Denial of home building cracking and subsidence claim
Summary
The applicants claimed for building cracking caused by broken clay pipes and soil movement, and the FSP denied it. AFCA found the damage occurred before the home policy started and was excluded under the settling exclusion, and that the applicants had not proved damage during the earlier farm policy period, so no payment was ordered.
The insured must prove an insured event occurred within the period of insurance, and the insurer may then rely on a policy exclusion for settling or ground movement if established on the balance of probabilities.
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
Claim - Exclusion/Condition
Determination
Case No: 384883 Determination Page 1 of 8
Case number: 384883 11 June 2015
1 Overview
1.1 Dispute
The Applicants held more than one type of insurance policy with the Financial
Services Provider (FSP) to cover their home building. The Applicants held a farm
policy between 2004 and 2012 and a home and contents policy between 1 July
2013 and 1 July 2014. Throughout the two periods the risk address was covered
for Accidental Damage. Between 2012 and 2013, the Applicants were insured
with another insurer (AL).
The Applicants lodged a claim for extensive cracking damage throughout their
home as a result of broken pipes and leaking water, which caused soil movement.
AL made a partial settlement on the basis only part of the damage was due to the
broken pipes.
The FSP denied the claim on the basis the damage occurred in 2013, before the
home and contents policy started. As to damage potentially having occurred
during the period in which the farm policy was in place, the FSP argues:
damage to the pipes and the subsequent effects of the leaking water occurred
during AL‟s period of insurance
damage was due to causes excluded from cover by the policy (earth
movement and building movement)
the Wayne Tank principle applies to defeat the claim
the Applicants failed to mitigate their loss.
The Applicants disagree with this decision and want the FSP to pay for the
balance of their claim not paid by AL (including repairs to the slab).
1.2 Issues and key findings
Can the FSP deny the claim under the home and contents policy?
The FSP can deny the claim under the home and contents policy because it is not
in dispute the damage occurred before the period of insurance started.
Can the FSP deny the claim under the farm policy?
The FSP can deny the claim under the farm polic y because the damage occurred
after the period of coverage under that policy and in any event the evidence, on
balance, indicates the damage was caused by earth movement, which is
excluded from cover by the policy.
Case No: 384883 Determination Page 2 of 8
1.3 Determination
This Determination is in favour of the FSP. The FSP is entitled to deny the claim
both under the home and contents policy and under the farm policy.
Case No: 384883 Determination Page 3 of 8
2 Reasons for Determination
2.1 Can the FSP deny the claim under the home and contents policy?
On the balance of probabilities:
the Applicants must prove an insured event caused their loss or damage
within the period of insurance
the FSP must then prove the claim is not covered or is otherwise excluded.
Applicants have not proved damage occurred within period of insurance
The parties have extensively argued as to the chronology of the events that led to
the claimed damage. However, in their submissions and when claiming under
AL‟s policy , the Applicants acknowledged they noticed the damage occurred in
early 2013 (likely in March 2013).
Under the home and contents policy, the FSP covers accidental loss or damage
only during the period of insurance. “Damage” is defined in the product disclosure
statement (PDS) as:
“Any form of physical harm to property but does not include wear and tear or anything that
was present before this Policy came into force.”
The PDS says accidental damage cover also includes cover for any of the insured
events listed in the PDS.
Under “ insured event 8” , the FSP relevantly covers “damage caused by … leaking
(of) fix ed pipes used to hold or carry liquid of any kind.” While “insured event 14”
does provide „earth movement‟ cover for the event of „escaping liquid‟, there is a
72 hour window of opportunity, post the escaping liquid, in which this provision
can potentially be enlivened. It is not disputed between the parties that this time
horizon does not apply to the leak and the subsequent earth movement.
The Applicants lodged a claim with AL. AL offered a partial settlement on the
basis the breakage and subsequent leaking of the clay pipes would have occurred
during its policy period but part of the damage would have been pre-existing.
The Applicants accepted this offer, thus acknowledging the damage occurred
before the FSP‟s home and contents policy was in place .
Therefore, the Applicants have not established the damage occurred as a result
of “accidental damage” or insured event 8, as shown in the policy, because:
the claimed damage occurred before the period for this policy started.
Even if there was an insured event, FSP can rely on a policy exclusion
Even if it were accepted the Applicants had established the damage occurred
within this period of insurance, under the Accidental Damage provision or defined
event 8, the remainder of the damage not covered by AL would still be excluded
by this policy. The Panel determines that on the balance of probability the
exclusion relating to: „settling, shrinkage or expansion in buildings, foundations,
walls or pavements‟, is applicable.
Case No: 384883 Determination Page 4 of 8
The parties‟ expert evidence (as per sectio n 3.2 below) suggests the damage was
caused by differential soil movement, which in turn reacted on the building‟s
foundations (as in the slab) and this may have been caused/contributed by
inadequate site drainage and the presence of trees. It is also acknowledged by all
parties that the soils on which the risk address sits are highly reactive to changes
in seasonal conditions (as in drought/non-drought).
There is no other evidence to counter these findings or provide an alternative
explanation on causation. Accordingly, the Panel is satisfied the FSP has
established, on the balance of probabilities that it can rely on:
its “settling” exclusion.
to deny the claim.
2.2 Can the FSP deny the claim under the farm policy?
The Applicants have not established that the damage occurred during this
period of insurance
The onus upon the Applicants to show that the loss and damage arose from an
insured event during the period of insurance, applies equally to the farm policy, as
it does to the home policy. The farm policy ended in 2012, but the evidence
confirms the damage likely occurred in March 2013. There is no evidence to
confirm that the damage occurred during the period of coverage under the farm
policy.
In the absence of this evidence the Panel cannot be satisfied, on the balance of
probabilities that the Applicants have met their onus to establish coverage under
the farm policy.
Case No: 384883 Determination Page 5 of 8
3 Supporting information
3.1 FOS approach for this dispute
This dispute has not been the subject of a FOS Recommendation. Due to its
nature, FOS has considered it appropriate to proceed directly to Determination in
line with the Operational Guidelines to the FOS Terms of Reference.
This decision has been made by a Panel consisting of an Ombudsman and two
Panel members with extensive experience in i nsurance industry matters and
consumer claims.
There has been a full exchange of the relevant material between the parties and
each party has had the opportunity to address the issues raised.
The Panel has reviewed and considered all of the material provided by the
parties. While the parties have raised numerous issues in their submissions, for
the purposes of this Determination, the Panel has restricted its commentary to
those issues which it considers directly relevant to the outcome only.
3.2 Key points on relevant expert material/statements
Record Key points
Applicant s ’ plumber (M)
Report
13 Dec 2013
Visual examination of water supply pipework indicated it is
intact.
An area just off the pathway and behind the toilet was
excavated to inspect the pipework servicing the toilet and
bathroom with a camera and a hydraulic test. Broken pipes
were evident in both cases.
The existing clay pipework under the slab has failed and
has contributed to the movement of the slab.
FSP’s loss assessor (C)
First report
23 De c 2013
Property is a brick veneer construction, about 26 – 30 years
of age.
Inspection shows movement damage around the entire
area of the building, despite the fact the sewerage is
located at the rear.
Fractures are noted in the front and side walls of the
structure and in particular on the southern side of the
building; whereas the sewerage plumbing is located on the
western side.
It may be that a fracture of the sewerage lines has caused
movement, in turn, causing damage to stormwater lines,
allowing them to leak and resulting in the damaged area
expanding around the entire building.
The issues with leaking plumbing and sewerage lines result
from normal earth movement in black clay soil.
E C cannot recommend works to occur until a substantial
period is allowed for drying after the plumbing repairs have
been completed.
Case No: 384883 Determination Page 6 of 8
FSP’s engineer (EC)
Report
7 Feb 2014
In July 2013, the insured started noticing large cracks and
after further investigation, a leaking pipe was discovered in
the toilet and bathroom. The insured thinks it has
contributed to the subsidence of the property.
The dwelling is surrounded by 600mm wide concrete
paths, which were level, with no apparent slope.
The sewer pipe servicing the toilet has been temporarily
fixed but the one servicing th e shower is still leaking.
There are cracks to internal walls and ceiling linings
throughout the dwelling with the majority of cracks being
less than 2mm wide.
Numerous cracks have formed throughout the external
brickwork and no articulation joints were ev ident.
Evidence of previous repairs to internal wall s , ceiling linings
and external brickwork was observed at various locations
throughout the residence.
Brickwork at the southeast corner has subsided about
15mm towards the north, causing the main entry do or to
bind (cannot be opened).
Medium sized trees and shrubs are in close proximity to
the residence. There are also previous repairs coinciding
with the vicinity of the trees.
Soil in the area is known to contain reactive clay.
Soils that support footings of the residence will be
subjected to seasonal expansion and shrinkage, which will
cause differential movements of the building foundations.
These will be exacerbated in times of drought .
External factors such as inadequate site drainage and the
presence of trees had also influenced the soil moisture
condition, further exacerbating the differential movements
of the foundations.
P revious repairs to the brickwork that have been painted
over are evidence the residence has been experiencing
differential ground movement for an extended period.
M reported a clay pipe has been leaking and increasing the
moisture content of the soils on the western side of the
building. Clay pipes are rigid and brittle, they will crack due
to differential movement of soils.
In EC‟s opinion, the leaking pipe has contributed to the
differential ground movement and has exacerbated the
observed damage.
The damage observed has not affected the structural
integrity of the residence and can be repaired.
Insured should also be advised the s ource of water leak
should be repaired as soon as possible to mitigate the risk
of further damage.
After completion of these works, soil should be left to dry
out for a period of at least 6 months before undertaking any
repairs. The drying period will allo w for any further ground
movement as the soil dries, which may cause further
damage.
Case No: 384883 Determination Page 7 of 8
FSP’s loss assessor (C)
Fifth report
24 Mar 2014
The insured confirmed that it will be necessary for him to
carry out the plumbing repairs as a matter of priority and
thi s cost will be at their own expense.
FSP’s loss assessor (C)
Seventh report
30 Apr 2014
The male Applicant confirmed in March 2013 they first
noticed the fracture in the wall of the bedroom and they
initially did not worry about it, as they believed to be normal
ground movement.
Movement in the house continued and the cracks became
bigger and it was on 18 October 2013 they decided to
investigate further.
C advised the insured it is apparent the loss was
originating from an event in or around March 2013 and this
was a period before the FSP was on risk.
C told the male Applicant it would be necessary to direct a
claim submission to their previous insurer.
AL’s loss adjuster (AS)
Report
21 Jul 2014
M confirmed leaking has ceased after repairs to the clay
pipework.
Applicants believe the cracking seen to main bedroom wall
has accelerated sin ce its discovery in March 2013.
They believe this has led to other issues found within the
building such as the dropping of the cupboard doors and
other fresh cracks app earing.
N othing further appears to have been done from the time of
the initial discovery of the crack in the main bedroom wall
until U was notified in June/July 2013 that the crack had
worsened in a short amount of time.
U attended in December 2013 and advised to engage a
plumber to investigate. Eight months lapsed since the initial
discover of the cracking in the bedroom before M attended.
Based on the Applicants‟ first discovery of the cracking in
the bedroom in March 2013, AL‟s policy was in force at the
time.
AS is unable to establish the extent of pre - existing cracking
and movement of the slab and the cracking and movement
contributed to by the water leakage.
Applicant s ’ engineer (U)
Report
23 Oct 2014
M reported leakage from two sewer lines at the rear of the
building, which have now been repaired.
Subsidence and heaving have resulted in a difference in
levels of up to about 110mm.
It is assumed the fill under this area has dried out.
There is cracking in walls both internally and externally.
The sl ab floor has most probably cracked in a number of
places .
Soils in the area vary greatly and clay soils are subject to
severe movement. No guarantee can be given that some
further movement will not occur in the future.
Walls are brittle. While cracks in walls should reduce as U
lifts, it is possible new cracks will appear, which Applicants
will have to repair.
Case No: 384883 Determination Page 8 of 8
U is not stabilising clay against natural shrink/swell due to
moisture changes.
3.3 Other relevant material relied upon
Product disclosure statement for personal insurance policy with effective date
1 August 2011.
Product disclosure statement for farm insurance policy with preparation date
30 May 2008.
Policy schedule for the period 10 June
Policy schedule for the period 1 July 2013 to 1 July 2014.
Claim form signed on 16 December 2013.
M‟s tax invoices dated 7 January and 10 April (paid on 23 April 2014).
C‟s letter of 24 March 2014.
U‟s letter, undated.
Builder‟s scope of works, undated.
Correspondence between Applicants and AL dated 17 November 2014
Various images of the property.
Parties‟ submissions.