Home / Financial Firm (Unknown - Insurer) / Determination 384073

Determination 384073

Denial of subsidence and cracking claim outside 72-hour flood window

FirmFinancial Firm (Unknown - Insurer)
Decided2015-06-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicants claimed for cracking and subsidence damage to their carport and garage after the January 2013 floods, lodged about 18 months later. The Panel found the damage developed gradually and occurred outside the policy's 72-hour window, so the FSP is not liable.

The policy covers flood-related subsidence only if it occurs within 72 hours of the flood, and the evidence showed the damage developed over months.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Exclusion/Condition Determination Case No: 384073 Determination Page 1 of 6 Case number : 384073 5 June 2015 1 Overview 1.1 Dispute In January 2013, the Applicants lodged a claim under their home insurance policy with the Financial Services Provider (FSP) for water damage to their building and contents caused by floods in January 2013. The FSP acc epted the Applicants’ claim and arranged for the repair of their property. In July 2014, the Applicants lodged a further claim for cracking and movement damage to their home which they believe was caused by the floods in January 2013. The FSP denied the Applicants’ second claim on the basis that the damage was not caused by the floods but by factors which are excluded under the policy, such as naturally occurring earth movement and the inadequate installation of the slab. The FSP says that, even if the damage was caused by the floods, it did not occur within 72 hours, as required under the policy. 1.2 Issues and key findings Is the FSP liable for the damage to the Applicants’ property? The available information establishes that, on the balance of probabilities, the subsidence and resultant cracking damage to the Applicants’ home occurred more than 72 hours after the flood event. Damage caused in this manner is not covered under the policy. 1.3 Determination This Determination is in favour of the FSP. The FSP is not liable for the cracking and movement damage to the Applicants’ property. The Applicants are not entitled to compensation. Case No: 384073 Determination Page 2 of 6 2 Reasons for Determination 2.1 Is the FSP liable for the damage to the Applicants’ property? FSP’s liability depends on cause of damage The Applicants ’ policy provides cover for damage to their property caused by the events listed in the policy (including flood), subject to the conditions and exclusions set out in the policy. The FSP does not dispute that the Applicants’ home was affected by widespread floods affecting the local area in January 2013. The FSP accepted the claim lodged by the Applicants shortly after the flood, for damage to their home and contents caused by the flood waters. However, the FSP says that it is not liable for the additional damage which is the su bject of the Applicants’ second claim, which was lodged in July 2014 and concerns cracking and movement damage to the property as a result of subsidence at one corner of the house. The Applicants consider this additional damage was caused by the floods some eighteen months earlier, which inundated the ground floor of their property to a height of approximately 3.5 centimetres. Under the terms of the Applicants’ policy, the insured event of flood specifically excludes loss or damage caused by subsidence unless it results directly from, and occurs within 72 hours of, a flood. Accordingly, in order to determine the FSP’s liability for the cracking and movement damage to the Applicants’ property, it is necessary to identify the proximate cause of the damage (that is, the real, effective or dominant cause). If any of the damage was caused by the floods in January 2013, it will be necessary to determine when and how that damage occurred. Floods contributed to claimed damage The Applicants’ claim relates primarily to sinking of the support posts at one corner of the building and cracking of the concrete slabs in their carport and garage. The engineer (FE) appointed by the FSP to inspect the damage confirmed that the support post at the south-west corner of the carport had subsided, resulting in the carport doors becoming misaligned. FE also observed extensive cracking in the concrete floor slab of the carport, which he noted to be very drummy due to the cracking and some loss of soil support to the slab. He confirmed that a concrete vehicle wheel track next to the carport was also drummy due to loss of soil support. In his report dated 9 September 2014, FE concluded that the subsidence of the carport post was related to the inundation of the property by the floods in January 2013. He concluded that the damage to the garage slab and concrete wheel track Case No: 384073 Determination Page 3 of 6 had occurred gradually over time, but had worsened as a result of the floods in January 2013. FE concluded that the cracking and drumminess of the garage slab had been present for many years and had been primarily caused by inadequate construction of the slab (which had been installed in a piecemeal fashion), possibly exacerbated by the effect of vehicle jacking forces on the slab. FE also observed some movement across the joints in the concrete slab of the rumpus room beneath the carpet which had been replaced as part of the original claim repairs. FE attributed this movement to the disjointed method of slab construction and naturally occurring seasonal foundation movement. The Applicants have queried FE’s findings, particularly his conclusion that the damage to the garage slab was primarily caused by inadequate construction. The Applicants have advised that they had the damage inspected by their own engineers, who do not agree with FE’s findings. However, they have not provided any written confirmation of the views expressed by their engineers. The Panel accepts that, as a structural engineer, FE is suitably qualified to determine the cause of the cracking and movement dama ge to the Applicants’ property. In the absence of any independent information to the contrary, the Panel considers that it is appropriate to give due weight to FE’s findings. Based on FE’s report , the Panel is satisfied that, while not all of the claimed damage was caused by the floods in January 2013, subsidence resulting from the floods did contribute to at least some of that damage. Damage was not caused by subsidence within 72 hours of floods As outlined above, the Applicants’ policy does not p rovide cover for damage caused by subsidence resulting from a flood, unless it occurs within 72 hours of the flood. In his report, the FSP’s engineer (FE) concluded that the damage to the Applicants’ carport and garage had occurred gradually over the time between the floods in January 2013 and his inspection in September 2014. FE based his conclusions in part on his discussions with the Applicants, who he reported had advised him that the misalignment of the carport doors and the cracking of the concrete slabs had developed gradually over a number of months since the floods in January 2013. Accordingly, FE concluded that the subsidence and resulting damage had not occurred within 72 hours of the floods. The Applicants dispute FE’s conclusions and say that he has misreported their comments. The Applicants say that the cracking damage to the concrete was clearly visible as soon as the mud and other debris from the floods was removed, but was ignored by the FSP’s assessors and repairers . However, having carefully reviewed the history of the earlier claim, the Panel considers that, on the balance of probabilities, the subsidence and resulting damage did not occur within 72 hours after the floods in January 2013. In the Case No: 384073 Determination Page 4 of 6 Panel’s view, the available information is more consistent with the damage having developed gradually over time duri ng the months following the floods. In this regard, the Panel notes that:  the FSP’s contemporaneous claim notes for the earlier claim indicate that the Applicants did not notify the FSP of any subsidence or cracking damage to the carport or garage at the time they lodged their claim;  the photographs taken by the FSP’s assessor when he attended the property approximately one week after the floods do not show any cracking damage and the scope of works prepared by the FSP’s assessor did not provide for the repair of any such damage;  while the Applicants contacted the FP to discuss various issues during the course of their earlier claim, there is no indication that they ever raised the issue of subsidence and cracking damage;  the Applicants confirmed to the FSP that they were happy with the claim- related repairs in July 2013 and did not contact the FSP again until they lodged their current claim approximately one year later; and  t he FSP’s claim notes indicate that, during a telephone discussion on 23 September 2014, the Applicants advised that cracks in the concrete had started appearing four to five months after the floods. In these circumstances, the Panel is satisfied that the subsidence and resulting damage occurred more than 72 hours after the floods in January 2013. Accordingly, under the terms of the policy, the FSP is not liable for this damage. Case No: 384073 Determination Page 5 of 6 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, the Panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. 3.2 Terms of policy S ubject Terms Insured event – flood We cover Loss or damage caused by flood. We do not cover …  loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover damage caused by a landslide or subsidence that occurs within 72 hours of, and directly because of, flood and not because of erosion over time structural fault or design fault … 3.3 Claims handling issues In their submissions, the Applicants have raised conce rns about the manner in which the FSP has handled their claim and, in particular, the conduct of the FSP’s contractors. Having reviewed the claim history, the Panel is not satisfied that there is any independent information which establishes that the FSP and its contractors acted in appropriately. The FSP was entitled to engage an engineer to determine the cause of the claimed damage and, under the terms of their policy, the Applicants were obliged Case No: 384073 Determination Page 6 of 6 to allow the engineer to inspect their property in order to allow their claim to be assessed. The FSP was entitled to rely on the engineer’s findings, in the absence of any independent information to the contrary.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.