Home / Financial Firm (Unknown - Insurer) / Determination 386929

Determination 386929

Storm-related vehicle impact damage to home: FSP cash settlement offer on inadequate scope of works versus repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2016-05-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home was damaged when a vehicle crashed into it. The FSP offered a cash settlement based on a quote of $44,434.72, which the applicant said omitted storage, accommodation and other costs. AFCA found the cash offer unfair and ordered the FSP to obtain a revised scope of works and arrange the repairs.

Given uncertainty about impact damage, possible sub-floor and unspecified works, and temporary accommodation and storage costs, a cash settlement on the existing scope would be unfair, so the FSP must carry out the repairs under the policy.

Issues

Subjects and remedies

home or building damagemotor vehicle collisionreassess claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 386929 Determination Page 1 of 5 Case number: 386929 23 May 2016 1 Overview 1.1 Dispute The applicant holds a Home Building and Contents Policy with the financial service provider (FSP). On 8 September 2014, the applicant’s home was damaged when a vehicle crashed into the property. A dispute has arisen as to the Scope of Works required to repair the property. The FSP have offered to cash settle the applicant’s claim. The applicant wants the FSP to complete the repairs to the property plus meet the costs of any offsite accommodation and storage costs. 1.2 Issues and key findings Is the FSP s’ offer to cash settle fair in the circumstances? The FSP is offer to cash settle the claim on the basis of its Scope of Works is not fair in the circumstances. The offer does not provide for the repair of all damage sustained to the property nor allow for any temporary accommodation required and/or storage costs. Should the FSP repair the property? Given the damage to the property, it is fair in the circumstances that the FSP attend to the repairs rather than cash settle the claim. In attending to the repairs, it may be necessary for the applicant to complete some maintenance to the property to be agreed between the parties. 1.3 Determination This determination is partially in favour of the applicant. The FSP is to obtain a revised Scope of Works and arrange for the repair of the applicant’s property in accordance with the terms of the policy. Insofar as the repairs cannot be completed until maintenance work is performed by the applicant, then the parties should agree to a timeframe for the completion of that work. In the event that the parties are unable to reach an agreement as to a suitable timeframe then the parties may agree to cash settle the claim in accordance with the terms and conditions of the policy. Case No: 386929 Determination Page 2 of 5 2 Reasons for determination This determination is reached after reviewing all of the information exchanged and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. The dispute is essentially about whether the FSP’s offer to cash settle the applicant’s claim is fair and reasonable in the circumstances and whether the FSP’s Scope of Works is fair in the circumstances. It was agreed that the applicant would obtain architectural drawings and a further engineering report and Scope of Works. Although this was agreed to in November 2015, the applicant, despite repeated attempts, has been unable to obtain the Scope of Works from his engineer. 2.1 Is the FSP ’ s offer to cash settle the claim fair in all the circumstances? The offer to cash settle the claim on the basis of the Scope of Works is not fair in the circumstances. The claim arose when a vehicle collided into the front of the applicant’s property on 8 September 2014. The FSP had a repairer attend to complete the make safe repairs. The repairer recommended that an engineer attend th e applicant’s property. On 29 October 2014 C Pty Ltd provided a report and two quotes were requested. The FSP authorised repairs on 3 December 2014 through PP who again requested a Scope of Works. At that time, it was recommended that the claim be cash settled due to pre- existing issues with the property. The FSP’s assessor recommended cash settlement due to movement issues of the property, a defective guttering system and soil not being graded away from the property. The applicant obtained an independent structural engineer’s report from KBT. The engineer considered the damage to the property was most likely due to the impact as the hairline cracks identified in the ceiling and surrounding walls were first observed post- accident. He recommended a site inspection and classification report be conducted by a qualified civil engineer to determine whether the hairline cracking was in fact due to seasonal movement as claimed by the FSP. In a supplementary report, KBT indicated the poor site drainage may not have affected the footing performance as there was no sign of cracks to the external brickwork elsewhere in the property. The FSP obtained a further engineer’s report based on a visual inspection of the property. The report from FMG dated 17 July 2015 identifies that the vehicle impact caused damage to the front elevation of the house but otherwise the remainder of the defects and damage was non-structural and was not unexpected on highly reactive soil. Case No: 386929 Determination Page 3 of 5 The Scope of Works accompanying the report from FMG is quite detailed and include the need as part of any repair for the repairer to arrange:  inspection of the sub floor  engagement of a fully qualified structural engineer to assess issues during repairs  potential additional works. The report does not refer to the repairs required to the fence, roof or replacement letterbox. The FSPs offer based on the quotation obtained from JL of $44,434.72 to repair the property does not take into account the possibility of unidentified building and works not specified in the Scope being exposed, possible sub-floor damage, the need to engage a fully qualified structural engineer or damage to the letterbox, roof or fence. In addition, the FSP has failed to take into account the likely storage cost or temporary accommodation costs. The applicant in an email dated 11 June 2015 provided an estimate of the following costs:  Storage  Estimate 3 months  $1,479  $1,608  Transport  Cost of removalist to transport property from applicant’s premises to storage accommodation during repairs  $6,000  Accommodation costs  Estimate two to three months @$289 per night  $26,010 The FSP has provided no response to these estimates. The applicant has assessed the accommodation costs based on a nightly rate at an apartment. It is likely that the FSP would be able to organise accommodation at a cheaper rate from this. The potential for additional works being required with additional associated costs is high. The risk associated with the repairs would be transferred to the applicant which is not consistent with the intention of the parties when entering the insurance contract. The applicant would be exposed to the possibility of additional works being required, temporary accommodation and storage costs as well as the engineering costs, Further the applicant would have to bear the cost of replacing the fencing and letterbox as well as the roof repairs. To allow the FSP to cash settle on the basis of the quotations in the circumstances would, in my view, be unfair. 2.2 Should the FSP repair the property? Whilst the terms of the policy allow for the FSP to cash settle the claim, I am not satisfied given the nature of the damage to the applicant’s property that it would be fair to cash settle the claim. In my view, given the uncertainty as to the damage sustained to the property from impact, it is only fair that the FSP attend to the actual repairs. Case No: 386929 Determination Page 4 of 5 I accept the comments made by the assessor and engineers that there may be pre- existing issues with the property. This should be clarified by obtaining a further report from FMG. By agreeing to repair the property, the FSP will be able to account for any unidentified building or works not specified in the Scope, will be able to account for any sub-floor damage due to the impact and ensure that the repairs are conducted to an appropriate standard. The FSP will be able to arrange for suitable temporary accommodation and storage if required and complete the repairs to the fence and letterbox. Insofar as repairs to the roof are concerned, I accept that there are issues with the guttering which the applicant should attend to as part of the repair process. The FSP should not be required to repair the property until such time as the guttering is repaired. It may be tha t the applicant can agree with the FSP’s repairer to meet the costs associated with replacing the guttering as part of the repair process. Only if the applicant is not prepared to replace the guttering, do I believe it would be fair that the FSP be entitled to cash settle the claim. In the event that the FSP is to cash settle the claim on this basis, then the FSP must obtain a revised Scope of Work taking into account the issues raised in section 2.1 of this determination and make suitable allowance for those items as well as the removal and storage of items during the repair process as well as temporary accommodation. Case No: 386929 Determination Page 5 of 5 3 Supporting information 3.1 Relevant documentation  Applicant’s submissions.  FSP’s submissions.  Report from C Pty Ltd dated 29/10/2014.  Report from IL.  Applicant report KBT 23/4/2015.  Supplementary report KBT.  Additional costings supplied by applicant 11 June 2015.  JL quote - $4,434.72.  GE engineering report – 17 July 2015.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.