Determination 382671
Liability for roof rectification and predecessor insurer's substandard works
Summary
The Applicant asked the FSP to fund roof rectification to current building standards, relying on a 2006 claim and on works done by a predecessor insurer after a 1990 cyclone. AFCA found the FSP not liable on either basis.
The policy excludes inherent defects and non-compliance alone is not covered, and any claim about the predecessor's 1990/91 works is probably time-barred under the Limitation of Actions Act 1974 (Qld).
Issues
- Claim denial primary · not upheld
“The policy does not provide cover for inherent defects in isolation, so the FSP is not liable for roof rectification under the 2006 claim.”
- Other secondary · not upheld
“Liability for substandard 1990/1 works by predecessor insurer CC could not be established, and the Limitation of Actions Act probably applies.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - Service - Service quality
Case number : 382671 19 August 2015
1 Overview
1.1 Dispute
A dispute has arisen in relation to whether the FSP is responsible for carrying out
rectification works in order to bring the Applicant‟s roof up to current building
standards.
The Applicant says the roof was originally repaired/replaced in 1990/1 by her then
insurer (CC). She says CC was then acquired by the FSP. The Applicant believes the
FSP is liable for the rectification works on two grounds:
If CC did not repair the roof in line with applicable building standards in 1990/1,
as the FSP acquired CC, it should be liable to rectify same.
If CC did repair the roof in line with applicable building standards in 1990/1, the
FSP is responsible to undertake rectification works under the claim lodged with it
(as her then current insurer) in 2006.
1.2 Issues and key findings
Is the FSP liable for any substandard works undertaken by CC?
The FSP is not liable for any substandard works undertaken by CC because:
it cannot be established it assumed liability for the Applicant‟s CC policy
it cannot be established works undertaken by CC were substandard
on the information provided, the Limitation of Actions Act probably applies applies
to de feat the Applicant‟s claim.
Is the FSP liable for roof rectification works under the 2006 claim?
The FSP is not liable for roof rectification works under the 2006 claim as the policy
does not provide cover for inherent defects in isolation.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is not liable for rectifying the roof non-compliance issues and not required to
take any further action.
Case No: 382671 Determination Page 2 of 7
2 Reasons for Determination
Timeline of events
The facts applicable to this dispute span some 25 years and during which time three
insurers (including the FSP) have had varying levels of involvement. In light of this, it
is appropriate to first summarise what, from the available evidence, appears to have
been the sequence of events to date:
Year Event
1990 Cyclone Joy causes damage to the Applicant‟s property. The
claim is accepted by CC and associated works include repairs
to and/or replacement of the roof.
1990 - 2005 At some point between 1990 and 2005, the FSP acquired CC
and in some cases, „in - for ce‟ CC policies.
2006 Cyclone Larry causes damage to the Applicant‟s property. The
FSP, who was the Applicant‟s insurer at this time, accepted the
claim. Associated works did not include any roof repairs.
2009 The Applicant contacted the FSP to advise the carport and
patio roof had not been repaired. During subsequent
investigations it was identified that the roof was not compliant
with associated building standards. The Applicant was
previously unaware of this.
2011 Cyclone Yasi caused further crackin g to the brickwork. The
Applicant lodges a claim with her current insurer, EE.
2013 EE also confirms the roof was not compliant with current
roofing standards and says it is not liable for associated
rectification works.
2014 The Applicant approaches the FSP with her current claim in
relation to rectification of the roof non - compliance issues.
2.1 Is the FSP liable for any substandard works undertaken by CC?
It is u nclear whether FSP assumed liability for Applicant’s CC policy
The Applicant submits that if CC did not repair the roof in line with applicable building
standards in 1990/1, as the FSP acquired CC, it should be liable to rectify same.
The FSP accepts it acquired CC following the Applicant‟s claim in 1990. It also
accepts it assumed liability for s ome „in force policies‟.
That said, whether it assumed liability for the Applicant‟s particular policy is unable to
be established with any level of certainty. Due to the time that has since elapsed,
neither party have been able to obtain any comprehensive information in relation to
the Applicant‟s CC policy, and so whether any liability was assumed by the FSP in
relation to same.
Case No: 382671 Determination Page 3 of 7
Even if FSP did assume liability, Limitation of Actions Act means no remedies
are available
The FSP submits that, due to the time elapsed, any liability it may have borne from
the claim with CC in 1990 falls outside the period dictated by the „Statute of
Limitations Act‟.
I note the relevant Act in Queensland is the „Limitation of Actions Act 1974‟ (the Act).
The Act precludes the availability of any remedies for a breach of contract (whether
by CC or the builder) not commenced within 6 years of the breach actually occurring
ie, in 1990/1 when the roof repairs/replacement took place.
Therefore, notwithstanding the fact the Applicant was unaware of any building
compliance issues during the relevant period, it appears probable any remedy for the
same are no longer available.
Even if the Applicant was able to establish the necessary factual matrix to apply
successfully to the Courts to extend the limitation period, there still must be evidence
to establish a right of action
Due to the time elapsed, the exact nature of the works completed in 1990/1 are
unable to be established with any level of certainty. The Applicant has been able to
make contact with the contractor who completed the associated works. However, the
contractor (understandably) no longer has associated paperwork. The contractor
could only suggest work would have been completed in line with instructions
provided and in accordance with applicable building standards.
Therefore, from the information currently available it does not appear the Applicant
could establish a cause of action (sub-standard works) against any party.
For these reasons, I am satisfied, on the material provided that on the balance of
probabilities, the FSP is not liable for any substandard works undertaken by CC.
2.2 Is the FSP liable for roof rectification works under the 2006 claim?
No evidence of roof damage in 2006
There is no dispute the FSP accepted the Ap plicant‟s claim for property damage in
2006 following Cyclone Larry.
The Applicant submits that if the roof was repaired in line with the applicable building
code in 1990/1, the FSP is responsible under the claim in 2006 to bring the roof back
in line with the current building standards.
The issue facing the Applicant in this scenario is that, whilst the policy provided cover
for accidental damage, there is no evidence the roof itself was damaged as a result
of cyclone Larry.
Policy does not provide cover for inherent defects
Whilst accepting the apparent building compliance issues were first identified as part
of this 2006 claim (albeit some years later), this was discovered in relation to
investigating other damage sustained at the property.
Case No: 382671 Determination Page 4 of 7
On this basis, the FSP says the building compliance issues are unrelated to the claim
and cannot be considered under the terms of the policy.
In other words, the FSP says there is no cover allowed for under the policy in
instances relating solely to non-compliance issues being identified. Indeed, the policy
specifically excludes any damage resulting from such „inherent defects‟.
For these reasons, I am satisfied, on the balance of probabilities, the FSP has not
erred in its position on this point and so not liable for roof rectification works under
the 2006 claim.
Case No: 382671 Determination Page 5 of 7
3 Supporting information
3.1 FOS approach to this dispute
General information
As advised to the parties, FOS has considered it appropriate to expedite the dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference. This
dispute has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
A full exchange of the relevant information has taken place between the respective
parties and each party has had the opportunity of addressing any issues raised.
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
All of the provided material has been read and considered. The parties have raised
numerous issues in their submissions to the Service. For the purpose of this
Determination, commentary is restricted to only those issues considered relevant to
the outcome.
Prima facie claim
There is an onus on an insured to establish on the balance of probabilities that a
claim fits the definition of an insured event. This is known as a prima facie claim.
Should this onus be discharged, it is then the responsibility of the insurer to establish
the application of any exclusion on which it relies to deny the claim.
3.2 Relevant extracts from expert reports
Report Key points
FSP’s loss adjuster (C)
18 June 2009
Cracking of the patio brick wall has resulted from lifting of
the front patio roof and recommend that an engineer
inspect the wall and report on the probable cause.
FSP’s engineer (PD)
12 August 2009
Inspected property 16 July 2009.
Current ro of framing was found to only just comply with
current Australian standards, however the fixing of the
battens to the rafters is unknown and should be
investigated further to ensure compliance.
FSP’s building report
(N)
15 September 2009
Owner indicated ro of renewed after earlier cyclone by
local plumbing firm .
Where cracking occurred, revealed no beam spanning
the veranda section only rafters cantilevered over the
existing top plate .
FSP’s engineer (PD)
27 October 2009
Support spanning beam across the veranda was not
present to the dwelling; rafters were cantilevering; a
number of roof hold down ties were compromised .
Cracking to the brickwork is as a result of overstressing
due to uplift by the rafter members .
Current structure exceeds the overhang .
Case No: 382671 Determination Page 6 of 7
St rongly advise that the home owners seek rectification
work to ensure compliance with current standards .
Also recommend that the insured consider a thorough
inspection by a builder to the current roof framing to
check for compliance and structural integrity in
accordance with Australian Standards.
FSP’s loss adjuster (C)
28 October 2009
The appointed engineer (PD) confirms the roof frame
does not comply with current Australian Standards. The
engineer recommends a thorough inspection by a builder
to check th e current roof framing for compliance and
structural integrity in accordance with Australian
Standards.
This issue is not related to Cyclone Larry but is more so
now related to the change in building codes from the time
when the home was constructed.
FSP’s loss adjuster (C)
8 June 2010
The engineer who attended the premises believed the
damage to the patio wall resulted from overstressing due
to uplift of the rafters.
The roof frame does not comply with Australian
standards and a thorough inspection by a builder is
recommended to check the current framing for
compliance and structural integrity.
Until such time as the roof framing is upgraded to current
building code, the pressure load on the front wall will
continue to cause cracking.
The FSP are not p repared to carry out any further repairs
until the roof frame has been upgraded.
Applicant’s plumber
28 May 2013
A copy of the report from C confirming the brick wall was
damaged as a result of uplift forces on the roof rafters
connected to the wall was provided.
He has not come across a similar situation where an
insurer requires the insured to complete repairs to a roof
structure as a result of cyclonic uplift. He has completed
numerous roof replacements for [C] in which uplift was
responsible for roof replacement and as part of that
process, associated work to bring the associated tie
downs up to the current code were completed.
Rectification quote in the amount of $41,405.01.
EE’s Causation
Inspection report (S)
3 October 2013
It is the builder‟s opin ion that the rectification (tie down) of
the roof frame carried out during rectification works in
1990 is inadequate and unless rectified the entire roof
frame is susceptible to uplift related damage.
3.3 Limitation of Actions Act 1974 (Queensland)
“ 10 Actions of contract and tort and certain other actions
(1) The following actions shall not be brought after the expiration of 6 years from the
date on which the cause of action arose”
Case No: 382671 Determination Page 7 of 7
3.4 FSP policy exclusion
“ When we will not pay a claim under your policy
This policy does not cover loss, liability, injury or damage:
…
g. Inherent defects
caused directly or indirectly through inherent defects, faulty design, structural defects or poor
workmanship”
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.