Home / Financial Firm (Unknown - Insurer) / Determination 387090

Determination 387090

Claim denial - storm damage to rental roof

FirmFinancial Firm (Unknown - Insurer)
Decided2015-07-08
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed for storm damage to the roof of their rental property, and the FSP denied the claim. AFCA found the damage resulted from structural defects and gradual deterioration, which are excluded, and ordered no action.

The applicants did not establish a storm cause, and even if accidental damage were established, the policy exclusions for structural defects and gradual deterioration applied.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim Determination Case No: 387090 Determination Page 1 of 7 Case number : 387090 7 July 2015 1 Overview 1.1 Dispute The Applicants lodged a claim under their Landlord Insurance policy, held with the Financial Service Provider (FSP), for storm damage to the roof of their rental property. The FSP denied the claim on the basis the damage was not due to storm, but was due to causes excluded from cover, including gradual deterioration and structural defects. The Applicants maintain the damage occurred as a result of a storm. 1.2 Issues and key findings Was the FSP entitled to deny the Applicants ’ claim? The FSP was entitled to deny the Applicants ’ claim because:  The expert evidence indicates the damage to the roof was not the result of storm but instead due to structural defects and gradual deterioration, both excluded from cover  Although the policy also covers accidental damage, which the policy defines as unintentional, unforseen or uncontrollable , the same exclusions relating to structural defects and gradual deterioration app ly . 1.3 Determination This Determination is in favour of the FSP. The FSP was entitled to deny the Applicants ’ claim. Case No: 387090 Determination Page 2 of 7 2 Reasons for Determination 2.1 Was the FSP entitled to deny the Applicant’s claim ? The Applicants must establish the policy responds to the claim The Applicants must establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. In the circumstances of this dispute, the Applicants must establish the damage to the roof of the property was caused by a storm, which is an event covered by the policy. If the Applicants establish a prima facie claim, the onus shifts to the FSP to demonstrate it is entitled to limit or deny the claim by proving the damage is due to causes excluded from cover. Evidence indicates damage due to structural defects & gradual deterioration The Applicants say the building was completely sound at the time of purchase in 2007 and no leaks existed prior to heavy storms in 2012. They say damage then worsened following storms in 2013. The Applicants claim they were not made aware of the damage to the property when it occurred because their tenant tried to remedy the problem by installing tarps and a pipe to direct water away. Upon receipt of the claim, the FSP appointed an assessor (CL) to determine the cause and extent of the damage. After inspecting the property, CL appointed a building consultant (SB), to further investigate the cause. SB inspected the property on 31 July 2014. SB observed the skillion roof overhang was sagging and the front eastern gutter had sagged, broken and separated at the centre. SB noted the skillion roof panels had sagged in between the spacing of the supporting beams. SB also noted a temporary pipe had been installed to drain the ponding roof water when it rained. SB noted the pitch of the roof was 1.6 degrees rather than the minimum 2 degrees recommended by the manufacturer. SB considered the installation of polystyrene roof panels on a roof with 1.6 degree pitch was defective building work. SB noted the hex head fixing screws had corroded and the flexible sealant had deteriorated across the roof area. SB also noted the panel joists had been covered with a 150mm wide bitumous foil flashing and black duct tape, which had deteriorated and was peeling from the roof panels. SB considered the deteriorated bitumous flashing tape was allowing water to enter through the roof panel joints when it rained. SB’s view was the damage had be en caused by the low pitch of the roof as this had allowed water to pond on the roof surface. SB considered the ponding water and external weather conditions had deteriorated the bitumous flashing tape installed to the roof panel joints, allowing water through into the rooms below. Case No: 387090 Determination Page 3 of 7 SB also noted 95% of the roof area was covered with tarpaulins, which were secured with expanding foam and weighted down with masonry anchors and ropes. SB considered the weight applied to the roof panels by the masonry anchors, combined with additional rainwater, had caused the roof panels to sag over a period of time and the sagging panels also allowed water to pond when it rained. The Applicants disagree the damage arose due to a building defect and consider if this was the case the damage would have been evident much sooner. However, they have not provided any material that rebuts the opinion of SB. Furthermore, it would appear the low roof pitch caused ponding of water, which in turn had caused parts of the roof to deteriorate and allow water entry. This would explain why the damage did not become evident sooner. In the absence of evidence to the contrary of SB, it is accepted the damage arose due to structural defects and gradual deterioration. The FSP is therefore entitled to deny the claim for damage to the roof as it arose due to causes excluded from cover. Applicants have not established the damage is covered by the policy The Applicants have not established the cause of the d amage was “storm”. However, the policy also provides cover for accidental loss or damage, which is defined by the policy as: “damage to, loss or destruction of your buildings or contents caused by an unintentional act, or an unfore seen or uncontrollable incident.” Clearly the damage was the result of an unintentional act but on the other hand, it may be argued that the loss was not unforeseen and not uncontrollable. However, the same policy exclusions relating to structural defects and gradual deterioration apply. Accordingly, even if the Applicants were able to establish a prima facie claim for accidental damage, the FSP is entitled to rely upon the policy exclusions relating to structural defects and gradual deterioration, to deny the claim. Case No: 387090 Determination Page 4 of 7 3 Supporting information 3.1 FOS approach for this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to an Ombudsman for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The case has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. All material provided by the parties has been reviewed and considered. For the purposes of this Determination, commentary is restricted to those issues considered directly relevant to the outcome only. 3.2 Extracts from policy “ Types of loss or damage your buildings are covered for We will cover your buildings against loss or damage caused by one or more of the insured events occurring during the period of insurance. We will also cover you for the other benefits listed below. Details of the terms, conditions and exclusions which specifically relate to each insured event and other benefits are detailed on the pages indicated. Insured events page number 1. Accidental breakage of glass 25 2. Accidental loss or damage 26 … 10. Storm, rainwater or run-off 29 … Insured events we will pay 1. Accidental breakage of glass … 2. Accidental loss or damage (Applicable whether you have buildings and/or contents cover) We will pay for accidental loss or damage, unless it is caused by: a. an event otherwise excluded under sections “Insured events we will pay” on pages 25 to 32 or “When we will not pay a claim under your policy” on pages 51 to 54; … 10. Storm, rainwater or run-off (Applicable whether you have buildings and/or contents cover) We will pay for loss or damage caused by storm, rainwater or run-off. We will not pay for loss or damage: a. caused by: • …. g. caused by water seeping, percolating or otherwise penetrating into the buildings as a result of: • structural defects; • faulty design of the buildings; • faulty workmanship in the construction of the buildings; or • your failure to adequately maintain the buildings; h. … Case No: 387090 Determination Page 5 of 7 When we will not pay a claim under your policy 1. This policy does not cover loss, liability, injury or damage: a. … f. Wear and tear arising out of depreciation, gradual deterioration, wear and tear; g. Inherent defects caused directly or indirectly through inherent defects, faulty design, structural defects or poor workmanship; ” 3.3 Key documents Record Key points FSP’s Assessor (CL ) Report 18 Jul 2014  Claim for damage to patio roof structure, which has allowed water to ingress the building.  Roof and internal ceilings form one structure with polystyrene insulation separating the colorbond roof sheet.  Damage involves deflection to an awning roof structure first discovered in 2011.  Building consultants have been appointed to assist in determining the cause of dam age.  Tenant has made safe the awning and placed a tarp over the external roof to prevent further water damage.  Damage has occurred over a long period of time and the insured has been aware. FSP’s Assessor (CL ) Report 21 Jul 2014  Claim relates to damage to the rear patio roof structure.  Roof structure which is covering the original patio area was a design construction of MH in 1988.  Roof structure is incorporated sandwich panel on a very low pitch.  External patio roof structure is tied into the original roof design however cannot comment on the condition or adequacy of the roof structure where the tile roof meets the colorbond skillion roof.  Tenants confirm in 2011 reported water ingress through low skillion roof to managing agent who reported to landlord .  Landlord arranged for contractor/handyman to attend site but no work was done to the awning that the tenant is aware of.  Water ingress and deterioration in the patio roof structure awning has exacerbated over three years since.  Awning roof has been cer tified and approved under Council development application and may be that over a period of three years the polystyrene sheets have been water logged each time there has been storm activity.  Have appointed SB to determine and substantiate cause.  Tenant has installed props internally to support the deflection of the awning structure and has placed a tarp over the entire patio section. Case No: 387090 Determination Page 6 of 7  Insured still legally liable to ensure no further damage to property or injury to general public.  Very little has been done si nce damage was first brought to the attention of the insured in 2011.  Satisfied the damage to the awning warrants the patio structure being removed and replaced .  Possible damage is due to a combination of inherent defects, omission or design, together with water ingress over a long period of time. FSP’s Building Consultant (SB) Report 13 Aug 2014  Tenant stated pergola area built prior to him purchasing the property in 1999 and a few leaks existed before he sold the property to the insured in 2007.  Tenant stated insured has not performed any maintenance on the property since purchase and the pergola area roof now leaks every time it rains.  Observed skillion roof overhang was sagging and the front eastern gutted had sagged, broken and separated at the centr e. Timber prop had been placed to hold the gutter from collapsing.  Observed the skillion roof panels had sagged in between the spacing of the supporting beams and that an adjustable prop and beam had been installed to the underside of the roof panels to prevent further sagging.  Temporary pipe secured with duct tape had a lso been installed to drain the ponding roof water when it rains.  95% of the roof area has been covered by tarpaulins, which have been secured with expanding foam and weighted down with masonry anchors and ropes.  The weight applied to the roof panels by t he masonry anchors, combined with additional rainwater , has caused the roof panels to sag over a period of time. The sagging panels allow water to pond when it rains.  After removing a section of the tarpaulin observed the hex head fixing screws have corro ded and the flexible sealant has deteriorated across the roof area.  Panel joists have been covered with a 150mm wide bitumous foil flashing and black duct tape. The tape has deteriorated and is peeling from the roof panels.  The deteriorated bitumous flashing tape is allowing water to enter through the roof panel joints.  Roof pitch is 1.6 degrees which does not comply with the manufacturer’s minimum requirement of 2 degrees.  The installation of polystyrene roof panels on a roof with 1.6 degree pitch is defective building work.  Due to the age of the structure consider repair of the damage to be a maintenance issue.  The low roof pitch has allowed water to pond on the roof surface. The ponding water and external weather conditions have deteriorated the bitumous flashing tape allowing water through the roof panel joints into the rooms below. Case No: 387090 Determination Page 7 of 7 FSP’s Assessor (CL ) Report 26 Aug 2014  Previously raised concern over the cause of the damage to the insured property and the extent of damage over a period of thre e years.  Insured has not been proactive in mitigating claim or addressing the issue, which has resulted in the damage exacerbating over a period of time.  Building consultants found damage has been occurring over a number of years. Insured was aware of da mage due to patch repair works completed.  Structure material has been deteriorating resulting in general wear and tear.  Roof pitch falls under building code requirement and outside manufacturer’s specification.  Satisfied rain has caused damage but not du e to an unforseen event.  Defects have allowed water to pool on the roof and cause elements such as screw heads to corrode allowing water ingress.  Deflection in the roof span has allowed the sheets to open again allowing rain water to ingress.  Water ingress has been absorbed in the polystyrene roof sheets adding weight causing damage to the internal soffit lining.  Cause of the damage is not from an individual event and the overall condition of the property is poor.  It is reasonable to accept t he insured was made aware of the damage and they responded to complaints by the tenant arranging handymen or contractors to attend and attempt to waterproof.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.