Home / Financial Firm (Unknown - Insurer) / Determination 385350

Determination 385350

Movement damage claims: liability and settlement amount

FirmFinancial Firm (Unknown - Insurer)
Decided2015-09-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$53,678
Non-financial loss—
Amount claimed$100,000
SourceAFCA PDF

Summary

The Applicant claimed about $100,000 for movement damage to his home from a stormwater overflow and a later storm. AFCA found the FSP liable for part of the damage and ordered $50,678 plus $3,000 towards engineer report costs, with no interest.

The insurer bears the onus to prove the proximate cause was excluded, so it is liable for damage caused by the insured overflow event while natural earth movement and pre-existing stump damage are apportioned out.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount Case number: 385350 17 August 2015 1 Overview 1.1 Dispute In September 2009, the Applicant lodged a claim under his home insurance policy with the Financial Services Provider (FSP) for movement damage to his home due to the overflow of water from a stormwater downpipe. The FSP accepted the Applicant’s claim but did not commence repairs immediately, in order to allow time for the sub-floor area to dry out. Before repairs could commence, the Applicant lodged a second claim for further movement damage to the property following a storm in February 2011. Despite protracted negotiations, the parties were unable to agree on an appropriate cash settlement amount for both claims. After carrying out further investigations, the FSP says that all of the claimed damage was caused by factors which are excluded under the policy and has reduced its settlement offer to $16,500 (being the amount quoted for the repair of the internal damage only). The Applicant seeks cover for the cost of repairing all of the damage to the property (including re-stumping), at an estimated cost of approximately $100,000. 1.2 Issue and key findings Is the FSP liable for the movement damage? The available information establishes that the Applicant’s property experienced extensive and varied movement damage, which was caused by a number of contributing factors. While some of the damage was caused by the overflowing drainpipe in September 2009 (and, to a lesser extent, the stormwater run-off in February 2011), the remainder was due to naturally occurring earth movement, which is not covered under the policy. Further, some parts of the property which require replacement as part of the repairs had pre-existing damage at the time the initial event occurred. Accordingly, it is fair in all the circumstances that the FSP be liable for some (but not all) of the costs of repairing the movement damage to the property. 1.3 Determination Case No: 385350 Determination Page 2 of 13 This Determination is partly in favour of the Applicant. The FSP is to pay the Applicant the amount of $50,678 in full and final settlement of both his claims. The FSP is to pay the Applicant an additional amount of $3,000 as reimbursement of costs incurred in obtaining reports from his engineer (LD). Case No: 385350 Determination Page 3 of 13 2 Reasons for Determination 2.1 Is the FSP liable for the movement damage? Policy provides cover for insured events subject to exclusions The Applicant is required to show that, on the balance of probabilities, he has suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. If the Applicant is able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The policy provides cover for damage to the Applicant’s property caused by the events listed in the policy, including the insured events of “storm, rainwater or wind”, “landslide and subsidence” and “water or liquid damage”. This c over is provided subject to the conditions and exclusions set out in the policy. The policy contains general exclusions for loss or damage which occurs as a result of, or arising from:  landslide or subsidence (except to the extent covered under the insured event of “landslide and subsidence”);  settling, shrinkage or any movement of earth; or  erosion, rust, corrosion, gradual deterioration, depreciation or wear or tear. Applicant has established a prima facie claim The FSP accepts that the Applicant’s property has suffered significant movement damage which has worsened over time, such that the building now requires complete re-stumping. The Applicant has provided detailed reports from his civil engineer (LD) which conclude that the damage to his property was caused by earth movement due to the inundation of the sub-floor soils by the overflowing downpipe in September 2009 and stormwater run-off in February 2011. The FSP’s claim records reflect that it initially accepted both of the Applicant’s claims, based on the findings of its engineer (BH), who inspected the property on several occasions over the two year period between October 2009 and October 2011. It was only when the FSP appointed another engineer (MC) in late 2013 (after the parties had been unable to agree on an appropriate settlement amount), that it sought to deny liability for the movement damage to the property. On this basis, the Panel is satisfied that the Applicant has established a prima facie claim under the insured event of “water or liquid damage” (in relation to the overflowing downpipe in September 2009) and/or the insured event of “storm, rainwater or wind” (in relation to the storm in February 2011 ). Case No: 385350 Determination Page 4 of 13 In these circumstances, the FSP bears the onus of establishing that, on the balance of probabilities, it is entitled to rely on a policy exclusion to deny liability for all or part of the Applicant’s claim s. In order to do so, the FSP must show that the proximate cause of the movement damage to the Applicant’s property (that is, the real, effective or dominant cause) was one or more of the excluded factors outlined above. The FSP says the proximate cause of the movement damage to the property was the gradual deterioration of the timber stumps over time, as well as differential foundation movement caused by naturally occurring changes in the moisture content of the extremely reactive foundation soils. Dispute primarily concerns extent of damage caused by 2009 event As outlined above, the claimed damage relates to two separate events in September 2009 and February 2011, both of which resulted in water running into the sub- floor area under the Applicant’s house. The available information suggests that the second event largely affected the same area as the first event, and caused only limited additional damage. The FSP’s original engineer (BH) indicated that the only additional damage which could be attributed to the second event was localised subsidence under one of the stumps under the dividing wall in the central area of the house. The Applicant’s engineer (LD) also acknowledged in a conversation with the FOS Case Manager on 28 May 2015 that he considered the bulk of the movement damage at the property to be due to the effects of the overflowing downpipe in 2009, not the stormwater run-off in February 2011. Parties have provided conflicting engineers’ reports The Applicant’s property is situated on extremely reactive (class “E”) clay foundation soils, which are known to exhibit a high degree of volumetric change as a result of variations in moisture content. The available information establishes that the property has experienced extensive and ongoing movement during the years since the initial claim was lodged in late 2009. The Panel notes that both the features of the property, and the length of time which has passed, increase the difficulty of accurately identifying the cause of the movement damage observed to various parts of the property. Each of the two engineers appointed by the FSP (BH and MC), and the engineer appointed by the Applicant (LD), have provided differing views as to the cause of the extensive movement damage observed at the property. The most significant variance is between the views expressed by the FSP’s second engineer (MC) (on the basis of whose reports the FSP essentially denied all liability) and the Applicant’s engineer (LD), who considered that all of the movement damage at the property was due to the inundation from the downpipe in September 2009. Case No: 385350 Determination Page 5 of 13 Part of movement damage was caused by overflowing pipe The Panel accepts that, as engineers, each of BH, MC and LD are appropriately qualified to provide a view as to the cause of the movement damage at the Applicant’s property. However, the Panel notes that neither MC nor LD inspected the property until more than four years after the initial event occurred. MC and LD did have the benefit of reviewing BH’s reports and the results of the level surveys he conducted in October 2009, April 2010 and August 2011. However, MC and LD have each drawn differing inferences from this information, which in part explains the conflicting conclusions they reached. Among other things, MC and LD disagreed as to which point in the house should have been used as the zero reference point. In these circumstances, the Panel considers that it is appropriate to place significant weight on the findings of BH, who inspected the damage to the property on at least three occasions over a period of almost two years, including after the sub-floor was affected by stormwater in February 2012. As a locally based engineer, BH also had the benefit of familiarity with the characteristics of the extremely reactive clay soils found in the region. Further, the FSP accepted and relied on BH’s reports over an extended period of time, for the purpose of assessing the Applicant’s claims. When BH first inspected the property in 2009, he accepted that, while there was evidence of some prior movement, significant movement of the stumps had occurred in the previous month, particularly in the area immediately adjacent to, and downslope from, the leaking downpipe. BH observed heave (“upward movement”) of the foundation soils in the affected area, but noted that, due to the nature of the soil, there was the potential for subsidence (due to bearing failure of the soils under the stumps) over the longer term, once the soils had dried out. He considered that it would not be possible to determine the ultimate effects of the overflow (and therefore the extent of repairs required) until such time as the soils had dried out. When BH re-attended the property in October 2010, he noted that the anticipated corrective movement in the affected area had occurred less quickly than expected and predicted that it may take a further two or three years for the soils to dry out completely. BH attributed this to the relatively poor sub-floor ventilation having impeded the drying process, although he also noted that it was possible that some of the movement in the affected area was due to natural moisture changes in the soil, rather than solely the leaking pipe. Following the storm in February 2011, the FSP engaged BH to re-attend the property in order to determine whether any additional damage had occurred. In his report dated 31 October 2011, BH referred to his earlier findings regarding the heave resulting from the overflowing downpipe in September 2009, and noted that the more recent changes in the floor levels on the western side of the house Case No: 385350 Determination Page 6 of 13 were consistent with his previous expectations (that is, that the effects of the overflow from the downpipe would dissipate as the soils dried out). Given the drought had ended by the time of BH’s inspection in 2011, the resulting climatic changes would have been likely to cause an increase (rather than a decrease) in the moisture content of the soil. Accordingly, the c omments in BH’s 2011 report suggest that the changes to the western side of the property observed at that time were more consistent with the initial movement to that part of the property having been caused by the overflowing downpipe, rather than solely or primarily by naturally occurring earth movement. For the reasons outlined above, on the basis of the investigations carried out by BH over the two year period following the initial event, the Panel is satisfied that at least some of the movement damage at the property is properly attributable to the overflowing downpipe in September 2009. Some of damage was due to naturally occurring earth movement Following his inspection in 2010 (and the results of the level surveys carried out at the time), BH observed that, in addition to the effects of the overflowing downpipe on the western side of the property, the footings on the eastern side had subsided. BH considered that the movement on the eastern side of the property was independent of the damage to the western side, and had been caused by the soil drying out as a result of the extended drought period. When he re-attended the property in 2011, BH observed that some soil swelling had occurred in the eastern section of the house (resulting in corrective movement), following the end of the drought and a return to normal rainfall patterns. However, BH noted that this recovery movement had not occurred consistently around the house, as various areas were differently exposed to the effects of normal rainfall. BH also observed that the house would continue to be susceptible to ongoing movement damage as a result of naturally occurring earth movement, due to the extremely reactive clay foundation soils and the relatively shallow footings on which it was built. The Applicant’s engineer (LD) says that all of the movement damage at the property is attributable to the initial overflow event in September 2009. LD says that the nature of the soils is such that a single inundation event can cause continuing movement over a period of six to ten years. However, based on the available information, the Panel considers it unlikely that all of the range of movement identified at the property is solely attributable to the effects of the overflowing downpipe. The Panel accepts that the features of the property made it susceptible to naturally occurring earth movement and there is evidence that the floors had been re-levelled in the past. Case No: 385350 Determination Page 7 of 13 Deterioration of stumps has contributed to repairs required Each of the engineers who inspected the Applicant ’ s property observed that the timber stumps had deteriorated over time. However, they have provided differing views as to the nature and extent of this deterioration. When he inspected the property in December 2013, the FSP’s engineer (MC) reported that both the 80 year old original timber stumps in the main part of the house and the newer red gum stumps in the extension were in poor condition and required replacing. MC attributed the bulk of the movement damage to the deterioration of the timber stumps over time. He considered the deteriorated stumps were no longer able to support the load imposed by the house. MC also commented that, had the stumps been in good condition, they would not have subsided following changes in the moisture content of the surrounding soils. The Applicant’s engineer (LD) disputes MC’s finding that the majority of the stumps were no longer able to support the weight of the house. While LD acknowledges that some of the stumps have deteriorated, he maintains that the stumps still have sufficient bearing capacity to support the weight of the house. Both MC and LD have provided photographs showing a selection of the 96 original and 27 new stumps at the property. Each engineer accuses the other of “cherry - picking” to show the stumps which best support their position. The original engineer appointed by the FSP (BH) did not actually inspect the stumps, although his report reflects that he suspected they were in poor condition. Based on the photographs provided, and given the age of the stumps, the Panel accepts that at least some of them were likely to be in poor condition. The Panel notes that, during the course of previous settlement negotiations, the Applicant accepted liability for the cost of replacing 20 to 25 rotted stumps. However, given the varying condition of the stumps as shown in the photographs and the nature of the damage observed, the Panel does not accept that the whole of the movement damage to the property was wholly or primarily caused by the deterioration of the stumps. Nevertheless, in circumstances where it appears that the property now requires a complete re-stumping, the Panel considers that it is appropriate to take into account the pre-existing damage to the stumps, when considering the basis on which the Applicant’s claims should be settled. Damage has been caused by a range of factors For the reasons outlined above, the Panel considers that the movement damage to the property has been caused by a range of factors affecting the property during the years since the stormwater overflow in September 2009. Based on the available information, the Panel considers that the bulk of the damage to the western side of the property is attributable to the 2009 event, while accepting that this area has also been exposed to the ongoing changes in climatic conditions over time. Case No: 385350 Determination Page 8 of 13 However, the Panel considers that the movement observed to the remainder of the property is primarily due to the effects of natura lly occurring earth movement. The Panel accepts that the deterioration of the timber stumps may also have contributed to some of the movement damage observed. In any event, the Panel notes that, under the terms of the policy, the FSP is only liable to repair that part of the property which suffered damage from an insured event. For this reason also, the Panel considers it appropriate to take into account the pre-existing condition of the stumps, when considering the appropriate settlement amount. FSP is liable for part of damage As outlined above, the Applicant’s policy provides cover for damage to his property caused by water, which on its ordinary meaning includes the overflow of stormwater from a downpipe. Accordingly, the Panel considers the FSP is liable for that part of the damage to the Applicant’s property which was caused by the overflow event in 2009. The FSP says that, even if the overflow event caused movement damage to the property, it should not be liable for that damage as the policy only provides cover for damage of this nature where it occurs within 72 hours of the insured event. It is incumbent on an insurer to ensure that any exclusions or limitations on cover are clearly outlined in the Product Disclosure Statement (PDS), which sets out the terms of the policy. In the present case, neither the insured event of “escape of water or liquid” nor the insured event of “storm, rainwater or wind” (as described in the Product Disclosure Statement) include any reference to a limitation based on the time at which the damage occurs. The policy contains exclusions for damage caused by earth movement, other than as provided for under the separate insured event of “Landslide or subsidence” (which includes the 72 hour limit referred to by the FSP). However, in the Panel’s view, this exclusion only applies where the proximate cause of the relevant damage is earth movement. In the present case, the proximate cause (that is, the real, effective or dominant cause) of the damage is the escape of stormwater from the downpipe, which is subject to cover under a specific insured event. On this basis, the Panel considers that FSP is not entitled to rely on the relevant exclusion to deny liability for the Applicant’s claims. Further, the Panel notes that the FSP initially accepted the Applicant’s claim (based on the reports of its own engineer) and entered into good faith negotiations over an extended period, in an attempt to agree on an appropriate settlement amount. The FSP did not seek to deny th e Applicant’s claim based on a policy exclusion until several years later, after it had engaged a new engineer who had no prior Case No: 385350 Determination Page 9 of 13 involvement with, or knowledge of, the circumstances of the claim. It is not clear why, if a further opinion were required, the FSP did not re-engage its original engineer (BH) who was very familiar with the claim history. In these circumstances, the Panel considers it would also be unfair to allow the FSP to seek to rely on the relevant exclusion. 2.2 How should the claims be settled? FSP should contribute to costs of re-stumping The original estimates for the repairs to the property (and the subsequent settlement negotiations) were based on the proposed re-levelling of the house and completion of the necessary internal repairs. However, both parties now recognise that this approach will not be effective and, given the extent of movement at the property, it is necessary for the entire building to be re-stumped. This process is complicated by the need to ensure that the re-stumping complies with current building requirements. The Applicant has provided a recent quote for $36,350 from a local contractor (BB) for the re-stumping, which includes the installation of adjustable stump connectors to address the potential for ongoing movement. While the FSP’s engineer (MC) has previously suggested that the re -stumping could be completed for a lesser amount, the FSP has not provided an alternative quote for the equivalent works. Based on the various quotes obtained throughout the course of the claim, the Panel is satisfied that BB’s quote is reasonable. Having regard to the extent of the damage, the range of likely contributing factors and the pre-existing condition of the stumps, the Panel considers that it is fair in all the circumstances that the FSP contribute to 50% of the cost of the repairs (being $18,175). The Panel does not accept that the FSP should be required to contribute to any further re-levelling and associated works required following completion of the re- stumping. The original quote provided by BB should allow for such minor adjustments as are typically required following re -stumping works. FSP should contribute to additional costs associated with re-stumping The Applicant’s engineer (LD) says that, in order for the re-stumping works to be effective, it is necessary for the chimney and the paved concrete veranda surrounding the house to be removed and replaced or rebuilt. LD says this is required so that the floor levels can be raised to the highest point. The FSP’s engineer (MC) disagrees with LD’s analysis. He considers the chimney and surrounding areas can be left in place and used as the datum point (ie the highest point) for re-levelling the floor. MC considers that the concrete veranda only requires replacing because it has deteriorated over time and due to the use of poor construction techniques. Case No: 385350 Determination Page 10 of 13 As noted above, there are differences between the ways in which the various engineers have interpreted the results of the level surveys carried out at the property, which is partly responsible for their conflicting views as to the manner in which the re-stumping works should be carried out. The Panel notes that such issues may have been avoided, had the FSP continued to use the same engineer throughout the claim process. Based on the information provided and considering the extent and range of movement at the property, the Panel accepts that it may be necessary for undamaged areas to be demolished in order for the re-stumping works to be carried out effectively. The Panel notes that several of the building contractors engaged to quote on the works have confirmed that it will be necessary to demolish areas such as the chimney and the concrete veranda. In these circumstances, it is appropriate that the cash settlement include an allowance for any such additional works. However, the Panel considers that at least part of the damage to the concrete veranda pre-existed the overflowing downpipe in September 2009. When the FSP’s original engineer (BH) initially inspected the proper ty in 2009 and 2010, he did not identify any damage to this area as having been caused by water escaping from the overflowing downpipe. When BH returned in 2011, he noted that the cracking damage to the external concrete paving slab appeared to be old damage and the location of the cracks was inconsistent with this damage having been caused by the overflowing downpipe. Given BH’s familiarity with the property over time, the Panel considers his views on the cause of the cracking damage to be highly persuasive. The Panel also accepts that it is likely that (as identified by the FSP’s engineer (MC)), the damage to the concrete veranda was caused by the corrugated iron sheets used to retain the soil having rusted away over time, resulting in the sand under the slab spilling into the sub-floor area, creating voids under the slab. In light of the issues outlined above, the Panel considers that it is fair in all the circumstances that the FSP contribute 50% of the costs of removing and replacing the chimney and concrete veranda. Based on the quotes obtained to date, this amounts to $10,915. FSP should contribute to cost of internal repairs The FSP has offered to settle the Applicant for $16,500 for the cost of internal repairs to the building required as a result of the movement damage, based on a quote obtained from a local builder (DN) in April 2014. The Applicant’s engineer (LD) says the cost of repairing the internal damage has increased due to continuing movement at the property due to the ongoing effects of the overflowing downpipe in September 2009, and the delay in carrying out the necessary repairs. Case No: 385350 Determination Page 11 of 13 The Panel accepts that the effects of a one -off inundation can be far-reaching, particularly in the context of extremely reactive foundation soils. Howe ver, for the reasons outlined above, the Panel considers that ongoing seasonal changes in the moisture content of the soils have also contributed to the further movement experienced at the property. In these circumstances, the Panel considers that the FSP’ s liability should be determined based on the cost of the internal repairs as initially quoted by DN, plus 50% of the increase in costs (based on DN’s updated quote). On this basis , the FSP is required to contribute $21,588 to the cost of the internal repairs. Applicant is entitled to partial reimbursement of LD’s costs Under paragraph 9.4 of the FOS Terms of Reference, FOS may require a financial services provider to contribute to legal or other professional costs incurred by an applicant in the course of their dispute. However, unless exceptional circumstances apply, FOS will not require a financial services provider to contribute more than $3,000 to such costs. The Applicant incurred costs of approximately $8,000 in obtaining reports from his engineer (LD). While the Panel has found LD’s reports to be of assistance, it has not fully accepted LD’s findings that all of the movement damage to the Applicant’s property was caused by the insured events . In these circumstances, the Panel considers that it is fair and reasonable for the FSP to reimburse the Applicant an amount of $3,000 for the costs of obtaining LD ’s report s. FSP is not required to pay interest The Panel acknowledges that the Applicant’s claims have taken a n extended period to resolve. Some of the delays experienced during the claim process were unavoidable, due to the need to allow the sub-floor of the property to dry out so that the damage arising from the overflowing drainpipe could be accurately assessed. The claim process was further complicated by the occurrence of a further event (the stormwater run-off in February 2011) before the initial claim had been resolved. However, the claim history also indicates that the parties failed to act promptly to progress the claim. In particular, there were extended delays during 2012 and 2013 while the Applicant sought to obtain his own engineer’s report. It was partly due to these extended delays that the FSP finally appointed a second engineer (MC) in late 2013, in an effort to expedite resolution of the claim. In these circumstances, the Panel does not consider that the FSP should be required to pay interest on the settlement amount. Case No: 385350 Determination Page 12 of 13 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, the Panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. During the course of this dispute, the Applicant has been represented by his civil engineer (LD). For the purposes of this Determination, submissions made by LD (in his capacity as the Applicant’s representative) have been treated as havin g been made by the Applicant himself. 3.2 Terms of policy Subject Terms Insured event - storm We will cover your buildings or contents for loss or damage as a result of storm, rainwater or wind. Insured event - water or liquid damage We will cover your buildings or contents for loss or damage caused by water or liquid … Insured event - landslide or subsidence We will cover your buildings or contents for loss or damage as a result of a landslide or subsidence. We will ONLY do this if the loss or damage o ccurs with in 72 hours of:  an earthquake or explosion  a storm, including rainwater or wind, or  liquid escaping from a fixed pipe, fixed gutter, fixed tank or a drain. Exclusions to cover - insured events We will NOT cover any loss, damage or liability as a result of, or arising from: …  landslide or subsidence, unless … we agree to cover the Case No: 385350 Determination Page 13 of 13 Subject Terms incident as described under “Landslide or Subsidence” General exclusions We will NOT cover any loss or damage as a result of, or caused by:  settling, shrinkage or any movement of earth;  erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear … How we settle your claim If your buildings suffer loss or damage we will decide whether to:  repair  rebuild, or  pay you the cost to repair or rebuild that part of your buildings that suffered loss or damage. If we do, we will: …  only repair, rebuild or pay you for the part or parts of the building that actually sustained loss or damage …

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.