The applicants claimed for storm damage to the roof of their rental property, and the FSP denied the claim. AFCA found the damage resulted from structural defects and gradual deterioration, which are excluded, and ordered no action.
The applicants did not establish a storm cause, and even if accidental damage were established, the policy exclusions for structural defects and gradual deterioration applied.
Issues
- Claim denial primary · not upheld“The FSP was entitled to deny the Applicants' claim because the damage to the roof was due to structural defects and gradual deterioration, both excluded from cover.”
Subjects and remedies
home or building damageno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
Claim
Determination
Case No: 387090 Determination Page 1 of 7
Case number : 387090 7 July 2015
1 Overview
1.1 Dispute
The Applicants lodged a claim under their Landlord Insurance policy, held with the
Financial Service Provider (FSP), for storm damage to the roof of their rental
property.
The FSP denied the claim on the basis the damage was not due to storm, but was
due to causes excluded from cover, including gradual deterioration and structural
defects.
The Applicants maintain the damage occurred as a result of a storm.
1.2 Issues and key findings
Was the FSP entitled to deny the Applicants ’ claim?
The FSP was entitled to deny the Applicants ’ claim because:
The expert evidence indicates the damage to the roof was not the result of
storm but instead due to structural defects and gradual deterioration, both
excluded from cover
Although the policy also covers accidental damage, which the policy defines
as unintentional, unforseen or uncontrollable , the same exclusions relating to
structural defects and gradual deterioration app ly .
1.3 Determination
This Determination is in favour of the FSP.
The FSP was entitled to deny the Applicants ’ claim.
Case No: 387090 Determination Page 2 of 7
2 Reasons for Determination
2.1 Was the FSP entitled to deny the Applicant’s claim ?
The Applicants must establish the policy responds to the claim
The Applicants must establish on the balance of probabilities that they have
suffered a loss caused by an event to which the policy responds. This is known as
a prima facie claim.
In the circumstances of this dispute, the Applicants must establish the damage to
the roof of the property was caused by a storm, which is an event covered by the
policy.
If the Applicants establish a prima facie claim, the onus shifts to the FSP to
demonstrate it is entitled to limit or deny the claim by proving the damage is due
to causes excluded from cover.
Evidence indicates damage due to structural defects & gradual deterioration
The Applicants say the building was completely sound at the time of purchase in
2007 and no leaks existed prior to heavy storms in 2012. They say damage then
worsened following storms in 2013. The Applicants claim they were not made
aware of the damage to the property when it occurred because their tenant tried
to remedy the problem by installing tarps and a pipe to direct water away.
Upon receipt of the claim, the FSP appointed an assessor (CL) to determine the
cause and extent of the damage. After inspecting the property, CL appointed a
building consultant (SB), to further investigate the cause.
SB inspected the property on 31 July 2014. SB observed the skillion roof
overhang was sagging and the front eastern gutter had sagged, broken and
separated at the centre. SB noted the skillion roof panels had sagged in between
the spacing of the supporting beams. SB also noted a temporary pipe had been
installed to drain the ponding roof water when it rained.
SB noted the pitch of the roof was 1.6 degrees rather than the minimum 2
degrees recommended by the manufacturer. SB considered the installation of
polystyrene roof panels on a roof with 1.6 degree pitch was defective building
work. SB noted the hex head fixing screws had corroded and the flexible sealant
had deteriorated across the roof area.
SB also noted the panel joists had been covered with a 150mm wide bitumous foil
flashing and black duct tape, which had deteriorated and was peeling from the
roof panels. SB considered the deteriorated bitumous flashing tape was allowing
water to enter through the roof panel joints when it rained.
SB’s view was the damage had be en caused by the low pitch of the roof as this
had allowed water to pond on the roof surface. SB considered the ponding water
and external weather conditions had deteriorated the bitumous flashing tape
installed to the roof panel joints, allowing water through into the rooms below.
Case No: 387090 Determination Page 3 of 7
SB also noted 95% of the roof area was covered with tarpaulins, which were
secured with expanding foam and weighted down with masonry anchors and
ropes. SB considered the weight applied to the roof panels by the masonry
anchors, combined with additional rainwater, had caused the roof panels to sag
over a period of time and the sagging panels also allowed water to pond when it
rained.
The Applicants disagree the damage arose due to a building defect and consider
if this was the case the damage would have been evident much sooner. However,
they have not provided any material that rebuts the opinion of SB. Furthermore, it
would appear the low roof pitch caused ponding of water, which in turn had
caused parts of the roof to deteriorate and allow water entry. This would explain
why the damage did not become evident sooner.
In the absence of evidence to the contrary of SB, it is accepted the damage arose
due to structural defects and gradual deterioration. The FSP is therefore entitled
to deny the claim for damage to the roof as it arose due to causes excluded from
cover.
Applicants have not established the damage is covered by the policy
The Applicants have not established the cause of the d amage was “storm”.
However, the policy also provides cover for accidental loss or damage, which is
defined by the policy as:
“damage to, loss or destruction of your buildings or contents caused by an
unintentional act, or an unfore seen or uncontrollable incident.”
Clearly the damage was the result of an unintentional act but on the other hand, it
may be argued that the loss was not unforeseen and not uncontrollable. However,
the same policy exclusions relating to structural defects and gradual deterioration
apply.
Accordingly, even if the Applicants were able to establish a prima facie claim for
accidental damage, the FSP is entitled to rely upon the policy exclusions relating
to structural defects and gradual deterioration, to deny the claim.
Case No: 387090 Determination Page 4 of 7
3 Supporting information
3.1 FOS approach for this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to an Ombudsman for
Determination, in line with the Operational Guidelines to the FOS Terms of
Reference.
The case has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
All material provided by the parties has been reviewed and considered. For the
purposes of this Determination, commentary is restricted to those issues
considered directly relevant to the outcome only.
3.2 Extracts from policy
“ Types of loss or damage your buildings are covered for
We will cover your buildings against loss or damage caused by one or more of the insured
events occurring during the period of insurance. We will also cover you for the other benefits
listed below. Details of the terms, conditions and exclusions which specifically relate to each
insured event and other benefits are detailed on the pages indicated.
Insured events page number
1. Accidental breakage of glass 25
2. Accidental loss or damage 26
…
10. Storm, rainwater or run-off 29
…
Insured events we will pay
1. Accidental breakage of glass
…
2. Accidental loss or damage
(Applicable whether you have buildings and/or contents cover)
We will pay for accidental loss or damage, unless it is caused by:
a. an event otherwise excluded under sections “Insured events we will pay” on pages 25 to 32 or
“When we will not pay a claim under your policy” on pages 51 to 54; …
10. Storm, rainwater or run-off
(Applicable whether you have buildings and/or contents cover)
We will pay for loss or damage caused by storm, rainwater or run-off.
We will not pay for loss or damage:
a. caused by:
• ….
g. caused by water seeping, percolating or otherwise penetrating into the buildings as a result of:
• structural defects;
• faulty design of the buildings;
• faulty workmanship in the construction of the buildings; or
• your failure to adequately maintain the buildings;
h. …
Case No: 387090 Determination Page 5 of 7
When we will not pay a claim under your policy
1. This policy does not cover loss, liability, injury or damage:
a. …
f. Wear and tear
arising out of depreciation, gradual deterioration, wear and tear;
g. Inherent defects
caused directly or indirectly through inherent defects, faulty design, structural defects or poor
workmanship; ”
3.3 Key documents
Record Key points
FSP’s Assessor (CL )
Report
18 Jul 2014
Claim for damage to patio roof structure, which has
allowed water to ingress the building.
Roof and internal ceilings form one structure with
polystyrene insulation separating the colorbond roof sheet.
Damage involves deflection to an awning roof structure first
discovered in 2011.
Building consultants have been appointed to assist in
determining the cause of dam age.
Tenant has made safe the awning and placed a tarp over
the external roof to prevent further water damage.
Damage has occurred over a long period of time and the
insured has been aware.
FSP’s Assessor (CL )
Report
21 Jul 2014
Claim relates to damage to the rear patio roof structure.
Roof structure which is covering the original patio area was
a design construction of MH in 1988.
Roof structure is incorporated sandwich panel on a very
low pitch.
External patio roof structure is tied into the original roof
design however cannot comment on the condition or
adequacy of the roof structure where the tile roof meets the
colorbond skillion roof.
Tenants confirm in 2011 reported water ingress through
low skillion roof to managing agent who reported to
landlord .
Landlord arranged for contractor/handyman to attend site
but no work was done to the awning that the tenant is
aware of.
Water ingress and deterioration in the patio roof structure
awning has exacerbated over three years since.
Awning roof has been cer tified and approved under
Council development application and may be that over a
period of three years the polystyrene sheets have been
water logged each time there has been storm activity.
Have appointed SB to determine and substantiate cause.
Tenant has installed props internally to support the
deflection of the awning structure and has placed a tarp
over the entire patio section.
Case No: 387090 Determination Page 6 of 7
Insured still legally liable to ensure no further damage to
property or injury to general public.
Very little has been done si nce damage was first brought to
the attention of the insured in 2011.
Satisfied the damage to the awning warrants the patio
structure being removed and replaced .
Possible damage is due to a combination of inherent
defects, omission or design, together with water ingress
over a long period of time.
FSP’s Building
Consultant (SB)
Report
13 Aug 2014
Tenant stated pergola area built prior to him purchasing the
property in 1999 and a few leaks existed before he sold the
property to the insured in 2007.
Tenant stated insured has not performed any maintenance
on the property since purchase and the pergola area roof
now leaks every time it rains.
Observed skillion roof overhang was sagging and the front
eastern gutted had sagged, broken and separated at the
centr e. Timber prop had been placed to hold the gutter
from collapsing.
Observed the skillion roof panels had sagged in between
the spacing of the supporting beams and that an adjustable
prop and beam had been installed to the underside of the
roof panels to prevent further sagging.
Temporary pipe secured with duct tape had a lso been
installed to drain the ponding roof water when it rains.
95% of the roof area has been covered by tarpaulins,
which have been secured with expanding foam and
weighted down with masonry anchors and ropes.
The weight applied to the roof panels by t he masonry
anchors, combined with additional rainwater , has caused
the roof panels to sag over a period of time. The sagging
panels allow water to pond when it rains.
After removing a section of the tarpaulin observed the hex
head fixing screws have corro ded and the flexible sealant
has deteriorated across the roof area.
Panel joists have been covered with a 150mm wide
bitumous foil flashing and black duct tape. The tape has
deteriorated and is peeling from the roof panels.
The deteriorated bitumous flashing tape is allowing water
to enter through the roof panel joints.
Roof pitch is 1.6 degrees which does not comply with the
manufacturer’s minimum requirement of 2 degrees.
The installation of polystyrene roof panels on a roof with
1.6 degree pitch is defective building work.
Due to the age of the structure consider repair of the
damage to be a maintenance issue.
The low roof pitch has allowed water to pond on the roof
surface. The ponding water and external weather
conditions have deteriorated the bitumous flashing tape
allowing water through the roof panel joints into the rooms
below.
Case No: 387090 Determination Page 7 of 7
FSP’s Assessor (CL )
Report
26 Aug 2014
Previously raised concern over the cause of the damage to
the insured property and the extent of damage over a
period of thre e years.
Insured has not been proactive in mitigating claim or
addressing the issue, which has resulted in the damage
exacerbating over a period of time.
Building consultants found damage has been occurring
over a number of years. Insured was aware of da mage due
to patch repair works completed.
Structure material has been deteriorating resulting in
general wear and tear.
Roof pitch falls under building code requirement and
outside manufacturer’s specification.
Satisfied rain has caused damage but not du e to an
unforseen event.
Defects have allowed water to pool on the roof and cause
elements such as screw heads to corrode allowing water
ingress.
Deflection in the roof span has allowed the sheets to open
again allowing rain water to ingress.
Water ingress has been absorbed in the polystyrene roof
sheets adding weight causing damage to the internal soffit
lining.
Cause of the damage is not from an individual event and
the overall condition of the property is poor.
It is reasonable to accept t he insured was made aware of
the damage and they responded to complaints by the
tenant arranging handymen or contractors to attend and
attempt to waterproof.