Storm damage claim - settlement amount and handling

FirmFinancial Firm (Unknown - Insurer)
Decided2015-11-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$64,870
Non-financial loss$2,000
Amount claimed$130,000
SourceAFCA PDF

Summary

The complainant disputed the insurer's cash settlement for hail storm damage to her home and contents and sought $130,000 plus compensation. AFCA increased the building settlement to $56,870, ordered $8,000 for contents, a mould inspection, restoration of certain items and $2,000 for non-financial loss.

The insurer is liable for storm damage and for its inadequate repairs and delays, but not for damage caused by excluded wear, deterioration or groundwater, so the settlement was set at a fair figure.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 386978 Determination Page 1 of 13 Case number: 386978 12 October 2015 1 Overview 1.1 Dispute The Applicant lodged a claim under her home insurance policy with the Financial Services Provider (FSP) for damage to her home and contents following hail storms in March 2010. The FSP accepted the claim and made arrangements to repair the property. After the initial repairs proved inadequate, the FSP undertook further repairs (including the replacement of the roof). The FSP has acknowledged that additional repairs to the building are required and has offered to cash settle the Applicant for approximately $23,000, being the estimated cost of these repairs. The FSP has also offered to cash settle the Applicant for $10,000 for water damage to her contents. The Applicant says the cash settlement offered by the FSP is not sufficient to address all of the damage to her home and contents caused by the storm in March 2010 and the subsequent actions of the FSP and its repairers. She seeks a cash settlement of $130,000, as well as compensation for stress and inconvenience caused by the FSP’s handling of her claim. 1.2 Issues and key findings Is the FSP’s settlement offer for building damage fair and reasonable? The proposed cash settlement amount should be increased to $56,870 to ensure that the Applicant is able to repair all of the damage caused by the storm and the subsequent actions of the FSP’s contractors. Is the FSP’s settlement offer for contents damage fair and reasonable? The FSP is required to cash settle the Applicant for $8,000 for the replacement of certain water damaged contents items. The FSP is to arrange for the attempted restoration of a number of other items and provide an additional settlement for the replacement of such items, if the restoration attempts are unsuccessful. Is the Applicant entitled to compensation? T he FSP’s failure to promptly rectify the inadequate initial repairs and take action to finalise the outstanding aspects of the claim has significantly contributed to the stress and inconvenience suffered by the Applicant. Accordingly, the Applicant is entitled to compensation. Case No: 386978 Determination Page 2 of 13 1.3 Determination This Determination is substantially in favour of the Applicant. The FSP is to:  pay the Applicant the amount of $56,870 in full and final settlement of her claim for damage to the building;  at its cost, appoint an appropriately qualified mould hygienist to inspect the Applicant’s home and c arry out remediation measures if required, in accordance with the process outlined in section 2.1 below;  pay the Applicant the amount of $8,000 for the replacement of damaged contents items;  arrange for the attempted restoration of certain other contents items as set out in section 2.2 below;  in the event that the restoration attempts are unsuccessful, at its election, either arrange for the replacement of the relevant items or cash settle the Applicant for the estimated retail cost of replacing the items; and  pay the Applicant an additional $2,000 as compensation for non-financial loss. Case No: 386978 Determination Page 3 of 13 2 Reasons for Determination 2.1 Is the FSP’s settlement offer for building damage fair and reasonable? Dispute concerns extent of FSP’s liability for further repairs The Applicant’s policy provides cover for damage to her property caused by the events listed in the policy (including the insured event of “storm, rainwater or wind”), subject to the conditions and exclusions set out in the policy. The FSP accepts that the Applicant’s property was damaged by the hail storm in March 2010, although her claim was not lodged until over six months later. Based on its initial assessment of the damage, the FSP arranged for the repair of a number of broken roof tiles and accepted liability for resultant internal water damage to the property. However, the FSP advised that the internal repairs could not commence until the Applicant had addressed the various maintenance issues with the roof identified by the FSP’s builder (TS). The Applicant notified the FSP that the roof was continuing to leak following completion of the initial roofing repairs in late 2010. After further investigations and extended negotiations, the FSP agreed to replace the entire roof and carry out mould testing and remediation (although the FSP considered that at least some of the issues with the leaking roof were due to the poor pre-existing condition of the roof at the time of the storm in March 2010). The roof was replaced by the FSP’s builder (R) in mid -2013, following which there were no further leaks. However, the initial internal damage caused by the storm has not yet been repaired. There has also been further internal damage due to the ongoing iss ues with the roof, which resulted in water continuing to enter the property over a period of two and a half years. In addition to the internal water damage, the Applicant seeks compensation for a number of other items of internal and external damage, which she says were caused either by the hail storm in March 2010 or by the subsequent actions of the FSP’s contractors during the repair process. The Applicant seeks a cash settlement of at least $70,000 for repairing the outstanding damage to the building, based on quotes obtained from her contractors. The FSP disputes its liability for a number of the items claimed by the Applicant, on the basis that this damage was not caused by the storm (or the subsequent repairs), but by factors which are excluded under the policy (such as wear and tear, gradual deterioration and a lack of maintenance). Case No: 386978 Determination Page 4 of 13 Claim should be cash settled Having carefully reviewed the claim history, the Panel is satisfied it is appropriate for the outstanding repairs to be cash settled. While t he FSP’s contractors have already completed some of the repairs, the relationship between the parties has deteriorated significantly since then. In these circumstances, the Panel considers that a cash settlement is the only feasible way to resolve the claim. Accordingly, the Panel will now consider whether the amount of the cash settlement offered by the FSP for the repair of the building damage is fair and reasonable. Claimed damage has occurred over a number of years The parties have provided extensive information in relation to the various disputed items of damage. In particular, the FSP has provided a number of reports prepared by its builders and engineers over the life of the claim, while the Applicant has provided numerous photographs of the claimed damage to her property. However, the extended period over which the claimed damage occurred (as well as the conflicting opinions expressed by the FSP’s contractors) has added to the difficulty faced by the Panel in identifying the proximate cause of each item of damage. At the request of the Panel, the FSP appointed additional consultants to provide updated reports on the nature and extent of various items of damage to the Applicant’s property. The Panel has carefully reviewed all of the available information for the purpose of determining the extent of the FSP’s liability for the outstanding repairs. Recent inspection has identified additional damage for which FSP is liable The FSP’s settlement offer of $23,305.20 reflects a quotation provided by its builder, based on a scope of works prepared by the FSP’s assessor (MF) following an inspection of the property in December 2013 and with regard to an earlier report prepared by the FSP’s engineer (CS). In addition to the proposed cash settlement, FSP offered to arrange for the repair of the top section of the storm water pipe at the north-east corner of the house and the reconnection of the downpipe. The key items included in CS ’s scope of works were:  replacing the bathroom floor and wall tiles (other than the tiles in the shower recess), the kitchen wall and bench tiles and the laundry wall and vinyl floor tiles;  replacing the bathroom vanity and the installation of waterproofing;  repairing, sealing and repainting of walls and ceilings in a number of rooms at the property; and  checking and repairing (as required) all ceiling mounted wall lights. At FOS’s request, in August 2015, the FSP appointed another building consultant (M) to inspect the property and provide an updated report. Case No: 386978 Determination Page 5 of 13 M was primarily engaged to report on the extent of damage to the timber ceiling linings, flooring and skirtings at the property. However, he also provided his views on numerous other aspects of the damage identified by the Applicant. The Panel considers that M’s report pr ovides a relatively detailed and comprehensive analysis of the extent of the damage to the Applicant’s home which is properly attributable to the storm on March 2010 and/or the subsequent inadequate repairs. In addition to the damage included in CS ’s scope of works, M noted the following internal damage which he considered consistent with the storm, ongoing water entry and inadequate repairs:  water damage to a small section of the skirting boards on the lower level of the house as a result of water entry due to the disconnected down pipe;  gaps between the skirting boards and the walls on the upper level (although the skirting boards themselves were undamaged);  uneven gaps between the timber ceiling linings and the cornice trims and minor cosmetic damage to the internal ceiling linings (although in general the surface finish has not been affected);  gaps in the joints of timber window frames and door frames, doors sticking and minor gaps in areas such as the stair balustrades, due to the continual wetting and drying of these areas;  ongoing issues with dirt falling through the joints of the ceiling planks due to the failure of the FSP’s roofer to properly line the ceiling from above when installing new insulation during the roof repairs  permanent damage to chipboard fittings in the bathroom and kitchen (including the bathroom vanity and the kitchen benchtop). However, M attributed at least some of the damage in the bathroom and the kitchen to the effects of water from ordinary daily usage;  cracking of the plasterboard lining in various rooms due to ongoing water entry;  likely damage to the central heating unit, given the presence of water marks to the surrounding area;  water damage to the sloping ceiling above the deck and eaves areas, such that a number of the planks required replacement (although some of this damage was noted to be due to ongoing rotting and deterioration, rather than the leaking roof);  water damage to the eaves closure boards behind the barge boards, due to ongoing water entry through the roof ridge (although M noted that the boards could be refixed and did not require replacement); and  potential mould issues which should be addressed by testing and (if required) carrying out appropriate remediation measures. Based on his inspection, M prepared a broad-based estimate of $44,000 (excluding GST) for the repair of the claim-related. By contrast, M estimated the cost of repairing the non-claim related damage at approximately $14,000 (excluding GST). FSP is not liable for all of claimed damage As out lined above, the FSP’s building consultants (C S and M) have identified a significant amount of damage for which the FSP is liable, on the basis that this damage has been caused by the storm in March 2010, ongoing water damage and the initial inadequate repairs. Case No: 386978 Determination Page 6 of 13 However, having carefully reviewed the available information, the Panel is satisfied that the FSP is not liable for all of the items of damage claimed by the Applicant. The Applicant has obtained quotations for $65,000 and $70,000 from two builders (MW and VC). These quotations appear to have been prepared by each builder based on their assessment of the necessary repairs to the property. However, neither builder has provided any opinion as to the cause of the various items of damage. While the Applicant has provided numerous photographs of the damage, she has not provided any reports from appropriately qualified experts in order to rebut the findings of the FSP’s consultants that some of the claimed damage was not due to the storm or the subsequent a ctions of the FSP’s contractors. On the basis of the available information, the Panel is satisfied that the FSP is not liable for the following items of damage:  damage to the timber floors of the stair landing and the northern balcony, which several experts have confirmed was caused by ongoing exposure to sunlight rather than water entry. The FSP’s building consultant (M) confirmed that the exposed timber floors throughout the property were generally in good condition and had not cupped or warped (even in rooms which had sustained other water damage);  the bulk of the damage to the fascia and gutters, which was due to ongoing exposure to the elements as the result of gradual deterioration, wear and tear and a lack of maintenance (although it is quite possible that, as the Applicant maintains, a portion of this damage was due to the FSP’s repairer dislocating the fascia and failing to replace the galvanised metal corner in certain locations during the roof repairs);  the bulk of the damage to the external timber decking which M confirmed was not caused by the roof leaking, but was due to gradual deterioration as a result of ongoing exposure to weather conditions;  a significant proportion of the damage caused by water and mud entering the sub-floor storage space , which the FSP’s engineer (CS) confirmed was primarily due to the effects of naturally occurring groundwater together with the significant slope of the property (although quite possibly exacerbated by the effects of the broken storm water pipe at the north east corner of the property);  cracking to the external brickwork at the property, the collapse of the retaining wall at the front of the property and damage to the pool filter and the hot water system, as there is insufficient information to link this damage to the storm or the subsequent repairs;  any damage to the stormwater drain (other than the top section) as there is insufficient evidence to establish this was caused by the storm or the FSP’s subsequent repairs; and  damage to the fence at the rear of the property which is more likely to have been due to the poor condition of the fence at the time of the storm. Settlement amount should be increased to $56,870 For the reasons outlined above (including the duration of the claim and the various factors affecting the property), it is difficult to determine with any certainty the likely cost of repairing the damage for which the FSP is liable on the basis set out above. Case No: 386978 Determination Page 7 of 13 The most recent assessment of the damage to the property is that carried out by the FSP ’s building consultant (M) in August 2015, based on which M estimated the cost of the claim-related repairs at $44,000 (excluding GST). M’s estimate included some damage for which the Panel considers the FSP is not liable (such as the damage to the retaini ng wall and some of the damage to the sub- floor storage area). It also included some damage which, under the terms of the policy, should be included in the contents settlement, rather than the building settlement (for example, damage to the air conditioner, blinds and drapes). On the other hand, M’s estimate did not include some costs related to issues for which the FSP is liable, such as costs associated with the recommissioning of the central heating system and addressing the ongoing issues with debris falling through the ceiling linings. It is also unclear whether the proposed mould inspection and remediation measures were accounted for in M’s estimate. Further, M’s estimate did not include any allowance for temporary accommodation, which the Panel considers will reasonably be required, given the nature and extent of the necessary repairs. While the Panel does not necessarily agree with M’s conclusions as to the cause of the damage in all respects, it considers that M’s estimate represents a reasonable starting point for determining an appropriate settlement amount. The quotations of $65,000 and $70,000 provided by the Applicant’s builders are based on their assessment of the repairs required to the property. However, it is not clear whether (and, if so, to what extent the Applicant’s builders) took into account the cause of the damage to each item in preparing their quotations. Further, the quotations prepared by the Applicant’s builders include the repair of some damage for which the FSP is not liable, for the reasons outlined above. For example, VC’s quotation of $70,000 includes an amount of $8,000 for the replacement of the external timber decking. Accordingly, it is likely that the quotations prepared by the Applicant’s builders overestimate the cost of repairing the claim – related damage. However, in circumstances where the FSP elected to undertake the necessary repairs to the property (and such repairs were partially completed), the Panel considers it is particularly important to ensure that the App licant has sufficient funds to enable her to complete the repairs herself. The estimate of $44,000 provided by M includes a contingency of 10% (on a pre- GST basis). However, the Panel considers that specific allowance should also be made for the temporary accommodation ($3,000), as well as measures to deal with the ongoing ceiling debris issue ($2,500). Finally, the Panel considers that it is fair in all the circumstances that M’s initial estimate of $44,000 also be increased by an additional 5% (i.e.$2,200) in order to provide a buffer for other unforeseen costs incurred by the Applicant in the process of carrying out the repairs to her property. Case No: 386978 Determination Page 8 of 13 On this basis, the FSP is required to cash settle the Applicant for $56,870 (including GST) for the damage to her home. In addition, the FSP is required to appoint an appropriately qualified mould hygienist to inspect the Applicant’s home (and carry out appropriate testing) to determine whether there are any ongoing issues with mould which may adversely impact the health of the Applicant and her family. To the extent that the mould hygienist identifies any such issues, the FSP is to pay for appropriate remediation measures, in accordance with the hygenist’s recommendations. As the increased cash settlement amount has been based on a current quotation, the FSP is not required to pay interest on this amount. 2.2 Is the FSP’s settlement offer for contents fair and reasonable? Dispute concerns extent of contents damage The Applicant’s policy provides cover for damage to her contents caused by storm, up to the maximum sum insured of $60,214. The FSP has offered to cash settle the Applicant for $10,000 for water damage to her contents items. However, it is not clear on what basis this amount was determined given the offer was made without the FSP having arranged for an inspection of the damaged items. However, the Applicant says the total value of her damaged contents items exceeds the maximum sum insured of $60,214. She says the damaged items include:  several rugs with a total value of approximately $40,000;  a leather lounge suite valued at approximately $10,000;  window blinds with a total value of approximately $7,000;  a mattress valued at approximately $4,000;  various items of furniture and office equipment valued at approximately $2,000  a wall unit air conditioner valued at $1,560. The Applicant says most of the water damage to her contents items has occurred as a result of the ongoing water entry issues over a period of two and a half years, due to the inadequacy of the initial roofing repairs undertaken by the FSP’s contractors. The Applicant also seeks cover for the cost of dry cleaning her clothing to remove dust which she says arose as a result of the FSP’s roofer failing to provide adequate protection while he carried out the roof repairs. Assessment of contents damage has been unreasonably delayed The Applicant’s contents claim was not properly assessed until September 2015 when, at the specific request of FOS, the FSP sent an assessor to the property to review the water damaged contents items. The FSP has not satisfactorily explained the reason for this delay. While the Applicant did not submit a detailed list of her damaged contents items to the FSP until March 2015, she says she provided a list to the FSP’s contractor (R) who carried out the roof repairs in mid-2013. Case No: 386978 Determination Page 9 of 13 In any event, it is clear that the FSP and its contractors were aware from a relatively early stage in the claim process that there had been water damage to a number of the Applicant’s contents. When the Applicant emailed the FSP in March 2011 to raise concerns about the quality of the initial roof repairs, she noted that the ongoing roof leaks were causing damage to various floor rugs. The FSP’s contractor (R) subsequently took photographs of some of the damaged items in mid-2013, while the assessor (MF) noted that the contents claim remained to be assessed when he attended the property in December 2013. Regardless of whether the Applicant had provided a detailed schedule of loss, it was incumb ent on the FSP to arrange for a proper assessment of the Applicant’s claim for contents damage in the interests of determining an appropriate settlement amount. In circumstances where the FSP has failed to do so (and given much of the damage has occurred due to the initial inadequate roof repairs), the Panel considers it important to ensure that the Applicant is not unduly disadvantaged by the delay. Nevertheless, given the significant amounts claimed, the Applicant is required to provide reasonable evidence to substantiate the nature and extent of her claimed loss. Available information does not clearly establish cause of damage As outlined above, the FSP’s contractors have confirmed that the Applicant’s property continued to be affected by ongoing roof leaks in a number of areas, from the initial hail storm in March 2010 until the roof was finally replaced in mid-2013. The numerous photographs provided by the Applicant confirm that a number of her contents items were affected by water during this period. However, it is difficult to determine from these photographs whether the damage is such that the relevant items (in particular, the lounge suite and the rugs) need to be replaced, or whether they can be adequately restored. The assessor (CL) who attended th e Applicant’s property at the request of FOS in September 2015 reported that the interior of the house was generally dirty and in poor condition (although it is unclear to what extent this was due to the ongoing water entry issues experienced several years earlier). Accordingly, the assessor concluded that all claimed items were in poor condition and he was unable to clearly establish whether there had been specific staining or water damage to a number of items. FSP is liable for replacement of some items Given the nature and extent of the ongoing water entry issues (as shown in the photographs), the Panel accepts that it is likely there has been some damage to contents items. The FSP’s building consultant (M) who inspected the property in September 2015 confirmed that the reverse cycle air conditioner had most likely been damaged, given Case No: 386978 Determination Page 10 of 13 the water marks apparent in the surrounding area. M also confirmed that there was water damage to two Venetian blinds and the dining room drapes (for which he estimated a replacement cost of $477). In her correspondence to the FSP throughout the claim, the Applicant referred to various items of office and audio visual equipment which were rendered inoperable by water damage. While the Applicant has disposed of some of these items, the Panel considers it reasonable that the FSP be required to cash settle her for the reasonable replacement value. The Applicant has also claimed for damage to various towels and blankets which she used to mop up dirty water after the initial storm and on an ongoing basis, as well as for several small rugs which she threw out because of the extent of the damage. The Panel considers it is reasonable in the circumstances to make some allowance for these items. The Panel considers that it is fair in all the circumstances that the FSP cash settle the Applicant for the amount of $8,000 in respect of the various items discussed above. For the avoidance of doubt, this amount is instead of (and not in addition to) the cash settlement of $10,000 offered by the FSP. FSP is required to arrange for restoration of some items The FSP’s assessor (CL) who viewed the damaged contents items in September 2015 was unable to conclusively determine the cause of damage to the various rugs identified by the Applicant and whether they may be able to be successfully restored. He was also unable to determine whether the lounge suite could be restored or would need to be replaced. Given the extent of the ongoing water entry issues (as reflected in the information provided) and the delay in assessing the claim, the Panel considers that the FSP should be liable for the damage to the rugs and the lounge suite. However, based on the photographs provided by the parties, the Panel is not satisfied that the replacement of these items is necessarily required. Accordingly, and consistent with CL’s recommendation, the FSP is required to arrange for the assessment and attempted restoration of the rugs and lounge suite by a suitably experienced restoration company. The FSP is also to arrange for the cleaning and restoration of the blinds and drapes (other than those identified above as requiring replacement) by a suitably qualified professional. In the event that any of the above items cannot be satisfactorily restored, the FSP is to, at its election, either arrange for the replacement of the relevant items or cash settle the Applicant for the estimated retail cost of replacing those items. While the FSP’s assessor (CL) was unable to determine whether the dust visible on the Applicant’s cl othing was due to the roof repairs, he considered that it was reasonable in the circumstances for the FSP to arrange for dry cleaning of these items. The Panel is of the same view. Case No: 386978 Determination Page 11 of 13 FSP is not liable for remaining items For the reasons outlined above, the Panel is not satisfied that the inundation of water and mud to the sub-floor storage space was primarily due to the storm in March 2010 or the subsequent repairs by the FSP’s contractors. Accordingly, the Panel has not allowed for resultant damage to furniture and other items in this area for the purpose of determining the FSP’s liability for the contents claim. The FSP’s assessor (CL) inspected the claimed damage to the mattress in the rear bedroom but was able to identify only a very small stain on the s urface, the cause of which was not clear. On this basis, the Panel considers the FSP is not required to address the damage to this mattress (or the mattress in the front bedroom which has been thrown away by the Applicant). 2.3 Is the Applicant entitled to compensation? Applicant is entitled to compensation for non-financial loss Under paragraph 9.3(b) of the Terms of Reference, FOS may award compensation (capped at $3,000) for non-financial loss where an applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. As outlined above, it has taken an excessive amount of time to resolve the Applicant’s claim. It is now almost five years sinc e the claim was first lodged. The Applicant says she has suffered considerable stress and inconvenience as a result of the initial inadequate repairs by the FSP’s contractors and the extended delay in resolving the claim and completing the repairs to the property. The Applicant says she and her family have suffered ongoing health issues as a result of living in a moisture-affected environment. She also says she has suffered several falls due to the inadequate repairs and ongoing unrepaired damage. The Panel acknowledges that not all of the delays experienced during the claim process are attributable to the conduct of the FSP and its contractors. At various stages during the claim process, the FSP was waiting for the Applicant to provide further information and/or obtain her own expert reports. It appears that the Applicant has also raised additional areas of damage as the claim progressed. However, having carefully reviewed the claim history, the Panel considers that the bulk of the delays experienced during the claim process (and the stress and inconvenience suffered by the Applicant as a result) is primarily due to the manner in which the FSP managed the claim. It is clear that the initial roof repairs carried out by the FSP’s contractors were unsatisfactory and may have caused further damage to the roof (due to the breakage of additional tiles). The FSP failed to respond promptly to the Applicant’s concerns Case No: 386978 Determination Page 12 of 13 about the quality of the roof repairs, which were subsequently found to be at least partially justified. The Panel considers that, once the need for additional roof repairs was required, the FSP should have acted promptly to repair the internal water damage and assess the damage to the Applicant’s contents items. By this time, the FSP was aware that the Applicant had been living in sub-standard conditions for more than two and a half years. In these circumstances, the Panel considers that an award of compensation for non- financial loss in the amount of $2,000 is appropriate. Case No: 386978 Determination Page 13 of 13 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. This decision has been made by a Panel. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this Determination, the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only.