Denial of balcony storm damage claim
Summary
The applicant's balcony was damaged after a storm and the FSP denied the home insurance claim under exclusions for gradual deterioration, inherent defects, faulty workmanship and faulty design. AFCA found the FSP had proven the exclusions applied and ordered nothing.
Once accidental damage was established, the insurer proved on balance that excluded causes produced the loss, and section 46 of the Insurance Contracts Act did not apply because the exclusions did not depend on pre-contract condition.
Issues
- Claim denial primary · not upheld
“The FSP has proven, on balance, the damage has been caused by gradual deterioration, inherent defects, faulty workmanship and faulty design; the FSP can deny the claim.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
claim
Determination
Case No: 384210 Determination Page 1 of 7
Case number : 384210 28 May 2015
1 Overview
1.1 Dispute
The Applicant lodged a claim on his home and contents policy held with the
Financial Services Provider (FSP), after he discovered damage to his balcony
following a storm.
The FSP denied the Applicant’s claim on the grounds the cause of the damage
was specifically excluded from cover.
1.2 Issue and key findings
Can the FSP deny the Applicant’s claim ?
The FSP can deny the Applicant’s claim because the FSP has established that
the damage was caused by gradual deterioration, inherent defects, faulty
workmanship and faulty design which are excluded by the policy.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is entitled to deny the claim.
Case No: 384210 Determination Page 2 of 7
2 Reasons for Determination
2.1 The FOS Approach
I have determined this dispute based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous Financial Ombudsman Service (FOS) decisions. I have taken into
account all the material submitted by the parties.
There has been a full exchange of all documents relied on to make this
Determination and each party has had the opportunity to address any issues
raised by the other.
This dispute has proceeded straight to a Determination. No Recommendation was
issued.
2.2 Can the FSP deny the Applicant’s claim ?
The policy covers accidental damage
The Applicant’s claim, lodged in November 2013, followed a storm on 26 January
2013 and continual bad weather. The Applicant said the weather caused damage
to the balcony which has continued to worsen.
The policy provides cover for accidental damage. As there is no dispute the
damage was unintended and unexpected, the damage has been caused by an
insured event.
The onus therefore shifts to the FSP to prove, on balance, the loss is not covered
or is otherwise excluded.
The FSP has established the damage was excluded under the policy
The FSP denied the Applicant’s claim based on the exclusions relating to gradual
deterioration, inherent defects, structural defects, faulty workmanship and / or
faulty design. The relevant extracts from the policy are set out in section 3.1
below.
The FSP relies on evidence provided by its own experts and the Applicant’s
expert. The expert reports are summarised in section 3.2 below.
All of the experts agree the damage had been occurring over a period of time and
was caused by a breakdown of the waterproofing membrane. This membrane
failed because it was penetrated when a hand rail was installed.
Additionally, there are other issues with the construction of the balcony, in
particular the way in which the edge of the balcony was sealed. No drip edge
protection was installed to the outer tile and the aluminium strip on the face of the
balcony was not sealed, allowing water to seep in between the tiles and the strip.
The Applicant submits that the roof over the balcony means a severe storm would
be required in order to penetrate the balcony. I do not accept this, given the roof is
Case No: 384210 Determination Page 3 of 7
high and rain often falls on an angle. The design of the balcony should be able to
withstand this.
The Applicant also asserted he could not reasonably have known of the flaw with
the balcony design. However, the exclusions are not reliant on the Applicant’s
knowledge of the fault.
Further, the FSP does not need to establish that the timber beam didn’t break
until after the storm. Rather, the FSP must establish that an exclusion applies to
deny the claim.
The FSP has proven, on balance, the damage has been caused by gradual
deterioration, inherent defects, faulty workmanship and faulty design.
As such, the FSP can deny the Applicant’s claim.
2.3 Section 46 does not assist the Applicant
The Applicant’s broker has presented an argument that section 46 of the
Insurance Contracts Act 1984 (Cth) (the Act) may apply to assist the Applicant in
this matter.
Section 46 of the Act provides that an insurer may not rely on an exclusion which
relates to the condition of something (such as the balcony) before the contract
was entered into, if it was reasonable for the insured not to have been aware of
that condition. For example, an exclusion regarding a pre-existing illness may not
apply if the insured was not reasonably aware of the illness prior to entering into
the contract of insurance.
In the present dispute, the FSP is not relying on an exclusion specifically relating
to the condition of the balcony prior to when the contract was entered into. Rather
the exclusion relates to structural and inherent defects, faulty workmanship and
gradual deterioration, that can have occurred at any time. As such, section 46
does not apply to assist the Applicant.
Case No: 384210 Determination Page 4 of 7
3 Supporting information
3.1 Policy wording
The following sections of the Product Disclosure Statement (PDS) apply in this
instance:
“ What we will not pay for
We will not cover your home or your contents for any loss or damage caused by:
…
Rust, corrosion, gradual deterioration, depreciation, wear or tear.
…
Inherent defects, structural defects, faulty workmanship or faulty design …”
3.2 Expert Evidence
Record Key points
Applicant’s builder
(WB )
Report and Quotation
14 November 2013
“[WB] inspected the damage deck and found the deck to be
unsafe for use and needing to be replaced ASAP. We believe
that this damage is due to un seasonal weather conditions in
which the area has endured over the previous seasons.” (sic)
FSP’s builder (RP )
Report
22 November 2013
The method of tiling to the edge of the balcony an d the
cladding to the balcony does not allow moisture to run off
the balcony (waterproofing method failure).
The cause of the damage is due to continual exposure to
moisture entering the face of the balcony over a period of
time.
One single event would not be the contributing factor, but
rather continual exposure to moisture.
There is a failure of the waterproofing method used.
Water could be entering through the fixings of the stainless
steel posts for the hand rail if they were not sealed
cor rectly when they were installed, however this could not
be confirmed without destructive investigation.
The front beam supporting the balcony has rotted and
sagged and is not safe to walk on.
The heads over bi - fold doors and windows have sagged.
There are signs o f movement to the rendered blue board
sheeting above these doors and windows.
Damage has occurred to the balcony from a water proofing
failure.
FSP’s engineer (JH)
Report
20 December 2013
The damaged area is a tiled balcony on the upper level of
the Appli cant’s home.
There was a distinct curvature of the outer edge of the
balcony, water damage to the underside soffit, water
staining to cement sheeting and down the masonry
columns which support the balcony.
Case No: 384210 Determination Page 5 of 7
The face of the balcony is rendered cement sheetin g with
an aluminium edge – the size of this indicates a structural
support beam lies inside the façade.
The stainless steel handrails are screw fixed directly onto
the tiled floor with hexagonal drive screens. These are
corroded.
There is no drip edge or b low back protection of the outer
facades.
The screws holding the handrails directly to the tiles are
corroded.
The bi - fold doors on the lower level under the balcony no
longer open.
Temporary protection was in place to prop up the balcony
and prevent it fr om collapse.
A Hydraulic Level Survey indicated a significant defle ction
in the outer balcony beam of 51mm.
It appears the outer balcony beam has failed.
The cause of the failure is two - fold :
The handrail screws have penetrating the
waterproofing membrane, allowing water to enter
into the floor framing and beam causing rotting of
the timber.
There is no drip edge protection to the outer tile
edge. This means that the water proof membran e
does n o t continue over the floor edge and down
onto th e ou t side face of the cement sheeted
façade . Water has therefore decay ed the floor
framing.
The balcony was not constructed in accordance with
relevant building codes.
Water has been slowly leaking into the floor framing of the
balcony for a longer period of time.
FSP’s engineer (JH)
Second Report
14 January 2014
The water staining would have been evident prior to the
storm event of January 2013 – this is based on the “white”
water stain marks which cannot be gene rated directly after
a single rain event.
Additionally, the timber beam has rotted and rot cannot
occur within 72 hours of a single event, rather it occurs
after continual saturation and long term moisture exposure.
The balcony features a high architectura l roof indicating
the edges of the balcony would become wet during a
normal rain shower.
The roof would probably not provide enough protection to
the balcony to keep in completely dry during normal rain.
Additionally, most rain falls are associated with so me
winds or breezes causing rainfall to be angled.
Applicant’s builder (TB)
Report
5 February 2014
T he Applicant’s wife first noticed the sagging of the
balcony around July 2013.
She had also noticed minor water marks on the rendered
blue board on the front of the balcony however believed it
Case No: 384210 Determination Page 6 of 7
to be normal water run off from the balcony.
Confirmed the front bearer to the balcony has failed which
has caused the balcony to sag.
The sta inless hand rail post has been installed directly over
the failed section of the bearer – it appears at installation,
the hand rail posts have compromised the waterproof
membrane to the balcony.
It is unreasonable to assume that the water staining would
in dicate there was damage occurring to the beam. The
owners would not have reasonably known that the bearer
was water damaged.
FSP’s engineer (JH)
Third Report
11 March 2014
The opinion of JH has not changed based on the additional
information provided by the Applicant and his experts.
Given the extent of the deflection of the outer beam, it is
likely that the beam has been gradually deflecting over at
least the last 3 to 5 years.
It is not possible that a single event would case the
balcony to deflect as t he strength of the timber would have
slowly decreased as the decay developed after each
period of rain, slowly breaking down the timber fibres
resulting in gradual beam deflection.
Had the deck been constructed in accordance with
relevant building codes, standards and manufacturer
guidelines, the failure would not have occurred.
There were indicators that the deck was slowly failing,
such as corroding light fittings, cracks and doors sticking.
Applicant’s builder (TB)
Report
15 October 2014
A section of the fibro cement ceiling sheet directly under
the damaged area was cut out and found that the front
laminated beam was totally rotten and starting to crumble .
There is an aluminium strip to the face of the tiled balcony
and this aluminium strip has now pul led away from the tiled
areas at the top exposing the fact that the aluminium strip
was only grouted and not sealed
TB is of the opinion that water has also been seeping in
between the tiles and aluminum strip .
O ver time this has caused the front laminated timber beam
to slowly rot.
The insured would not have known this damage was
happening until the beam collapsed.
3.3 Section 46 of the Act
Section 46 of the Insurance Contracts Act 1984 (Cth) provides:
1. This section applies where a claim under a contract of insurance (other than a
contract of insurance that is included in a class of contracts declared by the
regulations to be a class of contracts in relation to which this section does not
apply) is made in respect of a loss that occurred as a result, in whole or in part,
of a defect or im perfection in a thing.
Case No: 384210 Determination Page 7 of 7
2. Where, at the time when the contract was entered into, the insured was not
aware of, and a reasonable person in the circumstances could not be
expected to have been aware of, the defect or imperfection, the insurer may
not rely on a provision included in the contract that has the effect of limiting or
excluding the insurer's liability under the contract by reference to the condition,
at a time before the contract was entered into, of the thing.