Denial of hail damage claim to metal roof sheets and wall mounted canopies

FirmFinancial Firm (Unknown - Insurer)
Decided2015-06-11
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$138,761
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A strata body corporate claimed for hail damage to its metal roofs and canopies, and the FSP denied liability but offered $75,000. AFCA found the hail indentations covered and ordered a cash settlement of $138,761.11 with statutory interest, reducing the roof cost to 80% for pre-existing corrosion.

The FSP could not rely on maintenance or wear exclusions because the hail indentation damage, not the pre-existing coating condition, was the basis of the claim, and the roof was serviceable before the storm.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision - Denial of Claim - Exclusion/Condition Determination Case No: 384573 Determination Page 1 of 10 Case number : 384573 2 9 May 2015 1 Overview 1.1 Dispute The Applicant is the body corporate of a complex of 24 two storey townhouses, which is insured under a residential strata title policy with the Financial Services Provider (FSP). The Applicant lodged a claim under the policy for hail damage following a storm on 16 November 2013. The FSP accepted the Applicant‟s claim for minor damage to sky lights, windows and flyscreens, but denied liability for hail damage to the metal roofs and wall mounted canopies at the property. Despite denying liability, the FSP offered to cash settle the Applicant for a total of $75,000 for damage to these items. The Applicant disputes the FSP‟s denial and says that the cash settlement offered is insufficient to repair the hail damage. The Applicant seeks payment for the full cost of replacing the metal roofs and the wall mounted canopies. 1.2 Issue and key findings Is the FSP liable for the disputed damage? The available information establishes that the roof sheets remained in a serviceable condition at the time of the hail storm. However, the impact of the large hail stones experienced during the storm has caused extensive indentation damage to the roof sheets, with the result that they are no longer able to be effectively repainted. While the pre-existing condition of the roof sheets (and, in particular, the deterioration of the Colorbond coating) may have contribut ed to the „scuffing” damage caused by the hail stones, it did not cause or contribute to the indentation damage which is the basis for the Applicant‟s claim. Under the terms of the policy, the FSP is liable for hail damage. Accordingly, the FSP is liable for reasonable costs of repairing the damaged portion of the roof. 1.3 Determination This Determination is substantially in favour of the Applicant. The FSP is to cash settle the Applicant for $138,761.11 in full and final settlement of its claim. The FSP is to pay interest on this amount calculated in accordance with section 2.1 below. Case No: 384573 Determination Page 2 of 10 2 Reasons for Determination 2.1 Is the FSP liable for the disputed damage? Policy provides cover for accidental damage subject to exclusions The Applicant is required to show that, on the balance of probabilities, it has suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. If the Applicant is able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the claim. The Applicant‟s policy provides cover for accidental damage to the insured property, subject to the conditions and exclusions set out in the policy. The courts have confirmed that, in this context, “accidental” refers to damage which is unexpected and unintended. The FSP does not dispute that the insured property was affected by the hail storm in November 2013. The Applicant has provided copies of a report from the Bureau of Meteorology which confirms that hailstones the size of cricket balls were recorded in the vicinity of the Applicant‟s property. The various photographs provided by the parties confirm that the hailstones impacted the metal roofs at the property. While it appears that some of the smaller hailstones merely scuffed the surface of the roofs, other hailstones caused permanent indentations of various sizes. These indentations are clearly evident in the photographs provided and were confirmed by several of the FSP‟s contractors. The FSP says that the nature of the indentations and scuffing caused by the hail is suc h that is not does not constitute “damage” for the purposes of the policy. However, the Panel is satisfied that the nature and extent of the indentations is sufficient to constitute “accidental damage” for the purposes of establishing a prima facie claim under the policy. The Panel considers that the issues raised by the FSP in this regard are more properly considered in the context of determining the cause of the damage and the extent of the FSP‟s liability for it under the policy. On this basis, the Panel is satisfied that the Applicant has established a prima facie claim under the policy. In these circumstances, the FSP bears the onus of establishing that, on the balance of probabilities, it is entitled to rely on a policy exclusion or is otherwise entitled to deny the Applicant‟s claim. FSP says damage was pre-existing and/or caused by excluded factors The FSP has acknowledged that the impact of the hail stones caused permanent indentations to the metal roof sheets. However, the FSP says that it is not liable for the cost of replacing the roof sheets because the proximate cause of the need to replace the sheets is due to them Case No: 384573 Determination Page 3 of 10 having been at the end of their useful life and not properly maintained at the time of the storm. Accordingly, the FSP says that it is entitled to deny the Applicant‟s claim based on the policy exclusions for loss or damage caused by lack of maintenance, rust, oxidation, wear and tear, gradual corrosion and/or gradual deterioration. Further, to the extent that the hail stones caused additional damage to the roof sheets, the FSP says that it is not liable for this additional damage because:  the indentations caused by the hail stones have not damaged the waterproofing properties or compromised the structural integrity of the roof sheets; and  to the extent that the indentations have diminished the aesthetic qualities of the roof, any such damage is negligible given the pre-existing condition of the roof at the time of the hail storm. The Applicant dispute s the FSP‟s position that the roof was at the end of its useful life and had not been properly maintained prior to the hail storm. The Applicant says that the roof remained in a serviceable condition at the time of the hail storm, but now needs to be replaced due to the indentations suffered during the storm. Metal roof sheets were in serviceable condition prior to hail storm Having carefully reviewed the available information (including the various expert reports provided by the parties), the Panel is satisfied that the Colorbond metal roofing sheets remained in a serviceable condition prior to the storm. The available information establishes that the roof was approximately 20 years old at the time of the hailstorm, having been installed when the complex was originally constructed. The parties have provided conflicting information about the theoretical life expectancy of the roof. The FSP‟s engineer (M) says that a re asonable life expectancy for a Colorbond roof on a building located near the coast line (s uch as the insured property) is approximately 20 years. However, the Applicant‟s roofer (C) estimates that the roofs at the property were only half way through their life expectancy. The Applicant has provided a copy of a detailed report prepared by its builder (MW) who was engaged to provide a condition report on the property approximately two years prior to the storm. In his report, MW concluded that overall, the buildings were showing signs of deterioration as would be expected given their location near the coast and the “standard or lower” building techniques and materials used in construction. However, this comment is made specifically in relation to the external timber lattice work at the property, which the Applicant has acknowledged was in an advanced state of deterioration. In relation to the roofs, MW stated that the existing roof sheeting was in sound condition with no corrosion visible, although the original Colorbond coating had faded. The roof flashings were also in sound condition. Case No: 384573 Determination Page 4 of 10 MW identified certain specific issues with the roofs, including that the roof screws were discoloured and needed to be replaced, there were issues with the original workmanship where the roof ridges overlapped between particular units and there were signs of corrosion in the metal fasciae. The Applicant has also provided a report from another builder (MC) who inspected the property in April 2013 (six months prior to the hail storm), in order to advise on an appropriate scope of works for the maintenance of the building, including painting of the roof. Based on his inspection, MC considered that the roof sheeting was in a sound condition, there were no signs of corrosion on the roof sheets and none of the sheets required repair or replacement. Accordingly, MC confirmed that the proposed scope of works was viable. This included painting of the roof using standard paint specifications, with no special treatment or additional preparation required. In late October 2013, MC was engaged by the Applicant to co-ordinate the scope of works and, on 10 November 2013, a painting contractor (R) was appointed to commence painting of the roof, before the hail storm intervened. The Panel is satisfied that the reports provided by the Applicant‟s builders (MW and MC) clearly establish that, while the Colorbond coating of the roof had deteriorated over time and corrosion was evident to the roof screws and fasciae, the roof sheets themselves remained in a serviceable condition at the time of the storm. Both builders have confirmed that they did not identify any corrosion to the roof sheets. In the Panel‟s view, the description of the roof sheets provided by MW and MC is consistent with the photographs provided by the Applicant showing the roofs prior to the storm. The FSP disputes the o pinions expressed by the Applicant‟s builders and says that the roof was already at the end of its serviceable life and needed to be replaced prior to the storm. The reports provided by the FSP‟s contractors (who examined the roof after the storm) establish that there was heavy oxidation, weathering and loss of binder to the Colorbond coating on the roof sheets, due to gradual deterioration over the life of the roof. This is consistent with the views expressed by the Applicant‟s builders. However, when taken as a whole, the Panel is not satisfied that the reports provided by the FSP‟s contractors establish that the roof sheets themselves needed to be replaced. The FSP‟s engineer (M) stated that there was no corrosion to the roof sheets, although he noted that there was minor corrosion of the roof screws and the concealed gutter brackets (which is also consistent with the comments made by the Applicant‟s builders). While one of the builders (B) appointed by the FSP identified one area of corrosion, based on B‟s report and the photographs provided, this appears to have been localised to a specific area. Accordingly, for the reasons outlined above, the Panel is satisfied that, although the roof had deteriorated over time, the metal roof sheets remained in a Case No: 384573 Determination Page 5 of 10 serviceable condition and did not require replacement at the time of the hail storm. Metal roof sheets were damaged by hail As outlined above, the FSP says that, although the hail stones caused dents in the roof, the FSP should not be required to replace the roof sheets because these dents have not compromised the structural integrity of the roof and have not materially diminished its aesthetic appeal (given its pre-existing condition). The parties have provided a copy of a technical bulletin issued by the manufacturer of the roof sheets which provides that the replacement of hail damaged roof sheeting is generally only necessary where:  the indentations caused by the hail stones are significant enough to allow water to pond, causing future corrosion of the roof sheets; and/or  the roofs have been significantly deformed where the metal sheets overlap, causing the anti-capillary action to be lost such that water can be drawn into the sheet lap, resulting in corrosion. The various contractors appointed to inspect the hail damage (including the Applicant‟s roofing specialist (C) ) have confirmed that, given the relatively steep pitch of the roof, the indentations caused by the hail stones will not cause water to pond. However, the contractors have expressed differing views as to whether the hail has caused significant deformation in areas where the roof sheets overlap. The Applicant‟s roofing specialist (C) stated that the large indentations caused by the hail stones had stretched the metal in areas where the roof sheets overlapped, thereby compromising the structural integrity of the iron sheets. By way of example, C‟s report includes a photograph showing a sizeable gap between the overlapping roof sheets in one location. However, the FSP‟s engineer (M) has advised t hat he did not observe any side lap deformations which he considered to be significant enough to adversely affect the anti-capillary action between adjoining roof sheets. The Panel acknowledges that it is a question of degree (on which professional opinion may vary) as to whether the extent of deformation to the roof sheets overlap is significant enough to be likely to result in future corrosion to the roof sheets. However, given the unusual size of the hailstones which impacted the Applicant‟s roof during the hail storm, the Panel considers that it is likely that at least some of the roof sheets were impacted in a manner which may cause corrosion, as shown in the example photograph provided by the Applicant‟s roofing contractor. In any event, the Panel is satisfied that the hail stones have caused damage to the metal roofing sheets. While the FSP seeks to argue that the damage (if any) is aesthetic only, the Panel does not accept that such damage falls outside the scope of the policy, particularly given the number and size of the hail indentations, Case No: 384573 Determination Page 6 of 10 which have variously been estimated as affecting between 50% to 90% of the roof sheets. The FSP says that the pre-existing condition of the roof (specifically, the oxidation and weathering of the Colorbond coating) has significantly contributed to the damage resulting from the hail storm. The P anel accepts that this may well be accurate in relation to the “scuffing” damage to the roof, where the pre-existing deterioration of the Colorbond coating meant that it was readily removed by the impact of the hail stones. However, there is no reasonable basis on which the pre -existing condition of the roof can be considered to have caused or contributed to the indentations caused by the hail stones, which is the sole basis of the Applicant‟s claim for the replacement of the roofing sheets. The indentation damage is of a qualitatively different nature from the scuffing damage ca used by the removal of the Colorbond coating. The FSP also says that any additional aesthetic damage caused by the hail storm is negligible, given the pre-existing condition of the roofs. However, the report provided by the Applicant‟s builder (MC) confirms that, since the hail storm, the roofs are no longer able to be painted. As outlined above, at the time of the hail storm, a painter had been engaged to paint the metal roof sheets in order to improve the condition of the roof. However, MC has confirmed that, due to the numerous indentations caused by the hail stones, the roof sheets can no longer be painted in accordance with the paint manufacturer‟s specifications. Accordingly, the Applicant would be unable to obtain the benefit of the standard 10 year warranty provided by the paint manufacturer, if the roof sheets were painted in their current, damaged condition. The FSP has not disputed that the Applicant‟s roofs are no longer able to be successfully repainted due to the indentations caused by the hail storm. The Panel notes that the scope of works prepared by the FSP‟s engineer (M) in April 2014 specifically refers to the recommendations provided by the manufacturer of the roofing sheets in relation to the preparation and repainting of sheets where the Colorbond coating has been lost. Accordingly, M clearly contemplates that it is appropriate to repaint the roof sheets in order to prolong the aesthetic appeal of the roof. For the reasons outlined above, the Panel is satisfied that the damage to the Applicant‟s roofs sustained during the hail storm is subject to cover under the policy, having regard to both the size and extent of the hail indentations and the effect of the indentations on the Applicant‟s ability to maintain the appearance of the roofs. FSP is unable to rely on exclusions or Wayne Tank principle As outlined above, it is not disputed that the indentation damage which is the basis for the Applicant‟s claim was caused by the hail stones, rather than the pre - existing condition of the roof. Case No: 384573 Determination Page 7 of 10 In these circumstances, the FSP is unable to rely on the policy exclusions to which it has referred, as the excluded factors (including gradual deterioration and a lack of maintenance) did not cause or contribute to this damage in any way. For the same reason, the Wayne Tank principle does not assist the FSP. FSP is required to contribute to replacement of roof sheeting Under the terms of the Applicant‟s policy, the FSP is liable for the reasonable costs of reinstating the roof to its condition when new. However, the FSP is not liable for the replacement of any undamaged property. The cash settlement of $75,000 previously offered by the FSP comprised:  40% of the cost of replacing the entire roof (based on a quote provided by the FSP‟s builder (AB)); plus  an additional amount of $9,000 for the cost of replacing six wall mounted metal canopies which had sustained minor indentations during the hail storm. As noted above, there is significant variation between the estimates provided by the various contractors, in relation to the extent of the indentation damage to the roof sheets. The Panel notes that:  the Applicant‟s painter (R) and roofing specialist (C) both advised that there was damage “across the entire roof area”;  the builder (AB) initially appointed by the FSP estimated that 87.5% of the roof sheets had been damaged by the hail storm; and  the second builder appointed by the FSP (B) estimated that there was damage to approximately 50% to 60% of the roof sheets. Based on the reports provided by the various contractors, the Panel accepts that there was pre-existing corrosion damage to various parts of the roof (other than the roofing sheets), including the roof screws, flashings and gutter support brackets. The Applicant has acknowledged that it was part way through a maintenance program intended to address these issues when the hail storm occurred. O n this basis, the Panel considers that the FSP‟s liability for the costs of reinstating the roof to its condition when new should be discounted to take into account the pre-existing corrosion damage. Having carefully reviewed the available information (including the various photographs of the damage provided), the Panel considers that it is fair in all the circumstances that the FSP be responsible for 80% of the costs of replacing the roof sheeting, based on the quotation provided by AB (less the cost of replacing the damaged sky light domes, which has already been paid). On this basis, the FSP‟s liability for the cost of replacing the roof sheeting is $129,761.11 (including GST). In addition, the Panel considers that the FSP should be liable for the costs of replacing the six wall mounted canopies, which also suffered hail damage during the storm (at an estimated cost of $9,000). Case No: 384573 Determination Page 8 of 10 Accordingly, the FSP is to pay the Applicant a total cash settlement of $138,761.11, plus interest on this amount calculated in accordance with section 57 of the Insurance Contracts Act 1984 (Cth) from 2 May 2014 until the payment date. Case No: 384573 Determination Page 9 of 10 3 Supporting information 3.1 FOS approach for this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only. The Applicant is the body corporate of the insured property and has been represented by its chairman during the course of this dispute. For the purposes of this Determination, the Applicant and its chairman have been referred to collectively as “the Applicant”. 3.2 Terms of policy Subject Terms Accidental damage cover We insure You up to the Sum Insured shown on Policy 1 of the Schedule, against ACCIDENTAL LOSS or DAMAGE to Your Insured Property which occurs during the Period of Insurance. Exclusions We will not pay for loss or damage .. ..  caused by lack of maintenance, rust, oxidation, corrosion, Wear, Tear, fading, gradual corrosion or gradual deterioration, concrete or brick cancer, developing flaws, wet or dry rot, or f ailure to maintain the Insured P roperty in a reasonably good state of repair .  c aused by non - rectification of an Insured Property defect, err or or omission that You were aware of, or should reasonably have been aware of. Claims – how we will settle your claim Replacement If Your Insured Property is damaged, We may choose to either rebuild, replace, repair or pay the amount it would cost to rebuild, replace or repair … Case No: 384573 Determination Page 10 of 10 Subject Terms The amount We pay under Policy 1 will be the cost of Replacement at the time of Replacement subject to the following provisions:  When We wish to rebuild, replace or repair and You do not want this to occur We will only pay Inde mnity Value. We will not pay for the cost to:  Rebuild or replace Your undamaged Insured Property … Meaning of “Replacement” Replacement means:  the reasonable costs of rebuilding, replacing or repairing to a condition which is equivalent to or substantially the same as but not better nor more extensive tha n when it was new …