Denial of rental property lounge room floor tile damage claim for faulty workmanship
Summary
The applicants claimed under a landlords policy after rainwater entered their rental property and lifted lounge room floor tiles. The FSP denied the claim for faulty workmanship. AFCA decided in favour of the applicants, requiring the claim to be accepted with interest on any cash settlement, and declined non-financial loss.
The FSP did not establish on the balance of probabilities that faulty workmanship or gradual deterioration was the dominant cause, rather than the rainwater, so the exclusion did not apply.
Subjects and remedies
pay claimpay interest
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
claim
Determination
Case No: 385813 Determination Page 1 of 7
Case number : 385813 25 June 2015
1 Overview
The Applicants claimed against a landlords insurance policy held with the
Financial Services Provider (FSP) for damage to the floor tiles in the lounge room
of their rental property, after water entered through the ceiling.
The FSP denied the claim on the basis the damage was caused by faulty
workmanship which is excluded under the policy.
1.1 Issue and key findings
Is the FSP entitled to deny the claim?
The FSP is not entitled to deny the claim because:
The Applicants have established a claim under the policy.
The dominant cause of the damage was the rainwater.
The FSP has not established that there was faulty workmanship that caused
the damage.
1.2 Determination
This Determination is in favour of the Applicants.
The FSP must accept the claim in accordance with the terms and conditions of
the policy. The FSP must pay the Applicants interest on any cash settlement in
accordance with the Insurance Contracts Act from 16 September 2014 to the date
payment is made.
Case No: 385813 Determination Page 2 of 7
2 Reasons for Determination
2.1 The FOS Approach
I have determined this dispute based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous Financial Ombudsman Service (FOS) decisions. I have taken into
account all the material submitted by the parties, both before and after the
Recommendation was issued.
There has been a full exchange of all documents relied on to make this
Determination and each party has had the opportunity to address any issues
raised by the other.
2.2 Is the FSP entitled to deny the claim?
The Applicants have established a claim under the policy
The Applicants ‟ policy covers accidental loss or damage, which is cover for
unintended or unexpected events.
Rainwater entered the Applicants ‟ rental property through the roof and ceiling and
pooled on the tiled floor in the lounge room. Two weeks later the floor tiles had
lifted and required replacement.
The FSP has accepted other aspects of the Applicants ‟ claim in respect of this
event, but not the damage to the floor tiles.
I am satisfied the Applicants have a claim under the policy for accidental loss or
damage.
The onus therefore shifts to the FSP to establish it has a basis to deny the claim.
The FSP seeks to rely on the “f aulty workmanship ” exclusion
The policy contains an exclusion for faulty workmanship. The relevant clause is
set out in section 3.1 below.
The FSP relies on the reports of two builders, GBSC and SLP.
GBSC notes that there were “drummy” sounding tiles throughout the property,
citing glue failure and poor workmanship as the cause of the failure of the tiles.
SLP explains that tiles “pop” when moisture penetrates the underside of the tile
due to improper use of adhesive and when there are no control joints to relieve
the pressure from the swelling, resulting from the penetrated moisture.
The two reports are summarised in section 3.2 below.
Faulty workmanship did not cause the loss
Despite the two builders‟ reports, I am not satisfied that faulty workmanship was
the cause of the loss.
Case No: 385813 Determination Page 3 of 7
The property was built in 1999, and the Applicants had owned it since 2003. The
Applicants stated there have been no issues with the floor during this time. The
tiles “popped” un derneath where the roof leaked soon after the event.
Some of the defects as described by GBSC, such as the tiles not being uniform,
clearly did not contribute or cause the loss.
SLP acknowledged that he was not overly familiar in the field, noting that his
conclusions were drawn from his own experience and from research he
conducted after inspecting the site.
Drummy sounding tiles are not necessarily defective or going to perform poorly.
As the Applicants noted, there are different methods of measuring drummy tiles to
determine whether they are defective , but the FSP was unable to articulate what,
if any, of these methods were used. As such, the drummy sound of the tiles may
be of no relevance. This is supported by the article supplied by the Applicants
titled “The assessment of hollow or drummy tiling” and summarised in section 3.3
below.
Both builders appear to assume that lifted tiles must be the result of poor
workmanship and a failure of the adhesive, given tiles are used in wet areas and
do not lift. However, wet areas (which do not include a lounge room) have higher
and specific standards applicable to them. No evidence was provided by either
builder as to a breach of the standards applicable to the tiling of the lounge room,
at the time the property was built.
The Applicants provided evidence that it was not until 2007 that control joints (as
referred to by SLP) were required. According to the Applicants, the 2007
standards also introduced new sections for tiles adhesives and a new method for
spreading tile adhesives. This was not disputed by the FSP.
The Applicants also referred to photos that showed adhesive on the tiles and
asked the FSP to stipulate how much adhesive was meant to be used, as
opposed to what was used. The FSP did not answer this question, merely stating
it had been advised that the 1999 standards required sufficient and adequate
adhesive to be used and in any event the Australian Standards were not relevant
given both builders noted insufficient or substandard adhesive. I do not agree with
this point as the Australian Standards provide a yardstick on which to measure
what is insufficient or substandard workmanship at the relevant time. The FSP
has not explained how the tiling did not meet those relevant standards when the
property was built.
The Applicants also provided evidence, which I accept, that during a flood, the
adhesive can be compromised. While the pooling of rainwater on the floor is not
the same as a flood, it is evidence that exposure to water can compromise the
adhesive. This is particularly relevant for areas that are not designated wet areas.
This means that the builder‟s observation of insufficient adhesive may be as a
result of the penetrated water, as opposed to being the cause of the problem.
On balance, bearing in mind the relevant standards at the time, the FSP has not
established that the dominant cause of the damage to the tiles was faulty
Case No: 385813 Determination Page 4 of 7
workmanship. Nor has the FSP established that the dominant cause of the
damage was gradual deterioration or wear and tear.
I am also not satisfied that there were two equal or near equal concurrent causes
of loss, one of which was faulty workmanship or gradual deterioration. As such,
the Wayne Tank principle (as described in section 3.4 below) does not apply.
The Applicants did not fail in their duty to mitigate
I also do not accept that the Applicants failed to mitigate their loss by replacing
the tiles with matching tiles, as opposed to using feature tiles for any tiles that
broke when removed. Having reviewed the photos of the lounge room floor, which
is an expanse of white tiles, it was reasonable to use matching tiles to replace the
damaged tiles.
The Applicants are not entitled to non-financial loss
The Applicants sought non financial loss for the inconvenience caused to their
tenants as they were unable to have full use of the house for five days.
The FSP noted the Applicants are not entitled to claim loss of rent as this was an
option not selected on the policy. The FSP also notes that as the tenants were out
of the house for a significant period of the day, they would not have been greatly
inconvenienced.
It took close to six months for the damage to the property to be repaired. While
some of this delay was due to the remote location for the property and covered
the Christmas period, the Applicants‟ angst is understandable. Nevertheless, in
this instance, given the minimal disruption, it is not sufficient to justify an award for
non-financial loss.
Case No: 385813 Determination Page 5 of 7
3 Supporting information
3.1 Relevant Policy Provisions
Exclusions to your cover
We will not cover any loss or damage as a res ult of, or caused by:
...
erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear
...
a defect in an item, structural defects, or faulty workmanship or design
...
3.2 Summary of evidence
Record Key points
Building report
15 Oct o b er 2003
(attached to Appl i c ant s ‟
dispute form)
Built in 1999
The home was well constructed and finished.
All work comp leted t o a high standard of finish .
All floors have a tiled finish throughout the house .
Tiler quote
2 Aug u s t 2014
On inspection of floor all tiles locate in lounge room have
lifted d ue to water damage caused by a leak in the roof
overhead which has resulted in the tiles lifting.
FSP’s Builder (GBSC)
Report
28 August 2014
Inspected the property and found floor tiles throughout the
property sound “drummy” in various areas
Gaps between tiles are not uniform, some tiles are proud
Lifting tiles are not due to water entry as they are used in
wet areas.
Glue failure and poor workmanship seem to be the cause
of failure.
Floor tiling work appears to be an “untradesman” like
standard.
Applic ant s ’ Builder
(SLP)
Report
18 September 2014
Inspected property on Friday 12 September 2014
Tenant says property suffered a major water leak from the
roof, resulting in water pooling over the tiled area claimed.
The water was there for several hours before the tenants
discovered and mopped it up.
Many floor tiles began displacing within two weeks of the
roof leak incident.
Popping or drummy tiles are generally caused by:
- Use of substandard or incorrect adhesive
- Insufficient coverage of adhesive
- Excess ive floor movement
- Tiles growing in size as they absorb moisture
- No allowance for expansion (control joints)
The tiles appear to have popped because they had
absorbed moisture from the roof leak, causing them to
swell.
Case No: 385813 Determination Page 6 of 7
Tiles can only absorb water fro m th e unsealed side
(underside).
Water would not be absorbed through the sealed (glazed)
face of the tile .
If the adhesive was appropriate and of good coverage, the
underside‟s exposure to moisture would be minimal and
should not be adversely affected .
A tiled shower recess or external balcony, although
constantly exposed to water, will generally not „pop‟ if laid
correctly .
The extent of „popped‟ tiles would indicate a possible pre -
existing defect (drummy tiles), allowing water to spread
and collect beneath the tiles .
Although water may have been removed from the topside,
water beneath the tiles would not have been able to dry out
and would slowly absorb into the tiles .
As the room was fully tiled with no control joints, the tiles
would not have been able to move once they bega n
swelling, causing increased pressure to lift.
3.3 Applicants ’ research
Record Key points
“Homeowner: Guide to
Rebuilding after a
flood” by Building
Services Authority of
Queensland
December 2009
Floor tiles: Adhesive may be compromised and may
become drummy and retain contaminants.”
The assessment of
hollow or drummy tiling
By Colin Cass , from
“Tile Today”
The costs of rem o ving and disposing of “hollow” sounded
tiles are often incurred unnecessarily as they are capable
of performing satisfactorily for a reasonable period of time.
Some hollow sounding tiling will fail in t h e short term, while
some w i ll perform satisfactorily for years or decades.
There are different metho ds available for assessing the
soundness of the tiles that provide more valid and reliable
results than simply tapping the surface of the t iling and
listening to the resulting sound.
A condition survey, together with visual observation and
destructive investigation, is useful in determin ing how the
drummy sounding tiles will perform in the future.
Destructive testing that reveals inadequate amount of
adhesive or adhesive that is brea king down o r not bonding,
usually mean s that the long term viability o f the tiling is
seriously compromised and replacement is warranted.
Case No: 385813 Determination Page 7 of 7
3.4 Relevant Law
Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corp Ltd (1974) QB
57
Lord Denning MR said:
“… there was not one dominant cause, but two causes which were equal or nearly equal in
their efficiency in bringing about the damage. One of them is within the general words and
would render the ins urers liable. The other is within the exception and would exempt them
from liability. In such a case it would seem that the insurers can rely on the exception
clause….”