks a further $140,000 for the
cost of additional repairs, including replacing the slab for the main part of the
house. He also seeks compensation for various financial and non-financial losses
incurred as a result of the FSP’s actions since the previous Determination .
1.2 Issues and key findings
Is the FSP liable for the cost of the additional repairs?
The available information does not establish that the main slab required
replacement as a result of damage caused by the leaking pipe in 2009, or in order
to allow the necessary building works to be carried out effectively. Accordingly,
the FSP is not liable for the costs of replacing the slab or reinstating the
surrounding area .
Is the Applicant entitled to compensation?
The FSP’s conduct following the issue of the original Determination was
reasonable in the circumstances. Accordingly, the Applicant is not entitled to
compensation.
Case No: 387530 Determination Page 2 of 9
1.3 Determination
This Determination is in favour of the FSP.
The FSP is not required to make any further payments to the Applicant.
Case No: 387530 Determination Page 3 of 9
2 Reasons for Determination
2.1 Is the FSP liable for the cost of the additional repairs?
FSP has complied with previous Determination
As outlined above, the FSP cash settled the Applicant for over $300,000 in May
2014. The cash settlement amount included:
100% of the costs of rebuilding the Applicant’s extension (including replacing
the concrete slab);
50% of the costs of repairing the termite damage to the main part of the
house; and
the costs of temporary accommodation while the repairs were carried out.
The amount of the cash settlement was determined in accordance with the
detailed process set out in the previous Determination, which provided for the
appointment of an engineer (CS) to prepare a scope of works and a builder (CN)
to provide a quotation for the necessary works.
The FSP has subsequently paid the Applicant further amounts totalling in excess
of $15,000 for additional damage to his property identified during the repair
process, including termite damage to the roof trusses and cracking damage to the
concrete driveway.
Having carefully reviewed the available information, the Panel is satisfied that the
cash settlement paid by the FSP to date complies with its obligations under the
previous Determination.
Applicant seeks compensation for additional repairs
The Applicant seeks compensation for the costs of additional repairs which were
not included in the scope of works prepared by the FSP’s engineer (CS) for the
purpose of determining the cash settlement amount.
In particular, the Applicant says that, during the rebuilding process, his contractors
advised that the concrete slab on which the main section of the house was
constructed (the “main slab”) had to be removed and replaced.
The replacement of the main slab was not included in the scope of works
prepared by the FSP’s engineer (CS) in February 2014. CS’s scope of works
provided for the termite damaged main section of the house to be demolished to
slab level and rebuilt using the existing main slab.
The FSP ’s liability for the repairs included in CS’s scope of works was based on
the Panel’s findings that the relevant damage was caused by water leaking from
the burst pipe in 2009 (which is an insured event under the Applicant’ s policy)
and/or the actions of the FSP’s repairers following the leak.
In the same way, the FSP will only be liable for the additional repairs if the
Applicant can show that these repairs were required:
as a result of the damage caused by the initial insured event;
Case No: 387530 Determination Page 4 of 9
due to the subsequent actions of the FSP and its contractors; or
in order to allow the original repairs to be carried out effectively.
Available information does not establish main slab was damaged
The Applicant says the main slab was damaged by the effects of water leaking
from the burst pipe and/or the actions of termites attracted by the increased
moisture.
In support of his position, the Applicant has referred to the findings of a report
prepared by an engineer (S) appointed by the FSP in October 2011, which show
a misalignment between the main slab and the extension slab. He has also
provided photographs taken in June 2014, which he says show moisture and
termite damage to the main slab.
Having carefully reviewed the available information, the Panel is not satisfied that
the main slab was damaged and needed to be replaced.
The reports obtained in relation to the Applicant’s original claim confirm that the
leaking pipe caused subsidence of the extension slab. The FSP attempted repairs
using polyurethane injections which were unsuccessful and resulted in the
excessive elevation of one end of the slab (causing the misalignment noted in S’s
report).
While it appears that the edges of the slabs were ground down in an attempt to
address this misalignment, the Panel is not satisfied that this necessarily means
the main slab was damaged such that it was unable to be retained and used in
the rebuilding of the property.
The FSP’s engineer (CS) inspected the property for the purpose of preparing his
scope of works and confirmed that the main slab was capable of being reused.
While the FSP’s builder (K) has referred to the main slab as having “a proven
history of subsidence”, this is not consistent with the findings in th e earlier reports
which identified subsidence of the extension slab only. The reports provided by
the Applicant’s engineer (SC) do not specifically address whether there is
subsidence to the main slab.
The photographs provided by the Applicant show termite damage to the wooden
flooring over the main slab (which was to be replaced as part of the approved
repairs). However, these photographs do not establish that there was any
damage to the concrete slab itself.
On this basis, the Panel does not accept that the main slab was damaged by the
leaking pipe in 2009 or by the subsequent actions of the FSP’s repairers.
Main slab did not require replacement due to changes in soil conditions
The Applicant says that, regardless of any damage to the main slab, it needed to
be replaced because it was no longer appropriate, as changes to the soil at the
site caused by the leaking pipe required the use of a slab with additional
reinforcement measures.
Case No: 387530 Determination Page 5 of 9
The proposal under the scope of works prepared by the FSP’s engineer (CS ) to
reuse the existing slab was based on the soil at the site being classified as “S”
class (slightly reactive).
After the scope of works was approved but before the building works were carried
out, the Applicant engaged an engineer (SC) to carry out soil testing at the site.
In a preliminary report dated 16 May 2014, SC advised that the site had been
classified as Class “P” (problem), due to “the abnormal moisture and disturbed
ground caused by the removal of the existing structures from within the proposed
building footprint”.
However, the Panel is not satisfied that the classification of the site as Class “P”
necessarily required the removal and replacement of the main slab.
After reviewing the preliminary soil test results, the FSP’s engineer (CS)
confirmed that the use of an S class slab (such as the existing slab) remained
appropriate.
In his detailed report on the design of foundations for the site dated 27 May 2014,
the Applicant’s engineer ( SC) states that the classification of the site as Class “P”
was due to the disturbed ground caused by the removal of the existing structures
(and does not specifically refer to excessive moisture). SC notes that, while the
site had been classified as Class “P”, its characteristics were similar to those of a
Cla ss “S” site.
The Applicant considers that the classification of the site as Class “P” can only be
due to the presence of excessive moisture as the existing building was still in
place when the soil tests were conducted.
However, the Panel is satisfied that the references in SC’s report to the removal
of the existing structures relates to the proposed demolition of the existing
building (including the slab), which was specifically noted in both of SC’s reports
as the reason additional reinforcement measures may be required.
It appears that SC prepared his report on the basis that a new slab would be
poured and did not consider or take into account the possibility of reusing the
existing slab, as provided for in CS’s scope of works. Accordingly, his reports do
not establish that the existing slab needed to be replaced (given that the retention
of the existing slab would have minimised the disturbance to the soil which
triggered the classification of the site as “P” class).
The Applicant says that, despite consulting seven builders, he could not find one
who was prepared to carry out and warrant the necessary works if the existing
slab was reused.
The Applicant has provided a report from the builder (K) appointed to carry out the
works, which states that he was not prepared to warrant the work over the
existing slab due to its history of excessive water, subsidence and termite
damage.
However, as discussed above, K’s understanding of the site history (as it relates
to the main slab) is not consistent with the available information. Further, K refers
Case No: 387530 Determination Page 6 of 9
to a recommendation by SC that the slab be replaced which is not supported by
the materials provided.
The available information indicates that the design of the Applicant’s new house
does not mirror the existing slab contours. Accordingly, it is possible that this
contributed to the decision to replace the existing slab.
While the FSP agreed to pay for the costs of additional reinforcement measures
for the extension slab following the soil tests, this does not mean that
reinforcement of the main slab was also required. The extension slab had to be
removed due to damage caused by the leaking pipe and the subsequent repairs,
which necessarily involved the disturbance of the surrounding ground.
For the reasons outlined above, the Panel is not satisfied that the changes to the
site caused by the leaking pipe (or the subsequent repair) required the
replacement of the main slab.
FSP is not liable for costs of replacing main slab
As outlined above, the Panel is not satisfied that the main slab was damaged
and/or required replacement in order to enable the necessary repairs.
Accordingly, the FSP is not liable for the costs of replacing the main slab.
The Applicant says that he was compelled to proceed with the replacement of the
main slab (in accordance with his builder’s recommendation), after the FSP
unreasonably delayed responding to his request for approval.
The Applicant first notified the FSP on 12 June 2014 that the results of the soil
tests indicated concrete piers would be required to reinforce the slab.
In a follow-up email dated 18 June 2014, the Applicant clearly indicated that he
was seeking an increase in the settlement amount to allow for the reinforcement
of the extension slab and the removal and replacement of the main slab.
In response, the FSP addressed the Applicant’s request for reinforcement of the
extension slab and paid him an additional settlement amount based on a
quotation provided by his builder.
However, it appears the FSP overlooked the Applicant’s request for approval to
remove and replace the main slab and did not address this issue until after the
Applicant sent a further follow-up email on 15 September 2014.
The Panel accepts that the FSP erred in failing to properly respond to the
Applicant’s email of 18 June 2014. However, given the circumstances of the claim
as a whole, the Panel does not consider that the Applicant was justified in
proceeding with the removal and replacement of the main slab without the FSP’s
approval.
When the FSP provided its initial cash settlement offer in May 2014, it did so on
the basis that the settlement amount was based on CS’s scope of wo rks, which
expressly provided for the reuse of the existing slab (in accordance with the
earlier FOS Determination).
Case No: 387530 Determination Page 7 of 9
The FSP’s settlement letter dated 1 May 2014 clearly state d that, in the event that
any further damage became apparent during the works, the Applicant was
required to contact the FSP immediately to discuss a further assessment.
The Applicant was aware of the need to seek approval for any additional costs
required as a result of variations to the scope of works , and did so on several
occasions. In each case (other than for the main slab), the FSP provided its
approval.
The Panel considers that, in the absence of approval from the FSP, the
Applicant’s decision to proceed with the removal and replacement of the main
slab was at his own risk. In comparison to the other variations for which he had
sought and obtained approval, this represented a significant variation to the scope
of works with substantial cost implications.
The Applicant says it was unreasonable to expect him to put his builders on hold
for several months until the FSP responded.
However, there is no independent information to indicate that the Applicant
attempted to follow up the FSP between 18 June 2014 and 15 September 2014 to
arrange an assessment and obtain approval for the replacement of the slab. Nor
did the Applicant advise the FSP that he was intending to proceed with the
removal of the slab prior to doing so.
In these circumstances, the Panel does not consider that the FSP’s failure to
promptly respond to the Applicant’s request for approval to replace the main slab
means that it should be liable for the costs of doing so, in circumstances where
replacement was not otherwise required.
FSP is not liable for remaining costs
In addition to the costs of replacing the slab, the Applicant seeks cover for the
costs of replacing the verandah, paving, retaining walls and privacy screens.
The scope of works prepared by CS did not provide for the replacement of these
items, as they were not expected to be affected by the construction works. It
appears that they were demolished by the Applicant’s builder in connection with
the replacement of the existing slab.
As outlined above, the Panel has found that the FSP is not liable for the
replacement of the main slab. Accordingly, the FSP has no liability for
consequential damage to the additional items identified by the Applicant which
was caused by the slab replacement.
The available information does not establish that these items were damaged by
the leaking pipe in 2009 or the subsequent repairs carried out by the FSP’s
contractors.
Case No: 387530 Determination Page 8 of 9
2.2 Is the Applicant entitled to compensation?
Applicant seeks interest and compensation for non-financial loss
The Applicant seeks compensation of $3,000 for non-financial loss suffered as a
result of the manner in which the FSP has handled his claim. In particular, the
Applicant says the FSP forced him and his family to continue living in their
property when it was unsafe to so.
The Applicant also says the FSP unreasonably delayed implementation of the
earlier Determination and payment of the cash settlement amount. Accordingly,
he seeks interest on this amount.
FSP has managed settlement process reasonably overall
Having carefully reviewed the claim history, the Panel is satisfied that the FSP
acted promptly in implementing the earlier Determination.
Following the Applicant’s acceptance of the Determination on 29 January 2014,
the FSP arranged for a scope of works to be prepared by its engineer (CS) and a
quotation provided by its builder (CN). The initial scope of works was provided to
the Applicant on 6 March 2014, with the final version (accompanied by the
quotation) being provided on 2 April 2014.
After further negotiations with the Applicant regarding the allowance for temporary
accommodation, the cash settlement amount was agreed on 5 May 2014. The
cash settlement was paid on 20 May 2014, after the FSP obtained confirmation
from the prior mortgagee that it had no further interest in the property.
In the Panel’s view, these timeframes were reasonable, having regard to the
circumstances of the claim. Accordingly, the Applicant is not entitled to interest on
the cash settlement amount.
As outlined above, the FSP continued to consider requests by the Applicant for
additional amounts following payment of the cash settlement. While the FSP
failed to respond promptly to the Applicant’s request for approval for replacement
of the main slab, it reviewed and approved several other variations to the scope of
works valued at over $15,000.
The Panel is also satisfied that the FSP acted reasonably in providing the
Applicant and his family with temporary accommodation following an electrical fire
at the property in February 2014. When the house was subsequently declared
unsafe, the FSP provided further temporary accommodation.
The Panel notes that, under the earlier Determination, the Applicant was awarded
the maximum available compensation of $3,000 for stress and inconvenience
suffered as a result of the manner in which the FSP dealt with his original claim.
For the reasons outlined above, the Panel is satisfied that the FSP managed the
implementation of the previous Determination reasonably overall. Accordingly, an
award of further compensation is not justified in the circumstances.
Case No: 387530 Determination Page 9 of 9
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Reference. The Panel
consists of an Ombudsman and two representatives with consumer and insurance
experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
The Panel has reviewed and considered all of the material provided by the
parties. While the parties have raised a number of issues in their submissions, for
the purposes of this Determination the Panel has restricted its commentary to
those issues which it considers directly relevant to the outcome only.